← The Public RecordRecord of October 28, 2026 · pressed nightly · 64 meetings · 191.3 hours · no accounts · no trackingREAD · the record
MunicipalityBoston 44Brookline 20The whole recordthe whole record
Brookline · Select Board

Select Board Work Session Pt. 1 - September 16, 2026

Select Board · Brookline · 2026-09-16

words this meeting uses Select Board · affordable housing trust · executive session · Town Administrator · Chapter 40B · fiscal year (FY) — the glossary says what they mean

tap to load the tape · nothing plays until you do
the shape of the tape — click anywhere to jump● a decision, sized by weight · | a question · ▮ tension · $ money named · the eight lanes: where each lens’s words fell
financialfinancial — 123 words, where they fell along the tapesafetysafety — 21 words, where they fell along the tapecommunitycommunity — 28 words, where they fell along the tapeenvironmentalenvironmental — 6 words, where they fell along the tapelegallegal — 7 words, where they fell along the tapeequityequity — 31 words, where they fell along the tapeinfrastructureinfrastructure — 23 words, where they fell along the tapeprocessprocess — 6 words, where they fell along the tape0:16 · environmental: “green.”2:16 · safety: “accident.”3:05 · financial: “the amount of 1.26 million approximately”3:44 · safety: “related to safety of vehicles, including”4:13 · safety: “interactions with pedestrians and”4:32 · safety: “those six police officers out of those”4:34 · safety: “six police officers that were approving”4:48 · infrastructure: “street, more, you know, prioritization,”4:50 · safety: “right? The police have to prioritize,”5:19 · community: “receiving from the community is very”5:39 · process: “the Warren article that too.”6:57 · financial: “grant. Um I believe we typically have”6:59 · financial: “the amount existed grant in the agenda”7:34 · financial: “question 17 gift for grants in the”7:51 · process: “I had some amendments that I sent you”8:07 · process: “subject to the amendments opposed by”8:37 · financial: “rehabilitation and affordability of”8:39 · infrastructure: “homes at 99 Kent Street as favorably”10:49 · financial: “affordability of the units was tied to”11:26 · infrastructure: “into two uh 99 Kent Street um in the in”11:36 · community: “all affordable senior uh dwelling units.”11:36 · equity: “all affordable senior uh dwelling units.”11:45 · community: “Brook line with uh 193 family affordable”11:45 · equity: “Brook line with uh 193 family affordable”12:41 · equity: “other affordable housing trust”13:21 · environmental: “administrator uh Bernard Green from the”13:33 · community: “uh director for housing and community”14:35 · infrastructure: “construction many many decades ago. uh”15:38 · community: “senior housing at 99 Kent Street. Um uh”15:38 · infrastructure: “senior housing at 99 Kent Street. Um uh”15:47 · community: “basically 115 of the 117 senior housing”18:38 · legal: “is a longer detailed legal document that”25:12 · infrastructure: “project at Kent Street. Um and I have”27:22 · process: “hearing him in the room.”27:37 · environmental: “never turned green. So, we've never”29:50 · equity: “focus on on affordable and workforce”32:20 · environmental: “and the greenhouse as is uh and what”32:45 · equity: “units to make them code accessible.”33:35 · environmental: “deep energy retrofit that's starting at”37:05 · equity: “affordable. There's often a question of”44:37 · environmental: “obviously part of this energy project is”45:13 · legal: “forth between our legal council and”45:16 · legal: “women's legal counsel. So, um, what you”46:03 · legal: “language in the MOA that Wind's legal”47:15 · legal: “bit of legal use going back and forth,”1:00:44 · process: “changes the first amendment, but we're”1:05:22 · process: “procedural question. Is the”1:06:34 · legal: “minor legally stuff I'm not so worried”$3,000 +1$3,000 — said 2 times, first at 7:12$3,000 — said 1 time, first at 7:23$4 million +2$4 million — said 3 times, first at 15:30$35,000 — said 1 time, first at 16:02$5 million — said 1 time, first at 19:44$4$4 — said 2 times, first at 24:47$10 million +1$10 million — said 1 time, first at 33:40$10.5 million — said 1 time, first at 34:210:30 · a question: “Does my speaker need to be off or on?”2:07 · a question: “How good morning?”2:44 · a question: “3A through 3L?”2:49 · a question: “was not here?”4:38 · a question: “impact on traffic um, management?”5:54 · a question: “regularly revise contracts midstream?”6:32 · a question: “notified of that?”7:31 · a question: “agenda item 3B to reflect that?”7:43 · a question: “Any other questions?”19:35 · a question: “did we get to four?”23:07 · a question: “you hear us?”25:24 · a question: “mean I put it up here?”25:54 · a question: “what the Wi-Fi is here?”27:08 · a question: “Michael, are you back?”27:53 · a question: “presentation in the meantime?”30:24 · a question: “is why why are we here today, right?”37:07 · a question: “why do we leave two units out?”38:53 · a question: “matching funds?”39:25 · a question: “separate project, right?”39:38 · a question: “of Brookline what are we offering there?”41:02 · a question: “They need new carpet, right?”42:20 · a question: “renewing that contract, right?”44:09 · a question: “changing over time?”44:12 · a question: “utility supplied, right?”1:59 · decision: “Anthony, yes.”2:20 · decision: “I do the same thing at town meeting. I always vote no to journ.”4:52 · pushback: “those six police officers out of those six police officers that were approving for higher requests. Um, what is the…”7:51 · decision: “I had ahead.”8:07 · pushback: “All right. So I move approval of 3A be the minutes from September 2026 subject to the amendments opposed by Michael…”8:16 · decision: “And I also vote yes.”18:31 · decision: “10 dozen odd years at HUD, she also had direct experience um with this particular kind of project financing and you're…”22:22 · decision: “to induce the state through wind. They can present this as the town being a serious player here so that we can get…”23:01 · pushback: “hear some more from I think Amy next and then Michael remotely and Dwayne will be be giving you their formal…”39:06 · decision: “There's one of the main questions is does the town is the town offering matching funds? And that's why we're here and…”41:35 · pushback: “would like you know have things that are beyond their useful life and would like them replaced or committed to working…”41:59 · pushback: “Yeah. Um I thank you for also touching Village Way. I know there's a lot of folks in the community that are very…”47:53 · pushback: “not be a relationship that we're we're a part of and and I think that MOA is is um is sufficient with respect to that…”48:24 · decision: “And so this would be upon our approval that 4 million would be depleted immediately or how does that work?”1:00:01 · decision: “negotiations that have happened to extend some affordability protections to the village because I think it's it's…”1:00:44 · decision: “intent of affordability protections for the village are not going to go away with whatever negotiations and the MLA are…”1:04:24 · decision: “All right. So with that, I think we may be prepared to take a series of votes.”0:0030:001:00:0039:06
the same, as a table
timekindthe moment
1:59decisionAnthony, yes.
2:20decisionI do the same thing at town meeting. I always vote no to journ.
4:52pushbackthose six police officers out of those six police officers that were approving for higher requests. Um, what is the…
7:51decisionI had ahead.
8:07pushbackAll right. So I move approval of 3A be the minutes from September 2026 subject to the amendments opposed by Michael…
8:16decisionAnd I also vote yes.
18:31decision10 dozen odd years at HUD, she also had direct experience um with this particular kind of project financing and you're…
22:22decisionto induce the state through wind. They can present this as the town being a serious player here so that we can get…
23:01pushbackhear some more from I think Amy next and then Michael remotely and Dwayne will be be giving you their formal…
39:06decisionThere's one of the main questions is does the town is the town offering matching funds? And that's why we're here and…
41:35pushbackwould like you know have things that are beyond their useful life and would like them replaced or committed to working…
41:59pushbackYeah. Um I thank you for also touching Village Way. I know there's a lot of folks in the community that are very…
47:53pushbacknot be a relationship that we're we're a part of and and I think that MOA is is um is sufficient with respect to that…
48:24decisionAnd so this would be upon our approval that 4 million would be depleted immediately or how does that work?
1:00:01decisionnegotiations that have happened to extend some affordability protections to the village because I think it's it's…
1:00:44decisionintent of affordability protections for the village are not going to go away with whatever negotiations and the MLA are…
1:04:24decisionAll right. So with that, I think we may be prepared to take a series of votes.
7:12money$3,000 — said 2 times
7:23money$3,000 — said 1 time
15:30money$4 million — said 3 times
16:02money$35,000 — said 1 time
19:44money$5 million — said 1 time
24:47money$4 — said 2 times
33:40money$10 million — said 1 time
34:21money$10.5 million — said 1 time

↓ this picture, as .svg

the night, cut — reels the press made from this meeting’s moments
▶ the night in 2:23its 5 loudest moments, in order · plays clip to clip · the link is the share

Cut from the analyzer’s scored moments — a measurement, not a choice made for you. Open a reel and press make this reel yours to re-cut it; tick any moment or transcript line below to cut your own.

AI summary — supplements the official record

The Select Board voted to enter executive session [1:27] before reviewing miscellaneous agenda items [2:30]. The board discussed a lease agreement with KS State Bank [2:58], vehicle safety features [3:28], police staffing for traffic management [4:34], and a fire chief employment contract adjustment [5:45] before approving meeting minutes [8:04] and agenda items 3B through 3L in an omnibus vote [8:22]. Representatives then presented a plan to extend affordability and perform renovations at 99 Kent Street [8:35], requesting $4 million from town housing funds [15:30]. The board voted to approve the trust fund allocation [1:06:42], authorize state grant applications [1:07:17], and acknowledge a commitment letter regarding unit renovations and tenant protections [1:07:38]. Finally, the board reviewed proposed updates to the public bodies handbook concerning vacancy procedures and appointment scheduling [1:10:18].

the reading, drafted by a model — ai:gemini-3.6-flash, labeled · what it meant, who moved it, what to watch · check it against the tape

What it means: The board entered executive session to discuss real property lease terms [1:27]-[1:42]. In open session, the board reviewed routine business, including a 1.26 million dollar equipment lease agreement with KS State Bank [2:58]-[3:05], a fire chief contract adjustment to achieve salary parity with the police chief [5:45]-[6:23], and a 3,000 dollar grant item [7:12]-[7:22]. The main topic of the session was a proposed 4 million dollar commitment from the town's Affordable Housing Trust Fund to secure a 99-year extension of affordability for 115 senior housing units at 99 Kent Street [15:30]-[16:14], alongside building rehabilitations and electrification upgrades presented by developer Win Companies [33:33]-[35:16].

