Select Board Work Session Pt. 1 - September 16, 2026
words this meeting uses Select Board · affordable housing trust · executive session · Town Administrator · Chapter 40B · fiscal year (FY) — the glossary says what they mean
tap to load the tape · nothing plays until you dothe same, as a table
| time | kind | the moment |
|---|---|---|
| 1:59 | decision | Anthony, yes. |
| 2:20 | decision | I do the same thing at town meeting. I always vote no to journ. |
| 4:52 | pushback | those six police officers out of those six police officers that were approving for higher requests. Um, what is the… |
| 7:51 | decision | I had ahead. |
| 8:07 | pushback | All right. So I move approval of 3A be the minutes from September 2026 subject to the amendments opposed by Michael… |
| 8:16 | decision | And I also vote yes. |
| 18:31 | decision | 10 dozen odd years at HUD, she also had direct experience um with this particular kind of project financing and you're… |
| 22:22 | decision | to induce the state through wind. They can present this as the town being a serious player here so that we can get… |
| 23:01 | pushback | hear some more from I think Amy next and then Michael remotely and Dwayne will be be giving you their formal… |
| 39:06 | decision | There's one of the main questions is does the town is the town offering matching funds? And that's why we're here and… |
| 41:35 | pushback | would like you know have things that are beyond their useful life and would like them replaced or committed to working… |
| 41:59 | pushback | Yeah. Um I thank you for also touching Village Way. I know there's a lot of folks in the community that are very… |
| 47:53 | pushback | not be a relationship that we're we're a part of and and I think that MOA is is um is sufficient with respect to that… |
| 48:24 | decision | And so this would be upon our approval that 4 million would be depleted immediately or how does that work? |
| 1:00:01 | decision | negotiations that have happened to extend some affordability protections to the village because I think it's it's… |
| 1:00:44 | decision | intent of affordability protections for the village are not going to go away with whatever negotiations and the MLA are… |
| 1:04:24 | decision | All right. So with that, I think we may be prepared to take a series of votes. |
| 7:12 | money | $3,000 — said 2 times |
| 7:23 | money | $3,000 — said 1 time |
| 15:30 | money | $4 million — said 3 times |
| 16:02 | money | $35,000 — said 1 time |
| 19:44 | money | $5 million — said 1 time |
| 24:47 | money | $4 — said 2 times |
| 33:40 | money | $10 million — said 1 time |
| 34:21 | money | $10.5 million — said 1 time |
Cut from the analyzer’s scored moments — a measurement, not a choice made for you. Open a reel and press make this reel yours to re-cut it; tick any moment or transcript line below to cut your own.
The Select Board voted to enter executive session [1:27] before reviewing miscellaneous agenda items [2:30]. The board discussed a lease agreement with KS State Bank [2:58], vehicle safety features [3:28], police staffing for traffic management [4:34], and a fire chief employment contract adjustment [5:45] before approving meeting minutes [8:04] and agenda items 3B through 3L in an omnibus vote [8:22]. Representatives then presented a plan to extend affordability and perform renovations at 99 Kent Street [8:35], requesting $4 million from town housing funds [15:30]. The board voted to approve the trust fund allocation [1:06:42], authorize state grant applications [1:07:17], and acknowledge a commitment letter regarding unit renovations and tenant protections [1:07:38]. Finally, the board reviewed proposed updates to the public bodies handbook concerning vacancy procedures and appointment scheduling [1:10:18].
What it means: The board entered executive session to discuss real property lease terms [1:27]-[1:42]. In open session, the board reviewed routine business, including a 1.26 million dollar equipment lease agreement with KS State Bank [2:58]-[3:05], a fire chief contract adjustment to achieve salary parity with the police chief [5:45]-[6:23], and a 3,000 dollar grant item [7:12]-[7:22]. The main topic of the session was a proposed 4 million dollar commitment from the town's Affordable Housing Trust Fund to secure a 99-year extension of affordability for 115 senior housing units at 99 Kent Street [15:30]-[16:14], alongside building rehabilitations and electrification upgrades presented by developer Win Companies [33:33]-[35:16].
Who moved it: An unidentified speaker moved to enter executive session [1:48], which passed with roll call yes votes from Bernard [1:54], Michael [1:55], Amanda [1:56], Anthony [1:58], and the chair [1:59]. September meeting minutes were approved by Michael [8:10], Michael [8:13], Amanda [8:14], Anthony [8:15], and the chair [8:16], followed by an omnibus vote approving items 3B through 3L [8:22]-[8:30]. The transcript does not explicitly name the board member who introduced the text of the motion to authorize the 4 million dollar trust fund allocation [1:06:42], but the motion passed with yes votes from Bernard [1:07:11], Michael [1:07:12], Amanda [1:07:13], the chair [1:07:16], and Anthony [1:09:38]. Subsequent votes to authorize state grant applications and acknowledge Win's commitment letter passed with matching support from Bernard [1:07:33]-[1:07:50], Michael [1:07:34]-[1:07:52], Amanda [1:07:35]-[1:07:53], the chair [1:07:36]-[1:07:54], and Anthony [1:09:46]-[1:09:56].
What to watch: The developer plans to submit its state funding pre-application by September 24th [38:46]-[38:51], with willingness to reapply in up to four future rounds if state tax credits are not granted immediately [50:21]-[50:46]. Town officials and legal counsel will continue finalizing the specific language of the memorandum of agreement with Win to address resident protections and potential housing assistance voucher lapses [45:06]-[46:38], [1:04:33]-[1:06:18]. Additionally, the board will continue reviewing proposed changes to the public bodies handbook concerning vacancy advertising schedules and incumbent reappointment protocols [11:10]-[11:58], [13:20]-[14:16].
Scored, not chosen for you — the salience bar is a measurement, and every moment is a receipt into the transcript below. With JavaScript on, tick moments to compose a reel — and tick moments on other meetings too; a reel can span the record.
→ the publish kit for this meeting — the clips worth cutting and draft copy, for a producer.
Counted, not modeled — each lens is a word list; drift compares the first half to the second.
the same, as a table
| word | mentions |
|---|---|
| units | 55 |
| project | 41 |
| housing | 30 |
| affordable | 30 |
| million | 26 |
| years | 25 |
| still | 21 |
| sure | 20 |
| michael | 20 |
| back | 19 |
| affordability | 19 |
| state | 17 |
| process | 16 |
| little | 16 |
| kent | 16 |
| street | 15 |
| tenants | 15 |
| funds | 15 |
| income | 15 |
| moa | 14 |
| select | 13 |
| funding | 13 |
| market | 13 |
| rent | 13 |
| property | 12 |
| community | 12 |
| contract | 12 |
| terms | 12 |
| roger | 12 |
| village | 12 |
| able | 12 |
| building | 12 |
| move | 11 |
| basically | 11 |
| trust | 11 |
| committed | 11 |
| mentioned | 10 |
| part | 10 |
| unit | 10 |
| lease | 9 |
| bernard | 9 |
| sorry | 9 |
| important | 9 |
| police | 9 |
| obviously | 9 |
| take | 9 |
| goal | 9 |
| director | 9 |
| wind | 9 |
| great | 9 |
| application | 9 |
| number | 8 |
| first | 8 |
| executive | 8 |
| regarding | 8 |
| chief | 8 |
| win | 8 |
| point | 8 |
| presentation | 8 |
| brooklyn | 8 |
“units” came up 55 times. Sized by how often; civic stopwords out. With JavaScript off, a word opens the tape at its first mention.
0:02 You should
0:05 not say
0:07 well said.
0:08 So I have the meeting here.
0:12 Let me join the Zoom and I can at least
0:14 tell you if your window is turning
0:16 green.
0:17 Okay. Um,
0:28 I turned to not be on the internet.
0:30 Does my speaker need to be off or on?
0:33 I have this set as the microphone.
0:35 Yep. Um, your speaker should be on and
0:38 you want it to be set to probably set it
0:40 to Apple as well.
0:46 text me that the phone number so we have
0:48 it on record somewhere
0:56 out.
1:00 So yeah, so actually it was coming out
1:02 of the TV which is fine. So um am I
1:06 seeing it looks like it's picking up
1:08 close caption.
1:09 It's Yes.
1:11 It was here for sure.
1:15 And we are recording. So,
1:17 all right. Good morning everyone.
1:19 Welcome to our select board workshop. It
1:22 is Tuesday, September 15th. And now,
1:25 first item of business will be the
1:27 question of entering into executive
1:29 session for the purpose stated in item
1:32 two, which is an executive session
1:35 pursuant to general law chapter 30A 21
1:38 A6. Purpose six, for the purpose of
1:41 considering the purchase, exchange,
1:42 lease, or value of real property,
1:45 specifically the Coolage Corner Theater.
1:48 So, I will go ahead and move that we
1:50 enter into executive session for that.
1:54 Bernard,
1:54 yes.
1:55 Michael,
1:56 yes.
1:56 Amanda,
1:57 yes.
1:58 Anthony,
1:58 yes.
1:59 And I also vote yes. We will of course
2:01 be reconvening in open session once we
2:04 conclude our executive session.
2:07 How good morning?
2:09 So you want everything that we do to be
2:11 secret and executive special.
2:13 I just like hanging out with you guys.
2:14 That's just it's start. It's no
2:16 accident.
2:19 I do the same thing at town meeting. I
2:20 always vote no to journ.
2:27 All right. Welcome. We are now back and
2:30 we will proceed with agenda item number
2:32 three miscellaneous items. approval of
2:35 miscellaneous items or licenses and
2:38 contracts. Do any board members have
2:41 questions regarding items any items in
2:44 3A through 3L?
