BPDA Board of Directors Meeting 9/17/26
words this meeting uses zoning · BPDA · fiscal year (FY) · Article 80 · roll call · City Council — the glossary says what they mean
tap to load the tape · nothing plays until you dothe same, as a table
| time | kind | the moment |
|---|---|---|
| 1:21 | decision | Mr. Ali here and I the chair I am present. Item number one request authorization for the approval of the minutes of the… |
| 1:29 | pushback | All those in favor? I opposed. The eyes have it. Item number two. Request authorization to amend the engineering design… |
| 3:11 | decision | We're requesting an additional $49,315 for the design services along with a 10% design contingency of $4,931.50 for a… |
| 3:42 | decision | A motion is in order. |
| 3:52 | pushback | Oh. Oh gosh. Yeah. Second. [laughter] Um all those in favor? I I the opposed. The eyes have it. Motion passes. |
| 5:01 | decision | steel. Gail Associates was originally brought on to assess the conditions, develop repair options, and prepare the… |
| 5:40 | decision | Okay. Thanks, Tyler. Um any questions or comments from the board? Hearing and seeing none, a motion is in order. |
| 6:28 | decision | Good afternoon, Madam Chair, members of the board, Madam Secretary, Director Shen. I'm here today to request an… |
| 7:08 | decision | February 20th of 2027, and the total funds are close to being depleted due to the unforeseen amount of trash services… |
| 7:29 | decision | I opposed. The eyes have it. Motion passes. Thanks, Chris. Um, item number five, request authorization to issue an… |
| 8:37 | decision | Okay. Uh any questions or comments from the board? All right. Hearing and seeing none. A motion is in order. |
| 8:41 | pushback | I opposed. The eyes have it. Motion passes. Item number six. [clears throat] Oh, it's like all Chris. request… |
| 10:11 | decision | Okay. Uh any questions or comments from the board? Okay. Hearing and seeing none, a motion is in order. |
| 10:16 | pushback | All those in favor? I I opposed. The eyes have it. Um motion passes. Thanks so much. |
| 11:47 | decision | All right. Hearing and seeing none, a motion is in order. |
| 11:53 | pushback | I opposed. The eyes have it. Motion passes. |
| 27:51 | decision | and I know that, you know, um, the city staff will do their proper community outreach and due diligence to really find… |
| 28:43 | pushback | All those in favor? I opposed. The eyes have it. Motion passes. Thanks, Jim. |
| 30:11 | pushback | So seconded. [laughter] All those in favor? I I [snorts] uh opposed. The eyes have it. Motion passes. Thanks, Teresa. |
| 30:25 | pushback | I opposed. The eyes have it. Uh EDIC meeting adjourned. |
| 31:59 | pushback | All those in favor? I opposed. |
| 34:17 | pushback | All those in favor? I opposed. The eyes have it. Motion passes. Thanks, Ben. |
| 36:52 | pushback | All those in favor? I I opposed. The eyes have it. Motion passes. Thanks, Stephanie. |
| 38:21 | pushback | All those in favor? I I opposed. The eyes have it. Um, motion passes. Thank you, Tyler. |
| 1:42 | money | $49,315 — said 2 times |
| 1:48 | money | $4,931.50 — said 2 times |
| 1:55 | money | $54,246.50 — said 1 time |
| 2:03 | money | $189,90 — said 2 times |
| 3:13 | money | $54,246.50 — said 1 time |
| 4:11 | money | $25,000 — said 3 times |
| 4:15 | money | $586,365 — said 2 times |
| 1:00:28 | money | $5,000 — said 2 times |
Cut from the analyzer’s scored moments — a measurement, not a choice made for you. Open a reel and press make this reel yours to re-cut it; tick any moment or transcript line below to cut your own.
During the meeting, the board approved several operational contracts and amendments, including engineering services at Berth 10 [1:32], loading dock repairs at 12 Channel Street [3:57], trash removal and facility maintenance bids at the Raymond L. Flynn Marine Park [6:02], and hot works training instruction [10:27]. The board voted to accept grant funding and partner with MassDOT for the LinkUp Greater Boston Congestion Relief shuttle program [12:05]. Real estate decisions included extending a developer designation at 290 Tremont Street [32:02], conveying a parcel for the Charlestown Peace Park [34:27], issuing RFPs for Shipyard Park [36:59] and China Trade Center repairs [38:29], and approving an amended mitigation payment schedule for 20-30 Electric Avenue [59:26]. Housing and development approvals were granted for 42 rental units at 430 Cambridge Street [1:03:49], an affordable housing agreement on Lincoln Street [1:12:18], a 23-unit project at 1121 Dorchester Avenue [1:15:45], and five-year Institutional Master Plan extensions for Tufts Medical Center [1:14:08] and Boston University [1:27:47]. The board also received informational updates on the city's Anti-Displacement Action Plan [41:42] and the Director's monthly report [1:29:43] before adjourning [1:37:19].
What it means: The board considered contract amendments for dock engineering [1:36] costing an additional $49,315 [1:42], canopy repairs [4:02] increased by $27,500 [5:19], and trash removal [5:59] increased by $25,000 [6:06]. It authorized invitations for bids for transportation services [7:36] and HVAC maintenance [8:47], and approved executing a contract for a MassDOT grant [12:02] to support neighborhood shuttle services [12:18]. The board also received an annual update on the city anti-displacement action plan [42:15] and approved residential proposals, including a 42-unit building on Cambridge Street [1:05:07] and a 20-unit building at 2062 Dorchester Avenue [1:16:12].
Who moved it: The transcript records that motions were moved [1:26], [34:13], [1:12:04] and seconded [3:45], [8:39], [10:13], [11:49], [38:18], [1:27:36], [1:37:21], but it does not specify the names of the individual board members who made or seconded those motions. Items were presented to the board by city and agency staff, including deputy director Fitzgerald [12:31], executive director Katherine Lusk [42:04], project manager Joy Armstrong [45:23], senior project manager Tyler Ross [1:14:39], [1:16:26], [1:28:25], and Director Shen [1:12:44].
What to watch: Next steps include transportation management associations procuring vendors [27:59] and leading community outreach for new shuttle routes [28:18], completing the remaining timeline of the 12-month displacement disclosure pilot [47:29], [55:51], and the future presentation to the board of negotiated 121B tax agreements for four previously approved development projects [1:36:05], [1:36:43], [1:37:08].
Scored, not chosen for you — the salience bar is a measurement, and every moment is a receipt into the transcript below. With JavaScript on, tick moments to compose a reel — and tick moments on other meetings too; a reel can span the record.
→ the publish kit for this meeting — the clips worth cutting and draft copy, for a producer.
Counted, not modeled — each lens is a word list; drift compares the first half to the second.
the same, as a table
| word | mentions |
|---|---|
| project | 72 |
| units | 51 |
| boston | 48 |
| city | 48 |
| services | 41 |
| building | 41 |
| work | 38 |
| plan | 37 |
| community | 37 |
| request | 35 |
| contract | 35 |
| construction | 34 |
| development | 32 |
| great | 32 |
| planning | 32 |
| slide | 32 |
| number | 31 |
| authorization | 31 |
| street | 30 |
| comments | 29 |
| review | 29 |
| park | 27 |
| process | 27 |
| clears | 26 |
| throat | 26 |
| design | 26 |
| housing | 26 |
| grant | 25 |
| residential | 25 |
| order | 24 |
| favor | 24 |
| eyes | 24 |
| opposed | 23 |
| existing | 23 |
| proposed | 23 |
| displacement | 23 |
| staff | 22 |
| passes | 22 |
| good | 22 |
| within | 21 |
| small | 21 |
| department | 21 |
| seeing | 20 |
| years | 20 |
| neighborhood | 20 |
| projects | 20 |
| zoning | 20 |
| four | 19 |
| team | 19 |
| first | 19 |
| working | 19 |
| people | 19 |
| institutional | 19 |
| please | 18 |
| none | 18 |
| total | 18 |
| area | 18 |
| last | 18 |
| tenants | 18 |
| moved | 17 |
“project” came up 72 times. Sized by how often; civic stopwords out. With JavaScript off, a word opens the tape at its first mention.
0:27 ibility of Boston residents. Hybrid
0:29 means that our board meetings are
0:30 conducted in person at city hall in our
0:32 boardroom on the 9th floor and virtually
0:34 via Zoom and Boston City TV. For more
0:37 information and updates, please visit
0:38 bostonplans.org.
0:41 [clears throat]
0:41 The open public meeting law requires
0:43 that I notify the public that this
0:44 meeting is being recorded. Please be
0:46 aware that an audio and visual recording
0:48 of this meeting is being made and
0:49 broadcast by Boston City TV, which is a
0:51 part of the City of Boston Office of
0:52 Cable Communications at Exfinity channel
0:55 26, RCN channel 13, and Verizon Files
0:57 channel 962. It's also being livereamed
1:00 at boston.gov/cable.
1:02 Now, if there's anyone in the audience
1:03 who is recording this meeting, um I just
1:05 ask that you please identify yourself
1:06 now. Seeing none, we'll start with a
1:10 roll call. Miss Shock,
1:12 here.
1:12 Miss Bennett,
1:14 here.
1:14 Mr. Shepard
1:15 here.
1:16 Mr. Ali
1:17 here
1:17 and I the chair I am present. Item
1:20 number one request authorization for the
1:21 approval of the minutes of the August
1:23 13, 2026 board meeting. A motion is in
1:26 order.
1:26 So moved.
1:27 Second.
1:27 All those in favor? I
1:29 opposed. The eyes have it. Item number
1:32 two. Request authorization to amend the
1:34 engineering design services contract
1:36 with child's engineering for
1:38 construction documents to repair defects
1:40 at birth 10. increased the contract
1:42 amount by $49,315
1:45 and further executed 10% design
1:48 contingency in the amount of $4,931.50
1:52 for an aggregate contract amount not to
1:54 exceed $54,246.50
1:58 and the total aggregate contract amount
2:01 not to wait and the total aggregate
2:03 contract amount of $189,90.
2:08 Tyler,
2:09 thank you, Madam Chair, members of the
2:10 board. We are requesting authorization
2:12 to amend our existing services contract
2:14 with child's engineering for additional
2:16 design services for the birth 10 repairs
2:18 project at the Raymond L Flynn Marine
2:20 Park. Birth 10 is currently used by the
2:22 Boston Harbor Patrol and Thompson Island
2:24 out outwardbound. A previous inspection
2:27 identified a number of deficiencies
2:29 including [clears throat] deteriorated
2:31 concrete, marine bore damage to fender
2:33 piles and deterioration of the masonry
2:36 seaw wall. Child's engineering was
2:38 previously brought on to develop
2:39 construction documents to address those
2:41 conditions. As the design has progressed
2:43 and we've continued coordinating with
2:45 project stakeholders and several
2:46 additional needs for wereident
2:48 identified. These include replacement of
2:50 the two David cranes, additional
2:52 lighting and electrical upgrades,
2:54 replacement of the public sewer pumpout
2:55 and replacement of the broken ladders
2:57 and installation of a hose bib with heat
2:59 tracing.
3:01 We're requesting an additional $49,315
3:04 for the design services along with a 10%
3:06 design contingency of $4,931.50
3:11 for a total amendment amendment of
3:13 $54,246.50. [clears throat]
3:16 This will bring the total design
3:18 contract of to $189,90.
3:23 Funding for the design and resulting
3:24 construction is included in the FY2 FY27
3:27 capital construction budget. Staff is
3:29 therefore recommending authorization to
3:31 amend our existing engineering services
3:33 contract with child's engineering. If
3:35 you have any questions, I'd be happy to
3:36 answer them at this time.
3:37 Okay. Thank you. Any questions or
3:38 comments from the board? He
3:40 [clears throat] hearing and seeing none.
3:42 A motion is in order.
3:43 So move.
3:43 All those what?
3:45 Second.
3:45 Oh. Oh gosh. Yeah. Second. [laughter]
3:49 Um all those in favor? I
3:52 I
3:52 the opposed. The eyes have it. Motion
3:54 passes.
3:57 Item number three, request authorization
3:59 to amend the engineering services
4:01 contract with Gail Associates
4:02 Incorporated for the repair of the
4:04 platform and canopy at 12 Channel Street
4:06 within the Raymond L. Flynn Marine Park
4:09 and to increase the contract amount by
4:11 $25,000 in a 10% contingency for a total
4:15 contract amount not to exceed $586,365.
4:20 Tyler,
4:21 thank you again. [clears throat]
4:22 We are requesting authorization to amend
4:24 our existing engineering services
4:26 contract with Gail Associates for the
4:27 platform canopy repairs at 12 channel
4:29 Street in Raymond L Flame Marine Park.
4:31 The loading dock and canopy at 12
4:33 Channel Street have experienced
4:34 significant deterioration from exposure
4:36 to winter and marine weather including
4:38 spald concrete and corroded reinforcing
4:40 steel. Gail Associates was originally
4:42 brought on to assess the conditions,
4:44 develop repair options, and prepare the
4:46 construction documents. During
4:47 construction, we found that portions of
4:49 the existing structure were more
4:51 deteriorated than what was identified
4:52 during the initial assessment. This
4:54 required additional work, including
4:56 structural reinforcement of the canopy
4:57 supports and replacement of a larger
4:59 area of the reinforced concrete loading
5:01 dock slab. This amendment will provide
5:03 additional structural engineering
5:05 services and construction administration
5:06 support through the remaining traffic
5:08 coding work and final closeout. The
5:10 project is currently scheduled for final
5:12 completion on October 21st. We are
5:14 requesting additional $25,000 along with
5:16 a $2,500 contingency for a total
5:19 amendment of $27,500.
5:22 This will bring the total engineering
5:23 contract with Gail Associates to
5:25 $586,365.
5:28 Staff is therefore recommending
5:29 authorization to amend our existing
5:31 engineering services contract with Gail
5:32 Associates. Thank you. And I can't I'd
5:34 be happy to answer any questions at this
5:35 time.
5:36 Okay. Thanks, Tyler. Um any questions or
5:38 comments from the board? Hearing and
5:40 seeing none, a motion is in order.
5:42 So moved.
5:43 Second. Roll call for a vote. Oh, no.
5:45 We're not going to do that. I can't get
5:46 the votes right. All those in favor?
5:49 I [laughter] oppose. The the eyes have
5:51 it. Motion passes.
5:55 Um, okay. Item number four, request
5:57 authorization to amend the contract with
5:59 DBI Waste Systems Incorporated for trash
6:02 removal services in the Raymond Elf
6:04 Flynn Marine Park in the amount of
6:06 $25,000 for a total contract amount of
6:10 $140,00087.
6:12 No. 14087 $140,87.
6:19 Please take over from here, Chris. Like
6:21 I'm [laughter] not doing
6:21 Thank you, Madam Chair.