Who moved it: An unidentified speaker moved to enter executive session [1:48], which passed with roll call yes votes from Bernard [1:54], Michael [1:55], Amanda [1:56], Anthony [1:58], and the chair [1:59]. September meeting minutes were approved by Michael [8:10], Michael [8:13], Amanda [8:14], Anthony [8:15], and the chair [8:16], followed by an omnibus vote approving items 3B through 3L [8:22]-[8:30]. The transcript does not explicitly name the board member who introduced the text of the motion to authorize the 4 million dollar trust fund allocation [1:06:42], but the motion passed with yes votes from Bernard [1:07:11], Michael [1:07:12], Amanda [1:07:13], the chair [1:07:16], and Anthony [1:09:38]. Subsequent votes to authorize state grant applications and acknowledge Win's commitment letter passed with matching support from Bernard [1:07:33]-[1:07:50], Michael [1:07:34]-[1:07:52], Amanda [1:07:35]-[1:07:53], the chair [1:07:36]-[1:07:54], and Anthony [1:09:46]-[1:09:56].

What to watch: The developer plans to submit its state funding pre-application by September 24th [38:46]-[38:51], with willingness to reapply in up to four future rounds if state tax credits are not granted immediately [50:21]-[50:46]. Town officials and legal counsel will continue finalizing the specific language of the memorandum of agreement with Win to address resident protections and potential housing assistance voucher lapses [45:06]-[46:38], [1:04:33]-[1:06:18]. Additionally, the board will continue reviewing proposed changes to the public bodies handbook concerning vacancy advertising schedules and incumbent reappointment protocols [11:10]-[11:58], [13:20]-[14:16].

the moments — the analyzer’s scored read of this meeting; click one to jump the tape

Scored, not chosen for you — the salience bar is a measurement, and every moment is a receipt into the transcript below. With JavaScript on, tick moments to compose a reel — and tick moments on other meetings too; a reel can span the record.

→ the publish kit for this meeting — the clips worth cutting and draft copy, for a producer.

how the meeting framed it — eight civic lenses, counted from its own words
financial123↑ rising
equity31↑ rising
community28· steady
infrastructure23↓ fading
safety21↓ fading
legal7↑ rising
environmental6↓ fading
process6· steady

Counted, not modeled — each lens is a word list; drift compares the first half to the second.

the questions asked — typed by what they ask about
the meeting in words — what was said most; press a word to find every line that says it
unitsunits — 55 mentionsprojectproject — 41 mentionshousinghousing — 30 mentionsaffordableaffordable — 30 mentionsmillionmillion — 26 mentionsyearsyears — 25 mentionsstillstill — 21 mentionssuresure — 20 mentionsmichaelmichael — 20 mentionsbackback — 19 mentionsaffordabilityaffordability — 19 mentionsstatestate — 17 mentionsprocessprocess — 16 mentionslittlelittle — 16 mentionskentkent — 16 mentionsstreetstreet — 15 mentionstenantstenants — 15 mentionsfundsfunds — 15 mentionsincomeincome — 15 mentionsmoamoa — 14 mentionsselectselect — 13 mentionsfundingfunding — 13 mentionsmarketmarket — 13 mentionsrentrent — 13 mentionspropertyproperty — 12 mentionscommunitycommunity — 12 mentionscontractcontract — 12 mentionstermsterms — 12 mentionsrogerroger — 12 mentionsvillagevillage — 12 mentionsableable — 12 mentionsbuildingbuilding — 12 mentionsmovemove — 11 mentionsbasicallybasically — 11 mentionstrusttrust — 11 mentionscommittedcommitted — 11 mentionsmentionedmentioned — 10 mentionspartpart — 10 mentionsunitunit — 10 mentionsleaselease — 9 mentionsbernardbernard — 9 mentionssorrysorry — 9 mentionsimportantimportant — 9 mentionspolicepolice — 9 mentionsobviouslyobviously — 9 mentionstaketake — 9 mentionsgoalgoal — 9 mentionsdirectordirector — 9 mentionswindwind — 9 mentionsgreatgreat — 9 mentionsapplicationapplication — 9 mentionsnumbernumber — 8 mentionsfirstfirst — 8 mentionsexecutiveexecutive — 8 mentionsregardingregarding — 8 mentionschiefchief — 8 mentionswinwin — 8 mentionspointpoint — 8 mentionspresentationpresentation — 8 mentionsbrooklynbrooklyn — 8 mentions
the same, as a table
wordmentions
units55
project41
housing30
affordable30
million26
years25
still21
sure20
michael20
back19
affordability19
state17
process16
little16
kent16
street15
tenants15
funds15
income15
moa14
select13
funding13
market13
rent13
property12
community12
contract12
terms12
roger12
village12
able12
building12
move11
basically11
trust11
committed11
mentioned10
part10
unit10
lease9
bernard9
sorry9
important9
police9
obviously9
take9
goal9
director9
wind9
great9
application9
number8
first8
executive8
regarding8
chief8
win8
point8
presentation8
brooklyn8

↓ this picture, as .svg

“units” came up 55 times. Sized by how often; civic stopwords out. With JavaScript off, a word opens the tape at its first mention.

transcript — select any line to Cite it, click a time to jump; + on a line cuts it into your reel transcript .txtkit .json

0:02 You should

0:05 not say

0:07 well said.

0:08 So I have the meeting here.

0:12 Let me join the Zoom and I can at least

0:14 tell you if your window is turning

0:16 green.

0:17 Okay. Um,

0:28 I turned to not be on the internet.

0:30 Does my speaker need to be off or on?

0:33 I have this set as the microphone.

0:35 Yep. Um, your speaker should be on and

0:38 you want it to be set to probably set it

0:40 to Apple as well.

0:46 text me that the phone number so we have

0:48 it on record somewhere

0:56 out.

1:00 So yeah, so actually it was coming out

1:02 of the TV which is fine. So um am I

1:06 seeing it looks like it's picking up

1:08 close caption.

1:09 It's Yes.

1:11 It was here for sure.

1:15 And we are recording. So,

1:17 all right. Good morning everyone.

1:19 Welcome to our select board workshop. It

1:22 is Tuesday, September 15th. And now,

1:25 first item of business will be the

1:27 question of entering into executive

1:29 session for the purpose stated in item

1:32 two, which is an executive session

1:35 pursuant to general law chapter 30A 21

1:38 A6. Purpose six, for the purpose of

1:41 considering the purchase, exchange,

1:42 lease, or value of real property,

1:45 specifically the Coolage Corner Theater.

1:48 So, I will go ahead and move that we

1:50 enter into executive session for that.

1:54 Bernard,

1:54 yes.

1:55 Michael,

1:56 yes.

1:56 Amanda,

1:57 yes.

1:58 Anthony,

1:58 yes.

1:59 And I also vote yes. We will of course

2:01 be reconvening in open session once we

2:04 conclude our executive session.

2:07 How good morning?

2:09 So you want everything that we do to be

2:11 secret and executive special.

2:13 I just like hanging out with you guys.

2:14 That's just it's start. It's no

2:16 accident.

2:19 I do the same thing at town meeting. I

2:20 always vote no to journ.

2:27 All right. Welcome. We are now back and

2:30 we will proceed with agenda item number

2:32 three miscellaneous items. approval of

2:35 miscellaneous items or licenses and

2:38 contracts. Do any board members have

2:41 questions regarding items any items in

2:44 3A through 3L?

2:47 Could you separate the minutes because I

2:49 was not here?

2:50 Sure.

2:51 I have questions on

2:55 3C.

2:56 All right. So question of approving a

2:58 lease agreement with KS State Bank for

3:02 five dump trucks and one excavator in

3:05 the amount of 1.26 million approximately

3:08 be paid over two years. Who can talk

3:10 about that?

3:14 Oh sorry the dump trucks dump item.

3:17 So we've asked TPW for some information

3:20 around um purchasing believes that uh oh

3:22 here we go here just coming in now.

3:25 breaking

3:28 side guards are installed on the

3:29 infiltrate jiggles. Um they're still

3:31 trying to get more answers from you. Um

3:34 they're in a meeting right now, but

3:35 we'll we'll follow up with you after.

3:37 Perfect. Uh just to give some context, I

3:40 asked a question because in our vision

3:42 zero action plan, there are three items

3:44 related to safety of vehicles, including

3:47 retrofitting municipal vehicles with

3:49 intelligent speed assistant technology.

3:51 basically using GPS to make sure they

3:54 travel the speed limit. The second one

3:56 is making sure that um they either have

3:59 direct vision or install counter

4:01 measures to improve vision. Um and the

4:04 third one is um countermeasures to

4:07 counteract blind spots as well as side

4:10 guards which are actually really

4:11 important for uh problematic

4:13 interactions with pedestrians and

4:15 cyclists so that uh particularly

4:17 cyclists don't get pulled under the

4:19 trucks. Um, so I wanted to make sure

4:21 that if we are getting new trucks that

4:23 they are complying with our efficient

4:25 zero action steps.

4:28 Yeah.

4:29 I had one for 3G. I had a question. Um,

4:32 those six police officers out of those

4:34 six police officers that were approving

4:36 for higher requests. Um, what is the

4:38 impact on traffic um, management? Well,

4:42 as you know, as as with anything, right,

4:44 when we have more officers means the

4:46 more opportunity for people to be on the

4:48 street, more, you know, prioritization,

4:50 right? The police have to prioritize,

4:52 you know, um, you know, emergency

4:54 response and so forth to lose that

4:55 hierarchy. I will say that I went to the

4:58 swearing in of a couple of laterals last

5:00 week and the chief made special

5:02 reference at that at that uh at that uh

5:06 process to the fact that there's a real

5:08 push for traffic enforcement and that

5:10 that's where they're going to be

5:11 assigned for a lot of the work. So it's

5:14 um you know every every person

5:16 contributes to that and you know the

5:18 message that the police department is

5:19 receiving from the community is very

5:21 clear. Can we make can we make a note of

5:24 trying to track the number of traffic

5:25 violations and kind of I I'm sure we do

5:27 somewhere obviously, but I just want to

5:28 make sure that we talk about that later

5:30 down the line.

5:30 Sure. I mean, yeah, Sergeant um Sergeant

5:32 Johan has that information and we can

5:34 make sure that that that gets to you.

5:35 Yeah, I want the public to know about

5:36 that.

5:37 Yeah, they'll know when we talk about

5:39 the Warren article that too.

5:41 I have a question regarding 3 L into the

5:45 fire chief employment contract.

5:47 Sure. Uh and again it's not because I'm

5:49 substantively opposed but I'm just

5:50 curious in terms of process. Do we

5:54 regularly revise contracts midstream?