2:47 Could you separate the minutes because I
2:49 was not here?
2:50 Sure.
2:51 I have questions on
2:55 3C.
2:56 All right. So question of approving a
2:58 lease agreement with KS State Bank for
3:02 five dump trucks and one excavator in
3:05 the amount of 1.26 million approximately
3:08 be paid over two years. Who can talk
3:10 about that?
3:14 Oh sorry the dump trucks dump item.
3:17 So we've asked TPW for some information
3:20 around um purchasing believes that uh oh
3:22 here we go here just coming in now.
3:25 breaking
3:28 side guards are installed on the
3:29 infiltrate jiggles. Um they're still
3:31 trying to get more answers from you. Um
3:34 they're in a meeting right now, but
3:35 we'll we'll follow up with you after.
3:37 Perfect. Uh just to give some context, I
3:40 asked a question because in our vision
3:42 zero action plan, there are three items
3:44 related to safety of vehicles, including
3:47 retrofitting municipal vehicles with
3:49 intelligent speed assistant technology.
3:51 basically using GPS to make sure they
3:54 travel the speed limit. The second one
3:56 is making sure that um they either have
3:59 direct vision or install counter
4:01 measures to improve vision. Um and the
4:04 third one is um countermeasures to
4:07 counteract blind spots as well as side
4:10 guards which are actually really
4:11 important for uh problematic
4:13 interactions with pedestrians and
4:15 cyclists so that uh particularly
4:17 cyclists don't get pulled under the
4:19 trucks. Um, so I wanted to make sure
4:21 that if we are getting new trucks that
4:23 they are complying with our efficient
4:25 zero action steps.
4:28 Yeah.
4:29 I had one for 3G. I had a question. Um,
4:32 those six police officers out of those
4:34 six police officers that were approving
4:36 for higher requests. Um, what is the
4:38 impact on traffic um, management? Well,
4:42 as you know, as as with anything, right,
4:44 when we have more officers means the
4:46 more opportunity for people to be on the
4:48 street, more, you know, prioritization,
4:50 right? The police have to prioritize,
4:52 you know, um, you know, emergency
4:54 response and so forth to lose that
4:55 hierarchy. I will say that I went to the
4:58 swearing in of a couple of laterals last
5:00 week and the chief made special
5:02 reference at that at that uh at that uh
5:06 process to the fact that there's a real
5:08 push for traffic enforcement and that
5:10 that's where they're going to be
5:11 assigned for a lot of the work. So it's
5:14 um you know every every person
5:16 contributes to that and you know the
5:18 message that the police department is
5:19 receiving from the community is very
5:21 clear. Can we make can we make a note of
5:24 trying to track the number of traffic
5:25 violations and kind of I I'm sure we do
5:27 somewhere obviously, but I just want to
5:28 make sure that we talk about that later
5:30 down the line.
5:30 Sure. I mean, yeah, Sergeant um Sergeant
5:32 Johan has that information and we can
5:34 make sure that that that gets to you.
5:35 Yeah, I want the public to know about
5:36 that.
5:37 Yeah, they'll know when we talk about
5:39 the Warren article that too.
5:41 I have a question regarding 3 L into the
5:45 fire chief employment contract.
5:47 Sure. Uh and again it's not because I'm
5:49 substantively opposed but I'm just
5:50 curious in terms of process. Do we
5:54 regularly revise contracts midstream?
5:56 This is uh this is a little different uh
5:59 than usual but it's because um the
6:01 police and fire contract the so you have
6:04 three contract you have three contract
6:05 employees which me the police chief and
6:07 the fire chief. Um the police chief's
6:10 contract was updated most recently and
6:13 provided a substantial raise and as and
6:15 previously the police and fire chiefs
6:17 had been in parody. They were making
6:18 roughly the same amount of money and so
6:19 this is this is a an adjustment to
6:21 ensure that the fire chief remains
6:23 imperative with the police chief. Okay,
6:26 um back to 3G, you mentioned that
6:30 there's a swearing in recently. Were we
6:32 notified of that?
6:33 Uh the chief should have emailed you. I
6:36 will double check to make sure she did
6:37 not. I may have missed it, but you know
6:39 you used to be that we would Yes. attend
6:41 those sessions or swearing swearings in.
6:44 Yes. And to be clear, I'm not throwing
6:47 the chief under the bus. There must have
6:49 been miscommunication from our office.
6:51 So, we will we will figure that out. My
6:52 fault.
6:53 Um I just want to make a note in item 3B
6:55 it says questions accepting a gift or a
6:57 grant. Um I believe we typically have
6:59 the amount existed grant in the agenda
7:02 item. So, we just want to make sure that
7:04 that's recorded. Um, as far as the
7:07 minutes,
7:08 it is Oh, well, in the explanation of
7:12 the bookmarks, $3,000
7:15 gift,
7:17 right? Is it It's just not in the item
7:20 itself.
7:22 Yeah. Sorry. So, yes, 3B is $3,000.
7:25 Yeah.
7:29 Why don't we revise
7:31 agenda item 3B to reflect that? So
7:34 question 17 gift for grants in the
7:35 amount of $3,000 pursuant to GL chapter
7:38 44 except we'll amend that.
7:43 All right. Any other questions?
7:45 3A through 3 L and we will take 3A
7:48 separately.
7:50 All right.
7:50 I had ahead.
7:51 I had some amendments that I sent you
7:54 email sent
7:57 regarding minutes.
7:58 Regarding minutes.
7:59 Okay.
7:59 All right. So I move approval of 3A be
8:04 the minutes from September 2026
8:07 subject to the amendments opposed by
8:10 Michael
8:11 Bernard.
8:13 Michael
8:14 yes.
8:14 Amanda
8:15 yes.
8:15 Anthony
8:16 yes.
8:16 And I also vote yes.
8:19 Now items 3B. I move that we approve
8:22 items 3B through 3L in omnibus fashion.
8:26 Bernard.
8:26 Yes.
8:27 Michael.
8:28 Yes.
8:28 Amanda.
8:29 Yes. Anthony,
8:30 yes.
8:30 And I also vote yes. Well, that brings
8:33 us to item number four, discussion and
8:35 potential votes related to the
8:37 rehabilitation and affordability of
8:39 homes at 99 Kent Street as favorably
8:42 recommended by the Housing Advisory
8:45 Board as well as other related items.
8:50 So, um I'm Amy. Uh nice to see you all
8:55 again. Roger Blood um is should be here
9:00 any minute. He was going to kick this
9:01 agenda item off um if you'd like to wait
9:04 for him for a few minutes or I can um
9:08 fill in. We have a couple of guests with
9:10 us. We have Gilbert Win. Um and I'm
9:14 going to butcher your last name, I'm
9:15 afraid. Lauren,
9:16 I don't mind. Kafari
9:18 Kafari.
9:20 Well, what we can what we can do, we
9:21 have items 4 A through 4E. So, were one
9:24 of you going to be presenting
9:27 one of those additional items for B
9:29 through 4? And we can jump in with one
9:30 of those.
9:31 I think
9:32 he's here.
9:33 Oh, there he is.
9:37 Oh my go
9:45 get to that point.
9:52 We also have um Michael Alfren on Zoom
9:56 with us from a train on his way to New
9:59 York City
10:01 to help out with this presentation.
10:07 Gina said let's dive in.
10:09 Oh, I thought I was
10:14 good morning everybody.
10:16 Good morning. Um I'm Gerald the advisory
10:20 board and um I'm going to lead off
10:25 several presentations
10:27 regarding the u the expiry use situation
10:30 we have. Um the uh the general problem
10:34 challenge that that we face is um a
10:38 number of projects including the one
10:39 we're talking about here were financed
10:42 decades ago um under perhaps an illvised
10:46 uh structure whereby uh the
10:49 affordability of the units was tied to
10:51 the terms of the financing and um these
10:55 terms have now reached a point where
10:57 they're expiring and tenants are at risk
11:00 of um losing their affordability. Many
11:03 of them in this project if um uh terms
11:07 can't be uh achieved that um will
11:10 successfully
11:11 substantially extend the affordability
11:14 terms um in the in the project.
11:17 What we have here is probably the
11:19 largest such situation in the pine. Um,
11:23 originally a single property now divided
11:26 into two uh 99 Kent Street um in the in
11:31 the village and north of the TRAS with
11:33 um 117
11:36 all affordable senior uh dwelling units.
11:39 And then um on the south of the TA
11:42 tracks um of village way there was a
11:45 Brook line with uh 193 family affordable
11:49 units and uh straddling the two
11:52 properties um a large uh uh parking
11:55 garage um serving the property um under
11:58 a long-term air rights lease uh with the
12:01 uh with the T. Um
12:04 our um the objective here uh is to uh
12:08 both extend the affordability and um
12:11 also renovate and upgrade the property
12:13 so that they will um physically uh be in
12:18 uh top shape to uh to serve the tenants
12:21 over the uh extended affordability term.
12:24 Um our our goal um from the town's
12:28 perspective in addition to these two um
12:31 general objectives is to optimize uh the
12:34 town's investment um in this project.