6:23 Good afternoon, Madam Chair, members of
6:24 the board, Madam Secretary, Director
6:26 Shen. I'm here today to request an
6:28 amendment for funds to our current
6:30 contract for trash removal services
6:31 within the Raymond Flint Marine Park. On
6:34 November 21st, 2023, the EDIC board
6:36 authorized the director to enter into a
6:38 three-year contract with EBI Way Systems
6:40 in an amount not to exceed $115,87.
6:44 The current contract is set to expire on
6:46 February 20th of 2027, and the total
6:49 funds are close to being depleted due to
6:51 the unforeseen amount of trash services
6:53 needed during um and after the sale 250
6:57 event within our marine park. In
6:59 consideration of this unanticipated
7:01 escalation of services, staff is asking
7:03 to amend the current contract by a total
7:05 not to exceed $25,000. The total cost of
7:08 the amended contract is not expected to
7:09 exceed $140,87
7:12 for this term. I'm happy to answer any
7:15 questions.
7:15 Okay. Um any questions or comments from
7:18 the board?
7:20 All right. Hearing and seeing none, a
7:21 motion is in order.
7:22 So moved.
7:23 Second.
7:24 All those in favor?
7:25 I
7:27 opposed. The eyes have it. Motion
7:29 passes. Thanks, Chris. Um, item number
7:31 five, request authorization to issue an
7:34 invitation for bids for trash removal in
7:36 the Raymond Alflyn Marine Park for a
7:38 period of 3 years with two one-year term
7:40 renewal options. Chris,
7:42 thank you, Madam Chair. I'm before you
7:44 today to request permission to advertise
7:46 for trash removal services for the
7:47 Raymond Flynn Marine Park. The selected
7:49 vendor will be responsible for all
7:51 labor, materials, equipment,
7:52 transportation, and services within the
7:54 park. The IFB will publicly be publicly
7:57 advertised with local newspapers on the
7:59 BPDA's website, the statewide combi
8:01 system, the state goods and services
8:03 bulletin, and through other channels as
8:04 appropriate, including affirmative
8:06 marketing to small, local, and diverse
8:08 businesses. The resultant contract will
8:10 be awarded to the responsible and
8:12 responsive bidder with the lowest total
8:13 bid price. The awarded contract will be
8:16 for a term of three years with two
8:17 single optioners to be exercised at the
8:19 sole discretion of the BPDA. Funding for
8:22 this project will be from BPDA's fiscal
8:24 year 27 operating budget and the total
8:26 cost is not expected to exceed 195,000
8:29 for the initial three-year term. Thank
8:30 you. I'm happy to answer any questions.
8:32 Okay. Uh any questions or comments from
8:34 the board? All right. Hearing and seeing
8:37 none. A motion is in order.
8:38 So move.
8:39 Second.
8:39 All those in favor?
8:40 I
8:41 opposed. The eyes have it. Motion
8:43 passes. Item number six. [clears throat]
8:45 Oh, it's like all Chris. request
8:47 authorization to issue an invitation for
8:49 bids for inspection, testing, servicing,
8:51 and full preventative maintenance of
8:53 heating, ventilation, and air
8:54 conditioning systems at 12 Channel
8:56 Street and the Raymond Alpha Marine Park
8:58 for a period of 3 years with two
9:00 one-year term extension options. Chris,
9:03 thank you again, Madam Chair. I'm before
9:05 you today to request permission to
9:06 advertise for heating, ventilation, and
9:08 air conditioning system maintenance at
9:10 12 Channel Street in the Raymond El Flyn
9:12 Marine Park. The selected vendor will be
9:14 responsible for all labor, materials,
9:16 equipment, transportation supplies, and
9:17 services at the marine park. The
9:19 selected bidder
9:21 will furnish all supervision as well to
9:25 test, service, and maintain heating,
9:27 ventilation, and air conditioning
9:28 systems within the building. The IFB
9:30 will be publicly advertised with local
9:32 newspapers on the BPDA's website, the
9:34 state combine system, state's goods and
9:36 services bulletin, and through other
9:37 channels as appropriate, including also
9:40 affirmative marketing to small, local,
9:42 and diverse businesses. The result the
9:44 resulting contract will be awarded to
9:46 the responsible and responsive bidder
9:47 with the lowest total bid price. The
9:49 awarded contract will be for a term of
9:51 three years with two single optioners to
9:53 be exercised at the sole discretion of
9:54 the BPDA. Funding for this project will
9:56 also be from the BPDA's fiscal year 27
9:58 operating budget. This cost is not
10:00 expected to exceed 255,000 for the
10:03 initial three-year term. Thank you. And
10:05 I'm happy to answer questions.
10:06 Okay. Uh any questions or comments from
10:08 the board? Okay. Hearing and seeing
10:11 none, a motion is in order.
10:12 So moved.
10:13 Second.
10:13 All those in favor? I
10:15 I
10:16 opposed. The eyes have it. Um motion
10:18 passes. Thanks so much.
10:20 All right. Um, item number seven,
10:24 request authorization to execute a
10:25 contract with the Peterson School to
10:27 deliver instruction in hot works
10:29 commercial and industrial refrigeration
10:32 prep HVAC um, R E S Ego HVAC Nate and
10:38 Construction Math for the Power Core
10:40 Boston Building Operations Training
10:42 Program for a period of 6 months and a
10:45 and in a contract amount not to exceed
10:48 130,000. table.
10:50 Good afternoon, esteemed board members
10:52 and in particular, Madame Chair Roas.
10:55 Um, you actually read my whole uh um and
10:59 so the Office of Workforce Development
11:00 is asking that this request be granted.
11:03 I can read back through it if that makes
11:05 sense.
11:05 No, can you maybe just tell us a little
11:06 bit about the about the program?
11:09 So, it's a workforce development
11:11 training program. It has a green
11:12 industry focus. is uh targeting folks
11:15 that are 18 to 30 Boston residents,
11:17 introducing them to green careers, uh
11:20 providing the proper training and
11:22 industry recognized credentials that
11:24 allow them to get entry level employment
11:26 opportunities. This training that we're
11:28 rece uh requesting uh funding for helps
11:32 in particular with the building
11:33 operations track um and prepares them to
11:36 help de uh carbonize commercialsiz
11:38 buildings.
11:39 Wow, that's amazing. Um cool. Any
11:42 question, other questions or comments
11:44 from the board?
11:46 All right. Hearing and seeing none, a
11:47 motion is in order.
11:48 So moved.
11:49 Second.
11:50 All those in favor?
11:52 I
11:53 opposed. The eyes have it. Motion
11:54 passes.
11:55 Thank you guys. Have a great rest of
11:56 your day.
11:57 Take care. Um, item number eight,
12:00 request authorization to execute a pass
12:02 through contract with the Massachusetts
12:04 Department of Transportation for the
12:05 Linkup Greater Boston Congestion Relief
12:08 Program Grant in an amount not to exceed
12:11 11,448
12:13 wait no 11 million $448,556
12:18 to support neighborhood shuttle and
12:20 microtransit services in Alustin,
12:22 Brighton, Charle Town, Madapan, Roxbury,
12:25 and the Sequ Jim. Uh, thank you, Chair
12:28 Rojas, members of the board, Director
12:30 Shen, Secretary Wilheis. I'm Jim
12:31 Fitzgerald, deputy director of planning
12:33 review. Um, and if we go to the next
12:35 slide, [clears throat] uh, approving
12:37 this request will allow the EDIC to, and
12:39 the next one, uh, to access over 11.5
12:43 million uh, worth of federal grant
12:45 funding and partnering with MASDOT to
12:46 provide that funding uh, for uh, shuttle
12:49 services throughout the city. Uh I think
12:51 I'm going to hand it over now for the
12:52 rest of the presentation to get into the
12:53 grant administration by Amina Scott um
12:56 who's our deputy controller of strategic
12:58 funding and then Matt Morand who's our
13:00 partner from uh deputy director of the
13:02 transit team at the streets department.
13:04 Awesome.
13:06 Good afternoon. You can go to the next
13:09 slide please.
13:11 Um so I just wanted to establish
13:13 [clears throat] this grant uh is just
13:15 going to be another grant within our
13:16 portfolio. We already have the
13:17 infrastructure in place to manage it
13:19 like we manage all of our other external
13:21 funding. Uh we have the accounting
13:23 aspect down. It will be a part of our
13:25 regular audit. It is a cost
13:26 reimburseable grant as well. Um and so
13:29 we will have oversight of the
13:30 reimbursement process, ongoing
13:32 communication and oversight and
13:34 check-ins with the uh the project teams
13:37 as well as our state contract partners
13:39 and managers. Um and if you go to the
13:41 next slide, please. Um this just speaks
13:44 a little bit more to the actual
13:45 reimbursement process itself. Um it's
13:48 already established again this will just
13:50 be another uh grant within our
13:51 portfolio. And then the next slide.
13:55 So it does trigger the single audit
13:57 which we are already subject to. Um and
13:59 again we have great auditors and a great
14:01 finance team on the back end who would
14:03 support the overall oversight of our
14:06 fiscal year audits for this grant. And I
14:09 will pass it off to Matt.
14:14 Uh good afternoon madam chair, members
14:16 of the board. My name is Matt Moran. I
14:17 lead the transit team within the city of
14:19 Boston streets cabinet. I just want to
14:20 acknowledge a few folks. Uh so first
14:22 off, I want to thank the planning
14:23 department for all of their partnership
14:25 and hard work on this grant. Um it
14:27 wouldn't have been possible without
14:28 their support. I also want to
14:30 acknowledge a few folks who are in the
14:31 room. Uh my colleague Amanda Caparoso
14:34 who will be helping to lead the
14:36 administration of the shuttle services
14:38 and the grant. She's from BTD operations
14:40 and has been leading a lot of our work
14:41 in response to MBTA diversions over the
14:43 past few years. We also have Scott
14:45 Mullen from a better city TMA who again
14:48 is a great partner and has been working
14:49 with us uh tirelessly on coming up with
14:52 this grant and facilitating its
14:54 execution. So you might be asking what
14:56 is first mile last mile transportation
14:58 which is what this grant is all about.
15:00 So we are looking to connect residents
15:03 and employees with MBTA services and
15:06 other essential services that might be a
15:08 little bit geographically difficult to
15:10 reach today. And so we're not looking to
15:12 duplicate MBTA services. We're looking
15:15 to really um add services to areas of
15:17 the city that haven't traditionally had
15:19 a lot of good transit either because
15:21 there hasn't been development there or
15:23 because historically they've been
15:24 underinvested in. Uh we are looking at
15:27 um as I said uh working with the MBTA on
15:30 this. So they actually supported this
15:31 grant application back in 2024 when we
15:34 first proposed this grant and wrote us a
15:36 letter of support and we anticipate that
15:38 partnership to continue. Next slide.
15:42 So we've been we've been supporting
15:44 these first mile last mile shuttles over
15:46 the past decade uh plus. So, one example
15:50 of this is the Mission Hill Link, which
15:51 provides first mile, last mile service
15:53 to residents on Mission Hill along with
15:55 people who who are going up to New
15:57 England Baptist Hospital. We've done
15:59 that through a few different means.
16:00 We've put staff time into it, helping
16:02 them plan, helping them think through
16:04 their uh service options. We also use
16:06 city staff time to apply for an ARPA
16:09 grant to get them a new vehicle. And we
16:11 are doing this with other services as
16:12 well. So we've supported not only the
16:14 mission hill link but easy ride and the
16:16 lower mystic link along with working
16:18 with a strong shuttles. Next slide.
16:23 And so this grant this 11.5 million will
16:26 support five different transit services
16:28 uh throughout Boston. And so three of
16:30 these would be run by different TMAs. So
16:33 a better city will be running the Austin
16:35 Brighton uh routes. the uh Charles Town
16:38 and Lower Mystic program will be run by
16:40 the Lower Mystic TMA. Uh Seapport, which
16:43 is down the bottom, but I'm just going
16:44 to go through the order in terms of
16:46 TMAs, will also be run by the Seapport
16:48 TMA. And then there will be two city
16:51 organized uh routes, one in Madapan and
16:54 one in Roxberry. Those two routes will
16:56 need to be coordinated more closely with
16:58 the community. So, we're still working
17:00 on what exactly those routes will will
17:02 be, but this is an idea of what they
17:04 could look like. again connecting people
17:06 from rapid transit services whether it's
17:08 the red line the orange line uh to
17:10 services so the Madapan community health
17:12 center madapan branch public library
17:15 madun community center grove hall the
17:17 Roxy YMCA and so on this is like a bit
17:20 of an example of what they could look
17:21 like but again we'll confirm that with
17:23 the community in the coming months next
17:25 slide
17:28 and so while these would be individually
17:31 run services we're not looking to create
17:32 one giant new transit service. Uh they
17:35 would have a few things in common so
17:36 that residents, people coming to the
17:38 city to to [clears throat] visit, people
17:39 coming to the city for work would be
17:41 able to understand what they are. So one
17:43 common brand, so they would all be
17:44 branded with the link. You would be able
17:46 to see that and understand exactly what
17:48 that is. Uh consistent rider
17:50 information, so one website that could
17:52 direct people to what these services are
17:53 along with additional transit services
17:55 that are provided in their area. Uh
17:57 shared expectations around
17:58 accessibility. So if you are boarding
18:01 this, we will ensure that all the
18:02 vehicles are accessible to people with
18:04 mobility devices. We'll be collecting
18:06 data and um sort of reporting that
18:08 performance out over time. And um we are
18:11 looking as I said for these to be all
18:13 tailored to their local communities. So
18:15 to the extent that Austin Brighton might
18:17 have different needs than say the
18:18 seapport or than Matipan, we're really
18:21 looking at these to be individually
18:22 tailored to the neighborhoods. And so
18:23 there'll be a strong community buyin
18:25 process and discussion as we continue
18:27 on. So, we're asking for your acceptance
18:30 of this mass administered grant in the
18:32 amount of 11 half million dollars and
18:33 I'm happy to take any questions. So,
18:35 thank you very much.
18:37 Thank you. Questions or comments from
18:38 the board?
18:39 Yes. Thank you.
18:41 You always start it. Go.
18:42 Thank you.
18:44 Um this is really exciting. Uh really
18:47 really appreciate this. I think we
18:49 should be exploring this even far
18:51 beyond. So I'd love to see this this
18:53 start. Um,
18:55 will the, you may have said this and
18:57 forgive me, I was taking notes as I was
18:59 listening. How will this fund the
19:00 program for one year? Is it multiple
19:02 years?
19:02 Great question. So, it's a three-year
19:04 program.
19:04 Three years or 11 and a half. And then
19:08 provided these are successful uh pilots.
19:11 Will there be an opportunity to get
19:13 increased funding three years from now?