5:56 This is uh this is a little different uh

5:59 than usual but it's because um the

6:01 police and fire contract the so you have

6:04 three contract you have three contract

6:05 employees which me the police chief and

6:07 the fire chief. Um the police chief's

6:10 contract was updated most recently and

6:13 provided a substantial raise and as and

6:15 previously the police and fire chiefs

6:17 had been in parody. They were making

6:18 roughly the same amount of money and so

6:19 this is this is a an adjustment to

6:21 ensure that the fire chief remains

6:23 imperative with the police chief. Okay,

6:26 um back to 3G, you mentioned that

6:30 there's a swearing in recently. Were we

6:32 notified of that?

6:33 Uh the chief should have emailed you. I

6:36 will double check to make sure she did

6:37 not. I may have missed it, but you know

6:39 you used to be that we would Yes. attend

6:41 those sessions or swearing swearings in.

6:44 Yes. And to be clear, I'm not throwing

6:47 the chief under the bus. There must have

6:49 been miscommunication from our office.

6:51 So, we will we will figure that out. My

6:52 fault.

6:53 Um I just want to make a note in item 3B

6:55 it says questions accepting a gift or a

6:57 grant. Um I believe we typically have

6:59 the amount existed grant in the agenda

7:02 item. So, we just want to make sure that

7:04 that's recorded. Um, as far as the

7:07 minutes,

7:08 it is Oh, well, in the explanation of

7:12 the bookmarks, $3,000

7:15 gift,

7:17 right? Is it It's just not in the item

7:20 itself.

7:22 Yeah. Sorry. So, yes, 3B is $3,000.

7:25 Yeah.

7:29 Why don't we revise

7:31 agenda item 3B to reflect that? So

7:34 question 17 gift for grants in the

7:35 amount of $3,000 pursuant to GL chapter

7:38 44 except we'll amend that.

7:43 All right. Any other questions?

7:45 3A through 3 L and we will take 3A

7:48 separately.

7:50 All right.

7:50 I had ahead.

7:51 I had some amendments that I sent you

7:54 email sent

7:57 regarding minutes.

7:58 Regarding minutes.

7:59 Okay.

7:59 All right. So I move approval of 3A be

8:04 the minutes from September 2026

8:07 subject to the amendments opposed by

8:10 Michael

8:11 Bernard.

8:13 Michael

8:14 yes.

8:14 Amanda

8:15 yes.

8:15 Anthony

8:16 yes.

8:16 And I also vote yes.

8:19 Now items 3B. I move that we approve

8:22 items 3B through 3L in omnibus fashion.

8:26 Bernard.

8:26 Yes.

8:27 Michael.

8:28 Yes.

8:28 Amanda.

8:29 Yes. Anthony,

8:30 yes.

8:30 And I also vote yes. Well, that brings

8:33 us to item number four, discussion and

8:35 potential votes related to the

8:37 rehabilitation and affordability of

8:39 homes at 99 Kent Street as favorably

8:42 recommended by the Housing Advisory

8:45 Board as well as other related items.

8:50 So, um I'm Amy. Uh nice to see you all

8:55 again. Roger Blood um is should be here

9:00 any minute. He was going to kick this

9:01 agenda item off um if you'd like to wait

9:04 for him for a few minutes or I can um

9:08 fill in. We have a couple of guests with

9:10 us. We have Gilbert Win. Um and I'm

9:14 going to butcher your last name, I'm

9:15 afraid. Lauren,

9:16 I don't mind. Kafari

9:18 Kafari.

9:20 Well, what we can what we can do, we

9:21 have items 4 A through 4E. So, were one

9:24 of you going to be presenting

9:27 one of those additional items for B

9:29 through 4? And we can jump in with one

9:30 of those.

9:31 I think

9:32 he's here.

9:33 Oh, there he is.

9:37 Oh my go

9:45 get to that point.

9:52 We also have um Michael Alfren on Zoom

9:56 with us from a train on his way to New

9:59 York City

10:01 to help out with this presentation.

10:07 Gina said let's dive in.

10:09 Oh, I thought I was

10:14 good morning everybody.

10:16 Good morning. Um I'm Gerald the advisory

10:20 board and um I'm going to lead off

10:25 several presentations

10:27 regarding the u the expiry use situation

10:30 we have. Um the uh the general problem

10:34 challenge that that we face is um a

10:38 number of projects including the one

10:39 we're talking about here were financed

10:42 decades ago um under perhaps an illvised

10:46 uh structure whereby uh the

10:49 affordability of the units was tied to

10:51 the terms of the financing and um these

10:55 terms have now reached a point where

10:57 they're expiring and tenants are at risk

11:00 of um losing their affordability. Many

11:03 of them in this project if um uh terms

11:07 can't be uh achieved that um will

11:10 successfully

11:11 substantially extend the affordability

11:14 terms um in the in the project.

11:17 What we have here is probably the

11:19 largest such situation in the pine. Um,

11:23 originally a single property now divided

11:26 into two uh 99 Kent Street um in the in

11:31 the village and north of the TRAS with

11:33 um 117

11:36 all affordable senior uh dwelling units.

11:39 And then um on the south of the TA

11:42 tracks um of village way there was a

11:45 Brook line with uh 193 family affordable

11:49 units and uh straddling the two

11:52 properties um a large uh uh parking

11:55 garage um serving the property um under

11:58 a long-term air rights lease uh with the

12:01 uh with the T. Um

12:04 our um the objective here uh is to uh

12:08 both extend the affordability and um

12:11 also renovate and upgrade the property

12:13 so that they will um physically uh be in

12:18 uh top shape to uh to serve the tenants

12:21 over the uh extended affordability term.

12:24 Um our our goal um from the town's

12:28 perspective in addition to these two um

12:31 general objectives is to optimize uh the

12:34 town's investment um in this project.

12:37 Our our piece uh uh as as with so many

12:40 other affordable housing trust

12:42 investments um isn't the biggest piece,

12:45 but it's the you might think of it as

12:47 the last one in and what makes

12:48 everything else possible and draws other

12:51 resources that are that are critically

12:52 needed. Um very quickly um the uh the

12:57 participants in in this and the process

12:59 itself uh has involved um um a a

13:05 negotiating committee on the on the part

13:07 of the town at the executive level uh

13:10 that uh began um it its meetings last

13:13 April. So, it's been going on for some

13:15 time and periodic uh uh executive

13:18 sessions uh that have included our town

13:21 administrator uh Bernard Green from the

13:23 select board uh town council um uh the

13:28 planning uh director, planning

13:30 department director and um uh assistant

13:33 uh director for housing and community

13:35 development uh and and uh and myself

13:38 from from the HAB. Um

13:42 the um the HAB is uh has been another um

13:45 participant in this uh not just myself

13:48 on the negotiating committee by all

13:50 means but um of the uh the entire AB um

13:54 itself I'll come in a little bit further

13:56 about that in a moment but other other

13:58 critical players we were fortunate to

14:00 have been able to secure uh a very

14:03 capable consultant Michael Alpring I

14:05 think you all know is now an independent

14:08 consultant and he has proven to be

14:12 critically helpful not only from from

14:14 his knowledge and experience but in his

14:17 positioning in this process uh as an

14:20 intermediary between the town and and

14:22 win as those negotiations have have

14:25 continued. Um then the other uh major

14:28 player of course is is players are is is

14:31 when uh the development owner operator

14:33 of the project since its uh original

14:35 construction many many decades ago. uh

14:38 and um this the Commonwealth of the OLC

14:42 um being another major player. While

14:44 this is a a negotiation that involves

14:47 three critical parties, uh in a sense

14:50 it's not a three-way negotiation. Um u

14:53 the way this is structured is that um

14:57 the town is negotiating with with wind

15:00 at at our our local level and uh at the

15:03 same time win it has the relationship

15:05 and negotiating um responsibility with

15:08 uh with the with the commonwealth.