12:37 Our our piece uh uh as as with so many
12:40 other affordable housing trust
12:42 investments um isn't the biggest piece,
12:45 but it's the you might think of it as
12:47 the last one in and what makes
12:48 everything else possible and draws other
12:51 resources that are that are critically
12:52 needed. Um very quickly um the uh the
12:57 participants in in this and the process
12:59 itself uh has involved um um a a
13:05 negotiating committee on the on the part
13:07 of the town at the executive level uh
13:10 that uh began um it its meetings last
13:13 April. So, it's been going on for some
13:15 time and periodic uh uh executive
13:18 sessions uh that have included our town
13:21 administrator uh Bernard Green from the
13:23 select board uh town council um uh the
13:28 planning uh director, planning
13:30 department director and um uh assistant
13:33 uh director for housing and community
13:35 development uh and and uh and myself
13:38 from from the HAB. Um
13:42 the um the HAB is uh has been another um
13:45 participant in this uh not just myself
13:48 on the negotiating committee by all
13:50 means but um of the uh the entire AB um
13:54 itself I'll come in a little bit further
13:56 about that in a moment but other other
13:58 critical players we were fortunate to
14:00 have been able to secure uh a very
14:03 capable consultant Michael Alpring I
14:05 think you all know is now an independent
14:08 consultant and he has proven to be
14:12 critically helpful not only from from
14:14 his knowledge and experience but in his
14:17 positioning in this process uh as an
14:20 intermediary between the town and and
14:22 win as those negotiations have have
14:25 continued. Um then the other uh major
14:28 player of course is is players are is is
14:31 when uh the development owner operator
14:33 of the project since its uh original
14:35 construction many many decades ago. uh
14:38 and um this the Commonwealth of the OLC
14:42 um being another major player. While
14:44 this is a a negotiation that involves
14:47 three critical parties, uh in a sense
14:50 it's not a three-way negotiation. Um u
14:53 the way this is structured is that um
14:57 the town is negotiating with with wind
15:00 at at our our local level and uh at the
15:03 same time win it has the relationship
15:05 and negotiating um responsibility with
15:08 uh with the with the commonwealth.
15:11 Um
15:13 the um the HAV's role in this um our our
15:18 formal role is a bit narrower than the
15:21 than the broader informal role. We are
15:23 here to recommend um as trustees of the
15:26 town's housing trust a um uh what what
15:30 has ended up being a $4 million uh
15:32 investment specifically for one of the
15:36 two project components which is the
15:38 senior housing at 99 Kent Street. Um uh
15:42 one way of looking at that investment of
15:44 $4 million as it applies to um uh
15:47 basically 115 of the 117 senior housing
15:50 units there uh and and have
15:54 instinctively looks at almost everything
15:56 we invest from the trust on a per unit
15:59 basis. Uh that comes out to um about
16:02 $35,000
16:04 per unit of the 115 units for uh what
16:07 we're proposing. uh it's called
16:09 perpetual but it's a basically a 99-year
16:12 extension of the affordability
16:14 provisions um of the units on that
16:16 component of the project. Um they have
16:21 um as a as a public body um and our
16:25 meetings have been uh basically a part
16:27 of the public process but I want to
16:29 emphasize um that the HAB's role has
16:32 been um more extensive than that. Um we
16:36 we have been fortunate to bring to the
16:38 table uh this is a very complex project
16:42 perhaps even more so than some of the
16:44 new developments. Um the H have a a a
16:47 range of skill sets and experience and
16:49 in this uh current situation we're
16:51 fortunate to have had uh three members
16:54 and now four which who have direct uh
16:57 experience with this unique kind of um
17:01 financing and refinancing uh under under
17:04 expiring use terms. Um so the process
17:08 that we set up to uh to to try to
17:11 optimize uh the the HAB's um role of
17:15 this was to open up a line of commun a
17:18 continuing iterative line of
17:20 communication between those uh the three
17:23 active HAB members Jonathan Klein Pam
17:26 Goodman and Carol Gladstone where they
17:29 could communicate back and forth uh
17:31 directly with our consultant who could
17:33 then take their combined expertise piece
17:36 on a Q&A basis, you know, continuing and
17:39 add that to the negotiating process that
17:42 um that that Michael Alurn was was doing
17:45 uh directly with wind. This this proved
17:47 to be very helpful. Um uh I I myself
17:51 added a little bit to that, but not
17:53 having the direct professional
17:55 experience that I have was very well
17:57 structured to uh to set things up this
18:00 way. And then we were um we were
18:02 fortunate to have um Amy Upast join the
18:06 process from the staff um because with
18:09 her
18:11 10 dozen odd years at HUD, she also had
18:13 direct experience um with this
18:16 particular kind of project financing and
18:17 you're going to hear from her
18:19 immediately following myself. Um the um
18:23 the um the end result of what we're
18:27 recommending to the select board uh and
18:29 and I know you've seen the details in in
18:31 your packet is both the HABs vote and
18:34 then the that folded into the the
18:36 memorandum of agreement which uh which
18:38 is a longer detailed legal document that
18:40 you're you're
18:43 looking at executing. Um the the uh the
18:48 financing gap uh that began last spring
18:51 u as brought to us with wind and their
18:54 detailed numbers showed uh around 6 and
18:57 a half million that potentially could be
19:00 called upon the town if we were to close
19:02 the entire gap. Um
19:05 early on in the process that that number
19:08 was able to be reduced uh without an
19:10 awful lot of difficulty to five million
19:13 of when took on some more of its own
19:17 some of the line items that the
19:19 developer fee deferral uh a a seller
19:22 note which is functionally equivalent um
19:25 but a separate line item that they were
19:27 able to uh to to to make a little bit
19:30 more attractive. So we we were at 5
19:32 million and then um question being how
19:35 did we get to four? Uh that that aspect
19:39 was was a little bit different. Um and
19:41 the way that was done um when there was
19:44 a $5 million uh um investment that we
19:47 were contemplating. Um it it um it was
19:51 in the form of uh the town uh loaning at
19:54 at a a positive rate of interest for
19:58 repayment at the end of of a loan term
20:01 and the the the town's money being put
20:04 in uh to a considerable extent at the
20:08 closing, some upfront and some at the
20:10 closing. The way the additional million
20:11 dollar reduction was achieved was um
20:15 advancing the timing of the of the
20:17 funds. So that you you'll see in in the
20:20 proposed terms now 95% of the funds can
20:23 be put in at the closing with only a 5%
20:27 uh hold back. Um and um instead of uh us
20:32 relying on uh like with with a a loan or
20:36 a mortgage repayment terms with an
20:38 interest uh applied and acrewing the the
20:41 terms that are being proposed now and
20:43 these are quite similar to other new
20:45 projects that we do. there's a 0%
20:48 interest and the um the 4 million will
20:51 be due at least on paper uh after 45
20:54 years but um that that will possibly be
20:57 re renegotiated um on village at
21:00 Brooklyn our role is more informal since
21:03 there's no trust fund money um we uh we
21:06 have appined and and been very
21:08 interested in the way that the terms of
21:09 that that extend extended affordability
21:12 has been negotiated
21:14 um it it didn't it didn't make everybody
21:17 totally thrilled at the end of the day,
21:18 but you know what they say about about
21:21 bad deals that if not everybody's
21:23 entirely happy, it's a sign that
21:25 probably it's as good as anybody is
21:26 going to get. Um and then on the timing
21:30 um which I think you you'll hear more
21:32 about from from others including Michael
21:35 um that it it we there's a preliminary
21:38 um commitment from the select board and
21:40 and again with new projects we do
21:42 something very similar a two-step
21:43 process with you all where we're asking
21:46 for it and you would be executing now a
21:48 preliminary commitment. The function of
21:50 that is that the state, this is
21:52 critical, needs to see some assurance
21:55 that the locality, us are really
21:58 stepping up with some significant funds
22:01 to induce the state through wind. They
22:04 can present this as the town being a
22:06 serious player here so that we can get
22:09 priority for the funding. We know
22:11 there's annual rounds and possibly
22:13 semianual
22:14 uh and and get this done early. And the
22:17 timing has been moved up so that your
22:19 schedule now is rather tight. You're
22:21 going to meet today, I think, and maybe
22:22 one more time soon so that you can vote
22:25 in time for when to get in the um under
22:29 the late September deadline for the
22:31 so-called preliminary preliminary round.
22:34 And so with that, I hope it's not too
22:36 detailed and because you're going to
22:38 hear some more from I think Amy next and
22:40 then Michael remotely and Dwayne will be
22:42 be giving you their formal presentation
22:44 after that and I'll come back and then
22:47 ask for you to vote which we'll have a
22:48 look at for you before you see it and we
22:51 may or may not vote today but you'll see
22:53 what we're the details of what we're
22:55 offering. So,
22:56 would you like to go to Michael first if
22:59 possible while we have him just because
23:01 I'm concerned that we we may lose him on
23:03 his way on his travels. Um, Michael, can
23:06 you hear us?
23:12 He's muted.
23:24 should be able to
23:33 see if not
23:35 Amtrak Wi-Fi is not great.
24:09 it get my call.
24:12 Okay. All right.
24:19 So, I don't have a lot to add. Um Roger
24:21 did a very thorough job of of letting
24:24 you know how we got to where we are
24:25 today. Um, but I will say just echo what
24:29 he said about the town's commitment of
24:32 funds being very important to the
24:34 application process that when plans to
24:36 proceed with with the executive office
24:38 of housing liberal communities and um,
24:43 you know, we're hoping uh that our if
24:47 the town chooses to commit the $4
24:49 million that that will really make a
24:51 case to EOHLC that we're invested in
24:54 this project and We want to see it go
24:56 forward um because it's a very
24:58 competitive funding round. So, we want
25:00 to be able to help win get where they
25:02 need to be so that the application was
25:04 successful. Um I'd like to turn it over
25:07 to to Gilbert and Lauren right now to
25:10 give a presentation on the proposed
25:12 project at Kent Street. Um and I have
25:15 hard copies of people with
25:18 I'll give I promise I will make it.
25:21 Roger gave such a good introduction. I
25:23 feel like gave a presentation. So you
25:24 mean I put it up here?