19:15 So, this is something we would be
19:17 looking into over the course of the
19:18 three years. So the first year we really
19:20 see is understanding exactly what these
19:21 services are,
19:22 the ridership, the demand and in year
19:26 two we will start to explore other grant
19:27 opportunities. So for example, our
19:29 colleagues at the lower mystic TMA uh
19:31 have already won state money to start
19:33 that service. So that service is
19:34 actually already running. It'll be
19:36 expanded through this program, but there
19:38 are other opportunities out there. So
19:39 we'll think through things like um state
19:41 resources, um potentially some
19:43 development review money. So that's part
19:45 of our local match is using development
19:46 review money. and we'll think about
19:48 other funding opportunities, but that's
19:50 going to come later in the process, but
19:51 certainly something we're thinking about
19:53 and and this will be free to all
19:55 Exactly.
19:56 residents or guests or visitors. There's
19:58 not going to be a you don't need to show
20:00 an ID to get on to prove you're a Boston
20:01 resident, I assume.
20:02 Exactly. So, the mayor's commitment to
20:04 fair free transit extends here. So,
20:06 these will be fair free and anyone who's
20:08 visiting the city, who lives in the
20:10 city, will be able to access these
20:11 services for free.
20:12 Yeah. And um I love the idea. I love the
20:15 sort of the point about underscoring
20:17 that every neighborhood is different and
20:18 the needs and are going to be different.
20:20 So it should be um tail tailored as
20:22 such. I think some consistency on on a
20:24 you know public awareness campaign will
20:26 be important. Uh will the roots and I
20:29 guess maybe the answer is we haven't
20:30 been decided yet but follow like the
20:32 MBTA routes. I mean I'd imagine be
20:34 looking at at major arterial roads to
20:37 run.
20:38 Yeah. So they're going to f they're
20:40 going to link, pardon the pun, with MBTA
20:42 routes. Yeah.
20:43 Uh so there'll be transfer points either
20:44 at the rapid transit stations or at key
20:46 bus locations, but they're going to
20:48 deviate in some specific areas and
20:50 provide a service that he doesn't really
20:52 offer today.
20:52 Yeah.
20:53 So for example, in Grove Hall, we
20:55 anticipate that we will use the driveway
20:57 for stop and shop to really give a much
21:00 easier connection
21:01 for people to get to and from the
21:03 supermarket.
21:04 That's one area we'll deviate. We're
21:06 looking at maybe using Quinsey Street
21:07 that has no existing transit service on
21:09 there, but again, we would have to
21:10 coordinate that with the local community
21:12 to see if that makes sense.
21:13 Yeah,
21:13 this will provide a cross town option
21:14 that doesn't exist today in uh Roxberry
21:16 and Madapan.
21:17 Yeah. And and I'm sure you know there's
21:18 two other points is one, I would just
21:20 urge you to work with um the Art Strong
21:22 Commission. I know recently Mayor Woo
21:23 had um rolled out this great policy that
21:26 allows seniors the opportunity to get uh
21:27 get a number of free uh ride share
21:29 rides. So a way to sort of
21:31 crosspollinate, you know, the message
21:33 and the amplification of this. That's
21:35 when the second I believe this will be
21:37 success. I look forward to hearing it.
21:39 Continued success
21:41 as the opportunity for new routes to be
21:43 developed comes into play. I would urge
21:46 you to consider uh southwest Boston,
21:48 particularly Hyde Park, Rosdale, and
21:50 West Rox. Those are three neighborhoods
21:51 that do not have any access to subway
21:53 stations. Um, as many folks know, many
21:57 folks at this table know, it's in a uh
21:59 uh uh another [clears throat] commuter
22:01 rail uh uh zone, which makes it even
22:03 more expensive for for folks to access
22:05 this. So, anything we can do to um
22:07 include those, I think, would be uh well
22:09 wellreceived across the board. But great
22:11 work team. Looking forward to seeing
22:12 this be a success.
22:13 Really appreciate that. Thank you.
22:15 I definitely that was going to be my
22:16 point. The Southwest Corridor um we
22:19 definitely need to look at that.
22:21 Yeah, certainly. and we're definitely
22:23 open to ideas. So, anyone who has ideas,
22:25 we would love to hear them. Um, but
22:27 certainly open to expansion
22:28 opportunities as well as funding and
22:30 time allows. Thank you.
22:34 Um,
22:35 I Hi, it's Kate. I agree. Um, this is
22:38 fantastic. I just was curious. Um is
22:42 there any expectation that any BPS
22:44 students will be using this service or
22:49 not so much or
22:51 so to the extent that they'll be free
22:53 and open to the public and operating
22:54 during BPS arrival and dismissal hours?
22:57 I can imagine a world where there will
22:59 be some BPS students who are using them,
23:01 but um we haven't gotten into that level
23:02 of detail yet, but we flagged it for our
23:04 colleagues at
23:04 But you wouldn't preclude that,
23:06 right? Exactly.
23:08 Yeah. Exactly.
23:08 Okay, great. Thank you.
23:11 Great. Um I do have a couple questions.
23:12 So um so I just want to get a sense of
23:16 got a lot of different players here like
23:18 who are the roles what who is doing all
23:21 this stuff like and particularly I would
23:24 like you to explain the um the pass
23:26 through concept right and want to make
23:28 sure that you know there's awareness of
23:31 what that really means um and and kind
23:34 of why we do it in that structure.
23:37 Sure. So I can start an answer and then
23:40 start. Yeah.
23:40 Mina, Jim, if you guys want to add as
23:42 well.
23:42 So [clears throat and cough] the the the
23:45 who, right?
23:45 Yeah. Yeah.
23:46 So we are working with uh our colleagues
23:49 here within the streets cabinet to
23:51 actually administer sort of the on
23:53 street services. So as we think about
23:54 where shuttle stop locations will have
23:56 to be.
23:57 Yeah.
23:57 We're going to work to identify places
23:59 that are accessible and we'll put post
24:01 signs and we'll be able to have like a
24:03 really good experience for somebody
24:04 who's trying to board the bus and an
24:05 accessible experience. Right. Right. So
24:06 you'll be able to board the mobility
24:07 device. So we'll work in the operations
24:09 within streets.
24:10 And as we think through the grant and
24:11 contract administration, we'll be
24:13 working with Amina, with Jim to make
24:15 sure that we fulfill all of the
24:16 requirements of the grant. So whether
24:18 that's the data collection, whether
24:20 that's the financial oversight, we'll
24:21 make sure that that's all covered.
24:23 Why pass through? So at the end of the
24:26 day, Mass is primed to receive federal
24:29 grants in a way that um is efficient.
24:32 they are already receiving half this
24:33 grant uh which is sort of a uh bike
24:37 share program. Uh so it was just thought
24:40 to be more um efficient if one party
24:42 received the money from the federal
24:43 government as opposed to having multiple
24:45 grantees within the same grant.
24:46 Got it.
24:47 Got it. No, it makes sense. And who's
24:49 going to be doing that community
24:50 outreach? Does that go into our like our
24:54 processes, our people, or is that in a
24:56 different area department?
24:57 Uh so it will be city staff who lead
25:00 that outreach. So at the end of the day,
25:01 it's going to be a combination of folks
25:03 from the streets cabinet who are already
25:05 working in Blue Hill along Blue Hill A
25:07 and Madan
25:08 uh Growall and then it'll be folks up
25:10 here in planning who we will coordinate
25:12 with and O andS of course.
25:13 Got it. Um okay, let me see if I have
25:17 any other questions. I scribbled them
25:18 everywhere. Well, I do want to thank um
25:20 thank you um and it wasn't lost on me um
25:23 the accounting and the risk management
25:25 and the financial controls slide and you
25:29 know the risk that comes with path
25:30 passroughs and and I'm glad that you uh
25:34 deliberately put that there. So, thanks
25:36 for reading my mind on that one. Uh I am
25:38 an auditor. That's what I do for a
25:40 living. So, [laughter] so this is um uh
25:43 it was all there and financial controls.
25:45 Um, I'm glad that we've kind of set up
25:48 the infrastructure already, that we have
25:50 a program grant management with like new
25:52 tools and new processes. And I'm geeking
25:55 out, but like all of this stuff, right?
25:58 All of that hard work that you did for
26:00 like the past, I don't know, 10 years
26:02 that I've been watching
26:03 is um, you know, is were benefiting from
26:07 all of that work. So, just wanted to
26:09 kind of um shout out uh and recognize
26:13 all of that hard work that leads up to
26:14 this to a more smooth and well-ontrolled
26:18 um administration of these large sums of
26:20 money. So, um that was just really
26:24 exciting for me. Um
26:26 um and credit where credits do Amina and
26:27 her team put this all together.
26:29 Yeah. Yeah. Yeah.
26:30 Yeah.
26:30 Is there is there one I think I think I
26:32 saw on the slide that it um the
26:35 application was in 24 submitted in 24.
26:37 you've just received it. Where does the
26:39 three years come into play? Is it three
26:42 years from
26:43 so to put the money out there?
26:45 We have to spend the money by uh 2030.
26:47 So that's where the three years comes
26:48 into play.
26:49 And it's funding that will allow us to
26:51 get to that that
26:52 Okay.
26:52 level. Yeah.
26:53 Great. Thank you.
26:55 Okay. Good.
26:56 Um and okay, the last the last thing I
27:00 know we haven't done I know we have gone
27:02 with the community process. It does make
27:03 me nervous that the two that were less
27:06 uh sure about the routes are Roxbury and
27:08 Manipan. So, um I know you've got lots
27:11 of work and outreach and stuff like that
27:12 to do that. Um but um
27:16 uh
27:18 yeah,
27:19 you got one.
27:19 I think any [laughter] kind of just
27:21 Yeah, any kind of update. I mean, I just
27:23 wanted to say that that you know, that
27:25 worries me for that, but I know why. Um,
27:27 and I know that, you know, um, the city
27:30 staff will do their proper community
27:32 outreach and due diligence to really
27:34 find out like what are those paths,
27:36 right? Like some of those paths I'm on
27:38 and I'm just like, "Oh, okay. I can see
27:40 this, but I also see how we walk around
27:42 all over the place." So anyway, um, so
27:47 what happens now if we right, we're
27:49 going to what are the next steps right
27:51 after we take a vote?
27:53 Certainly. So at this point we sort of
27:55 divide into two different segments. So
27:57 there's the three TMA run routes and
27:59 this gives the TMAs the ability to sort
28:02 of work with us begin procuring you know
28:04 sign all the final legal paperwork
28:06 procure their vendors and begin running
28:08 the routes. The next step on the
28:11 engagement side is we would start to
28:12 work with our colleagues within office
28:14 of neighborhood services within streets
28:16 and begin to identify what is the sort
28:18 of proper community process. How do we
28:20 want to start to uh sort of speak to the
28:22 community about these these ideas?
28:24 Again, some of this work's already
28:25 happening with our Blue Hill AV work.
28:26 So, some of it might get sort of tacked
28:28 on to that, but um there's definitely
28:30 going to be some standalone public
28:31 meetings that will address these.
28:33 Exciting. Okay, great. Any other
28:35 questions or comments? Right. Hearing
28:37 and seeing none, a motion is in order.
28:39 So moved.
28:39 Second.
28:40 All those in favor? I
28:43 opposed. The eyes have it. Motion
28:44 passes. Thanks, Jim.
28:46 Thank you all so much.
28:47 All right. Okay. Item number nine,
28:49 personnel Teresa.
28:58 Good evening. We have a couple of items
29:01 for your consideration on the EDIC
29:03 agenda with exact details included in
29:05 the board memos. We have one contract in
29:08 the IT division, Zachary Gagny. We have
29:12 one internship in the urban design
29:14 division for Sheeta Gorla. And we have
29:18 one resignation in the research
29:20 division, Emily Cores, who is a research
29:23 associate. Okay. All right. Um any
29:25 questions or comments from the board?
29:28 We'll definitely want to welcome um our
29:31 um in new intern,
29:34 uh you know, new contractor consultants
29:36 that are working with us and to again
29:37 thank Emily um for all your
29:39 contributions um here at the city and
29:41 the research department. um you guys
29:44 just churn out these like analysis and
29:47 reports that um and make them really
29:49 available and I just really appreciate
29:52 that too. So I just want to say that and
29:56 um any further questions or comments.
29:59 Did we did I already make a motion? No.
30:03 Did I move?
30:03 No.
30:04 No. Okay. A motion is in order.
30:06 So moved.
30:07 So seconded. [laughter]
30:09 All those in favor? I
30:10 I [snorts]
30:11 uh opposed. The eyes have it. Motion
30:13 passes. Thanks, Teresa.
30:15 Sorry about that.
30:16 And finally, uh I need a motion to
30:18 adjourn the EDIC meeting.
30:20 Motion to adjurnn.
30:22 Second.
30:23 All those in favor?
30:24 I
30:25 opposed. The eyes have it. Uh EDIC
30:28 meeting adjourned.
30:31 Okay, we're going to start the uh the
30:33 next portion of the meeting. Thank you
30:35 for joining the September 17th, 2026.
30:38 Boston Redevelopment Authority board
30:40 meeting. At this time, the Boston
30:41 Planning and Development Agency is
30:43 hosting public meetings in a hybrid
30:45 setting for the health, safety, and
30:46 accessibility of Boston residents.
30:48 Hybrid means that our board meetings are
30:50 conducted in person at city hall in our
30:52 boardroom on the 9th floor and virtually
30:55 via Zoom and Boston City TV at the same
30:58 time. For more information and updates,
31:00 visit bostonplans.org.
31:02 The open public meeting law requires
31:04 that I notify the public that this
31:05 meeting is being recorded. Please be
31:07 aware that an audio and visual recording
31:09 of this meeting is being made and
31:10 broadcast by Boston City TV which is a
31:12 part of the city of Boston office of
31:13 cable communications at Xfinity channel
31:16 26 RCN channel 13 and Verizon files
31:18 channel 962. It's also being live
31:20 livereamed at boston.gov/cable.
31:23 If there's anyone in the audience who is
31:25 recording this meeting, I just ask that
31:26 you please identify yourself now. Okay,
31:28 seeing none. Um, also please note that
31:31 demonstrations of approval and
31:33 disapproval from members of the public
31:34 are not permitted during the meeting.
31:36 And we're going to start with a roll
31:37 call. Miss Jacqu
31:38 here,
31:39 Miss Bennett
31:40 here.
31:41 Mr. Shepard
31:42 here.
31:42 Mr. Omali
31:43 present.
31:44 And uh I the chair house and present. Um
31:48 item number one, request authorization
31:50 for the approval of the minutes of the
31:52 August 13th, 2026 board meeting. A
31:54 motion is in order.
31:55 So moved.
31:56 Second.
31:57 All those in favor? I
31:58 opposed.