15:11 Um

15:13 the um the HAV's role in this um our our

15:18 formal role is a bit narrower than the

15:21 than the broader informal role. We are

15:23 here to recommend um as trustees of the

15:26 town's housing trust a um uh what what

15:30 has ended up being a $4 million uh

15:32 investment specifically for one of the

15:36 two project components which is the

15:38 senior housing at 99 Kent Street. Um uh

15:42 one way of looking at that investment of

15:44 $4 million as it applies to um uh

15:47 basically 115 of the 117 senior housing

15:50 units there uh and and have

15:54 instinctively looks at almost everything

15:56 we invest from the trust on a per unit

15:59 basis. Uh that comes out to um about

16:02 $35,000

16:04 per unit of the 115 units for uh what

16:07 we're proposing. uh it's called

16:09 perpetual but it's a basically a 99-year

16:12 extension of the affordability

16:14 provisions um of the units on that

16:16 component of the project. Um they have

16:21 um as a as a public body um and our

16:25 meetings have been uh basically a part

16:27 of the public process but I want to

16:29 emphasize um that the HAB's role has

16:32 been um more extensive than that. Um we

16:36 we have been fortunate to bring to the

16:38 table uh this is a very complex project

16:42 perhaps even more so than some of the

16:44 new developments. Um the H have a a a

16:47 range of skill sets and experience and

16:49 in this uh current situation we're

16:51 fortunate to have had uh three members

16:54 and now four which who have direct uh

16:57 experience with this unique kind of um

17:01 financing and refinancing uh under under

17:04 expiring use terms. Um so the process

17:08 that we set up to uh to to try to

17:11 optimize uh the the HAB's um role of

17:15 this was to open up a line of commun a

17:18 continuing iterative line of

17:20 communication between those uh the three

17:23 active HAB members Jonathan Klein Pam

17:26 Goodman and Carol Gladstone where they

17:29 could communicate back and forth uh

17:31 directly with our consultant who could

17:33 then take their combined expertise piece

17:36 on a Q&A basis, you know, continuing and

17:39 add that to the negotiating process that

17:42 um that that Michael Alurn was was doing

17:45 uh directly with wind. This this proved

17:47 to be very helpful. Um uh I I myself

17:51 added a little bit to that, but not

17:53 having the direct professional

17:55 experience that I have was very well

17:57 structured to uh to set things up this

18:00 way. And then we were um we were

18:02 fortunate to have um Amy Upast join the

18:06 process from the staff um because with

18:09 her

18:11 10 dozen odd years at HUD, she also had

18:13 direct experience um with this

18:16 particular kind of project financing and

18:17 you're going to hear from her

18:19 immediately following myself. Um the um

18:23 the um the end result of what we're

18:27 recommending to the select board uh and

18:29 and I know you've seen the details in in

18:31 your packet is both the HABs vote and

18:34 then the that folded into the the

18:36 memorandum of agreement which uh which

18:38 is a longer detailed legal document that

18:40 you're you're

18:43 looking at executing. Um the the uh the

18:48 financing gap uh that began last spring

18:51 u as brought to us with wind and their

18:54 detailed numbers showed uh around 6 and

18:57 a half million that potentially could be

19:00 called upon the town if we were to close

19:02 the entire gap. Um

19:05 early on in the process that that number

19:08 was able to be reduced uh without an

19:10 awful lot of difficulty to five million

19:13 of when took on some more of its own

19:17 some of the line items that the

19:19 developer fee deferral uh a a seller

19:22 note which is functionally equivalent um

19:25 but a separate line item that they were

19:27 able to uh to to to make a little bit

19:30 more attractive. So we we were at 5

19:32 million and then um question being how

19:35 did we get to four? Uh that that aspect

19:39 was was a little bit different. Um and

19:41 the way that was done um when there was

19:44 a $5 million uh um investment that we

19:47 were contemplating. Um it it um it was

19:51 in the form of uh the town uh loaning at

19:54 at a a positive rate of interest for

19:58 repayment at the end of of a loan term

20:01 and the the the town's money being put

20:04 in uh to a considerable extent at the

20:08 closing, some upfront and some at the

20:10 closing. The way the additional million

20:11 dollar reduction was achieved was um

20:15 advancing the timing of the of the

20:17 funds. So that you you'll see in in the

20:20 proposed terms now 95% of the funds can

20:23 be put in at the closing with only a 5%

20:27 uh hold back. Um and um instead of uh us

20:32 relying on uh like with with a a loan or

20:36 a mortgage repayment terms with an

20:38 interest uh applied and acrewing the the

20:41 terms that are being proposed now and

20:43 these are quite similar to other new

20:45 projects that we do. there's a 0%

20:48 interest and the um the 4 million will

20:51 be due at least on paper uh after 45

20:54 years but um that that will possibly be

20:57 re renegotiated um on village at

21:00 Brooklyn our role is more informal since

21:03 there's no trust fund money um we uh we

21:06 have appined and and been very

21:08 interested in the way that the terms of

21:09 that that extend extended affordability

21:12 has been negotiated

21:14 um it it didn't it didn't make everybody

21:17 totally thrilled at the end of the day,

21:18 but you know what they say about about

21:21 bad deals that if not everybody's

21:23 entirely happy, it's a sign that

21:25 probably it's as good as anybody is

21:26 going to get. Um and then on the timing

21:30 um which I think you you'll hear more

21:32 about from from others including Michael

21:35 um that it it we there's a preliminary

21:38 um commitment from the select board and

21:40 and again with new projects we do

21:42 something very similar a two-step

21:43 process with you all where we're asking

21:46 for it and you would be executing now a

21:48 preliminary commitment. The function of

21:50 that is that the state, this is

21:52 critical, needs to see some assurance

21:55 that the locality, us are really

21:58 stepping up with some significant funds

22:01 to induce the state through wind. They

22:04 can present this as the town being a

22:06 serious player here so that we can get

22:09 priority for the funding. We know

22:11 there's annual rounds and possibly

22:13 semianual

22:14 uh and and get this done early. And the

22:17 timing has been moved up so that your

22:19 schedule now is rather tight. You're

22:21 going to meet today, I think, and maybe

22:22 one more time soon so that you can vote

22:25 in time for when to get in the um under

22:29 the late September deadline for the

22:31 so-called preliminary preliminary round.

22:34 And so with that, I hope it's not too

22:36 detailed and because you're going to

22:38 hear some more from I think Amy next and

22:40 then Michael remotely and Dwayne will be

22:42 be giving you their formal presentation

22:44 after that and I'll come back and then

22:47 ask for you to vote which we'll have a

22:48 look at for you before you see it and we

22:51 may or may not vote today but you'll see

22:53 what we're the details of what we're

22:55 offering. So,

22:56 would you like to go to Michael first if

22:59 possible while we have him just because

23:01 I'm concerned that we we may lose him on

23:03 his way on his travels. Um, Michael, can

23:06 you hear us?

23:12 He's muted.

23:24 should be able to

23:33 see if not

23:35 Amtrak Wi-Fi is not great.

24:09 it get my call.

24:12 Okay. All right.

24:19 So, I don't have a lot to add. Um Roger

24:21 did a very thorough job of of letting

24:24 you know how we got to where we are

24:25 today. Um, but I will say just echo what

24:29 he said about the town's commitment of

24:32 funds being very important to the

24:34 application process that when plans to

24:36 proceed with with the executive office

24:38 of housing liberal communities and um,

24:43 you know, we're hoping uh that our if

24:47 the town chooses to commit the $4

24:49 million that that will really make a

24:51 case to EOHLC that we're invested in

24:54 this project and We want to see it go

24:56 forward um because it's a very

24:58 competitive funding round. So, we want

25:00 to be able to help win get where they

25:02 need to be so that the application was

25:04 successful. Um I'd like to turn it over

25:07 to to Gilbert and Lauren right now to

25:10 give a presentation on the proposed

25:12 project at Kent Street. Um and I have

25:15 hard copies of people with

25:18 I'll give I promise I will make it.

25:21 Roger gave such a good introduction. I

25:23 feel like gave a presentation. So you

25:24 mean I put it up here?

25:26 Yeah.

25:26 Yeah. So way to do it is to join

25:28 Zoom and I'll make

25:29 Yeah. Is it the same thing to send a

25:32 package?

25:42 It's the same.

25:43 The same thing. The center packet.

25:45 Yes.

25:45 Okay. Okay.

25:46 If anyone would like a hard copy, if you

25:48 don't have one, I'll just

25:50 Yeah. on my uh on my phone's Wi-Fi. See

25:54 what the Wi-Fi is here?

25:56 Yeah.

25:57 Bernard's

26:01 I was told the number

26:06 617 730207.

26:15 Okay.

26:29 Oh,

26:42 we're going

26:44 to talk to us.

26:56 Um,

27:00 so Michael came back.

27:08 Michael, are you back?

27:09 I I am. I apologize for the spotty

27:12 internet.

27:13 I am. I apologize for the spotty

27:14 internet. can write some notes in the

27:16 chat to the slide if helpful.

27:21 Yeah, we're having we're having trouble

27:22 hearing him in the room.

27:23 Is there a volume issue on our

27:25 No,

27:31 there.

27:31 Yeah. Also, his

27:32 Oh, he's still muted. Yeah, I see. Oh,

27:34 we're getting the caption. I see

27:35 unmuted for a moment, but his window

27:37 never turned green. So, we've never

27:40 Yeah, looks like it's

27:41 I'm trying. I will write notes in the

27:43 chat for you. Sorry for the spotty

27:44 internet.

27:45 Nobody's in the way.

27:47 Okay, she's got to turn.

27:52 Why don't we continue with your

27:53 presentation in the meantime? And if

27:54 Michael can join us, you can jump in.

27:56 Okay, great. And I am joining right this

28:00 moment. It says

28:08 okay record.

28:14 Okay.

28:17 So

28:19 sure

28:42 beginning.

28:47 All right, I'm going to make this very

28:48 quick because I feel like Roger did a

28:50 great job introing us. Um, but thank you

28:53 all for having us here today. Um, Lauren

28:56 Canopari, senior project director at Win

28:58 and Gilbert Wyn, CEO of Wind Companies.

29:01 Um, here to talk about 99 Kent Street.

29:04 So,

29:06 I have a few slides about Win. I'm not

29:08 going to bore you guys with information

29:10 about us. Um, you know, we manage more

29:14 than 100,000 apartment homes in 25

29:16 states. Um, been around for 53 years.

29:21 Um, our development team is in 12 states

29:24 in the District of Columbia. Um, you

29:26 know, obviously our our focus is we do a

29:29 lot of work in Massachusetts and, um,

29:31 you know, we've been at 99 Kemp Street.

29:34 Um, you know, we last rehabed the

29:36 project in in 1997, 1998. Um, and you

29:42 know, we're we're a proud owner operator

29:45 um throughout throughout the East Coast

29:47 and um you know, obviously with a big

29:50 focus on on affordable and workforce

29:52 housing. Um this is our team working on

29:54 the project. um Gilmer W and myself

29:58 um Jotif who's our divisional vice

30:01 president of Gwen Residential um who

30:03 actually was the property manager at um

30:08 Villages Brooklyn

30:10 about 20 something years ago and is

30:12 still with WIN um and still oversees the

30:15 the region. Um Trevor who's our wind

30:17 communities and myself and Marcel who's

30:20 our assistant project director. So, I

30:22 think the important thing to talk about

30:24 is why why are we here today, right? Um,

30:26 as Roger mentioned, we are applying to

30:28 EOHLC

30:30 um for funding to rehab the 99 Kent

30:33 Street project. Um, pre-applications are

30:35 due September 24th with the full

30:37 application due in December. So, what do

30:40 we need to show for our December 24th

30:43 preapp? really to make it um competitive

30:46 um we need to show strong town support

30:50 um including matching funds um you know

30:52 to be invited back to do a

30:53 pre-application and hopefully get

30:55 funding for the project. It's it's a as

30:57 Amy says extremely competitive uh

31:00 process and you know we think we think

31:03 99 Kent Street is is a really compelling

31:06 case for that. Um, you know, the other

31:08 items we want to talk about aside from

31:10 the funding, um, is, you know, a a

31:13 resoning to reduce parking requirements

31:15 on site and help with extending, um, our

31:18 MVTA air rights lease. As you can see,

31:21 um, from this picture, there's um, you

31:24 know, we are built, our parking garage

31:27 and community space is built on top of

31:28 the train tracks, and we have a a

31:31 99-year lease that expires in um, 2075.

31:36 So 99 Kent Street, this is the um

31:39 elderly, you know, 55 plus restricted

31:42 117 unit building um at 99 Kent Street

31:46 um built in 1975. It's been 28 years

31:50 since the last renovation and our our

31:52 affordability expires in in 2027.

31:56 So as Roger said, I think the priority

31:58 of of the town and when and the state

32:00 hopefully our compelling argument is

32:02 affordability is expiring next year.

32:04 want to extend it and we've committed to

32:05 do that for 99 years. Um so here's what

32:08 the project looks like. Um you know it's

32:13 the tenants really have a lot of pride

32:15 in it, take great care of it. Um you

32:17 know this is kind of the community space

32:20 and the greenhouse as is uh and what

32:24 needs to be done. So, here's a unit

32:25 that's been renovated, but you know, our

32:27 goal as this for this project is to

32:30 really gut, you know, kitchens and

32:32 bathrooms, all new kitchens, all new

32:34 bathrooms. Um, this talks a little bit

32:37 about what we like to do. Plumbing,

32:38 fixtures, appliances, flooring,

32:39 lighting, thermostats. Um, the nine ADA

32:43 units, we would fully gut the entire

32:45 units to make them code accessible.