25:26 Yeah.
25:26 Yeah. So way to do it is to join
25:28 Zoom and I'll make
25:29 Yeah. Is it the same thing to send a
25:32 package?
25:42 It's the same.
25:43 The same thing. The center packet.
25:45 Yes.
25:45 Okay. Okay.
25:46 If anyone would like a hard copy, if you
25:48 don't have one, I'll just
25:50 Yeah. on my uh on my phone's Wi-Fi. See
25:54 what the Wi-Fi is here?
25:56 Yeah.
25:57 Bernard's
26:01 I was told the number
26:06 617 730207.
26:15 Okay.
26:29 Oh,
26:42 we're going
26:44 to talk to us.
26:56 Um,
27:00 so Michael came back.
27:08 Michael, are you back?
27:09 I I am. I apologize for the spotty
27:12 internet.
27:13 I am. I apologize for the spotty
27:14 internet. can write some notes in the
27:16 chat to the slide if helpful.
27:21 Yeah, we're having we're having trouble
27:22 hearing him in the room.
27:23 Is there a volume issue on our
27:25 No,
27:31 there.
27:31 Yeah. Also, his
27:32 Oh, he's still muted. Yeah, I see. Oh,
27:34 we're getting the caption. I see
27:35 unmuted for a moment, but his window
27:37 never turned green. So, we've never
27:40 Yeah, looks like it's
27:41 I'm trying. I will write notes in the
27:43 chat for you. Sorry for the spotty
27:44 internet.
27:45 Nobody's in the way.
27:47 Okay, she's got to turn.
27:52 Why don't we continue with your
27:53 presentation in the meantime? And if
27:54 Michael can join us, you can jump in.
27:56 Okay, great. And I am joining right this
28:00 moment. It says
28:08 okay record.
28:14 Okay.
28:17 So
28:19 sure
28:42 beginning.
28:47 All right, I'm going to make this very
28:48 quick because I feel like Roger did a
28:50 great job introing us. Um, but thank you
28:53 all for having us here today. Um, Lauren
28:56 Canopari, senior project director at Win
28:58 and Gilbert Wyn, CEO of Wind Companies.
29:01 Um, here to talk about 99 Kent Street.
29:04 So,
29:06 I have a few slides about Win. I'm not
29:08 going to bore you guys with information
29:10 about us. Um, you know, we manage more
29:14 than 100,000 apartment homes in 25
29:16 states. Um, been around for 53 years.
29:21 Um, our development team is in 12 states
29:24 in the District of Columbia. Um, you
29:26 know, obviously our our focus is we do a
29:29 lot of work in Massachusetts and, um,
29:31 you know, we've been at 99 Kemp Street.
29:34 Um, you know, we last rehabed the
29:36 project in in 1997, 1998. Um, and you
29:42 know, we're we're a proud owner operator
29:45 um throughout throughout the East Coast
29:47 and um you know, obviously with a big
29:50 focus on on affordable and workforce
29:52 housing. Um this is our team working on
29:54 the project. um Gilmer W and myself
29:58 um Jotif who's our divisional vice
30:01 president of Gwen Residential um who
30:03 actually was the property manager at um
30:08 Villages Brooklyn
30:10 about 20 something years ago and is
30:12 still with WIN um and still oversees the
30:15 the region. Um Trevor who's our wind
30:17 communities and myself and Marcel who's
30:20 our assistant project director. So, I
30:22 think the important thing to talk about
30:24 is why why are we here today, right? Um,
30:26 as Roger mentioned, we are applying to
30:28 EOHLC
30:30 um for funding to rehab the 99 Kent
30:33 Street project. Um, pre-applications are
30:35 due September 24th with the full
30:37 application due in December. So, what do
30:40 we need to show for our December 24th
30:43 preapp? really to make it um competitive
30:46 um we need to show strong town support
30:50 um including matching funds um you know
30:52 to be invited back to do a
30:53 pre-application and hopefully get
30:55 funding for the project. It's it's a as
30:57 Amy says extremely competitive uh
31:00 process and you know we think we think
31:03 99 Kent Street is is a really compelling
31:06 case for that. Um, you know, the other
31:08 items we want to talk about aside from
31:10 the funding, um, is, you know, a a
31:13 resoning to reduce parking requirements
31:15 on site and help with extending, um, our
31:18 MVTA air rights lease. As you can see,
31:21 um, from this picture, there's um, you
31:24 know, we are built, our parking garage
31:27 and community space is built on top of
31:28 the train tracks, and we have a a
31:31 99-year lease that expires in um, 2075.
31:36 So 99 Kent Street, this is the um
31:39 elderly, you know, 55 plus restricted
31:42 117 unit building um at 99 Kent Street
31:46 um built in 1975. It's been 28 years
31:50 since the last renovation and our our
31:52 affordability expires in in 2027.
31:56 So as Roger said, I think the priority
31:58 of of the town and when and the state
32:00 hopefully our compelling argument is
32:02 affordability is expiring next year.
32:04 want to extend it and we've committed to
32:05 do that for 99 years. Um so here's what
32:08 the project looks like. Um you know it's
32:13 the tenants really have a lot of pride
32:15 in it, take great care of it. Um you
32:17 know this is kind of the community space
32:20 and the greenhouse as is uh and what
32:24 needs to be done. So, here's a unit
32:25 that's been renovated, but you know, our
32:27 goal as this for this project is to
32:30 really gut, you know, kitchens and
32:32 bathrooms, all new kitchens, all new
32:34 bathrooms. Um, this talks a little bit
32:37 about what we like to do. Plumbing,
32:38 fixtures, appliances, flooring,
32:39 lighting, thermostats. Um, the nine ADA
32:43 units, we would fully gut the entire
32:45 units to make them code accessible.
32:46 They're not up to current ADA codes. um
32:50 common area improvements. A big priority
32:52 for the site is offering services to the
32:55 senior residents. We have a pretty
32:57 extensive services program now. We'd
32:59 like to expand that um and improve the
33:02 community spaces to offer not only, you
33:05 know, better services, but also bring in
33:06 providers, nursing providers, meal
33:09 providers, things like that um for the
33:11 tenants. And then some exterior upgrades
33:13 to um sidewalks and landscaping and
33:16 things like that. So, um I know this has
33:20 all been previewed with you and you've
33:22 seen the presentation, but just to get a
33:23 little bit uh this rehab that we're
33:26 talking about today, um funding for is
33:30 really the second phase in a two-part um
33:33 rehabilitation. The first phase is a
33:35 deep energy retrofit that's starting at
33:37 the end of this year. Um and we have
33:40 already received over $10 million in
33:43 awards from DOE, MHP, and Massave. um in
33:48 order to do this. So, it's it's in
33:50 progress. It's starting probably the end
33:52 of this year or very beginning of next
33:54 year. And that will essentially be a
33:57 total reskinning of the exterior of the
33:59 building, new all new windows, um
34:03 upgrade to the electrical system, um new
34:05 HVAC system. Um so that's, you know, a
34:10 pretty big project. Um, so that's kind
34:13 of what we consider that's the exterior
34:15 project that's happening now to um make
34:18 the project more efficient. Um, and in
34:21 addition to that $10.5 million we've
34:23 been awarded, WIN is putting in um $7.2
34:27 million into the project to kind of
34:29 complete that. So this is this is a
34:31 pretty major project that's about to be
34:33 underway and then our rehab will come
34:34 in, do the interior of the units, kind
34:36 of marry the two projects together. I
34:39 know someone on the select board had a
34:41 question about um electrification of the
34:43 building. So the current um building has
34:46 gas powered boilers and heat. This will
34:50 essentially completely electrify the
34:52 building. So it will be um electric
34:55 heat, electric hot water. We are going
34:57 to maintain one backup
35:00 boiler that is gas powered that will be
35:03 supplemental for the building. So, not
35:05 used on a daily basis, but if something
35:06 fails, they will have a gas powered
35:08 backup. Um, but aside from that, it'll
35:11 be essentially a full electrification
35:13 um of the building. And this is how the
35:16 beautiful new exterior um will look.
35:20 So, when we're talking about this um you
35:23 know, the the 99 Kent Street project
35:26 that we're applying for now, we're
35:27 applying for it as a twin deal. So, two
35:29 separate projects using both four and 9%
35:34 tax credits. And that's one of the way
35:36 Roger mentioned that we were able to
35:38 reduce our ask to the town um of
35:40 Brookline. But so, it's it's two
35:42 separate deals, but one building um and
35:46 additional funds, you know, the funds
35:48 we're applying for outside of um
35:55 outside of the Brooklyn funds. Um, you
35:59 know, we're applying for another $6.5
36:01 million of soft debt in addition to
36:03 large amounts of state tax credits, 4%
36:06 credits, 9% credits, and of course, um,
36:09 we're putting in our deferred developer
36:11 fee, some deferred developer fee, and
36:13 we're, as Roger mentioned, we're putting
36:15 in a seller note, um, back into the
36:17 project as well to make make this work
36:19 and be able to get all of the work done
36:21 that we want to do. Oh, one thing I also
36:24 wanted to mention, sorry, I'm not just
36:25 going to go back for one second. Um,
36:27 something that I missed on the scope of
36:28 improvements that we just added to the
36:30 scope is we're going to sprinkler the
36:32 building. So, the BR building doesn't
36:34 have any sprinklers right now. We're not
36:35 required to have any sprinklers. Um,
36:38 kind of as we've been talking about
36:40 this, it's an important like like life
36:43 health safety thing to add. So, that's
36:45 going to be another thing that's going
36:46 to be added as part of this
36:48 rehabilitation
36:49 hopefully. Um so you know here we have
36:52 the uses of the funds how the money is
36:54 being spent that you know the total CDC
36:56 is about total development cost about
36:58 $73 million for this project. Um I know
37:02 Roger mentioned 115 of the units will be
37:05 affordable. There's often a question of
37:07 why do we leave two units out? Um that's
37:11 because there are two units two tenants
37:14 currently at the property who are over
37:16 income. Um and we don't we are always
37:19 committed when we do these in place
37:21 rehabs not to lose any tenants as part
37:23 of that. So those two existing tenants
37:25 will stay those will become market units
37:27 so they can stay in their units and then
37:29 the other 115 units will become
37:31 affordable for 99 years.