32:00 Um I was I too. The eyes have it. Motion
32:02 passes. Um item number two, request
32:04 authorization to extend the t tentative
32:06 designation status of a joint venture
32:08 between Asian Community Development
32:11 Corporation and the community builders
32:12 incorporated as the redeveloper of
32:14 parcel P-12Z in the South Cove Urban
32:17 Renewal Area. project number Mass R-92
32:21 located at 290 Tmont Street in Chinatown
32:24 for a period of 12 months until
32:26 September 30th, 2027. Ben. Thank you,
32:29 Madam Chair, members of the board,
32:31 member of our real estate disposition
32:33 team, and we are requesting board
32:35 approval to extend the tenative
32:37 designation status of the joint venture
32:39 between Asian Community Development
32:41 Corporation, also known as AC/DC, and
32:44 the Community Builders Incorporated,
32:45 which is known as TCB, together known as
32:47 the redeveloper, for the redevelopment
32:49 of parcel P12C, and to continue lease
32:52 negotiations with them to facilitate the
32:54 long-term ground lease PCL P12C located
32:58 at 290 Tmont Street in the Chinatown
33:00 neighborhood is an approximately
33:02 29,000qt site located in the South Cove
33:05 urban renewal area. [clears throat] The
33:07 current proposed plan is for the
33:09 development to include 111 affordable
33:11 rental units um after it went through a
33:13 notice of project change that the board
33:15 approved [clears throat]
33:17 last year around this time. All rental
33:19 units will be income restricted at rents
33:21 affordable to h households with income
33:22 levels ranging from approximately 30% of
33:25 area [clears throat] median income to
33:26 80% area median income. Additionally,
33:28 the proposed project will include
33:30 approximately 1,900 square ft of ground
33:33 level community uh more commercial space
33:36 100 level and 111 bicycle parking
33:38 spaces. Since receiving its tenant
33:40 designation, uh, ACDC and TCB have made
33:43 great strides in moving their project
33:45 forward, which you can see the specifics
33:47 in the board memo. Um, and during the,
33:51 um, the next 12-month extension, the
33:52 development team hopes to achieve um,
33:55 the steps necessary to receive final
33:57 designation and maybe even start
33:59 construction. Uh, given this
34:00 information, we respectfully request
34:02 that you vote to extend TCB and ACDC's
34:05 tenative designation status for 12
34:06 months. Thank you and happy to answer
34:08 any questions. Okay. Any questions or
34:10 comments from the board? Hearing and
34:12 seeing none. A motion is in order.
34:13 So moved.
34:14 Second.
34:14 All those in favor? I
34:16 opposed. The eyes have it. Motion
34:18 passes. Thanks, Ben.
34:20 Thank you.
34:22 And great progress on that project. I'm
34:24 excited. Uh item number three, request
34:27 authorization to convey parcel number
34:30 0202822010
34:34 located at the corner of Mount Vernon
34:36 Street and Looney Way in the Charleston
34:39 neighborhood, also known as Charleston
34:41 Peace Park, to the city of Boston Parks
34:44 and Recreation Department. Stephanie,
34:46 [clears throat]
34:46 thank you, Madam Chair, and members of
34:48 the board. I'm here to request
34:49 authorization to transfer one parcel
34:51 known as the Charlestown Peace Park from
34:53 the BPDA to the city of Boston Parks and
34:55 Recreation Department. Peace Park was
34:57 originally dedicated to the late Robert
34:59 McGrath, a beloved Charletown resident
35:01 resident who is tragically the victim of
35:03 violence 30 years ago. The park has a
35:05 strong history of community stewardship
35:07 starting in 2019 when a group of
35:09 neighbors and community members took
35:10 charge to add new plant beds, repair
35:12 park furniture, and rep fences. Around
35:15 this time, the Charlestown Coalition
35:17 Youth Program turned it around, began
35:19 maintaining the park. They soon after
35:20 began holding peace focused events at
35:22 the site following receipt of a Love
35:24 Your Block Grant from the city of Boston
35:26 in 2020. The next year in 2021, the city
35:28 of Boston awarded the Charlestown
35:30 Coalition a CPA or community
35:32 preservation award to fully design and
35:33 build a renovated park. In November
35:36 2023, the BPDA real estate team
35:38 presented a request to the board to
35:40 acquire the parcel from the MA from Mass
35:42 DOT in order to oversee the park
35:44 redesign in coordination with the
35:46 coalition and prior to transfer of the
35:48 completed park to the Boston Parks
35:50 Department. The team returned to the
35:52 board in June 2024 and April 2025 to
35:55 request authorization to release an uh
35:57 invitation for bids and to execute a
35:59 contract with Haven Contracting Group
36:01 for the completion of the work
36:02 respectively. Since this time, the real
36:05 estate capital construction team has
36:06 worked closely with the Charlestown
36:08 Coalition and Parks Department staff
36:10 throughout the design and construction
36:11 process. This included helping the
36:14 coalition refine and bid out the design
36:15 work, overseeing the environmental site
36:17 assessment, bidding, and execution of
36:19 the construction work and overseeing or
36:21 assisting in the coordination of all
36:23 final closeout documentation for the CPA
36:25 grant and construction work. We're happy
36:27 to report the park is complete and very
36:28 beautiful. Following this request to
36:31 transfer, this parcel will be brought
36:32 before the parks commission for their fi
36:34 formal vote to accept the property into
36:36 their inventory. As the final step,
36:38 staff will record the deed for a nominal
36:40 fee of $1. Thank you. And I'm happy to
36:42 answer any questions.
36:43 Excellent. Thank you. Any questions or
36:45 comments from the board? All right.
36:47 Hearing and seeing none, a motion is in
36:48 order.
36:49 So moved.
36:49 Second.
36:50 All those in favor? I
36:52 I
36:52 opposed. The eyes have it. Motion
36:54 passes. Thanks, Stephanie.
36:57 Item number four, request authorization
36:59 to issue a request for proposals to hire
37:01 a licensed design consultant to provide
37:03 landscape and engineering design
37:05 services resulting in construction
37:06 documents for the shipyard park
37:08 landscape and infrastructure repairs
37:09 project in the Charlestown Navyyard in
37:12 Boston, Massachusetts. Tyler,
37:14 thank you again, Madam Chair, members of
37:15 the board. We are requesting
37:17 authorization to advertise a request for
37:19 proposals for landscape and engineering
37:20 design services for repairs at Chipyard
37:23 Park in the Charles Town Charles Town
37:25 Navyyard. The park dates back to the
37:27 1980s and we're looking to have
37:28 consultant conduct and a comp
37:31 comprehensive condition assessment of
37:33 the park's landscaping hardscape and
37:35 utility infrastructure with a particular
37:37 focus on the irrigation system. The
37:39 consultant will develop construction
37:41 document documents, obtain permits,
37:43 assist with bidding, provide basic
37:46 construction administration. We have
37:47 $150,000 budgeted for the design
37:50 contract with an anticipated
37:51 construction budget of $850,000.
37:54 Our goal is to complete the design and
37:56 bidding process and begin construction
37:58 in spring [clears throat] of 2027. Staff
38:00 is therefore recommending authorization
38:02 to advertise and issue the request for
38:04 proposals for the landscape and
38:05 engineering design services project at
38:08 Shipyard Park. Thank you for having
38:09 questions answered at this time.
38:11 Okay. Thank you. Any questions or
38:13 comments from the board? Right. Hearing
38:15 and seeing none. A motion is in order.
38:17 So moved.
38:18 Second.
38:19 All those in favor? I
38:20 I
38:21 opposed. The eyes have it. Um, motion
38:24 passes. Thank you, Tyler.
38:25 Item number five, request authorization
38:27 to issue an invitation for bids for the
38:29 construction of the China Trade Center
38:31 roof replacement located at two Boilston
38:33 Street. Tyler,
38:35 thank you again. We are requesting
38:37 authorization to advertise and issue an
38:38 invitation for bids for the China Trade
38:40 Center roof replacement project at two
38:42 Boilston Street. The the China Trade
38:45 Center is a sixstory approximately
38:47 90,000 square foot historic building
38:49 that dates back to 1887 and is both
38:51 listed on the National Registration of
38:53 Historic Places and designated as a
38:55 Boston city landmark. The existing roof
38:57 was replaced in 2001 and is now beyond
39:00 its anticipated service life. A
39:02 [clears throat] recent building systems
39:03 assessment found significant
39:04 deterioration including water
39:06 infiltration, structural and life sa
39:09 life life safety concerns and insulation
39:11 that does not meet current energy code
39:12 require requirements. The project will
39:15 primarily consist of replacing the
39:17 existing roof system along with
39:19 replacing the skylights, roof hatch,
39:21 mechanical curbing, and adding
39:22 guardrails. The estimated construction
39:24 cost is 1.5 million which is included in
39:26 the FY27 capital construction budget.
39:29 The invitation for bids will be publicly
39:31 advertised under Mass General Law
39:33 chapters 149 with the contract award to
39:35 the most responsible and responsible low
39:37 bidder. Staff is therefore recommending
39:40 authorization to advertise and issue the
39:42 invitation of to bid for the China trade
39:44 roof replacement project. Thank you. If
39:46 you have any questions, I'd happy to
39:47 answer them at this time.
39:48 Thank you. Questions or comments from
39:49 the board?
39:51 Um, I'm just gonna So, with a roof, um,
39:55 are there opportunities to like I'm
39:58 getting into Matt your zone here. I
40:01 thought you were going to ask a
40:02 question, but yes, opportunities to get
40:04 it, you know, ready for solar ready or
40:07 just, you know,
40:09 replacing it in a way that is like
40:11 forward looking so that way it's, you
40:13 know, ready if we wanted to do something
40:15 like that or I don't even know what the
40:17 roof looks like if you can.
40:19 uh the way this roof structurally is. I
40:23 we were just kind of designing it off of
40:25 what's there like replacing the the uh
40:28 skylights themselves.
40:30 Um
40:32 just something to think about, just
40:33 something to to think about when we're
40:35 going through all these like um I just
40:37 saw a roof and I thought
40:40 Matt always wants to throw some stuff up
40:41 on a roof. So uh so I thought I'd ask.
40:45 [laughter] All right. No, but it's good
40:46 stuff. um
40:47 ask about apprenticeship.
40:50 Um okay, any further questions or
40:52 comments? Hearing nay. None. Motion is
40:54 in order.
40:54 So moved.
40:55 Second.
40:56 All those in favor?
40:57 I
40:58 opposed. The eyes have it. Motion
41:00 passes. Thanks, Tyler.
41:01 Thank you.
41:02 Uh item number six, requests
41:04 authorization to issue a certificate of
41:05 completion for the successful completion
41:08 of uh 1003 through 1013 Harrison Avenue
41:12 project in accordance with section C.4
41:14 four of the cooperation agreement buying
41:16 between the Boston Redevelopment
41:17 Authority doing business as a Boston
41:18 Planning and Development Agency and the
41:21 Benjamin Franklin Cummings Institute of
41:23 Technology dated November 29th, 2023.
41:26 This is a certificate of completion uh
41:28 that we'll hear about at the closing
41:30 remarks, but um there's no presentation.
41:32 So, a motion is in order.
41:34 So, move second.
41:35 All those in favor?
41:36 I I opposed. The eyes have it. Motion
41:40 passes. Item number seven,formational
41:43 update on our one-year progress of a
41:46 place to thrive, an anti-displacement
41:48 action plan for Boston, outlining
41:50 targeted policies, programs, and
41:52 resources city departments committed to
41:54 advance on a two-year implementation
41:57 timeline to mitigate residential, small
41:59 business, and cultural displacement.
42:01 Katherine, hello everyone. Apologies.
42:03 Uh, it's a pleasure to be with you. I'm
42:04 Katherine Lusk, executive director of
42:06 the Planning Advisory Council. Was last
42:08 before you a year ago. um when the board
42:11 adopted a place to thrive, Boston's
42:12 first anti-displacement plan. It's a
42:14 pleasure to be back in front of you with
42:15 an update one year on. Uh next slide.
42:20 [clears throat]
42:21 So, as a quick reminder, in July 2025,
42:24 Boston adopted our first citywide
42:25 anti-displacement plan. Um within the
42:28 plan, we focused on residential as well
42:30 as small business and cultural
42:31 displacement. At the time, the plan
42:33 included 29 new or updated residential
42:35 stabilization policies or programs and
42:38 15 commercial and cultural stabilization
42:40 initiatives. The [clears throat] tools
42:42 were designed to fill gaps in our
42:43 existing toolkit. So, there was a
42:45 rigorous process which I won't remind
42:47 everyone of uh both engaging with
42:49 community looking at best practices and
42:50 doing a deep dive into all of the
42:52 resources that we have at our disposal
42:54 at the time and really understanding uh
42:56 what those gaps were that we needed to
42:57 fill. Um it was an administrativewide
42:59 effort. The plan was created in
43:00 partnership with more than 20
43:01 departments and together with community.
43:03 At the time, we stated we were on a
43:05 two-year implementation timeline and we
43:07 made a public commitment to a one-year
43:09 progress report. Next slide.
43:13 Again, by way of additional background,
43:15 um uh to be most effective, we started
43:17 with a common understanding of what we
43:18 mean when we say displacement. In
43:20 general, it means when people are forced
43:21 to leave their homes and neighborhoods
43:23 due to external pressures. But there are
43:25 different kinds of displacement that we
43:26 see um and hear from our residents that
43:29 they're living with on a day-to-day
43:30 basis. And the plan worked to address
43:32 all four. So direct displacement refers
43:34 to when a household is forced to move uh
43:37 typically due to something like an
43:38 eviction, a foreclosure, or demolition
43:39 of the property. Economic displacement,
43:42 sometimes also called indirect
43:43 displacement, is when people are priced
43:45 out of their chosen community, be it the
43:46 city at large or their chosen
43:48 neighborhood, due to rising costs and
43:49 expenses or lack of supply relative to
43:52 demand. Commercial and cultural
43:53 displacement refers to the closure or
43:55 relocation of a business, which may be
43:57 due to direct or economic displacement.
43:59 Our businesses experience the same kind
44:00 of pressures that our residents do. And
44:03 then lastly, gentrification typically
44:05 describes a pattern of neighborhood
44:06 change where a neighborhood experiences
44:08 new public or private investment. often
44:10 accompanied by demographic change.
44:12 Historically, that's referred to
44:13 instances where low-income residents are
44:15 replaced by higher income earning
44:17 residents. Next slide.
44:20 Again, last slide. By way of final
44:21 reminder, um Boston's approach was
44:23 structured around the four Ps of
44:25 stability. So, um this was just a way of
44:28 explaining to the public as we think
44:29 about a broad array of tools and
44:31 resources. Um how do we uh sort of uh
44:34 philosophically and through a framework
44:36 um work to mitigate displacement? So, on
44:38 the residential side, we work to protect
44:40 low-income renters and homeowners from
44:42 displacement. We work to preserve um
44:45 affordable public and private uh housing
44:47 and make sure it stays affordable, to
44:49 produce new housing for people of all
44:51 incomes, and to support prosperity. So,
44:54 building wealth through home ownership,
44:55 workforce development, and financial
44:56 empowerment is as important as
44:58 responding to a crisis a household might
45:00 be experiencing. Um, we have those same
45:02 principles when it comes to commercial
45:04 and cultural stability. Working to
45:05 protect, anchor small businesses and
45:06 cultural enterprises, preserve physical
45:08 spaces and places that are important to
45:10 community, produce new affordable and
45:12 market rate commercial cultural spaces
45:14 and priority areas, and support
45:16 prosperity for our small businesses by
45:18 building wealth through ownership and
45:19 contracting opportunities.