32:46 They're not up to current ADA codes. um

32:50 common area improvements. A big priority

32:52 for the site is offering services to the

32:55 senior residents. We have a pretty

32:57 extensive services program now. We'd

32:59 like to expand that um and improve the

33:02 community spaces to offer not only, you

33:05 know, better services, but also bring in

33:06 providers, nursing providers, meal

33:09 providers, things like that um for the

33:11 tenants. And then some exterior upgrades

33:13 to um sidewalks and landscaping and

33:16 things like that. So, um I know this has

33:20 all been previewed with you and you've

33:22 seen the presentation, but just to get a

33:23 little bit uh this rehab that we're

33:26 talking about today, um funding for is

33:30 really the second phase in a two-part um

33:33 rehabilitation. The first phase is a

33:35 deep energy retrofit that's starting at

33:37 the end of this year. Um and we have

33:40 already received over $10 million in

33:43 awards from DOE, MHP, and Massave. um in

33:48 order to do this. So, it's it's in

33:50 progress. It's starting probably the end

33:52 of this year or very beginning of next

33:54 year. And that will essentially be a

33:57 total reskinning of the exterior of the

33:59 building, new all new windows, um

34:03 upgrade to the electrical system, um new

34:05 HVAC system. Um so that's, you know, a

34:10 pretty big project. Um, so that's kind

34:13 of what we consider that's the exterior

34:15 project that's happening now to um make

34:18 the project more efficient. Um, and in

34:21 addition to that $10.5 million we've

34:23 been awarded, WIN is putting in um $7.2

34:27 million into the project to kind of

34:29 complete that. So this is this is a

34:31 pretty major project that's about to be

34:33 underway and then our rehab will come

34:34 in, do the interior of the units, kind

34:36 of marry the two projects together. I

34:39 know someone on the select board had a

34:41 question about um electrification of the

34:43 building. So the current um building has

34:46 gas powered boilers and heat. This will

34:50 essentially completely electrify the

34:52 building. So it will be um electric

34:55 heat, electric hot water. We are going

34:57 to maintain one backup

35:00 boiler that is gas powered that will be

35:03 supplemental for the building. So, not

35:05 used on a daily basis, but if something

35:06 fails, they will have a gas powered

35:08 backup. Um, but aside from that, it'll

35:11 be essentially a full electrification

35:13 um of the building. And this is how the

35:16 beautiful new exterior um will look.

35:20 So, when we're talking about this um you

35:23 know, the the 99 Kent Street project

35:26 that we're applying for now, we're

35:27 applying for it as a twin deal. So, two

35:29 separate projects using both four and 9%

35:34 tax credits. And that's one of the way

35:36 Roger mentioned that we were able to

35:38 reduce our ask to the town um of

35:40 Brookline. But so, it's it's two

35:42 separate deals, but one building um and

35:46 additional funds, you know, the funds

35:48 we're applying for outside of um

35:55 outside of the Brooklyn funds. Um, you

35:59 know, we're applying for another $6.5

36:01 million of soft debt in addition to

36:03 large amounts of state tax credits, 4%

36:06 credits, 9% credits, and of course, um,

36:09 we're putting in our deferred developer

36:11 fee, some deferred developer fee, and

36:13 we're, as Roger mentioned, we're putting

36:15 in a seller note, um, back into the

36:17 project as well to make make this work

36:19 and be able to get all of the work done

36:21 that we want to do. Oh, one thing I also

36:24 wanted to mention, sorry, I'm not just

36:25 going to go back for one second. Um,

36:27 something that I missed on the scope of

36:28 improvements that we just added to the

36:30 scope is we're going to sprinkler the

36:32 building. So, the BR building doesn't

36:34 have any sprinklers right now. We're not

36:35 required to have any sprinklers. Um,

36:38 kind of as we've been talking about

36:40 this, it's an important like like life

36:43 health safety thing to add. So, that's

36:45 going to be another thing that's going

36:46 to be added as part of this

36:48 rehabilitation

36:49 hopefully. Um so you know here we have

36:52 the uses of the funds how the money is

36:54 being spent that you know the total CDC

36:56 is about total development cost about

36:58 $73 million for this project. Um I know

37:02 Roger mentioned 115 of the units will be

37:05 affordable. There's often a question of

37:07 why do we leave two units out? Um that's

37:11 because there are two units two tenants

37:14 currently at the property who are over

37:16 income. Um and we don't we are always

37:19 committed when we do these in place

37:21 rehabs not to lose any tenants as part

37:23 of that. So those two existing tenants

37:25 will stay those will become market units

37:27 so they can stay in their units and then

37:29 the other 115 units will become

37:31 affordable for 99 years.

37:34 Um so some of the challenges I mentioned

37:37 so of course this is an occupied rehab.

37:39 Tenants will stay in place during their

37:41 during construction of their units.

37:42 We'll have a place for them to go during

37:44 the day. Um and then the nine units that

37:47 are being completely got renovated,

37:50 bring them up to code. Those tenants

37:51 will be moved out. Um we have, you know,

37:54 we have a lot of experience doing this

37:55 and and um have a consultant that comes

37:58 and helps us and moves everybody and

38:00 make sure that everybody's safe and um

38:03 you know, taken care of during the

38:04 during the rehab. Um obviously being on

38:07 top of the train tracks makes things

38:09 complicated. We need help with an

38:11 extension to the air rights lease and um

38:15 you know we need some help with zoning

38:19 parking um a reduction in our parking

38:21 requirement. Um that will give us more

38:23 flexibility with the garage and you know

38:26 we've talked had some conversations

38:28 about uh entering into a partnership

38:30 with the town to lease spaces or you

38:33 know selling the garage and leasing

38:34 spaces back to us. Um, so that's

38:36 something we're still trying to figure

38:37 out to maybe have more funding and more

38:40 sources for the project. Um, so as Roger

38:43 mentioned, timeline, the real big thing

38:46 is this preapp is due September 24th.

38:49 There's one of the main questions is

38:51 does the town is the town offering

38:53 matching funds? And that's why we're

38:55 here and we really want to be able to

38:56 say yes because that's what makes a

38:57 project competitive given the amount of

39:00 resources we're asking for from the

39:01 state. So, the goal would be we apply

39:04 the full application in December, get

39:06 approved beginning of next year, and

39:08 close by the end of next year. Um, with

39:11 an 18-month construction schedule, we

39:14 would hopefully close in uh complete

39:16 construction mid 2029.

39:19 Um, I also just wanted to very quickly

39:22 touch on the villages of Brooklyn. So,

39:25 separate project, right? So that was my

39:28 I know Bernard this is one of Bernard's

39:29 comments was it was confusing the

39:31 presentation mixed everything together.

39:33 So everything I just talked about was 99

39:35 Kent Street. Now talking about villages

39:38 of Brookline what are we offering there?

39:41 This isn't the project that we're asking

39:43 for funding for but I know it's

39:45 obviously a concern because there's 193

39:48 families living there um as well. So

39:51 following the expiration of the of the

39:54 LITC restriction and extended 40T

39:56 protections um there are two red burden

40:00 households there. So we've been working

40:02 with these households to secure subsidy

40:05 for them um you know secure vouchers and

40:09 if we can't help them find a subsidy

40:11 then you know we have agreed to limit

40:14 their rent increases um for you know in

40:17 the year over year to the change in CPI

40:19 just 3%. So, we're um as long as people

40:22 are certifying their income, we're

40:24 keeping their units affordable and

40:26 making sure their rent burden households

40:28 aren't um you know losing their house

40:31 losing their housing or or being rent

40:33 burdened. Um we're also committing to

40:37 renovating um the affordable units of

40:40 Village Brooklyn over the next 5 years,

40:42 approximately 12 units per year. Um and

40:45 that's a pretty pretty um heavy scope of

40:48 renovation. includes new kitchens, um

40:51 appliances, bathrooms, painting floors,

40:54 um basically anything where we feel like

40:57 they've they're beyond their useful

40:59 life. You know, we have subtenants there

41:01 who have been in the same units for 30

41:02 years. They need new carpet, right? Or

41:05 they need carpet replaced for flooring.

41:07 Um so, you know, this is working

41:10 individually with each resident. every

41:12 unit is surveyed and you know if tenants

41:15 would like you know have things that are

41:17 beyond their useful life and would like

41:18 them replaced or committed to working

41:20 with them um or scope plan committing to

41:23 scope all units by the first of the year

41:26 um with approximately 12 units um

41:29 completed per year. So I just want to

41:32 touch on those two things at Village of

41:33 Brooklyn villages because I know there's

41:35 been a lot of questions and concern

41:38 about that property as well. So, I know

41:41 I went really quickly through that, but

41:43 um I think you're more important to take

41:45 questions and I hope that was a helpful

41:50 description. Go ahead.

41:52 Yes.

41:52 Yeah. Um I thank you for also touching

41:56 Village Way. I know there's a lot of

41:57 folks in the community that are very

41:59 concerned about the vacant use. Um, and

42:01 I know it is in the MOA, but I'm hoping

42:03 you can touch on it um for extending

42:07 this renewal of the housing assistant

42:09 payment contract with the BHA and what

42:11 the plans are for that.

42:13 Yes. So, that contract expires in 2044.

42:16 Um, and basically we're committed to

42:20 renewing that contract, right? um we you

42:23 know would like essentially we're

42:26 committed to keeping those units

42:27 affordable for 99 years. Um you know the

42:32 plan is to renew that contract. If it's

42:34 not renewed then you know our agreement

42:36 is to partner partner with the town

42:38 where we kind of you know contribute

42:41 half of the of the you know funding to

42:45 get there. the town contributes the

42:46 other half and we keep those units

42:48 affordable um at a similar level of

42:50 subsidy going.

42:53 So that's better.

42:54 And so with the combination of that and

42:57 the two additional

42:59 uh units that you talked about, the

43:01 assumption is that the affordability

43:04 uh that currently exists in village way

43:06 will continue.

43:09 The goal is the goal is for for the

43:12 units that are affordable to continue to

43:14 be affordable.

43:17 Thank you.

43:18 Anyone else with questions at this

43:20 juncture? Michael. Um so thank you for

43:22 uh answering the couple of questions

43:26 that I raised earlier about um the

43:29 current heating cooling source um and

43:32 the building being all all electric. Um,

43:34 one of the reasons why I I raise these

43:37 questions is because at some point over

43:40 time as we continue to transition off

43:42 gas, um,

43:45 having the town push for, um, basically

43:49 shutting down of gas pipelines, um, is

43:52 was a necessary part of that strategy.