37:34 Um so some of the challenges I mentioned
37:37 so of course this is an occupied rehab.
37:39 Tenants will stay in place during their
37:41 during construction of their units.
37:42 We'll have a place for them to go during
37:44 the day. Um and then the nine units that
37:47 are being completely got renovated,
37:50 bring them up to code. Those tenants
37:51 will be moved out. Um we have, you know,
37:54 we have a lot of experience doing this
37:55 and and um have a consultant that comes
37:58 and helps us and moves everybody and
38:00 make sure that everybody's safe and um
38:03 you know, taken care of during the
38:04 during the rehab. Um obviously being on
38:07 top of the train tracks makes things
38:09 complicated. We need help with an
38:11 extension to the air rights lease and um
38:15 you know we need some help with zoning
38:19 parking um a reduction in our parking
38:21 requirement. Um that will give us more
38:23 flexibility with the garage and you know
38:26 we've talked had some conversations
38:28 about uh entering into a partnership
38:30 with the town to lease spaces or you
38:33 know selling the garage and leasing
38:34 spaces back to us. Um, so that's
38:36 something we're still trying to figure
38:37 out to maybe have more funding and more
38:40 sources for the project. Um, so as Roger
38:43 mentioned, timeline, the real big thing
38:46 is this preapp is due September 24th.
38:49 There's one of the main questions is
38:51 does the town is the town offering
38:53 matching funds? And that's why we're
38:55 here and we really want to be able to
38:56 say yes because that's what makes a
38:57 project competitive given the amount of
39:00 resources we're asking for from the
39:01 state. So, the goal would be we apply
39:04 the full application in December, get
39:06 approved beginning of next year, and
39:08 close by the end of next year. Um, with
39:11 an 18-month construction schedule, we
39:14 would hopefully close in uh complete
39:16 construction mid 2029.
39:19 Um, I also just wanted to very quickly
39:22 touch on the villages of Brooklyn. So,
39:25 separate project, right? So that was my
39:28 I know Bernard this is one of Bernard's
39:29 comments was it was confusing the
39:31 presentation mixed everything together.
39:33 So everything I just talked about was 99
39:35 Kent Street. Now talking about villages
39:38 of Brookline what are we offering there?
39:41 This isn't the project that we're asking
39:43 for funding for but I know it's
39:45 obviously a concern because there's 193
39:48 families living there um as well. So
39:51 following the expiration of the of the
39:54 LITC restriction and extended 40T
39:56 protections um there are two red burden
40:00 households there. So we've been working
40:02 with these households to secure subsidy
40:05 for them um you know secure vouchers and
40:09 if we can't help them find a subsidy
40:11 then you know we have agreed to limit
40:14 their rent increases um for you know in
40:17 the year over year to the change in CPI
40:19 just 3%. So, we're um as long as people
40:22 are certifying their income, we're
40:24 keeping their units affordable and
40:26 making sure their rent burden households
40:28 aren't um you know losing their house
40:31 losing their housing or or being rent
40:33 burdened. Um we're also committing to
40:37 renovating um the affordable units of
40:40 Village Brooklyn over the next 5 years,
40:42 approximately 12 units per year. Um and
40:45 that's a pretty pretty um heavy scope of
40:48 renovation. includes new kitchens, um
40:51 appliances, bathrooms, painting floors,
40:54 um basically anything where we feel like
40:57 they've they're beyond their useful
40:59 life. You know, we have subtenants there
41:01 who have been in the same units for 30
41:02 years. They need new carpet, right? Or
41:05 they need carpet replaced for flooring.
41:07 Um so, you know, this is working
41:10 individually with each resident. every
41:12 unit is surveyed and you know if tenants
41:15 would like you know have things that are
41:17 beyond their useful life and would like
41:18 them replaced or committed to working
41:20 with them um or scope plan committing to
41:23 scope all units by the first of the year
41:26 um with approximately 12 units um
41:29 completed per year. So I just want to
41:32 touch on those two things at Village of
41:33 Brooklyn villages because I know there's
41:35 been a lot of questions and concern
41:38 about that property as well. So, I know
41:41 I went really quickly through that, but
41:43 um I think you're more important to take
41:45 questions and I hope that was a helpful
41:50 description. Go ahead.
41:52 Yes.
41:52 Yeah. Um I thank you for also touching
41:56 Village Way. I know there's a lot of
41:57 folks in the community that are very
41:59 concerned about the vacant use. Um, and
42:01 I know it is in the MOA, but I'm hoping
42:03 you can touch on it um for extending
42:07 this renewal of the housing assistant
42:09 payment contract with the BHA and what
42:11 the plans are for that.
42:13 Yes. So, that contract expires in 2044.
42:16 Um, and basically we're committed to
42:20 renewing that contract, right? um we you
42:23 know would like essentially we're
42:26 committed to keeping those units
42:27 affordable for 99 years. Um you know the
42:32 plan is to renew that contract. If it's
42:34 not renewed then you know our agreement
42:36 is to partner partner with the town
42:38 where we kind of you know contribute
42:41 half of the of the you know funding to
42:45 get there. the town contributes the
42:46 other half and we keep those units
42:48 affordable um at a similar level of
42:50 subsidy going.
42:53 So that's better.
42:54 And so with the combination of that and
42:57 the two additional
42:59 uh units that you talked about, the
43:01 assumption is that the affordability
43:04 uh that currently exists in village way
43:06 will continue.
43:09 The goal is the goal is for for the
43:12 units that are affordable to continue to
43:14 be affordable.
43:17 Thank you.
43:18 Anyone else with questions at this
43:20 juncture? Michael. Um so thank you for
43:22 uh answering the couple of questions
43:26 that I raised earlier about um the
43:29 current heating cooling source um and
43:32 the building being all all electric. Um,
43:34 one of the reasons why I I raise these
43:37 questions is because at some point over
43:40 time as we continue to transition off
43:42 gas, um,
43:45 having the town push for, um, basically
43:49 shutting down of gas pipelines, um, is
43:52 was a necessary part of that strategy.
43:56 Um, so I'm wondering when you say
43:57 there's a backup generator um that is
44:00 gas powered, is that utility supplied or
44:03 is that independently supplied at this
44:05 point? How do you enision how do you
44:07 envision that changing over potentially
44:09 changing over time?
44:10 I don't know. I mean it's so it is
44:12 utility supplied, right? Essentially
44:14 it's a you know a boiler a backup boiler
44:18 that will be utility supplied with gas.
44:20 Um, but I I mean we are constantly
44:24 this is obviously a conversation I think
44:26 we're having in a lot of places right
44:27 like electrification is the goal for and
44:30 I think that's
44:31 wind's goal you know we're going to all
44:33 electric when we're building new
44:34 properties um it's more complicated here
44:37 obviously part of this energy project is
44:39 upgrading the entire electrical system
44:40 to support all of this because it's not
44:42 as simple as just like changing it
44:44 um right so I think that's I think we're
44:46 we're moving towards that and I think
44:48 maybe
44:49 the next goal is getting off of of gas
44:52 alto together.
44:58 Anyone else?
45:00 Okay, continue.
45:02 Um, I just have a couple of things to
45:04 add. That was great. Thank you. Um, I
45:06 just wanted to say that the MOA that was
45:09 in your meeting packet is still evolving
45:12 a little bit. We're still going back and
45:13 forth between our legal council and
45:16 women's legal counsel. So, um, what you
45:19 have before you now will most likely
45:21 change a little bit. Um, but what Lauren
45:25 presented is the overall scope of that
45:28 agreement. And Lauren also mentioned a
45:30 letter um that when prepared for the
45:33 town that outlines um the some of the
45:39 things that they are um agreeing to do
45:42 at at the villages of Brookline, which
45:44 Lauren just talked about. So the
45:45 renovations and the rental protections
45:47 there for the tenants. Yeah. So those
45:49 yeah those are outlined in a kind of
45:51 side letter that commits says what we're
45:53 committed to that we will sign is
45:55 obviously part of this.
45:58 What are the issues that are still
45:59 outstanding in the MOA? Um there's some
46:03 language in the MOA that Wind's legal
46:06 council added that talks about uh the
46:09 town's
46:11 ongoing commitment to um
46:16 to what Lauren just described. And then
46:18 we also there's also some language that
46:21 talks about if the housing assistance
46:24 payment contract to renew the project
46:26 based vouchers isn't available, what
46:29 that will look like. Um, so we're still
46:32 going back and forth on that. So I don't
46:34 really want to delve into it um because
46:36 we haven't reached agreement on that
46:37 yet. But
46:38 yeah, I think it was that and I think it
46:39 was also
46:41 um you know we'd like like the town to
46:44 say that they'll support us, you know.