45:22 So, with that, I'm going to turn it over
45:23 to my colleague Joy Armstrong, who is
45:25 going to take you through some updates
45:26 um, and some specific progress we've
45:28 seen over the last year.
45:29 Great. Thank you.
45:33 Hi, I'm Joy Armstrong, implementation
45:35 manager with the planning advisory
45:36 council and yes, here to give you guys
45:39 an overall update and go to the next
45:40 slide um on progress over the last year
45:44 of implementation. So, we're looking at
45:46 53 tools in total. Nearly 70% of our
45:50 commitments are already actively being
45:52 implemented or or are in development.
45:55 This includes 10 new initiatives
45:56 launched since the original plan was
45:58 adopted. 11 policies are sitting in our
46:01 legislative pipeline awaiting state or
46:02 city council action. Six initiatives are
46:05 currently paused or under review. These
46:07 are driven primarily by shifts in the
46:09 broader regulatory environment or
46:11 resource constraints. Next slide.
46:16 Now we'll go into a few progress
46:18 highlights from plan implementation over
46:20 the last year. In January 2026, we
46:22 launched the article 80 direct
46:24 displacement disclosure pilot under
46:26 which proponents of new small and large
46:28 projects must notify existing tenants of
46:30 the project and disclose potential
46:32 direct residential, commercial or
46:34 cultural displacement to the city at
46:36 filing, including proposed mitigation
46:38 where relevant. This pilot puts two
46:40 things in place. one, a unified review
46:43 process across the departments that
46:45 would need to respond to this
46:46 disclosure, including planning, the
46:48 mayor's office of housing, the office of
46:50 economic opportunity inclusion, and the
46:52 mayor's office of arts and culture. Two,
46:54 it puts in place a clearer, more
46:55 transparent pathway so displacement
46:57 commitments stay visible as projects
46:59 move forward. Since launching, we've
47:01 accomplished four major milestones. One,
47:04 we built out the core tool kit, the core
47:06 toolkit for the disclosure, including a
47:07 standardized disclosure forms, tenant
47:10 notification templates, and priority
47:12 population guidance. Two, we embedded
47:14 the requirement into our development
47:16 review process, adding it to pre-file
47:18 guidance and internal review tools.
47:20 Three, we strengthened our cross
47:21 departmental coordination so roles are
47:23 clearer among relevant departments. And
47:25 four, finally, we set up an internal
47:27 tracker to evaluate the pilot over its
47:29 12-month run. Next slide.
47:34 To see an example of how this has worked
47:36 in practice, let's we're looking at a
47:38 project on Washington Street which came
47:39 in earlier this year. Here the city
47:42 received information earlier in review
47:44 that previously would have been
47:45 discovered much later. In this example,
47:47 the proposal would replace an existing
47:49 retail building with 35 homes and two
47:52 new storefronts. With this pilot now in
47:54 place, our staff flagged those active
47:56 uses during initial intake and requested
47:58 the d the direct displacement
48:00 disclosure. Next, the disclosure made
48:02 potential displacement more visible. The
48:05 disclosure documented two current
48:07 commercial tenants, including a
48:08 long-standing small business. In this
48:11 case, the proponent also indicated
48:13 willingness to work with qualifying
48:14 tenants on relocation terms and
48:16 potential return to the new development.
48:19 Finally, it also established clear city
48:21 ownership and cross-dep departmental
48:22 handoffs. After being circulated
48:25 internally, the disclosure um
48:26 development review connected the project
48:28 with our dedicated team in OOI and small
48:31 business, ensuring the right city staff
48:32 are engaged to support those tenants as
48:34 the review moves forward. It's still
48:37 early in the pilot and projects have not
48:39 advanced far enough for us to point to
48:40 many completed mitigation agreements
48:42 yet, but we are already seeing the
48:44 process do what it was designed to do.
48:46 Tenants are receiving advanced notice.
48:48 Proponents are documenting existing
48:50 tenencies at filing. And the city has
48:52 information earlier in review that
48:53 previously could have been difficult to
48:55 identify.
48:57 Next slide.
48:59 Moving to our next progress highlight.
49:01 We're looking at the Boston Acquisition
49:02 Fund. The Mayor's Office of Housing
49:05 created a public private revolving loan
49:07 fund to support missiondriven developers
49:09 in purchasing and preserving occupied
49:11 multif family properties to convert them
49:13 into permanently affordable housing. On
49:15 the progress side, the fund now sits at
49:17 $45 million. It's actively administered
49:20 by our partners at the Massachusetts
49:22 Housing Investment Corporation. Recent
49:24 acquisitions align with community
49:26 priorities set during planning and
49:27 processes. A great example of this
49:29 pictured here on the left is the recent
49:31 acquisition of Parkside on Adams and
49:33 Rosendale Village, which successfully
49:35 preserved 43 rental units as long-term
49:37 affordable homes for the neighborhoods.
49:40 Next slide. Our next highlight is on the
49:43 housing accelerator fund. This is a $110
49:46 million municipal revol revolving loan
49:49 program designed to jumpstart
49:51 residential construction and make
49:53 stalled mixed income projects
49:54 financially viable across the city. That
49:57 110 million is broken down across three
50:00 main buckets. 50 million was dedicated
50:02 to the Bunker Hill redevelopment. This
50:04 funding enabled construction to kick off
50:06 on a 266 unit mixed [clears throat]
50:08 income building in Charles Town which
50:10 includes 58 deeply affordable units. The
50:13 next 50 million was dedicated to
50:15 preferred equity financing for market
50:16 rate rental housing. These investments
50:18 are being made alongside the state
50:20 matching their ongoing investments in
50:22 housing creation across Boston. And the
50:24 final 10 million was aimed at market
50:26 rate home ownership projects. On this
50:28 piece, the the Boston Housing Authority
50:30 has issued an RFP for its first round of
50:32 accelerated funding and is currently
50:34 active actively reviewing pro proposals
50:37 with another funding round anticipated
50:39 in the future.
50:41 Next slide.
50:43 Next, our office to residential
50:45 conversion program. Our fasttrack
50:47 permitting and tax incentive
50:48 [clears throat] program to accelerate
50:49 the conversion of older underutilized
50:51 office buildings into mixed income
50:53 multif family residential units. Looking
50:55 at our progress, 19 projects are now
50:57 board approved, representing nearly 1500
50:59 units total, 276 of which are income
51:02 restricted. Seven projects are actively
51:05 in construction and one is fully
51:06 completed. And we have another nine
51:08 applica applications currently underway.
51:11 Next slide.
51:13 Additionally, there are some instances
51:15 where we've had to remain adaptive in
51:17 the last year. Some efforts are on hold
51:20 due to staffing or financial constraints
51:21 that limit feasibility at this time. And
51:24 in other instances, there have been
51:26 impacts from federal actions or
51:28 regulatory changes. Next slide.
51:33 Oh, you can
51:35 skip through these. And another Yeah,
51:37 there we go. In the last year, we've
51:39 also been able to add In the last year,
51:40 we've also been able to add 10 new tools
51:42 to the toolbox responsive to the needs
51:44 of community. These center around
51:46 lowering utility burden, ensuring that
51:48 our business districts are vibrant, and
51:51 contributing to long-term planning
51:53 efforts.
51:54 Next slide.
51:56 You can learn about our progress on all
51:58 other tools from the plan in our year 1
52:01 progress report which you can find at
52:02 boston.gov/anti-displacement.
52:05 Thank you. And we're happy to answer any
52:07 questions.
52:08 Great. Thank you. Uh questions
52:11 or comments from the chair?
52:12 Quick comment. Um, well, with access to
52:15 capital being so tough right now for
52:18 projects to pencil out, we need programs
52:20 like this to accelerate housing and also
52:23 to accelerate construction projects to
52:25 get, you know, people in the city back
52:27 to work. So, um, definitely I think this
52:29 is a great program, 266 units in the
52:32 Bucket Hill area. That's great to see.
52:36 Yeah.
52:38 Additional questions or comments?
52:40 Well, this isformational update.
52:42 Go ahead, please. Yeah,
52:45 Kate, the floor.
52:45 Sorry, I can't see this.
52:46 I know. [laughter]
52:47 Should I go ahead? Okay.
52:48 Yes.
52:49 Sorry. Um,
52:51 I'm just wondering what the disclosure
52:54 notice like can you just briefly
52:56 summarize what that says and does the
52:58 city provide that language or do the
53:01 developers?
53:03 Sure. There's Yeah. Yeah. Kate, great
53:05 question. Um, there's uh three
53:07 components to the article article 80
53:09 direct displacement disclosure process.
53:11 The first is the tenant notification
53:13 form. So we provided tenants um sorry we
53:16 provided proponents with templated what
53:18 we call TNFs. Um there's a version of it
53:21 for residential tenants and there's a
53:23 version of it for small business
53:24 tenants. In both instances it's
53:26 providing the tenant with information
53:28 about the proposed project and it
53:30 includes uh additional resources that
53:33 are available on the city side. So for
53:34 example for residents it would direct
53:36 them to the office of housing stability
53:38 um and other folks they can call in the
53:39 city you know within mayor's office of
53:41 housing um in the small business TNF it
53:43 would direct them to the uh neighborhood
53:45 business managers and other people they
53:46 can reach out to with resource for
53:48 additional resources the disclosure
53:50 itself the proponent fills out and
53:52 submits to the city and that's where
53:54 we're getting additional information
53:56 about either current residential
53:58 tenencies or current small business and
54:00 cultural tenencies. So who are the
54:02 tenants? what's the nature of the terms
54:04 of their leases and then has there been
54:07 discussion with them about the proposed
54:09 project and has there been any
54:10 discussion with them about either
54:12 relocation or options to return in the
54:14 future. The third piece of the project
54:17 as it moves through the pipeline is
54:19 documentation of any of those
54:21 considerations about relocation or
54:24 options to return and those unfold in
54:26 partnership with both the tenants of
54:28 course with input from community led by
54:30 our colleagues in development review and
54:32 with input from staff from um supporting
54:35 departments.
54:37 That's great. Thanks Katherine. And so
54:40 if I understood what you said, it sounds
54:42 like it's too early to know
54:46 if there are you are you measuring
54:48 actual actual displacements through that
54:51 process?
54:52 It's a not at the moment it's a
54:54 notification process. So it's both
54:56 ensuring that there's greater
54:58 transparency for the existing tenants
55:00 about the project kicking off. So
55:02 they're not finding out from, you know,
55:04 natural examples, right? Someone's
55:05 walking their dog saying, "Did you know
55:06 that your your building's being
55:08 redeveloped?" so that there's really uh
55:10 transparency upfront for the tenants. Um
55:12 and then it's also just putting in place
55:14 the uh uh to ensure predictability for
55:17 all parties that the city also has
55:19 information and is able to provide both
55:21 support to those tenants and then also
55:23 work with the proponent throughout the
55:25 development process to ensure that any
55:28 um any ways that they might want to
55:29 mitigate displacement impacts or think
55:31 about obviously in some instances folks
55:33 really want to hang on to a really
55:35 important small business that has great
55:36 foot traffic and create pathways
55:37 [clears throat] to bring them back and
55:38 we just want to make sure that we're
55:39 accounting for that as the develop
55:41 velment process as the um filing process
55:44 continues. So, we have a 12-month pilot
55:47 underway right now. We're really making
55:49 sure that the process is working, that
55:51 the developer is doing what they're told
55:53 to. We're doing what we're told to, our
55:55 colleagues and other departments are at
55:56 the table and community is well
55:58 informed. Um, and then we'll report back
56:00 to the board at the end of the calendar
56:03 year. The pilot officially went into
56:05 place. You all adopted it in October and
56:07 it officially went into place in January
56:09 of 2026.
56:12 Great. Thanks. Appreciate it.
56:14 Great. Um, just a couple of of
56:17 questions. Um, so I think it's it's
56:21 great. Um, this is more just on the
56:22 process of the planning and advisory
56:25 council. I love that it's there that
56:26 it's in place. Um, and um, but I'm just
56:29 curious, right, like how who from an
56:31 ownership and roles and responsibility
56:33 structure like how do you manage that?
56:35 And I just love love love this um you
56:38 know this annual report right of the
56:42 pilot. Um it shows great transparency
56:44 and accountability of what we're you
56:46 know of what we're doing all the things
56:48 that we're doing um and gives us the
56:50 kind of the working definition so that
56:52 we can have kind of these nuance
56:54 conversation right about um what is
56:57 displacement right and what are specific
57:00 things that we can do depending on the
57:01 type of displacement. Um, and I really
57:03 appreciate the um the [clears throat]
57:06 examples that you give. Um, because
57:08 anyway, I'm just I just really like this
57:10 because I can it helps me um have these
57:13 conversations, right, as when you're
57:16 talking to your neighbors and, you know,
57:18 trying to not combat some of the, you
57:20 know, the real challenges, but to
57:24 highlight
57:25 the different things that we're doing to
57:27 be able to address those challenges. So,
57:30 um, in there there was a question, but
57:32 yeah, the ownership, how's it going with
57:35 the council?
57:36 Sure. Um, I think this, uh, perfectly
57:39 exemplifies the reason for the formation
57:41 of the planning advisory council. We
57:43 really were designed by the mayor and
57:45 the planning department to be a central
57:47 coordinating body for plans. In this
57:49 case, we stood up a plan. Um, it was
57:52 truly a cross- departmental effort. So
57:55 um even in the early days we had five
57:58 ultimately seven cabinet chiefs who said
57:59 how do we actually create this plan
58:01 together and so it's very much a sense
58:03 of uh collective ownership and then the
58:05 planning advisory council as our team is
58:08 taking responsibility for doing the
58:10 ongoing tracking and then public
58:12 progress reporting.
58:13 Fabulous. Um all right. Um,
58:17 oh, last thing. I hope I'll be seeing
58:20 some more like Instagram reels and
58:22 stories and stuff about this with the
58:24 P's and all of that. Like I I want to
58:26 just also commend everybody on their
58:28 social media like um pages um and those
58:33 little videos to kind of explain some of
58:35 these definitions to explain those
58:36 concepts um I think are just really
58:38 great. So um you know
58:40 we appreciate that. That was one of the
58:42 things that we tried to do at the
58:43 beginning. I think the uh it is a a
58:46 topic about which people feel deeply and
58:48 and experience in their day-to-day lives
58:50 and trying to help people understand the
58:53 coordinated way that the city is working
58:55 together to advance it. Um but also
58:58 do explainer videos and other things on
59:00 social media as we did when we adopted
59:01 the plan last summer so that folks
59:03 really know that this is a coordinated
59:04 strategy versus just individual tools
59:07 being deployed by individual
59:08 departments.
59:09 Yeah. Yeah. That's so great. Um, all
59:11 right. Any other questions or comments?