43:56 Um, so I'm wondering when you say

43:57 there's a backup generator um that is

44:00 gas powered, is that utility supplied or

44:03 is that independently supplied at this

44:05 point? How do you enision how do you

44:07 envision that changing over potentially

44:09 changing over time?

44:10 I don't know. I mean it's so it is

44:12 utility supplied, right? Essentially

44:14 it's a you know a boiler a backup boiler

44:18 that will be utility supplied with gas.

44:20 Um, but I I mean we are constantly

44:24 this is obviously a conversation I think

44:26 we're having in a lot of places right

44:27 like electrification is the goal for and

44:30 I think that's

44:31 wind's goal you know we're going to all

44:33 electric when we're building new

44:34 properties um it's more complicated here

44:37 obviously part of this energy project is

44:39 upgrading the entire electrical system

44:40 to support all of this because it's not

44:42 as simple as just like changing it

44:44 um right so I think that's I think we're

44:46 we're moving towards that and I think

44:48 maybe

44:49 the next goal is getting off of of gas

44:52 alto together.

44:58 Anyone else?

45:00 Okay, continue.

45:02 Um, I just have a couple of things to

45:04 add. That was great. Thank you. Um, I

45:06 just wanted to say that the MOA that was

45:09 in your meeting packet is still evolving

45:12 a little bit. We're still going back and

45:13 forth between our legal council and

45:16 women's legal counsel. So, um, what you

45:19 have before you now will most likely

45:21 change a little bit. Um, but what Lauren

45:25 presented is the overall scope of that

45:28 agreement. And Lauren also mentioned a

45:30 letter um that when prepared for the

45:33 town that outlines um the some of the

45:39 things that they are um agreeing to do

45:42 at at the villages of Brookline, which

45:44 Lauren just talked about. So the

45:45 renovations and the rental protections

45:47 there for the tenants. Yeah. So those

45:49 yeah those are outlined in a kind of

45:51 side letter that commits says what we're

45:53 committed to that we will sign is

45:55 obviously part of this.

45:58 What are the issues that are still

45:59 outstanding in the MOA? Um there's some

46:03 language in the MOA that Wind's legal

46:06 council added that talks about uh the

46:09 town's

46:11 ongoing commitment to um

46:16 to what Lauren just described. And then

46:18 we also there's also some language that

46:21 talks about if the housing assistance

46:24 payment contract to renew the project

46:26 based vouchers isn't available, what

46:29 that will look like. Um, so we're still

46:32 going back and forth on that. So I don't

46:34 really want to delve into it um because

46:36 we haven't reached agreement on that

46:37 yet. But

46:38 yeah, I think it was that and I think it

46:39 was also

46:41 um you know we'd like like the town to

46:44 say that they'll support us, you know.

46:47 So just said we're here right now,

46:48 right? 30 years have gone by. The

46:50 project needs work done, you know. So,

46:54 our goal is that, you know, we we're

46:56 committed to keeping the project

46:57 affordable for 99 years, but we'd like

47:00 in 30 years from now, we'd like help,

47:02 you know, again, with the state and and

47:04 advocating for this project to be

47:06 renovated or rehabbed as needed. Um, so

47:09 there was just some language around

47:10 that, but um I think we're close. I

47:13 think it's, you know, kind of a little

47:15 bit of legal use going back and forth,

47:17 right? And apologies for not having that

47:19 completed.

47:20 Yeah, I think that should be tried. I I

47:22 did send you back another draft now.

47:24 Hopefully. Yeah. So hopefully it's

47:26 Well, my my concern has always been that

47:30 the relationship between and the tenants

47:32 not be a relationship that we're we're a

47:35 part of and and I think that MOA is is

47:39 um is sufficient with respect to that

47:42 that issue. I just want to make sure

47:44 that we're not sort of seeping into

47:47 No, and I think um I think you're

47:50 sensitive that

47:51 we are. I think that was and I think

47:53 that was a concern that the tenants

47:55 brought up that we were very sensitive

47:56 to that, you know, we're working with

47:58 the tenants association very closely

48:01 directly right now. So yeah, and I think

48:03 they don't want they don't want the town

48:05 to say something on their behalf, right?

48:07 They want their voices to be heard and

48:08 they so I think we've been working with

48:10 them pretty closely.

48:12 Any

48:15 other questions?

48:17 I have a question regarding the

48:18 affordable housing trust fund balance.

48:20 So this 4 million is that currently

48:22 sitting in the affordable housing trust

48:24 fund? Yes.

48:24 And so this would be upon our approval

48:26 that 4 million would be depleted

48:27 immediately or how does that work?

48:29 Um it would be um encumbered. So

48:32 effectively it would be not available

48:35 for anything else. And um the uh the

48:38 unencumbered trust fund balance is a

48:41 little bit north of at the moment at 6

48:43 million. So it would largely it would it

48:46 would not fully depleted but it would

48:48 largely depleted and our priority top

48:51 priority for the trust fund is to build

48:53 it up for the known other first priority

48:57 of walnut high phase two which likely

48:59 would be close to 10 million. So we're

49:02 starting with a very low base after we

49:04 commit this. But the actual

49:06 dispersement of our um encumbered $4

49:09 million would um as I mentioned briefly

49:12 now it's advanced but still only near

49:15 the point of um you know postclosing. Y

49:19 so that's still a little ways off. So

49:21 and so Melissa that uh free cash

49:24 waterfall gets a uh gets calculated

49:27 against the unencumbered.

49:29 Right.

49:29 Got it. And just one, Roger, you had

49:32 seen the updated balance. So I know

49:34 this, but um the waterfall payment from

49:36 the prior fiscal year or the one that

49:39 allocation that um just posted to the

49:42 trust recently, so we're we're up a

49:45 little bit above 7 million right now.

49:47 And once this is encumbered, it'll be a

49:49 three.

49:49 Okay.

49:50 Around.

49:50 Got it. Michael,

49:52 um you you had mentioned uh earlier

49:56 about the state the state grant being

49:59 competitive. Um and you know, obviously

50:02 we all want to do as much as we can in

50:04 order to make that happen. I'm wondering

50:06 what the contingency is. If for some

50:09 reason we don't get the state funding,

50:12 what happens to this project? Uh what

50:15 happens to the uh encumbered funds from

50:18 the town, etc.? Um yeah, that's a great

50:21 question. Um we're committed to reapply

50:24 as well. I think oftentimes what happens

50:26 is uh with competitive it's we're

50:30 qualified to receive these funds. So

50:32 it's more a question of what the

50:33 competition in that given year is. So we

50:35 would reapply and then we would reapply

50:37 again and then we reapply again. We're

50:39 basically we're committed to four rounds

50:42 of applications. And I I think as as

50:46 long as the town stays committed as it

50:48 is and helps us kind of prioritize the

50:51 lobby, I round should be sufficient to

50:54 get it done.

50:55 And that's that's a frequent occurrence

50:57 that

50:57 Yeah, that happens often to us where

50:59 Yeah. We But I apply,

51:02 right? For everybody. Yeah. But I feel

51:03 like often, you know, um especially when

51:06 we have support like this, it's not this

51:08 round, it's the next round.

51:11 Yeah.

51:12 So I I have a question regarding the uh

51:16 extension of 99 years for these units

51:18 being affordable. So 115 of the 117 will

51:24 uh receive that 99year extension because

51:26 two of the units the families currently

51:28 there do uh not meet the threshold. What

51:32 happens though if the same were to occur

51:36 for a family and one of the other 115?

51:39 Would they be asked to leave? would they

51:41 be extended a similar courtesy as to

51:45 um you're saying for this current I I'll

51:48 actually address your other question too

51:49 because interest the implication of the

51:51 other question will just be in the

51:52 future um so yeah if between today and

51:56 closing

51:57 um somebody else goes over income they

52:02 would be able to stay and the likelihood

52:04 is that they would even still qualify

52:06 for tax credits because they're able to

52:08 go up to I think 140% % of the area

52:11 median income without overqualifying.

52:14 Um so the likelihood so we implicit in

52:18 that would be to say we're not going to

52:19 rerand a vacant unit to a market ten.

52:22 So we won't have that issue. So it'll

52:24 just be the folks that are there if they

52:27 happen to go over income under the

52:28 grandfathering rules of the tax credit

52:30 program they would still be eligible and

52:33 still keep them affordable. The only

52:35 time they wouldn't be is if they go over

52:37 140% from their current 60% which is

52:40 pretty unlikely in the next six or seven

52:42 months

52:42 to get yeah be a big

52:45 a very big salary increase between now

52:47 and then for that to happen.

52:49 But but just I implicit in that was what

52:52 happens 30 years because we're going to

52:54 99 years. Um there there's federal rules

52:58 around that. So, let's say uh 30 years

53:01 from now we're going to do this again

53:04 and somebody is above 140%.

53:08 The federal rules allow that person to

53:10 stay as long as they wish. They're never

53:12 kicked out. It's just that the next

53:15 available unit always has to be

53:16 affordable.

53:18 So, like you can hypothetically have

53:21 less than all affordability, but every

53:22 time it payates you have to react.

53:25 So, once they move out, that unit would

53:26 be reacting. That's sort of how it all

53:28 works because I don't want to displace

53:29 them.

53:30 So I guess the the the other sort of

53:33 piece of this in terms of installation

53:35 is for those two units, those two units

53:38 are currently occupied by people who

53:40 have

53:42 um over income, right? So they have to

53:45 be market because they were income when

53:47 they moved in and then they've lived

53:48 there for so long.

53:49 No, actually those no those are

53:50 different. So those there were uh

53:53 certain units that were not encumbered

53:54 by affordability. That's right. And

53:56 those were starting in 2014. And those

53:58 two units that are over income were

54:00 rented as market rate units. That's

54:02 right.

54:02 Okay. So the so so if at some point

54:05 those people move out, those would

54:06 remain market rate units.

54:08 Yes. Correct.

54:10 And there's there is there any path that

54:13 would convert those two units to

54:15 affordable

54:16 at the next rehab?

54:18 Yeah, we could do I mean there's I would

54:20 say two paths. One would be at the, you

54:22 know, when we're sitting here 30 years

54:24 from now, we could have two. The other

54:26 more quick path would be to the extent

54:29 that that's important to the town, we

54:30 could enter into some negotiation of

54:33 what

54:34 town support and state support would be

54:36 there to

54:38 create those later. It's affordable. You

54:39 don't have to do that as part of the

54:41 rehab. We could do that

54:42 two years from now if we wanted to.