46:47 So just said we're here right now,
46:48 right? 30 years have gone by. The
46:50 project needs work done, you know. So,
46:54 our goal is that, you know, we we're
46:56 committed to keeping the project
46:57 affordable for 99 years, but we'd like
47:00 in 30 years from now, we'd like help,
47:02 you know, again, with the state and and
47:04 advocating for this project to be
47:06 renovated or rehabbed as needed. Um, so
47:09 there was just some language around
47:10 that, but um I think we're close. I
47:13 think it's, you know, kind of a little
47:15 bit of legal use going back and forth,
47:17 right? And apologies for not having that
47:19 completed.
47:20 Yeah, I think that should be tried. I I
47:22 did send you back another draft now.
47:24 Hopefully. Yeah. So hopefully it's
47:26 Well, my my concern has always been that
47:30 the relationship between and the tenants
47:32 not be a relationship that we're we're a
47:35 part of and and I think that MOA is is
47:39 um is sufficient with respect to that
47:42 that issue. I just want to make sure
47:44 that we're not sort of seeping into
47:47 No, and I think um I think you're
47:50 sensitive that
47:51 we are. I think that was and I think
47:53 that was a concern that the tenants
47:55 brought up that we were very sensitive
47:56 to that, you know, we're working with
47:58 the tenants association very closely
48:01 directly right now. So yeah, and I think
48:03 they don't want they don't want the town
48:05 to say something on their behalf, right?
48:07 They want their voices to be heard and
48:08 they so I think we've been working with
48:10 them pretty closely.
48:12 Any
48:15 other questions?
48:17 I have a question regarding the
48:18 affordable housing trust fund balance.
48:20 So this 4 million is that currently
48:22 sitting in the affordable housing trust
48:24 fund? Yes.
48:24 And so this would be upon our approval
48:26 that 4 million would be depleted
48:27 immediately or how does that work?
48:29 Um it would be um encumbered. So
48:32 effectively it would be not available
48:35 for anything else. And um the uh the
48:38 unencumbered trust fund balance is a
48:41 little bit north of at the moment at 6
48:43 million. So it would largely it would it
48:46 would not fully depleted but it would
48:48 largely depleted and our priority top
48:51 priority for the trust fund is to build
48:53 it up for the known other first priority
48:57 of walnut high phase two which likely
48:59 would be close to 10 million. So we're
49:02 starting with a very low base after we
49:04 commit this. But the actual
49:06 dispersement of our um encumbered $4
49:09 million would um as I mentioned briefly
49:12 now it's advanced but still only near
49:15 the point of um you know postclosing. Y
49:19 so that's still a little ways off. So
49:21 and so Melissa that uh free cash
49:24 waterfall gets a uh gets calculated
49:27 against the unencumbered.
49:29 Right.
49:29 Got it. And just one, Roger, you had
49:32 seen the updated balance. So I know
49:34 this, but um the waterfall payment from
49:36 the prior fiscal year or the one that
49:39 allocation that um just posted to the
49:42 trust recently, so we're we're up a
49:45 little bit above 7 million right now.
49:47 And once this is encumbered, it'll be a
49:49 three.
49:49 Okay.
49:50 Around.
49:50 Got it. Michael,
49:52 um you you had mentioned uh earlier
49:56 about the state the state grant being
49:59 competitive. Um and you know, obviously
50:02 we all want to do as much as we can in
50:04 order to make that happen. I'm wondering
50:06 what the contingency is. If for some
50:09 reason we don't get the state funding,
50:12 what happens to this project? Uh what
50:15 happens to the uh encumbered funds from
50:18 the town, etc.? Um yeah, that's a great
50:21 question. Um we're committed to reapply
50:24 as well. I think oftentimes what happens
50:26 is uh with competitive it's we're
50:30 qualified to receive these funds. So
50:32 it's more a question of what the
50:33 competition in that given year is. So we
50:35 would reapply and then we would reapply
50:37 again and then we reapply again. We're
50:39 basically we're committed to four rounds
50:42 of applications. And I I think as as
50:46 long as the town stays committed as it
50:48 is and helps us kind of prioritize the
50:51 lobby, I round should be sufficient to
50:54 get it done.
50:55 And that's that's a frequent occurrence
50:57 that
50:57 Yeah, that happens often to us where
50:59 Yeah. We But I apply,
51:02 right? For everybody. Yeah. But I feel
51:03 like often, you know, um especially when
51:06 we have support like this, it's not this
51:08 round, it's the next round.
51:11 Yeah.
51:12 So I I have a question regarding the uh
51:16 extension of 99 years for these units
51:18 being affordable. So 115 of the 117 will
51:24 uh receive that 99year extension because
51:26 two of the units the families currently
51:28 there do uh not meet the threshold. What
51:32 happens though if the same were to occur
51:36 for a family and one of the other 115?
51:39 Would they be asked to leave? would they
51:41 be extended a similar courtesy as to
51:45 um you're saying for this current I I'll
51:48 actually address your other question too
51:49 because interest the implication of the
51:51 other question will just be in the
51:52 future um so yeah if between today and
51:56 closing
51:57 um somebody else goes over income they
52:02 would be able to stay and the likelihood
52:04 is that they would even still qualify
52:06 for tax credits because they're able to
52:08 go up to I think 140% % of the area
52:11 median income without overqualifying.
52:14 Um so the likelihood so we implicit in
52:18 that would be to say we're not going to
52:19 rerand a vacant unit to a market ten.
52:22 So we won't have that issue. So it'll
52:24 just be the folks that are there if they
52:27 happen to go over income under the
52:28 grandfathering rules of the tax credit
52:30 program they would still be eligible and
52:33 still keep them affordable. The only
52:35 time they wouldn't be is if they go over
52:37 140% from their current 60% which is
52:40 pretty unlikely in the next six or seven
52:42 months
52:42 to get yeah be a big
52:45 a very big salary increase between now
52:47 and then for that to happen.
52:49 But but just I implicit in that was what
52:52 happens 30 years because we're going to
52:54 99 years. Um there there's federal rules
52:58 around that. So, let's say uh 30 years
53:01 from now we're going to do this again
53:04 and somebody is above 140%.
53:08 The federal rules allow that person to
53:10 stay as long as they wish. They're never
53:12 kicked out. It's just that the next
53:15 available unit always has to be
53:16 affordable.
53:18 So, like you can hypothetically have
53:21 less than all affordability, but every
53:22 time it payates you have to react.
53:25 So, once they move out, that unit would
53:26 be reacting. That's sort of how it all
53:28 works because I don't want to displace
53:29 them.
53:30 So I guess the the the other sort of
53:33 piece of this in terms of installation
53:35 is for those two units, those two units
53:38 are currently occupied by people who
53:40 have
53:42 um over income, right? So they have to
53:45 be market because they were income when
53:47 they moved in and then they've lived
53:48 there for so long.
53:49 No, actually those no those are
53:50 different. So those there were uh
53:53 certain units that were not encumbered
53:54 by affordability. That's right. And
53:56 those were starting in 2014. And those
53:58 two units that are over income were
54:00 rented as market rate units. That's
54:02 right.
54:02 Okay. So the so so if at some point
54:05 those people move out, those would
54:06 remain market rate units.
54:08 Yes. Correct.
54:10 And there's there is there any path that
54:13 would convert those two units to
54:15 affordable
54:16 at the next rehab?
54:18 Yeah, we could do I mean there's I would
54:20 say two paths. One would be at the, you
54:22 know, when we're sitting here 30 years
54:24 from now, we could have two. The other
54:26 more quick path would be to the extent
54:29 that that's important to the town, we
54:30 could enter into some negotiation of
54:33 what
54:34 town support and state support would be
54:36 there to
54:38 create those later. It's affordable. You
54:39 don't have to do that as part of the
54:41 rehab. We could do that
54:42 two years from now if we wanted to.
54:45 Couple other questions I have. So one of
54:47 them regarding the AMI 30% and 60% what
54:52 determines that distribution is it
54:55 mostly based on investment presumably
54:58 30% AMI you would need a bigger
55:01 investment from state federal local
55:03 so right now there's no 30% units at the
55:05 property um as part of this application
55:08 that's another thing that makes it
55:10 competitive is to add 30% units um so
55:13 we're doing we're adding some 30% units
55:15 um approximately
55:18 15% on each 4% and 9% project. Um so
55:22 there will be 30% units, 60% units, and
55:25 then the two market rate units.
55:26 And and to answer your question, the the
55:28 reason we're able to that's all baked
55:30 into the numbers. Um, but one of the
55:32 things that's helpful at this project is
55:34 that there's already 40% of the units,
55:38 40
55:40 a federal housing assistance payment
55:42 contract, which
55:44 means that you're getting the rent from
55:46 HUD at a at a fixed level.
55:48 And so whether the person is earning 60
55:50 or 30 doesn't affect the rent level that
55:52 the property receives for those 40%
55:55 units. that allows this property to be
55:58 very competitive with the state because
56:00 it can do more 30% units than others
56:03 because it has that housing assistance
56:05 payment.
56:07 A significant percentage of the units
56:09 are two-bedroom and is there some kind
56:12 of age restriction on all family members
56:17 that are living in this unit? Because if
56:19 there is, I'm curious as to why there
56:20 would sometimes be two bedrooms because
56:23 guests are allowed for up to a certain
56:24 period of time. Are these sibling
56:26 groups?
56:27 Uh, that's a great question. This dates
56:29 back um many this dates back to 1975. So
56:33 um the
56:36 elderly folks, let's say um someone has
56:38 a caregiver that wants that that
56:40 qualifies to live with them. That that
56:42 would be in the second unit. Sometimes
56:43 there's medical reasons why the husband
56:46 and wife can't or the the spouses can't
56:48 live together in the same room. So they
56:50 or and then yes sometimes there's
56:52 children with an elderly
56:55 um lease holder. So this you can under
56:58 this lease as long as the head of
57:00 household is 55 or older they can have a
57:04 child.