59:14 All right. This isformational update. I
59:16 feel very informed. So, thank you so
59:18 much. [laughter]
59:19 Um, really appreciate it. Keep up the
59:21 awesome work.
59:23 Okay. Item number eight, request
59:26 authorization to execute an an amended
59:29 and restated cooperation agreement for
59:31 the Alustin Green project located at 20
59:33 Lynden Street in Alustin to adjust the
59:36 payment schedule for mitigation and
59:38 public benefits funds for from the
59:40 project. Aaron,
59:41 thank you, Chair Rojas. Uh, good evening
59:43 everybody, members of the board,
59:45 Director Shen and Secretary Pois. I'm
59:47 here u my name is Aaron Hollquist.
59:49 manager for developer compliance here to
59:51 request that the director be authorized
59:53 to execute and deliver a first amended
59:55 and restated cooperation agreement for
59:57 the Austin Green project at 20 Lynen
1:00:00 Street in Austin. When the board
1:00:02 approved this project back in December
1:00:03 of 2020,
1:00:06 um Austin Green was approved by the
1:00:07 board uh following following
1:00:10 contributions, sorry, were included in
1:00:11 the overall suite of mitigation and
1:00:13 public benefits. $100,000 to the BPDA to
1:00:16 be paid at the issuance of a building
1:00:18 permit held in escrow by the BPDA and
1:00:21 released to the Austin Brighton
1:00:22 Community Development Corporation.
1:00:24 $30,000 towards the Austin Brighton
1:00:26 mobility study due at building permit as
1:00:28 well and a further $5,000 also at
1:00:31 building permit for an Austin Brighton
1:00:33 youth coordinator position. Uh over the
1:00:36 past several years, the ongoing real
1:00:38 estate market uncertainties and
1:00:40 post-pandemic operational disruptions
1:00:42 have delayed construction beyond the
1:00:44 original construction schedule, altering
1:00:47 the timeline for the construction of the
1:00:49 three buildings that comprise the
1:00:50 overall Alustin Green development. For
1:00:52 instance, we have three buildings in
1:00:54 this project. Buildings A, B, and C.
1:00:56 Building C is the first one that is
1:00:58 underway. We've kind of gone backwards,
1:01:00 and it's also the smallest of the three.
1:01:02 It's only 49,000 square ft with 68
1:01:04 residential units. So that pulled
1:01:07 permits um last year um in the fall. Um
1:01:12 reached out to them looking for payment
1:01:14 and basically found out that the you
1:01:17 know ultimately the cash wasn't there.
1:01:19 We're seeing this across the the real
1:01:21 estate market as you probably know. Um
1:01:24 these circumstances have led the owner
1:01:25 and us to renegotiate the milestones at
1:01:28 which these uh the mitigation and public
1:01:30 benefit contributions are to be paid. Uh
1:01:33 going forward then these contributions
1:01:35 will be provided in two installments.
1:01:37 The first half 67,500 will be provided
1:01:40 within 90 days of the issuance of the
1:01:42 certificate of occupancy for building C
1:01:45 the building currently underway. and the
1:01:47 second half 67,500
1:01:49 will be provided within 90 days of the
1:01:51 issuance of the certificate of occupancy
1:01:53 for building A or B whichever happens
1:01:56 first. So uh hopefully uh the way I see
1:02:00 things going building C which is
1:02:02 currently under construction hopefully
1:02:04 get the COO for that I believe first
1:02:07 quarter next year within 90 days I will
1:02:10 take receipt of that first trench and
1:02:12 then be looking for the second trench uh
1:02:14 after COO of the next building. Uh, with
1:02:16 that, I'm happy to entertain any of your
1:02:17 questions.
1:02:18 Okay. Uh, questions or comments from the
1:02:20 board.
1:02:23 Um, I think it's just an excellent uh an
1:02:26 excellent catch, right? Or just an
1:02:29 excellent illustration of how our
1:02:31 processes, our internal processes work
1:02:33 to identify, right, to stay on those
1:02:36 milestones and stick to the what we
1:02:39 contractually agreed agreed upon. Um,
1:02:41 and then, you know, if not, then we
1:02:43 Yeah. I mean,
1:02:46 you talk about it and do one of these
1:02:48 [laughter] so that you can figure it
1:02:50 out. But again, I'm uh guess I'm really
1:02:52 like process and control focused today.
1:02:54 But um uh just want to highlight that
1:02:57 that's that working and and it's not at
1:03:01 the end way end of the project, right?
1:03:04 That we're oh did anybody check on that,
1:03:07 right? Kind of combats that like common
1:03:10 misunderstanding or that perception,
1:03:12 right? like and so you put the processes
1:03:14 in place and put the money trenches in
1:03:18 place u for that reason and I think it's
1:03:20 just a you know it tells a great story
1:03:22 of our processes.
1:03:24 Well I think with this work it's just uh
1:03:26 between what I do working with project
1:03:29 managers with our legal department in
1:03:30 particular is just making sure we're in
1:03:32 constant communication with the
1:03:33 proponent and their their legal counsel
1:03:35 as well.
1:03:36 Yeah. Good stuff. Um all right any other
1:03:39 questions or comments? Hearing and
1:03:41 seeing none, a motion is in order.
1:03:42 So moved.
1:03:43 Second.
1:03:43 All those in favor?
1:03:45 I
1:03:45 opposed. The eyes have it. Uh motion
1:03:47 passes. Thanks, Aaron. Item number nine,
1:03:49 request authorization to issue a
1:03:51 certification of approval pursuant to
1:03:52 article 80E small project review of the
1:03:54 zoning code for the proposed
1:03:56 construction of 42 residential rental
1:03:58 units, including seven IC units, 24 car
1:04:00 parking spaces, and 44 bicycle spaces
1:04:03 located at 697 Cambridge Street. And to
1:04:06 execute a community benefits agreement
1:04:07 and to take all related actions. Dan.
1:04:10 Thank you. Good evening, Madam Chair,
1:04:11 members of the board, Secretary Paul
1:04:13 Heis, Director Shen. My name is Daniel
1:04:15 Palano, project manager for the small
1:04:17 project review for you this evening at
1:04:19 697 Cambridge Street located in the
1:04:22 Bright Neighborhood. On October 23rd,
1:04:24 2025, the proponent filed an application
1:04:26 for a small project review with the
1:04:28 planning department for the proposed
1:04:30 project pursuant to article 80 of the
1:04:32 Boston Zoning Code. In addition to that,
1:04:34 the planning department also sponsored
1:04:36 and held a virtual public meeting on
1:04:38 November 18th, 2025 via Zoom. Uh, next
1:04:41 slide, please.
1:04:45 Um, the project seeks to erect a
1:04:47 three-story addition at top existing
1:04:49 two-story commercial structure,
1:04:50 resulting in a five-story residential
1:04:52 building um with total gross uh floor
1:04:56 area approximately 29,741
1:04:59 square ft. The project will introduce 42
1:05:01 new residential rental units, including
1:05:04 seven IZ units and provide 24 uh off-
1:05:07 streetet parking spaces. The residential
1:05:09 units will include approximately 16 uh
1:05:12 studio units, 20 onebedroom units, four
1:05:15 uh two-bedroom units, and two
1:05:16 three-bedroom units. In addition to
1:05:18 this, uh prior to a certificate of
1:05:20 occupancy, the proponent will provide a
1:05:22 $5,000 contribution to the Austin Main
1:05:24 Streets and for the purpose of
1:05:27 landscaping and cleanup. In addition to
1:05:28 that, another 5,000 uh contributing to
1:05:31 soccer and youth uh uh hockey leagues.
1:05:34 Um the applicant also agreed to work
1:05:36 with the Brazilian Women's Group were
1:05:38 currently tenants of the building to
1:05:39 identify the alternative location for
1:05:40 its office. I'll now turn it over to uh
1:05:43 Ford Delve to speak on the planning
1:05:44 context.
1:05:47 Thank you, Dan. My name is Ford Delveio
1:05:49 and I'm the planning reviewer assigned
1:05:51 for this project. Uh next slide, please.
1:05:53 Perfect. The proposed project is located
1:05:56 at the corner of Cambridge and Dustin
1:05:57 Streets in a single family residential
1:06:00 subdist of Alustin Brighton neighborhood
1:06:01 zoning district. Tenants of the
1:06:03 commercial building at this location
1:06:04 include medical offices and the offices
1:06:06 of a nonprofit organization. The
1:06:08 proposed project is located in the study
1:06:10 area of the Alustin Brighton needs
1:06:11 assessment adopted by the BPDA board in
1:06:13 2024. Staff note that the provision of
1:06:15 new multif family housing is consistent
1:06:17 with the plan's findings related to the
1:06:19 need for additional housing in this
1:06:20 neighborhood to date. To date, zoning
1:06:22 has not been updated in this location to
1:06:24 affectuate the goals of the needs
1:06:25 assessment, nor the draft findings of
1:06:27 the ongoing Austin Bright community
1:06:28 plan. Planning department staff note
1:06:31 that while this area is zoned for single
1:06:32 family use, the immediate area is
1:06:34 predominantly characterized by
1:06:35 institutional and multif family
1:06:37 residential uses. Likewise, dimensional
1:06:39 requirements and zoning suited to single
1:06:41 family dwellings do not comport with a
1:06:43 larger scale of these uses that include
1:06:45 educational and medical facilities such
1:06:47 as Franciscan's Children's Hospital,
1:06:49 Boston Medical Center Brighton, and the
1:06:50 Boston Green Academy. Given this diverse
1:06:53 commercial, educational medical context,
1:06:55 the proposed multif family residential
1:06:56 use development complements the
1:06:58 surrounding neighborhood fabric and
1:06:59 aligns with the or corridor's ongoing
1:07:01 urban evolution. Thank you. And I'll now
1:07:03 turn it over to my colleague Andrew
1:07:05 Zimmerman to present the project uh from
1:07:06 the urban design perspective. Thank you.
1:07:08 Thanks.
1:07:11 Good afternoon. Uh my name is Andrew
1:07:13 Zimmerman. I am the urban designer
1:07:15 assigned to this project. I'm going to
1:07:16 walk you through the uh design of the
1:07:18 project. Um, as you can see here, the
1:07:22 project proposes to maintain the
1:07:24 existing building envelope and address
1:07:26 and the uh maintain the envelope and the
1:07:30 accessible entry at the along Cambridge
1:07:33 Street. The proposed site plan includes
1:07:35 Dustin Street edge updates to provide
1:07:38 complete street compliant sidewalks,
1:07:40 hosting four new street trees and
1:07:42 visitor bike parking. Proposed street
1:07:45 trees and sidewalk adjacent front yard
1:07:47 trees will also introduce canopy along
1:07:50 Cambridge Street frontage and provide
1:07:52 more pedestrian scale for the street and
1:07:54 building. Finally, uh the proposed
1:07:56 transformer will has been reoriented
1:07:59 closer to the street to allow for easier
1:08:01 access and make room for uh more on-site
1:08:04 landscaping near the building. Next
1:08:06 slide.
1:08:09 Uh the project preserves the existing
1:08:12 brickmasonry building while adding three
1:08:14 vertical stories to create much neededed
1:08:16 housing. To minimize uh height impacts
1:08:19 on the neighboring properties, the top
1:08:20 floor steps back in alignment with the
1:08:23 scale of existing buildings across
1:08:25 Cambridge Street. The additions updated
1:08:28 material pallet contrasts with the
1:08:30 existing masonry base while respecting
1:08:32 its original craftsmanship.
1:08:34 [snorts]
1:08:34 At the basement level, uh full height
1:08:37 window wells provide ample natural light
1:08:39 to enhance livability.
1:08:41 Uh following feedback from the planning
1:08:43 department, the proponent revise the
1:08:44 masting and site plan to deliver more
1:08:46 sensitive contextual design that
1:08:49 enriches the public realm and we expect
1:08:51 to continue to refine the building and
1:08:54 site elements with the proponent during
1:08:56 the postboard design review process. Uh
1:08:59 with that, I'll pass it back to Dan.
1:09:03 Thank you, Andrew. Um, this uh concludes
1:09:05 our presentation. We do have the
1:09:07 development team here to answer any
1:09:08 questions for you. Thank you.
1:09:09 Okay. Thank you. Questions or comments
1:09:11 from the board?
1:09:13 Can you go back to um I think at the
1:09:17 beginning you said um something about
1:09:19 the Brazilian women's group and like the
1:09:23 So, can you I just didn't hear the
1:09:25 sentence and I couldn't find it.
1:09:27 There's a Yes. No, absolutely. There's a
1:09:30 women's a Brazilian women's group there.
1:09:31 They uh work with um obviously providing
1:09:35 services of translation um other
1:09:37 immigration work and they're the current
1:09:39 tenants there and um the proponent has
1:09:42 agreed to work with them. They actually
1:09:44 extended their lease for a year and so
1:09:46 they were committed to u finding them a
1:09:50 different location once uh it's getting
1:09:52 close to to that point and proponent
1:09:55 also uh spoke to the counselor uh
1:09:57 counselor's concerns was those were the
1:09:58 major concerns and they agreed that they
1:10:01 would work with them. So yeah.
1:10:02 Yeah. Yeah. Um just want to highlight
1:10:04 that it's a it's a major concern of mine
1:10:07 um as well. um very this organization
1:10:10 provides some really vital services to
1:10:12 um large integrated populations um not
1:10:15 only here in the Boston area but across
1:10:17 Massachusetts. So um you know I don't
1:10:20 know if that gets codified in anything
1:10:23 in any way um but I just kind of want to
1:10:27 make sure that there is like a followup
1:10:30 and that happens and if not like that
1:10:32 that would be something I'd want to know
1:10:33 about. Yes, the it's it's written in our
1:10:35 board memo as well or that they will uh
1:10:39 have agreed to work with them uh and
1:10:41 actually with the extension of the of
1:10:43 the lease and working closely to that
1:10:46 the proponent also agreed to make sure
1:10:47 that they're they have us a place to go
1:10:49 within the within the area. So
1:10:51 yeah. Yeah.
1:10:52 Yeah. And the counselor is on board as
1:10:53 well. So we're keeping her in the loop.
1:10:55 Yeah. Perfect.
1:10:56 Um and thank you for doing that. and we
1:11:00 just came off of the displacement, you
1:11:02 know, anti-displacement and that's for
1:11:03 our organizations and for people and so
1:11:06 this is that that working in that. But
1:11:08 yes, please.
1:11:09 Thank you, Madam Chair, members of the
1:11:10 board, Director Shen, Secretary
1:11:12 Paleimus, Attorney Jeff Drago with Drago
1:11:14 and Dano on behalf of the applicant.
1:11:16 Just on your point, um one uh the uh
1:11:20 developer, Mr. Aise, who's here
1:11:22 immediately extended the lease to work
1:11:24 with them. the building has been losing
1:11:26 tenants over the years, so they're
1:11:28 smaller spaces, but he also has actively
1:11:31 used his contacts within the real estate
1:11:33 community to start working with them
1:11:35 one- on-one to find an alternate
1:11:37 location. So, they've already been
1:11:39 working together on that. So, he's
1:11:41 committed to finding them something. I
1:11:42 just wanted to make sure you knew that.