54:45 Couple other questions I have. So one of

54:47 them regarding the AMI 30% and 60% what

54:52 determines that distribution is it

54:55 mostly based on investment presumably

54:58 30% AMI you would need a bigger

55:01 investment from state federal local

55:03 so right now there's no 30% units at the

55:05 property um as part of this application

55:08 that's another thing that makes it

55:10 competitive is to add 30% units um so

55:13 we're doing we're adding some 30% units

55:15 um approximately

55:18 15% on each 4% and 9% project. Um so

55:22 there will be 30% units, 60% units, and

55:25 then the two market rate units.

55:26 And and to answer your question, the the

55:28 reason we're able to that's all baked

55:30 into the numbers. Um, but one of the

55:32 things that's helpful at this project is

55:34 that there's already 40% of the units,

55:38 40

55:40 a federal housing assistance payment

55:42 contract, which

55:44 means that you're getting the rent from

55:46 HUD at a at a fixed level.

55:48 And so whether the person is earning 60

55:50 or 30 doesn't affect the rent level that

55:52 the property receives for those 40%

55:55 units. that allows this property to be

55:58 very competitive with the state because

56:00 it can do more 30% units than others

56:03 because it has that housing assistance

56:05 payment.

56:07 A significant percentage of the units

56:09 are two-bedroom and is there some kind

56:12 of age restriction on all family members

56:17 that are living in this unit? Because if

56:19 there is, I'm curious as to why there

56:20 would sometimes be two bedrooms because

56:23 guests are allowed for up to a certain

56:24 period of time. Are these sibling

56:26 groups?

56:27 Uh, that's a great question. This dates

56:29 back um many this dates back to 1975. So

56:33 um the

56:36 elderly folks, let's say um someone has

56:38 a caregiver that wants that that

56:40 qualifies to live with them. That that

56:42 would be in the second unit. Sometimes

56:43 there's medical reasons why the husband

56:46 and wife can't or the the spouses can't

56:48 live together in the same room. So they

56:50 or and then yes sometimes there's

56:52 children with an elderly

56:55 um lease holder. So this you can under

56:58 this lease as long as the head of

57:00 household is 55 or older they can have a

57:04 child.

57:05 Um so that's kind of what the three

57:07 reasons why a two might be useful.

57:09 Okay. Yeah.

57:11 Yeah. My understanding is that with

57:12 respect to the market rate units in

57:15 Village at Brooklyn, uh we're still at

57:18 uh sort of workforce or upper workforce

57:21 rent levels.

57:22 Yes. There's various different

57:24 restrictions there. Um there's some that

57:27 are still affordable, some that are in

57:29 40t, some that Yeah. So there's there's

57:32 a variety of rental restrictions. I

57:35 think I can I can provide you a more

57:37 detailed breakdown if that's helpful.

57:38 Yeah, that would be it.

57:39 I think to to answer your question, what

57:41 we're committing to for long term

57:43 uh would be there are two ways to

57:46 qualify for um

57:48 for 40B for the subsidized housing

57:50 inventory. Either 20% of the units are

57:53 50% AMI or 25% at 80% AMI. Those are the

57:57 two ways that will be we'll be right

58:01 now. Um all those units are probably

58:03 closer to 30% AMI because they're under

58:05 a HAP contract. But what we're

58:07 committing to long term is to either do

58:10 20 of 50 or 25 of 80 um so that the town

58:13 continues to qualify those as 40

58:15 million. So we'll do we'll do one of

58:17 those.

58:17 My concern is or my question is uh with

58:21 respect to the market rate units we

58:26 they're at a probably 100 or 120% AMI or

58:32 does that even apply to those units?

58:35 Yeah. And the question is, you know,

58:36 what what what are the rent levels

58:38 there?

58:39 Uh yeah, so that the rent levels would

58:41 differ from the income restriction.

58:44 Yeah. So some of the rent levels because

58:46 they were affordable and because we've

58:48 agreed to sort of limit rent rent

58:50 increases now to 10% instead of marking

58:53 them up to market.

58:54 Um this is sort of in a negotiation with

58:56 the with the tenants.

58:58 Um

58:59 right now they are in a middle income

59:01 like we are saying 110 120%. But over

59:05 time, I would imagine they go to market,

59:07 they just go much slower than they would

59:09 have because of the 10% increase.

59:11 I just want to get it to be able to

59:14 understand that, you know, we're not

59:16 only maintaining affordable units as

59:19 that's usually um understood, but also

59:22 middle inome

59:24 housing.

59:28 Amanda

59:28 um so I just a a little bit of a

59:31 question on process and a little bit of

59:33 a statement. I think it's a great

59:34 opportunity to preserve a substantial

59:36 amount of affordable senior housing at

59:38 99 Kent. I'm really glad that about the

59:42 negotiations that have happened to

59:45 extend some affordability protections to

59:47 the village because I think it's it's

59:49 really important um that they are not o

59:52 overlooked in the process. Um

59:55 and it seems to me that if the MOA is

59:58 still being discussed, we are going to

1:00:01 vote on um authorizing the release of

1:00:05 funds authorizing um advocacy basically

1:00:08 for 99 Kent. Um and we were supposed to

1:00:12 vote on conditional approval but if of

1:00:15 the MOA but if there is still some

1:00:17 negotiation taking place um for for me

1:00:21 personally I would like to know that the

1:00:25 intent of affordability protections for

1:00:27 the village are not going to go away

1:00:29 with whatever negotiations and the MLA

1:00:31 are going

1:00:33 that's not yeah that's not we're we're

1:00:35 this is like we're we're talking about

1:00:37 like very small like that those things

1:00:39 are 100% in

1:00:41 It's not changing um unless the ch town

1:00:44 changes the first amendment, but we're

1:00:45 committed to all of that. Yeah, that's

1:00:47 that's definitely not changing and we

1:00:48 will um I just sent a revised version

1:00:51 over yesterday so we can you know

1:00:54 provide a a version when it's more

1:00:58 finalized. But yeah, those the

1:01:00 commitments for the affordability at 99

1:01:02 Kent and Village are in there.

1:01:09 That would be an important statement to

1:01:11 make sure is reflected in.

1:01:17 Sorry, Michael just sent me some notes

1:01:19 and I think we've covered everything.

1:01:23 Yes.

1:01:24 Thank you.

1:01:25 All right. So, any more questions,

1:01:27 comments from board members?

1:01:30 Oh, sorry. Just one brief comment on um

1:01:34 Roger's point on members of the HAD

1:01:36 being really useful. I would love to

1:01:37 figure out a way when this kind of topic

1:01:39 comes up to include their expertise

1:01:41 earlier in the process uh going forward

1:01:44 because I I think you are right we are

1:01:46 lucky and that we have some really

1:01:47 wellqualified members of the HAB that um

1:01:50 I would love their their guidance as we

1:01:53 go to challenges like expiring going

1:01:56 forward.

1:01:56 I do have to say some of like the most

1:01:58 detailed like intensive questions I've

1:02:02 ever received from a public board. So it

1:02:04 was it was uh clear that there was a lot

1:02:07 of experience there. So great.

1:02:09 Thank you select board for appointing

1:02:11 Wesley Reed because she hit the ground

1:02:13 running and is just as much

1:02:14 knowledgeable as Jonathan.

1:02:17 So reinforce that and yes

1:02:23 if I could just say something. So um for

1:02:26 those who don't know, um I grew up in

1:02:29 Brooklyn about a mile away. Um, my

1:02:32 father grew up in Brookline since 1939.

1:02:35 This is our hometown and we care very

1:02:37 much about this project. This is first

1:02:39 among equals

1:02:41 from the 120 developments we've

1:02:44 developed over the years. Very proud of

1:02:46 it. And um what I think is an

1:02:48 interesting fact for all of you because

1:02:49 I think this speaks to both the town's

1:02:52 um kind of uh dog on a bone

1:02:56 affordability uh needs and and our

1:03:00 partnership is that when it was

1:03:01 originally developed, it actually wasn't

1:03:03 an quote unquote affordable housing

1:03:05 project. In 1975, it was mostly um a

1:03:09 middle income housing project. is 80% of

1:03:12 80% AMI units on and that was going to

1:03:15 expire basically 30 years in. It was in

1:03:18 1997 that the town and wind worked

1:03:21 together to add tax credits to that and

1:03:23 actually created the affordability

1:03:24 that's expiring today. So it's actually

1:03:27 started more of a middle income in a

1:03:29 market. it turned into an affordable

1:03:31 housing and now it's going to turn, I

1:03:33 think, back into what essentially will

1:03:35 end up being 50% affordable and 50%

1:03:37 market, which is something that just

1:03:40 personally I push for. I love mixed

1:03:42 income housing. I think that's the

1:03:44 proper way uh to to sort of create a

1:03:46 community. But I just wanted to point

1:03:47 out that like this has really evolved

1:03:50 over time with the partnership with the

1:03:51 town. And I think I'm I'm very proud of

1:03:54 how it's ending up. I think the town

1:03:55 should be uh because a lot of 70s era

1:04:00 HUD housing has gone to market over the

1:04:03 years or has fallen into disarray. It's

1:04:06 kind of unusual for this to result in a

1:04:09 family elderly mixed income regime that

1:04:11 that lasts. So, um just wanted to say

1:04:13 that that thank you for the profound

1:04:16 partnership and I'm looking forward to

1:04:17 the next 99 years. Thank you.

1:04:21 All right. So with that, I think we may

1:04:24 be prepared to take a series of votes.

1:04:26 So I move that we

1:04:30 I think we should make sure right with

1:04:31 the MOA then

1:04:33 um I wonder if we given that the MOA is

1:04:36 still in the final stages of being

1:04:38 addressed. I wonder if we might

1:04:40 hold the votes until next week. Is that

1:04:42 right?

1:04:42 Um

1:04:43 or are there certain votes that we

1:04:44 should take now?

1:04:46 Yeah, there's general consistent

1:04:47 I think you could take the the vote of

1:04:49 supporting their application for sure.

1:04:51 Um, I think the if

1:04:56 I wish I wish I have Michael's opinion

1:04:58 here. I think we could you could move

1:05:00 forward with the vote on the 4 million

1:05:03 um preliminary commitment and supporting

1:05:06 their application and acknowledging the

1:05:08 letter um that they provided. But I

1:05:10 think we should definitely I I think we

1:05:12 should hold off on the MOA just until we

1:05:15 finalize that.

1:05:17 Roger, do you do you agree?

1:05:19 Um, I think so. And I I was at one

1:05:22 procedural question. Is the

1:05:25 formal execution of MOA an absolute

1:05:29 requirement for the select board to

1:05:31 provide the conditional letter of

1:05:33 commitment on 4 million? Do they have to

1:05:35 follow in sequence?