57:05 Um so that's kind of what the three
57:07 reasons why a two might be useful.
57:09 Okay. Yeah.
57:11 Yeah. My understanding is that with
57:12 respect to the market rate units in
57:15 Village at Brooklyn, uh we're still at
57:18 uh sort of workforce or upper workforce
57:21 rent levels.
57:22 Yes. There's various different
57:24 restrictions there. Um there's some that
57:27 are still affordable, some that are in
57:29 40t, some that Yeah. So there's there's
57:32 a variety of rental restrictions. I
57:35 think I can I can provide you a more
57:37 detailed breakdown if that's helpful.
57:38 Yeah, that would be it.
57:39 I think to to answer your question, what
57:41 we're committing to for long term
57:43 uh would be there are two ways to
57:46 qualify for um
57:48 for 40B for the subsidized housing
57:50 inventory. Either 20% of the units are
57:53 50% AMI or 25% at 80% AMI. Those are the
57:57 two ways that will be we'll be right
58:01 now. Um all those units are probably
58:03 closer to 30% AMI because they're under
58:05 a HAP contract. But what we're
58:07 committing to long term is to either do
58:10 20 of 50 or 25 of 80 um so that the town
58:13 continues to qualify those as 40
58:15 million. So we'll do we'll do one of
58:17 those.
58:17 My concern is or my question is uh with
58:21 respect to the market rate units we
58:26 they're at a probably 100 or 120% AMI or
58:32 does that even apply to those units?
58:35 Yeah. And the question is, you know,
58:36 what what what are the rent levels
58:38 there?
58:39 Uh yeah, so that the rent levels would
58:41 differ from the income restriction.
58:44 Yeah. So some of the rent levels because
58:46 they were affordable and because we've
58:48 agreed to sort of limit rent rent
58:50 increases now to 10% instead of marking
58:53 them up to market.
58:54 Um this is sort of in a negotiation with
58:56 the with the tenants.
58:58 Um
58:59 right now they are in a middle income
59:01 like we are saying 110 120%. But over
59:05 time, I would imagine they go to market,
59:07 they just go much slower than they would
59:09 have because of the 10% increase.
59:11 I just want to get it to be able to
59:14 understand that, you know, we're not
59:16 only maintaining affordable units as
59:19 that's usually um understood, but also
59:22 middle inome
59:24 housing.
59:28 Amanda
59:28 um so I just a a little bit of a
59:31 question on process and a little bit of
59:33 a statement. I think it's a great
59:34 opportunity to preserve a substantial
59:36 amount of affordable senior housing at
59:38 99 Kent. I'm really glad that about the
59:42 negotiations that have happened to
59:45 extend some affordability protections to
59:47 the village because I think it's it's
59:49 really important um that they are not o
59:52 overlooked in the process. Um
59:55 and it seems to me that if the MOA is
59:58 still being discussed, we are going to
1:00:01 vote on um authorizing the release of
1:00:05 funds authorizing um advocacy basically
1:00:08 for 99 Kent. Um and we were supposed to
1:00:12 vote on conditional approval but if of
1:00:15 the MOA but if there is still some
1:00:17 negotiation taking place um for for me
1:00:21 personally I would like to know that the
1:00:25 intent of affordability protections for
1:00:27 the village are not going to go away
1:00:29 with whatever negotiations and the MLA
1:00:31 are going
1:00:33 that's not yeah that's not we're we're
1:00:35 this is like we're we're talking about
1:00:37 like very small like that those things
1:00:39 are 100% in
1:00:41 It's not changing um unless the ch town
1:00:44 changes the first amendment, but we're
1:00:45 committed to all of that. Yeah, that's
1:00:47 that's definitely not changing and we
1:00:48 will um I just sent a revised version
1:00:51 over yesterday so we can you know
1:00:54 provide a a version when it's more
1:00:58 finalized. But yeah, those the
1:01:00 commitments for the affordability at 99
1:01:02 Kent and Village are in there.
1:01:09 That would be an important statement to
1:01:11 make sure is reflected in.
1:01:17 Sorry, Michael just sent me some notes
1:01:19 and I think we've covered everything.
1:01:23 Yes.
1:01:24 Thank you.
1:01:25 All right. So, any more questions,
1:01:27 comments from board members?
1:01:30 Oh, sorry. Just one brief comment on um
1:01:34 Roger's point on members of the HAD
1:01:36 being really useful. I would love to
1:01:37 figure out a way when this kind of topic
1:01:39 comes up to include their expertise
1:01:41 earlier in the process uh going forward
1:01:44 because I I think you are right we are
1:01:46 lucky and that we have some really
1:01:47 wellqualified members of the HAB that um
1:01:50 I would love their their guidance as we
1:01:53 go to challenges like expiring going
1:01:56 forward.
1:01:56 I do have to say some of like the most
1:01:58 detailed like intensive questions I've
1:02:02 ever received from a public board. So it
1:02:04 was it was uh clear that there was a lot
1:02:07 of experience there. So great.
1:02:09 Thank you select board for appointing
1:02:11 Wesley Reed because she hit the ground
1:02:13 running and is just as much
1:02:14 knowledgeable as Jonathan.
1:02:17 So reinforce that and yes
1:02:23 if I could just say something. So um for
1:02:26 those who don't know, um I grew up in
1:02:29 Brooklyn about a mile away. Um, my
1:02:32 father grew up in Brookline since 1939.
1:02:35 This is our hometown and we care very
1:02:37 much about this project. This is first
1:02:39 among equals
1:02:41 from the 120 developments we've
1:02:44 developed over the years. Very proud of
1:02:46 it. And um what I think is an
1:02:48 interesting fact for all of you because
1:02:49 I think this speaks to both the town's
1:02:52 um kind of uh dog on a bone
1:02:56 affordability uh needs and and our
1:03:00 partnership is that when it was
1:03:01 originally developed, it actually wasn't
1:03:03 an quote unquote affordable housing
1:03:05 project. In 1975, it was mostly um a
1:03:09 middle income housing project. is 80% of
1:03:12 80% AMI units on and that was going to
1:03:15 expire basically 30 years in. It was in
1:03:18 1997 that the town and wind worked
1:03:21 together to add tax credits to that and
1:03:23 actually created the affordability
1:03:24 that's expiring today. So it's actually
1:03:27 started more of a middle income in a
1:03:29 market. it turned into an affordable
1:03:31 housing and now it's going to turn, I
1:03:33 think, back into what essentially will
1:03:35 end up being 50% affordable and 50%
1:03:37 market, which is something that just
1:03:40 personally I push for. I love mixed
1:03:42 income housing. I think that's the
1:03:44 proper way uh to to sort of create a
1:03:46 community. But I just wanted to point
1:03:47 out that like this has really evolved
1:03:50 over time with the partnership with the
1:03:51 town. And I think I'm I'm very proud of
1:03:54 how it's ending up. I think the town
1:03:55 should be uh because a lot of 70s era
1:04:00 HUD housing has gone to market over the
1:04:03 years or has fallen into disarray. It's
1:04:06 kind of unusual for this to result in a
1:04:09 family elderly mixed income regime that
1:04:11 that lasts. So, um just wanted to say
1:04:13 that that thank you for the profound
1:04:16 partnership and I'm looking forward to
1:04:17 the next 99 years. Thank you.
1:04:21 All right. So with that, I think we may
1:04:24 be prepared to take a series of votes.
1:04:26 So I move that we
1:04:30 I think we should make sure right with
1:04:31 the MOA then
1:04:33 um I wonder if we given that the MOA is
1:04:36 still in the final stages of being
1:04:38 addressed. I wonder if we might
1:04:40 hold the votes until next week. Is that
1:04:42 right?
1:04:42 Um
1:04:43 or are there certain votes that we
1:04:44 should take now?
1:04:46 Yeah, there's general consistent
1:04:47 I think you could take the the vote of
1:04:49 supporting their application for sure.
1:04:51 Um, I think the if
1:04:56 I wish I wish I have Michael's opinion
1:04:58 here. I think we could you could move
1:05:00 forward with the vote on the 4 million
1:05:03 um preliminary commitment and supporting
1:05:06 their application and acknowledging the
1:05:08 letter um that they provided. But I
1:05:10 think we should definitely I I think we
1:05:12 should hold off on the MOA just until we
1:05:15 finalize that.
1:05:17 Roger, do you do you agree?
1:05:19 Um, I think so. And I I was at one
1:05:22 procedural question. Is the
1:05:25 formal execution of MOA an absolute
1:05:29 requirement for the select board to
1:05:31 provide the conditional letter of
1:05:33 commitment on 4 million? Do they have to
1:05:35 follow in sequence?
1:05:38 So the way the MOA is written, it it um
1:05:42 would be executed after
1:05:45 the um after this leadboard votes
1:05:48 approval on the funding because if
1:05:49 there's a line in the MOA that lists
1:05:52 what they they approved it. Um so
1:05:54 so execution of the MOA would fall in
1:05:56 that bucket of conditions.
1:05:58 Yes. So you could issue the um the
1:06:02 letter the wing needs to to provide the
1:06:04 state the town's preliminary commitment.
1:06:07 Right. So so it seems to me that we
1:06:09 could vote on 4B, 4 C and 4 E and hold
1:06:13 off on memorandum of agreement till we
1:06:15 see it. Of course, which is 4 D. So that
1:06:18 would be my suggestion unless other
1:06:20 board members feel differently.