1:11:44 Yeah. No, thank you.
1:11:45 Um, and I'm glad again we're just having
1:11:47 the, you know, the conversation on the
1:11:48 record and all of that stuff. Um, that,
1:11:50 you know, these are the kind of things
1:11:52 that we
1:11:53 uh intentionally look out for. So that's
1:11:56 I think the end of my questions. Uh any
1:11:58 further questions or comments? Hearing
1:12:00 and seeing none. A motion is in order.
1:12:02 So move second.
1:12:03 All those in favor? I
1:12:04 I
1:12:05 opposed. The eyes have it. Motion
1:12:07 passes. Thank you so much and good luck
1:12:08 with the project. I appreciate
1:12:11 item number 10. request authorization to
1:12:13 enter into an affordable rental housing
1:12:15 agreement and restriction and affordable
1:12:18 housing contribution agreement by and
1:12:20 between the BPDA and Berkeley 176
1:12:24 Lincoln Holdings LLC care of Berkeley
1:12:27 Investments Incorporated if necessary or
1:12:30 require the same be executed by and
1:12:33 between the proponent and the mayor's
1:12:34 office of housing in connection with the
1:12:36 proposed development located at 176
1:12:39 Lincoln Street and to take all related
1:12:41 actions. Andy.
1:12:42 Uh, thank you very much, Madam Chair,
1:12:44 Director Shen, Secretary Poheimis, and
1:12:47 members of the board. I'm Andy Feldman,
1:12:49 housing policy manager with the mayor's
1:12:51 office of housing. Uh, tonight I'm here
1:12:53 to request your vote on an affordable
1:12:55 rental housing agreement and
1:12:57 restriction, as well as an affordable
1:12:59 housing contribution agreement for the
1:13:01 proposed development at 176 Lincoln
1:13:03 Street in Brighton. This development,
1:13:05 previously approved development,
1:13:06 proposes to build about 253 rental
1:13:09 units. Uh the propo the proponent now
1:13:11 proposes to revise its IDP program to
1:13:14 include 50% of IDP units or 23 units on
1:13:18 site in the residential building a
1:13:20 including the 10 artist units. In lie of
1:13:22 the other half of IDP units, the
1:13:24 proponent will be make a contribution to
1:13:26 the IDP special revenue fund of
1:13:28 approximately $4.3 million as required
1:13:31 by the policy. Uh therefore, the vote in
1:13:33 front of you tonight will allow the
1:13:34 agency to enter into this affordable
1:13:37 rental housing agreement and restriction
1:13:39 and the affordable housing contribution
1:13:41 agreement. Happy to answer any questions
1:13:43 that you may have. Thank you.
1:13:44 Thank you. Questions or comments from
1:13:46 the board. All right. Hearing and seeing
1:13:48 none, a motion is in order.
1:13:49 So moved.
1:13:50 Second.
1:13:50 All those in favor? I
1:13:52 opposed. The eyes have it. Motion
1:13:54 passes. Thanks, Andy.
1:13:56 Item number 11 is TUS. Miss Duran.
1:13:59 Madam Chair, I will recuse myself. Okay.
1:14:01 Well, we will see you later.
1:14:04 Item number 11, request authorization to
1:14:06 wave further review of the TUS Medical
1:14:08 Center institutional master plan
1:14:10 notification form dated August 10th,
1:14:12 2026 for the renewal and extension of
1:14:14 its 2012 institutional master plan for a
1:14:17 period of 5 years until 2031 and to
1:14:20 approve the renewal and extension of the
1:14:22 TUS Medical Center institutional master
1:14:24 plan pursuant to section 80D-5.2E,
1:14:27 2E section 80D-6 and section 80D-8 of
1:14:31 the zoning code and to take all related
1:14:33 actions. Tyler.
1:14:34 Thank you, Madam Chair, members of the
1:14:36 board, Secretary Pimis. I am Tyler Ross,
1:14:39 senior project manager in the
1:14:40 development review division. The
1:14:41 proposal for you is the TUS Medical
1:14:43 Center institutional master plan for
1:14:45 renewal and extension with no changes
1:14:47 for the term of 5 years. This is a
1:14:49 renewal of the existing institutional
1:14:51 master plan that was board approved in
1:14:52 July of 2012, which was subsequently
1:14:55 renewed and extended without changes in
1:14:57 2022 and 2024. At this time, Tus Medical
1:15:01 Center does not anticipate any new
1:15:03 institutional projects for the term of
1:15:04 the renewed institutional master plan.
1:15:07 The requested 5-year renewal is intended
1:15:09 to provide a bridge while TUS Medical
1:15:11 Center under President John Herman
1:15:13 advances strategic facilities in real
1:15:15 estate planning that will inform a new
1:15:17 comprehensive institutional master plan
1:15:19 in the future. The review process for
1:15:21 this institutional master plan renewal
1:15:23 began on August 10th and concluded on
1:15:25 September 10th. Since that time, no
1:15:27 comments were received. This concludes
1:15:29 the presentation. Thank you.
1:15:31 Okay. Thank you. Um questions or
1:15:33 comments for the board? Okay. Hearing
1:15:35 and saying none, a motion is in order.
1:15:37 So moved.
1:15:38 Second.
1:15:38 All those in favor? I
1:15:40 I
1:15:41 the oppos. The eyes have it. Motion
1:15:42 passes. Thank you, Tyler.
1:15:45 Item number 13, request authorization.
1:15:47 Oh, can someone get um Yeah,
1:15:50 [laughter]
1:15:51 I'll still read it. Or did I move the
1:15:54 wrong
1:15:55 Oh, item number 12. I turned my page too
1:15:57 fast. um request authorization to issue
1:15:59 a certification of approval approval
1:16:02 pursuant to article 80 small project
1:16:04 review of the zoning code for the
1:16:06 proposed construction of 20 residential
1:16:08 home ownership units including four IZ
1:16:10 units, five car parking spaces and 26
1:16:12 bicycle parking spaces located at 2062
1:16:15 Dorchester Avenue and to execute a
1:16:18 community benefits agreement and to take
1:16:19 all related actions. Tyler,
1:16:21 thank you. And good evening, Madam
1:16:22 Chair, Secretary uh Poheimis, Dire and
1:16:26 Director Shen, and members of the board.
1:16:27 My name is Tyler Ross. I am a senior
1:16:29 project manager in the development
1:16:31 review division. Uh filling in for my
1:16:33 colleague Zoe Duval here to present to
1:16:35 you the proposed article 80E small
1:16:38 project located at 2062 Dorchester
1:16:40 Avenue in the Dorchester neighborhood of
1:16:42 Boston. Next slide, please.
1:16:46 The project site is located on a 7,24
1:16:51 ft parcel currently occupied with a
1:16:53 vacant two family home. This project
1:16:55 proposes to demolish the existing
1:16:57 structure and construct a new fourstory
1:17:00 plus mezzanine residential building with
1:17:02 approximately 21,57
1:17:05 gross square ft comprising of 20
1:17:08 residential home ownership units, four
1:17:10 income restricted units. Um, and the
1:17:13 resident residential units will uh
1:17:15 include approximately two studio units,
1:17:18 13 one-bedroom units, and five
1:17:20 two-bedroom units. The project will also
1:17:22 contain five off- streetet subgrade
1:17:24 parking spaces and 34 interior long-term
1:17:27 bike parking spaces on the ground floor.
1:17:29 The project review application was filed
1:17:31 on April 24th of 2025. The public
1:17:35 comment period in the in connection with
1:17:36 the proponent submission of the small
1:17:38 project review application was open for
1:17:40 30 days and closed on May 26th of 2025.
1:17:44 The planning department sponsored the
1:17:45 first public meeting on May 19th of 2025
1:17:48 and another on August 31st of 2026. Both
1:17:52 of which were noticed through the
1:17:53 planning department's neighborhood
1:17:54 distribution list and events calendar
1:17:56 for the Doorchester neighborhood. I'll
1:17:58 now hand it over to my colleague Ford to
1:18:00 take over um to go through the planning
1:18:02 context. Thank you.
1:18:03 Great. Thanks.
1:18:05 [snorts]
1:18:05 Thank you. Uh once again, my name is
1:18:07 Ford Delveio and I'm the planning
1:18:09 reviewer assigned for this project. That
1:18:10 is the right side slide. Thank you. Um
1:18:13 located in the Dorchester neighborhood
1:18:15 zoning district's three family
1:18:16 residential subdist and governed by
1:18:18 article 65 of the Boston zoning code.
1:18:20 The proposed project is located on
1:18:21 Dorchester Avenue near Gallivan
1:18:22 [clears throat] Boulevard approximately
1:18:24 1 half mile from the Ashbon MBTA
1:18:26 station. The proposed project is not
1:18:28 located in an area that has been the
1:18:29 subject of recent planning or zoning
1:18:30 initiatives. The requirements of current
1:18:32 zoning do not comport with the current
1:18:34 context. While the surrounding area is
1:18:36 zoned for two and three family
1:18:37 dwellings, the existing built
1:18:38 environment includes a mix of two,
1:18:39 three, and multif family dwellings. The
1:18:41 proposed multif family use aligns with
1:18:43 the established local fabric. Next
1:18:45 slide, please.
1:18:48 Thank you. Through the staff review
1:18:49 process, the proposed project underwent
1:18:51 refinement to enhance it compatibility
1:18:53 with neighboring properties. In response
1:18:55 to staff feedback regarding its relation
1:18:56 to the adjacent lot and building, the
1:18:58 proponent revised the proposed building
1:19:00 envelope and setbacks by pulling its
1:19:01 masking back along the shared property
1:19:03 line. The revised proposal provides
1:19:05 greater physical relief, reduces visual
1:19:07 bulk, and ensures a more sensitive
1:19:09 contextual transition to the neighboring
1:19:11 property. Thank you. I now turn over to
1:19:13 my UD colleague, Scott Slarski, to go
1:19:15 over the uh urban design context in more
1:19:17 detail. Thank you.
1:19:20 Thank you very much, Scott Slarski,
1:19:22 architect and planner, urban design. Um,
1:19:25 so, uh, while this project is much
1:19:28 larger than the existing building that
1:19:29 was there in the context, it satisfies,
1:19:32 uh, it satisfies the zoning and we
1:19:33 worked very hard to take the transformer
1:19:36 and put it in an underground vault, um,
1:19:39 and create a garden at the rear. Next
1:19:42 slide, please.
1:19:45 though. Uh you can see from the plan
1:19:48 diagram that's here that it satisfies
1:19:50 the modal setback along the street um
1:19:53 and creates uh porches, exterior spaces
1:19:56 uh at the front and the top volume uh
1:19:59 steps back.
1:20:04 Next slide, please.
1:20:07 That's the conclusion I guess.
1:20:10 [laughter]
1:20:13 Okay. Um yeah, just to close out, uh I
1:20:16 just want to know that this project has
1:20:17 been responsive to both neighborhood and
1:20:19 planning staff feedback throughout the
1:20:21 review process resulting in resision
1:20:23 revisions to the ground floor design,
1:20:25 the open space configuration, and the
1:20:27 massing and facade. This concludes our
1:20:30 presentation for this item and uh myself
1:20:32 and the development team are available
1:20:33 for any questions. Thank you.
1:20:35 Okay, thank you. Any questions or
1:20:37 comments from the board?
1:20:38 Uh first a comment which is uh brevity
1:20:40 is always rewarded so appreciate that.
1:20:42 Uh, a couple questions. One, what's the
1:20:44 breakdown of the four IS units?
1:20:56 I don't have the four.
1:20:59 Four. No. No. But are they
1:21:01 are they one bedroom?
1:21:02 There's studios, one bedroom, two
1:21:03 bedroom,
1:21:04 one studio, two one studio, two
1:21:06 onebedrooms, two compact one bedrooms,
1:21:08 and two and one compact twobedroom.
1:21:10 Those are the four. Okay, that's that
1:21:12 sounds good. What's a comp what's the
1:21:13 difference between a compact onebedroom
1:21:15 and a regular one bedroom?
1:21:16 I don't know.
1:21:17 Are they all compact? They're all
1:21:19 compact, right?
1:21:20 You don't want to know the
1:21:21 Sorry, it just says compact. So, I don't
1:21:23 know if that's like
1:21:24 some some of the units here, George
1:21:26 Morans, I'm sorry. I'm the zoning
1:21:27 attorney for the developers.
1:21:29 Um,
1:21:31 and I'll actually comment a little bit
1:21:33 on the number of dwelling units in
1:21:35 relationship to the size of the site.
1:21:37 Okay. uh because that has been something
1:21:39 that was noticed by the community, 20
1:21:41 units on a site like this. Tyler did
1:21:43 touch upon that. Scott touched upon that
1:21:45 a lot of the units here are many of the
1:21:48 units here are smaller units. This is a
1:21:50 condominium project for sale. So, it's
1:21:52 not a rental project. So, the notion
1:21:54 behind or the or the motivation uh
1:21:57 behind the development concept here is
1:21:59 to provide some natural affordability by
1:22:01 doing smaller units.
1:22:03 So, there are larger, you know, more
1:22:06 traditionally sized units. There are
1:22:07 small units in the range of like 470
1:22:10 square ft. Um I will admit that I
1:22:13 sometimes get confused when architects
1:22:15 put a plus sign uh after a unit
1:22:18 designation what that actually means. Um
1:22:20 but the units are all uh basically metro
1:22:24 size units for studio ones twos. Uh
1:22:27 sometimes there's a little extra space
1:22:28 and that results in a plus being put
1:22:30 after it. I don't necessarily subscribe
1:22:32 to the theory of doing that, but the
1:22:34 fact is here there are smaller units,
1:22:36 but we are meeting the 17% affordability
1:22:39 requirement under
1:22:43 alluded to said earlier and alluded to
1:22:45 in a in a public meeting, [snorts] even
1:22:47 aside from the units which are um
1:22:50 formally speaking affordable, there's
1:22:52 some natural affordability here in terms
1:22:54 of providing smaller units for sale and
1:22:57 those are available to people who
1:22:58 actually want to move into this great
1:23:00 neighborhood. or people who live there
1:23:02 now in rent and can probably get a
1:23:04 competitive mortgage for not much more
1:23:06 than they're paying for rent. They could
1:23:08 actually build equity and eventually
1:23:10 move on to some other u you know some
1:23:12 other unit or or single family home.
1:23:14 Yeah.
1:23:15 And I I'm George, let me be clear. I I
1:23:17 am a full proponent of of you know a
1:23:20 good mix and smaller units make sense
1:23:21 for the very reason you said
1:23:23 particularly for firsttime uh homeowners
1:23:25 that are looking to build that sort of
1:23:26 generational wealth. Um, and it sounds
1:23:29 pretty good if if at least the matrix of
1:23:33 the four units is seems to be one of
1:23:36 each. Um, so I I applaud that. Sometimes
1:23:38 it can all be studios or or one
1:23:40 bedrooms. The second question is um I
1:23:43 didn't see the column on sustainability
1:23:45 that we typically see with these
1:23:46 presentations. So did you want to talk a
1:23:48 little bit about because I'd imagine
1:23:49 there still has to it's a smaller
1:23:51 project that still has to adhere to the
1:23:53 on article 37.