1:05:38 So the way the MOA is written, it it um

1:05:42 would be executed after

1:05:45 the um after this leadboard votes

1:05:48 approval on the funding because if

1:05:49 there's a line in the MOA that lists

1:05:52 what they they approved it. Um so

1:05:54 so execution of the MOA would fall in

1:05:56 that bucket of conditions.

1:05:58 Yes. So you could issue the um the

1:06:02 letter the wing needs to to provide the

1:06:04 state the town's preliminary commitment.

1:06:07 Right. So so it seems to me that we

1:06:09 could vote on 4B, 4 C and 4 E and hold

1:06:13 off on memorandum of agreement till we

1:06:15 see it. Of course, which is 4 D. So that

1:06:18 would be my suggestion unless other

1:06:20 board members feel differently.

1:06:22 I'm okay with that. I just want to note

1:06:24 when we vote on 4B that it's with the

1:06:27 understanding that nothing substantial

1:06:30 is going to be changing about that like

1:06:34 minor legally stuff I'm not so worried

1:06:36 about maybe because I'm not a lawyer but

1:06:42 all right so with that I move that we

1:06:45 authorize $4 million of affordable

1:06:47 housing trust funds on the terms and

1:06:49 conditions recommended by the housing

1:06:51 advisory board so long There are no

1:06:54 major modifications to those

1:06:56 recommendations to be utilized for the

1:06:58 substantial rehabilitation and extension

1:07:00 of affordable housing restrictions at

1:07:02 the senior rental housing at 99 Kent

1:07:04 Street for 99 years and authorizing the

1:07:06 select board chair to sign related

1:07:08 documents on behalf of the select board.

1:07:11 Bernard

1:07:11 yes.

1:07:12 Michael,

1:07:12 yes.

1:07:13 Amanda,

1:07:13 yes.

1:07:14 And I also vote yes. I move that we

1:07:17 authorize the town administrator,

1:07:19 director of planning, community

1:07:20 development, and housing and community

1:07:22 planning director favorably recommends

1:07:24 to the state or other funding sources

1:07:27 grant applications that support the

1:07:28 rehabilitation and affordability of

1:07:30 homes at 99 Kent Street. Bernard,

1:07:33 yes.

1:07:33 Michael,

1:07:34 yes.

1:07:34 Amanda,

1:07:35 yes.

1:07:35 I also vote yes. I move that we

1:07:38 acknowledge the letter from wind

1:07:39 companies to the town stating their

1:07:41 commitments to renovate units and to

1:07:43 extend rent protections for two income

1:07:45 qualified tenant households at 77

1:07:48 Village Way with changes proposed by the

1:07:50 town. Bernard,

1:07:51 yes.

1:07:52 Michael,

1:07:52 yes.

1:07:53 Amanda,

1:07:53 yes.

1:07:54 And I also vote yes.

1:07:56 All right. Well, thank you very much for

1:07:57 coming and for the very thorough

1:07:58 presentation and asking our m answering

1:08:02 our multitude of questions.

1:08:04 Thank you so much. Thank you everybody.

1:08:06 appreciate it. Good luck with the state.

1:08:14 He's one of the first to do this.

1:08:16 Thank you.

1:08:17 Thank you very much.

1:08:21 All right. So,

1:08:21 how about a break?

1:08:22 How about Sure.

1:08:24 We are ahead of schedule.

1:08:26 All right. if you'd like

1:08:27 or I can just go to like

1:08:34 David

1:08:35 the question probably has been answered

1:08:38 but are these agreements attached to the

1:08:41 property if they were to sell these

1:08:43 properties

1:08:44 yes

1:08:45 because when they

1:08:49 process property in in they flipped it

1:08:53 as soon as they got the third It is

1:08:56 touched by

1:08:59 you know I didn't see one right outside

1:09:00 on the right I think

1:09:03 you guys all

1:09:07 uh straight ahead I think on the right

1:09:09 sorry Bernard

1:09:11 we muted the room

1:09:19 all right I

1:09:22 would like to allow Anthony to provide a

1:09:25 vote to 4B, 4 C, and 4E. So, Anthony, do

1:09:29 you approve the question of authorizing

1:09:30 four million affordable housing trust

1:09:32 funds?

1:09:33 All right. So, yes, for Anthony on 4B.

1:09:35 Anthony, do you approve authorizing the

1:09:38 town administrator, director of plan,

1:09:39 community development, and housing,

1:09:40 community planning director to favorably

1:09:42 recommend state or other funding

1:09:43 sources, grant applications?

1:09:45 Yes.

1:09:46 All right. And do you uh acknowledge the

1:09:50 letter from wind companies to the

1:09:51 channel stating their commitment to

1:09:52 renovate units and extend rent

1:09:54 protections? Yes. Thank you, David, for

1:09:56 allowing me to vote on this.

1:10:01 Now, we will move to review the public

1:10:03 bodies handbook.

1:10:10 So,

1:10:13 um we have uh a new draft of the public

1:10:18 bodies handbook that is being um worked

1:10:22 through has been worked through. Um

1:10:24 we've been implementing re uh potential

1:10:28 comments from uh individual select board

1:10:30 members uh and working through to uh get

1:10:34 to where uh hopefully we uh need to be.

1:10:36 I will note um there are some comments

1:10:39 um came in over the weekend that we

1:10:41 still need I still need to implement. Um

1:10:43 so I'm apologize to kind of switching

1:10:45 back and forth between two versions

1:10:46 here. Um but you can see here um the

1:10:51 biggest the biggest changes um

1:10:54 substantively um are um one a

1:10:59 requirement um

1:11:01 um

1:11:03 is uh one a language about vacancies. Um

1:11:07 if you scroll down to page um

1:11:12 page eight or sorry page seven of the

1:11:14 manual um

1:11:17 there's now new language about vacancies

1:11:20 um and this is the after discuss you

1:11:22 know with discussion to the um

1:11:27 um

1:11:32 so if you scroll down to see the select

1:11:34 or endeavor and fill vacancies on public

1:11:37 bodies as soon as practiced. Posted

1:11:39 positions will remain open until filled,

1:11:41 but typically the select board will

1:11:42 endeavor to conduct interviews and fill

1:11:44 positions no earlier than 30 days and no

1:11:46 later than 60 days from posting.

1:11:47 Vacancies on public bodies requiring

1:11:49 specialized expertise may take longer to

1:11:51 fill. Select board also typically

1:11:52 endeavors to interview every applicant

1:11:54 and may decide not to do so in the

1:11:56 chair's discretion if an application is

1:11:58 submitted after a sufficient number of

1:11:59 candidates have been interviewed. So,

1:12:01 this sets a certain level of expectation

1:12:03 from the public, but doesn't foreclose

1:12:06 you from after a 60-day period if you

1:12:08 feel like you need to hear from more

1:12:10 applicants or you want to hold the

1:12:11 position open, particularly if it's one

1:12:13 requiring specialized expertise. Um, but

1:12:16 it sets right it gives the community a

1:12:18 sense of, you know, when they should get

1:12:20 their application in if they want to be

1:12:21 considered for a position.

1:12:26 Can I make one note and I'll just

1:12:28 explain my comment like this now

1:12:31 formalizes the definition of a vacancy

1:12:33 basically being not when someone does

1:12:35 not resubmit for reappointment but when

1:12:38 someone steps down early for one reason

1:12:40 or another.

1:12:41 Yes. uh

1:12:44 so that it it should be important and I

1:12:48 don't think that it necessarily needs to

1:12:50 be reflected in the handbook but then

1:12:52 essentially when we are considering

1:12:55 candidates for reappoint and we are

1:12:57 trying to make it on a regular calendar

1:13:01 schedule um then we're also considering

1:13:04 new candidates for appointment at the

1:13:06 same time um apart from vacancies which

1:13:09 are their own category

1:13:10 yeah I do think it would be helpful to

1:13:12 spell that out to be very clear because

1:13:14 this will be a bit of a departure from

1:13:17 prior protocol.

1:13:18 We can definitely do that. Um so we can

1:13:20 make clear that this that there's a

1:13:23 difference between an open position and

1:13:25 a position that's being considered for

1:13:26 reappoint.

1:13:28 So um

1:13:31 right then the the vacancy is right just

1:13:33 to spell out that someone has stepped

1:13:36 down early. It is a vacancy. we are

1:13:37 filling it not on the normal calendar

1:13:39 time that we are thinking about based on

1:13:42 when the person has stepped down. Um and

1:13:45 then reappoint we are I I don't actually

1:13:48 know that we have put this in here but

1:13:50 we are trying to make it sort of at the

1:13:53 same time each year right

1:13:55 hopefully yes um and that brings us to a

1:13:57 question of well reappointments if

1:13:59 someone misses the August 31st deadline

1:14:01 that you have set in one of your prior

1:14:03 meetings is that now considered a vacant

1:14:06 position and then that person who maybe

1:14:08 re reapplied three or four weeks later

1:14:11 are they now a new candidate do you want

1:14:12 to reinter

1:14:16 I think that's that's I'm sorry. Go

1:14:18 ahead.

1:14:18 Isn't Isn't interviewing at the

1:14:20 discretion of the chair anyway? So, do

1:14:23 we have to make a rule about that?

1:14:25 No, I just would like for my purposes in

1:14:28 scheduling. I have a couple of reappoint

1:14:30 applicants who missed the deadline. Do

1:14:31 you want to interview them or put them

1:14:33 on for reappoint? Because are they now

1:14:36 considered new applicants? So I

1:14:38 personally would like when when the vote

1:14:41 happens to not have separate categories

1:14:43 of reappoint and appointments um to have

1:14:46 one conversation. So just to take one

1:14:48 example from what happened previously,

1:14:50 we were voting on candidates for parks

1:14:54 and wreck for reappoint. Two of the

1:14:55 three put in for reappoint. Um and we

1:14:58 voted on them in a separate meeting and

1:15:00 then we just had the special meeting to

1:15:02 fill the third of those seats. I would

1:15:04 much prefer going forward to say we have

1:15:09 what would have been uh six candidates

1:15:15 these are incumbents and so we know them

1:15:17 and you have a little more familiarity

1:15:19 with them but then the comation becomes

1:15:21 which of those six get appointed to

1:15:23 those three seats um with the knowledge

1:15:26 it's sort of like it's an incumbent star

1:15:28 in the discussion as opposed to a

1:15:41 not going to be rubber stamping

1:15:42 incumbents in the future, which is not

1:15:44 to say they won't have an advantage. Uh

1:15:46 but if we're not going to be rubber

1:15:47 stamped

AI-touched surfaces are labeled; verify against the official record. The tape is embedded from YouTube, never rehosted.