Boston · Zoning Board of Appeal

Zoning Board of Appeal Hearings 11-17-26

Zoning Board of Appeal · Boston · 2026-11-17

words this meeting uses zoning · variance · Zoning Board of Appeals (ZBA) · BPDA · City Council · bylaw — the glossary says what they mean

tap to load the tape · nothing plays until you do
the shape of the tape — click anywhere to jump● a decision, sized by weight · | a question · ▮ tension · $ money named · the eight lanes: where each lens’s words fell
financialfinancial — 33 words, where they fell along the tapesafetysafety — 29 words, where they fell along the tapecommunitycommunity — 226 words, where they fell along the tapeenvironmentalenvironmental — 38 words, where they fell along the tapelegallegal — 24 words, where they fell along the tapeequityequity — 21 words, where they fell along the tapeinfrastructureinfrastructure — 141 words, where they fell along the tapeprocessprocess — 43 words, where they fell along the tape1:50 · process: “board review hearing for November 17th,”1:52 · process: “2026 is now in session. This hearing is”2:05 · process: “virtual hearings through June 2027. This”2:08 · process: “hearing of the board is being held”2:17 · process: “In order to ensure this hearing of the”2:20 · process: “the public may access this hearing”2:42 · legal: “their attorneys or representatives will”5:27 · infrastructure: “with the address of 19 Harrison Street.”6:58 · infrastructure: “Street.”7:06 · infrastructure: “with the address of 120 Glen Road.”7:17 · infrastructure: “with the address of 124 on D road.”7:32 · infrastructure: “Columbia Road.”7:57 · infrastructure: “Washington Street.”8:41 · financial: “May I have a motion to grant the”8:45 · financial: “Motion to grant the extensions as”11:06 · equity: “units and 33 affordable units. The”11:06 · financial: “units and 33 affordable units. The”11:37 · equity: “building, an all affordable building.”11:37 · financial: “building, an all affordable building.”11:50 · equity: “what the program is. It's all affordable”11:50 · financial: “what the program is. It's all affordable”11:52 · equity: “units. making this an over affordable”11:52 · financial: “units. making this an over affordable”11:57 · equity: “affordable units at the dock block”14:06 · legal: “attorney We again.”14:42 · community: “both residential units and ground”16:30 · legal: “attorney for the property owners, Carl”17:46 · community: “Um as a result of the community review”19:00 · community: “Um the existing two family townhouse is”19:36 · community: “separation from the neighboring decks.”24:43 · community: “community members during the community”25:16 · safety: “pososes many safety security and privacy”26:31 · safety: “would have a safety rail and privacy”28:00 · legal: “attorney representing the 79 Chandler”32:16 · safety: “not resolve the privacy, safety, and”32:22 · safety: “protect our privacy and safety and deny”39:36 · legal: “Thank you, Mr. Stumbridge. It's attorney”45:51 · safety: “narrow street and an immediate safety”45:55 · safety: “between properties and emergency egress.”46:32 · legal: “counselor would like to go on record in”1:09:22 · community: “amenity to the residents and neighbors”1:15:48 · environmental: “greenhouse, which you'll see on the”1:16:54 · environmental: “greenhouse that extends 15 feet from the”1:21:41 · environmental: “enclosure with a green roof. The rear”1:25:27 · environmental: “from the greenhouse nonconformity.”1:31:32 · environmental: “nonconformity which is the greenhouse on”1:31:54 · environmental: “with this 15 uh foot greenhouse in the”2:13:00 · equity: “100% affordable and over 100% AMI.”$4 +1$4 — said 1 time, first at 1:56:37$60,000 — said 1 time, first at 1:56:428:37 · a question: “Any questions from the board?”8:43 · a question: “extensions as requested?”9:38 · a question: “please explain case to the board?”10:14 · a question: “Do I have the permission to share?”13:13 · a question: “Is there a motion?”13:19 · a question: “Is there a second?”14:52 · a question: “Any questions from the board?”14:57 · a question: “May I have a motion?”15:03 · a question: “Is there a second?”15:09 · a question: “Miss Turner?”15:21 · a question: “Miss Ponado?”16:44 · a question: “first on the docket?”23:43 · a question: “Is that correct?”24:11 · a question: “May I have public testimony?”28:15 · a question: “of something that just pops up, right?”29:19 · a question: “Okay, looks like are you?”31:23 · a question: “please add new information?”33:56 · a question: “Cass to please uh provide feedback?”35:28 · a question: “they're referring to?”37:21 · a question: “So is that correct?”37:57 · a question: “May I have a motion?”38:36 · a question: “Is there a second?”39:45 · a