1:06:22 I'm okay with that. I just want to note
1:06:24 when we vote on 4B that it's with the
1:06:27 understanding that nothing substantial
1:06:30 is going to be changing about that like
1:06:34 minor legally stuff I'm not so worried
1:06:36 about maybe because I'm not a lawyer but
1:06:42 all right so with that I move that we
1:06:45 authorize $4 million of affordable
1:06:47 housing trust funds on the terms and
1:06:49 conditions recommended by the housing
1:06:51 advisory board so long There are no
1:06:54 major modifications to those
1:06:56 recommendations to be utilized for the
1:06:58 substantial rehabilitation and extension
1:07:00 of affordable housing restrictions at
1:07:02 the senior rental housing at 99 Kent
1:07:04 Street for 99 years and authorizing the
1:07:06 select board chair to sign related
1:07:08 documents on behalf of the select board.
1:07:11 Bernard
1:07:11 yes.
1:07:12 Michael,
1:07:12 yes.
1:07:13 Amanda,
1:07:13 yes.
1:07:14 And I also vote yes. I move that we
1:07:17 authorize the town administrator,
1:07:19 director of planning, community
1:07:20 development, and housing and community
1:07:22 planning director favorably recommends
1:07:24 to the state or other funding sources
1:07:27 grant applications that support the
1:07:28 rehabilitation and affordability of
1:07:30 homes at 99 Kent Street. Bernard,
1:07:33 yes.
1:07:33 Michael,
1:07:34 yes.
1:07:34 Amanda,
1:07:35 yes.
1:07:35 I also vote yes. I move that we
1:07:38 acknowledge the letter from wind
1:07:39 companies to the town stating their
1:07:41 commitments to renovate units and to
1:07:43 extend rent protections for two income
1:07:45 qualified tenant households at 77
1:07:48 Village Way with changes proposed by the
1:07:50 town. Bernard,
1:07:51 yes.
1:07:52 Michael,
1:07:52 yes.
1:07:53 Amanda,
1:07:53 yes.
1:07:54 And I also vote yes.
1:07:56 All right. Well, thank you very much for
1:07:57 coming and for the very thorough
1:07:58 presentation and asking our m answering
1:08:02 our multitude of questions.
1:08:04 Thank you so much. Thank you everybody.
1:08:06 appreciate it. Good luck with the state.
1:08:14 He's one of the first to do this.
1:08:16 Thank you.
1:08:17 Thank you very much.
1:08:21 All right. So,
1:08:21 how about a break?
1:08:22 How about Sure.
1:08:24 We are ahead of schedule.
1:08:26 All right. if you'd like
1:08:27 or I can just go to like
1:08:34 David
1:08:35 the question probably has been answered
1:08:38 but are these agreements attached to the
1:08:41 property if they were to sell these
1:08:43 properties
1:08:44 yes
1:08:45 because when they
1:08:49 process property in in they flipped it
1:08:53 as soon as they got the third It is
1:08:56 touched by
1:08:59 you know I didn't see one right outside
1:09:00 on the right I think
1:09:03 you guys all
1:09:07 uh straight ahead I think on the right
1:09:09 sorry Bernard
1:09:11 we muted the room
1:09:19 all right I
1:09:22 would like to allow Anthony to provide a
1:09:25 vote to 4B, 4 C, and 4E. So, Anthony, do
1:09:29 you approve the question of authorizing
1:09:30 four million affordable housing trust
1:09:32 funds?
1:09:33 All right. So, yes, for Anthony on 4B.
1:09:35 Anthony, do you approve authorizing the
1:09:38 town administrator, director of plan,
1:09:39 community development, and housing,
1:09:40 community planning director to favorably
1:09:42 recommend state or other funding
1:09:43 sources, grant applications?
1:09:45 Yes.
1:09:46 All right. And do you uh acknowledge the
1:09:50 letter from wind companies to the
1:09:51 channel stating their commitment to
1:09:52 renovate units and extend rent
1:09:54 protections? Yes. Thank you, David, for
1:09:56 allowing me to vote on this.
1:10:01 Now, we will move to review the public
1:10:03 bodies handbook.
1:10:10 So,
1:10:13 um we have uh a new draft of the public
1:10:18 bodies handbook that is being um worked
1:10:22 through has been worked through. Um
1:10:24 we've been implementing re uh potential
1:10:28 comments from uh individual select board
1:10:30 members uh and working through to uh get
1:10:34 to where uh hopefully we uh need to be.
1:10:36 I will note um there are some comments
1:10:39 um came in over the weekend that we
1:10:41 still need I still need to implement. Um
1:10:43 so I'm apologize to kind of switching
1:10:45 back and forth between two versions
1:10:46 here. Um but you can see here um the
1:10:51 biggest the biggest changes um
1:10:54 substantively um are um one a
1:10:59 requirement um
1:11:01 um
1:11:03 is uh one a language about vacancies. Um
1:11:07 if you scroll down to page um
1:11:12 page eight or sorry page seven of the
1:11:14 manual um
1:11:17 there's now new language about vacancies
1:11:20 um and this is the after discuss you
1:11:22 know with discussion to the um
1:11:27 um
1:11:32 so if you scroll down to see the select
1:11:34 or endeavor and fill vacancies on public
1:11:37 bodies as soon as practiced. Posted
1:11:39 positions will remain open until filled,
1:11:41 but typically the select board will
1:11:42 endeavor to conduct interviews and fill
1:11:44 positions no earlier than 30 days and no
1:11:46 later than 60 days from posting.
1:11:47 Vacancies on public bodies requiring
1:11:49 specialized expertise may take longer to
1:11:51 fill. Select board also typically
1:11:52 endeavors to interview every applicant
1:11:54 and may decide not to do so in the
1:11:56 chair's discretion if an application is
1:11:58 submitted after a sufficient number of
1:11:59 candidates have been interviewed. So,
1:12:01 this sets a certain level of expectation
1:12:03 from the public, but doesn't foreclose
1:12:06 you from after a 60-day period if you
1:12:08 feel like you need to hear from more
1:12:10 applicants or you want to hold the
1:12:11 position open, particularly if it's one
1:12:13 requiring specialized expertise. Um, but
1:12:16 it sets right it gives the community a
1:12:18 sense of, you know, when they should get
1:12:20 their application in if they want to be
1:12:21 considered for a position.
1:12:26 Can I make one note and I'll just
1:12:28 explain my comment like this now
1:12:31 formalizes the definition of a vacancy
1:12:33 basically being not when someone does
1:12:35 not resubmit for reappointment but when
1:12:38 someone steps down early for one reason
1:12:40 or another.
1:12:41 Yes. uh
1:12:44 so that it it should be important and I
1:12:48 don't think that it necessarily needs to
1:12:50 be reflected in the handbook but then
1:12:52 essentially when we are considering
1:12:55 candidates for reappoint and we are
1:12:57 trying to make it on a regular calendar
1:13:01 schedule um then we're also considering
1:13:04 new candidates for appointment at the
1:13:06 same time um apart from vacancies which
1:13:09 are their own category
1:13:10 yeah I do think it would be helpful to
1:13:12 spell that out to be very clear because
1:13:14 this will be a bit of a departure from
1:13:17 prior protocol.
1:13:18 We can definitely do that. Um so we can
1:13:20 make clear that this that there's a
1:13:23 difference between an open position and
1:13:25 a position that's being considered for
1:13:26 reappoint.
1:13:28 So um
1:13:31 right then the the vacancy is right just
1:13:33 to spell out that someone has stepped
1:13:36 down early. It is a vacancy. we are
1:13:37 filling it not on the normal calendar
1:13:39 time that we are thinking about based on
1:13:42 when the person has stepped down. Um and
1:13:45 then reappoint we are I I don't actually
1:13:48 know that we have put this in here but
1:13:50 we are trying to make it sort of at the
1:13:53 same time each year right
1:13:55 hopefully yes um and that brings us to a
1:13:57 question of well reappointments if
1:13:59 someone misses the August 31st deadline
1:14:01 that you have set in one of your prior
1:14:03 meetings is that now considered a vacant
1:14:06 position and then that person who maybe
1:14:08 re reapplied three or four weeks later
1:14:11 are they now a new candidate do you want
1:14:12 to reinter
1:14:16 I think that's that's I'm sorry. Go
1:14:18 ahead.
1:14:18 Isn't Isn't interviewing at the
1:14:20 discretion of the chair anyway? So, do
1:14:23 we have to make a rule about that?
1:14:25 No, I just would like for my purposes in
1:14:28 scheduling. I have a couple of reappoint
1:14:30 applicants who missed the deadline. Do
1:14:31 you want to interview them or put them
1:14:33 on for reappoint? Because are they now
1:14:36 considered new applicants? So I
1:14:38 personally would like when when the vote
1:14:41 happens to not have separate categories
1:14:43 of reappoint and appointments um to have
1:14:46 one conversation. So just to take one
1:14:48 example from what happened previously,
1:14:50 we were voting on candidates for parks
1:14:54 and wreck for reappoint. Two of the
1:14:55 three put in for reappoint. Um and we
1:14:58 voted on them in a separate meeting and
1:15:00 then we just had the special meeting to
1:15:02 fill the third of those seats. I would
1:15:04 much prefer going forward to say we have
1:15:09 what would have been uh six candidates
1:15:15 these are incumbents and so we know them
1:15:17 and you have a little more familiarity
1:15:19 with them but then the comation becomes
1:15:21 which of those six get appointed to
1:15:23 those three seats um with the knowledge
1:15:26 it's sort of like it's an incumbent star
1:15:28 in the discussion as opposed to a
1:15:41 not going to be rubber stamping
1:15:42 incumbents in the future, which is not
1:15:44 to say they won't have an advantage. Uh
1:15:46 but if we're not going to be rubber
1:15:47 stamped