1:23:54 Yeah. on that I will yield uh either to
1:23:57 our project architect who I think is
1:23:59 connected via Zoom or if the pro the
1:24:03 planning department team has more
1:24:04 information on that.
1:24:05 I know that it complies with article 37
1:24:09 but I don't have the details.
1:24:10 Okay.
1:24:13 Is his name Eric?
1:24:15 Yes.
1:24:16 Okay.
1:24:19 Anyone want to take a stab?
1:24:21 Thank you. Um [clears throat] they were
1:24:23 just and this is Eric Zacherson,
1:24:24 architect for the project. They were
1:24:26 just raising me to be a panelist. Um
1:24:28 yes, we fully comply with article 37 and
1:24:32 um it that it is part of the reason this
1:24:35 project has taken a little bit longer
1:24:37 than it might otherwise be uh have
1:24:39 taken. Uh I was trying to get actually
1:24:42 get my attent get attention earlier. The
1:24:45 reason that these were referred to as
1:24:47 compact living is this project actually
1:24:49 started right at the tail end of the
1:24:51 compact living pilot.
1:24:53 Yeah.
1:24:53 So all of all of the units in the
1:24:55 building would have been considered
1:24:56 compact.
1:24:57 All of the units are compact. All the
1:24:59 other units would be compact although
1:25:01 that definition kind of phased out in
1:25:03 2023.
1:25:04 Yeah.
1:25:05 Got it.
1:25:07 Okay. And do you want to speak a little
1:25:08 bit about some of the the is it
1:25:11 electric? Is there any PV on the roof?
1:25:13 is there.
1:25:14 So, it would be an all it will be an all
1:25:16 electric building. Um, we are going to
1:25:20 struggle to to meet the requirements of
1:25:22 article 37, but we've done all the
1:25:24 modeling and we've we've um proven that
1:25:26 it's it's possible. There's uh there's
1:25:29 not a system beyond that that is being
1:25:32 planned beyond uh meeting the kind of
1:25:35 stringent requirements for article 37.
1:25:39 And member Mali, if I can uh clarify,
1:25:42 this project was also submitted before
1:25:44 the change to article 37 uh took place
1:25:47 earlier this year. So this project is
1:25:49 exempt from the new article 37. It does
1:25:51 have to comply with the previous version
1:25:53 of article 37.
1:25:54 Is it also exempt from the stretch
1:25:55 energy code?
1:25:56 No, this needs to comply with that.
1:25:58 This needs to comply with that. Okay.
1:26:00 Okay. Thank you.
1:26:02 Okay. Thank you. Additional questions or
1:26:04 comments or did you want to say
1:26:05 something?
1:26:05 Uh I'm sorry for the interruption. Chair
1:26:07 Roas, Ted Schwarzburg, assistant deputy
1:26:10 director for planning review. I just
1:26:11 wanted to clarify an earlier staff
1:26:13 comment about uh zoning dimensions. Uh I
1:26:16 wanted to clarify for the record that
1:26:17 this will acquire require zoning relief
1:26:20 for dimension and use. Uh that was on
1:26:22 one of the earlier slides and I'd be
1:26:24 happy to elaborate on why staff thinks
1:26:25 that uh zoning relief is appropriate,
1:26:28 but just wanted to clarify that. Do
1:26:29 you want to just give us the like
1:26:31 three sentence?
1:26:32 Sure. If if you don't mind hopping back
1:26:34 third slide. uh [laughter] the the
1:26:36 zoning envelope uh would uh would give
1:26:40 us this one. So in pink uh that's um the
1:26:44 what what zoning allows and uh coming
1:26:47 out of the community process there was a
1:26:49 real desire to remove the building from
1:26:51 the side uh of the neighboring building
1:26:54 and it's an unusually deep parcel. So,
1:26:56 uh, they worked with staff to create the
1:26:58 yellow massing, uh, that will require a
1:27:00 lot of zoning relief, but takes
1:27:02 advantage of the depth of this parcel,
1:27:04 uh, without encroaching as much on the
1:27:06 neighbors.
1:27:08 Yeah, know that's really helpful. I This
1:27:11 was a good slide to kind of just put it
1:27:13 all into perspective, um, of what it's
1:27:15 replacing. But I think the design is
1:27:18 being um uh you know is well informed by
1:27:22 the rest of the you know houses on that
1:27:24 street and kind of um
1:27:28 uh yeah no I think it's a good use of
1:27:29 that space. So anyway uh if there are no
1:27:32 other further questions or comments
1:27:34 motion is in order.
1:27:35 So moved.
1:27:36 Second.
1:27:37 All those in favor?
1:27:38 I I
1:27:39 opposed. Uh the eyes have it. Motion
1:27:42 passes. Thanks Tyler.
1:27:45 Item number 13, request authorization to
1:27:47 wait further review of the Boston
1:27:48 University Charles River campus
1:27:50 institutional master plan notification
1:27:52 form for the renewal and extension of
1:27:55 the institutional master plan for a
1:27:57 period of 5 years until 2031 and to
1:28:00 approve the renewal of the Boston
1:28:02 University Charles River campus
1:28:04 institutional master plan pursuant to
1:28:06 section 80D-5.2E, 2E section 80D-6 and
1:28:10 section 80D-8
1:28:12 of the zoning code and to take all
1:28:14 related actions. Tyler.
1:28:16 Thank you, Madam Chair, members of the
1:28:17 board, Director Shen, and Secretary
1:28:19 Pyus. I'm Tyler Ross, senior project
1:28:21 manager in the development review. This
1:28:23 proposal before you is the Boston
1:28:25 University institutional master plan for
1:28:27 renewal and extension with no changes
1:28:29 for the term of 5 years. This is a
1:28:31 renewal of the existing institutional
1:28:32 [clears throat] master plan that was
1:28:33 board approved in September of 2024,
1:28:36 which was amended in 2025 for the
1:28:39 addition of the 13 Buzzwell property. At
1:28:41 this time, Boston University does not
1:28:43 anticipate any new institutional
1:28:45 projects for the term of the renewed
1:28:47 institutional master plan. The requested
1:28:50 5-year renewal is intended to allow for
1:28:52 sufficient time to finalize the next
1:28:54 Boston University campus framework that
1:28:56 will inform a new comprehensive
1:28:58 institutional master plan in the future.
1:29:00 The review process on this institutional
1:29:02 master plan renewal began on July 21st
1:29:04 and concluded on August 21st.
1:29:07 One task force and public meeting was
1:29:09 held on August 5th, 2026. The meeting
1:29:11 was well attended and received support.
1:29:13 This concludes the presentation. Thank
1:29:15 you.
1:29:16 Okay. Thank you. Any questions or
1:29:17 comments from the board? Hearing and
1:29:19 seeing none, a motion is in order.
1:29:21 So moved.
1:29:21 Second.
1:29:22 All those in favor? I
1:29:23 I
1:29:24 opposed. Uh the eyes have it. Motion
1:29:26 passes. Item number 14, contractual
1:29:29 payments. I need a motion to pay our
1:29:32 bills.
1:29:32 Like to make a motion to pay the bills.
1:29:34 I second that motion.
1:29:36 Right. All those in favor?
1:29:38 I
1:29:39 opposed. The eyes have it. Motion
1:29:40 passes. Please pay the bills. And
1:29:43 finally, uh item number 15, Director um
1:29:47 Shen, Chief Shen, the floor is yours.
1:29:50 Um good evening, uh members of the
1:29:52 board. I want to start my report with
1:29:54 just a quick summary of the projects
1:29:57 approved at this board meeting. Um there
1:29:59 were two new projects that were approved
1:30:02 uh delivering 82 units of housing of
1:30:06 which 11 will be income restricted. Um
1:30:09 there these two projects will total
1:30:12 49,000 square foot of new development
1:30:15 that will uh represent approximately $19
1:30:18 million of new investment. Uh this
1:30:21 investment will create 46 direct
1:30:23 construction jobs and 23 indirect uh
1:30:27 jobs. Um there was also one certificate
1:30:30 of completion
1:30:31 um that um that is for the Benjamin
1:30:34 Franklin Cummings Institute of
1:30:36 Technology in Nubian Square. Um, this
1:30:39 new technical educational building
1:30:41 houses seven academic departments
1:30:44 including programs like construction
1:30:46 management, HVAC,
1:30:49 automotive technology, and mechanical
1:30:51 engineering. The building contains 20
1:30:54 indoor technical education labs, eight
1:30:57 shared general classrooms, 13 conference
1:31:00 rooms, uh, a central student lounge,
1:31:03 student study spaces, administration,
1:31:06 and other offices. uh and support office
1:31:09 support spaces. Beyond the exceptional
1:31:12 programming and opportunity for students
1:31:14 um this building provides through its
1:31:16 facility. This certificate of completion
1:31:20 um also means that uh real tangible
1:31:23 tangible out um benefits uh have also
1:31:27 been delivered. Um there are two uh uh
1:31:31 tranches of uh monetary contributions.
1:31:35 There was $600,000
1:31:37 worth of improvements in the sidewalks,
1:31:40 crosswalks, and streetscape enhancements
1:31:42 to make the area around the building as
1:31:45 well as the square more pedestrian
1:31:47 friendly. There was also another
1:31:49 $650,000
1:31:51 uh of um uh investment into the
1:31:54 environmental cleanup of the site. Um
1:31:57 there the the building also um houses
1:32:02 many or has been delivering many
1:32:04 community events including open houses
1:32:07 uh for prospective students, technical
1:32:10 fairs and community exploration
1:32:12 workshops
1:32:14 uh in partnership with the Roxbury um uh
1:32:17 Boston Public Library branch. All of
1:32:20 these events and programming of course
1:32:22 contribute to the activation of Nubian
1:32:25 Square. Um the board also heard um uh
1:32:29 two other um uh programs this this
1:32:34 evening. The first was the uh anti-
1:32:37 displacement progress report. Um, that
1:32:40 was a very comprehensive presentation
1:32:42 that you got tonight that shows the
1:32:45 progress we've made in one year since
1:32:47 the launch of this a place to thrive
1:32:49 anti-displacement action plan. Um, this
1:32:52 board originally adopted the two-year
1:32:54 framework last July and included more
1:32:58 than 40 targeted uh policies, programs,
1:33:01 and resources that the city departments
1:33:04 uh would commit to addressing
1:33:07 residential and small business as well
1:33:10 as cultural displacement. This
1:33:12 framework, I think as you saw tonight,
1:33:15 includes 53 initiatives that um that
1:33:20 that are um that are organized under the
1:33:23 four PE tenants um protect, preserve,
1:33:27 produce, and prosper. And you saw that
1:33:30 uh more than 70% or 63 of these um or 36
1:33:36 of the 53 initiatives in fact are
1:33:38 advancing. Um, of the of these
1:33:41 initiatives that are advancing, 15 of
1:33:44 them are actually directly under the
1:33:46 oversight of this department, the
1:33:47 planning department. Um, I want to thank
1:33:50 Katherine Lus and her team for her
1:33:53 dedication to this plan. And as you've
1:33:56 many of you already noted that the
1:33:58 planning advisory council uh often takes
1:34:01 on the difficult task of doing some of
1:34:04 these projects that actually require a
1:34:06 great deal of inter interdep
1:34:07 departmental coordination. Um and I I'm
1:34:11 sure this team will look forward to
1:34:12 reporting uh to you again the the
1:34:15 progress that we will make in this
1:34:17 coming year. Um, the other exciting item
1:34:20 that you heard about was uh the funding
1:34:23 or the the the department and the EDIC
1:34:28 serving as the funding agent for the
1:34:31 link bus service in the five
1:34:33 neighborhoods across the city. Um, your
1:34:36 vote to accept the contract uh for
1:34:38 administering this money through EDIC
1:34:41 will allow the city and its partners to
1:34:43 move forward with con uh contracting
1:34:46 with community engagement service uh um
1:34:50 partners, planning and launching um
1:34:53 these routes in the near future. This
1:34:55 free service will expand neighborhood
1:34:58 transportation options and strengthen uh
1:35:00 connections to the MBTA lines as well as
1:35:05 connecting residents to jobs and schools
1:35:08 um as well as healthcare um local
1:35:11 businesses and other essential
1:35:13 destinations that are that are not easy
1:35:15 to get to for some of these residents
1:35:17 that aren't well served by transit. This
1:35:20 new and expanded service will operate in
1:35:22 the five neighborhoods that you heard
1:35:24 about in Madapan, Roxbury, Alustin,
1:35:27 Brighton, Charles Town, and Lower Mystic
1:35:29 as well as the South Boston waterfront.
1:35:32 Um, we are of course happy that Matt and
1:35:35 his team from Streets um have been
1:35:37 collaborated so well with our team. Um,
1:35:40 I want to end tonight just by u
1:35:44 referring to something that you've heard
1:35:45 in the press recently. Um uh of course
1:35:50 the the Globe reported this week as well
1:35:52 as you heard yesterday the mayor at the
1:35:55 Chamber of Commerce speech um highlight
1:35:58 the fact that the the city and this
1:36:01 department has already started um um um
1:36:05 working with four um previously approved
1:36:10 projects for some tax relief in order to
1:36:13 get them into construction in this next
1:36:16 year. Um, we officially advertised and
1:36:20 opened the 30-day comment period for
1:36:22 these four projects. Um, and it's our
1:36:24 intention to bring uh these projects to
1:36:27 the board next month for your
1:36:29 consideration and approval to enter into
1:36:32 a 12 into 121B agreements uh that would
1:36:37 um formalize uh the ability for these
1:36:41 projects to negotiate uh for us to
1:36:43 negotiate these uh tax agreements with
1:36:46 these proponents. Um the mayor has made
1:36:49 it very clear that she is intent on
1:36:51 using every tool that is available to uh
1:36:54 us as a city to get these previously
1:36:58 approved projects moving again. Uh and
1:37:01 we will look forward to presenting the
1:37:03 details to you next month um and
1:37:06 hopefully get more people back to work.
1:37:08 So with that um th this concludes my
1:37:12 report to you. Thank you.
1:37:13 Thank you. Um, awesome.
1:37:17 Uh, with that I need a motion to adjurnn
1:37:19 this meeting.
1:37:19 Motion to adjurnn.
1:37:21 Second.
1:37:21 All those in favor?
1:37:22 I
1:37:24 opposed. The eyes have it. Motion
1:37:25 passes. Thanks everyone. Um,
1:37:28 great work and have a good month. We'll
1:37:29 see you next month. [laughter]
1:37:32 Same time, same place.
1:37:35 Same vat channel.
1:37:36 Happy early birthday.