question: “Can you hear me?”39:52 · a question: “Do we have the BOA?”8:41 · decision: “Thank you. Any questions from the board?”9:05 · decision: “Chair votes yes. The motion carries.”10:30 · decision: “Yeah, we can scroll to the to the plan at the end of this document which is subdivision plan. The doc block project was…”13:13 · decision: “Thank you. Are there questions from the board? Hearing none. Is there a motion?”13:41 · decision: “Chair votes yes. The motion carries.”14:57 · decision: “Thank you. Any questions from the board?”15:24 · decision: “Chair votes yes. Motion carries. Good luck.”19:05 · decision: “Um the existing two family townhouse is currently under renovation and the pre approved use remains unchanged. The roof…”23:57 · decision: “Okay. Just wanted to clarify. Um I just I knew that you you were complying with the South End LMAR, but it knew if you…”26:06 · pushback: “primarily privacy, security, and lack of coordination. Frankly, uh last year I raised significant concerns about…”26:36 · pushback: “I haven't seen the renderings that were just presented. Um, and I am concerned about that study given the fact that 85…”27:32 · decision: “We have been incredibly reasonable and it's been very hard to work with the developers. I'm asking that you please not…”28:22 · pushback: “We think of a roof hatch. This stands 3 ft tall and it's already been built. My problem with this is this applicant was…”28:39 · decision: “They barely made any effort to do so, and now they've built the head house before they've come to you. It's being…”30:24 · pushback: “My primary concerns are security. The proposed deck is directly adjacent to mine, creating a major risk that could…”30:34 · pushback: “The third concern is property value.”31:16 · pushback: “I've been given very little input on this deck, any any input whatsoever. Um, as a longtime resident and director of…”32:07 · pushback: “entrance to the second bedroom. When I get out of bed, I would be visible. The only doorway from my bedroom to my…”0:0030:001:00:001:30:002:00:002:30:003:00:009:05
the same, as a table
timekindthe moment
8:41decisionThank you. Any questions from the board?
9:05decisionChair votes yes. The motion carries.
10:30decisionYeah, we can scroll to the to the plan at the end of this document which is subdivision plan. The doc block project was…
13:13decisionThank you. Are there questions from the board? Hearing none. Is there a motion?
13:41decisionChair votes yes. The motion carries.
14:57decisionThank you. Any questions from the board?
15:24decisionChair votes yes. Motion carries. Good luck.
19:05decisionUm the existing two family townhouse is currently under renovation and the pre approved use remains unchanged. The roof…
23:57decisionOkay. Just wanted to clarify. Um I just I knew that you you were complying with the South End LMAR, but it knew if you…
26:06pushbackprimarily privacy, security, and lack of coordination. Frankly, uh last year I raised significant concerns about…
26:36pushbackI haven't seen the renderings that were just presented. Um, and I am concerned about that study given the fact that 85…
27:32decisionWe have been incredibly reasonable and it's been very hard to work with the developers. I'm asking that you please not…
28:22pushbackWe think of a roof hatch. This stands 3 ft tall and it's already been built. My problem with this is this applicant was…
28:39decisionThey barely made any effort to do so, and now they've built the head house before they've come to you. It's being…
30:24pushbackMy primary concerns are security. The proposed deck is directly adjacent to mine, creating a major risk that could…
30:34pushbackThe third concern is property value.
31:16pushbackI've been given very little input on this deck, any any input whatsoever. Um, as a longtime resident and director of…
32:07pushbackentrance to the second bedroom. When I get out of bed, I would be visible. The only doorway from my bedroom to my…
1:56:37money$4 — said 1 time
1:56:42money$60,000 — said 1 time

↓ this picture, as .svg

the night, cut — reels the press made from this meeting’s moments
▶ the night in 1:26its 5 loudest moments, in order · plays clip to clip · the link is the share

Cut from the analyzer’s scored moments — a measurement, not a choice made for you. Open a reel and press make this reel yours to re-cut it; tick any moment or transcript line below to cut your own.

AI summary — supplements the official record

During the Boston zoning board hearing [1:48], the board considered several property proposals and deferral requests. The board voted to approve roof deck and building access proposals at 85 Chandler Street [16:07] [38:08] and 168 West Street [1:12:26] [1:37:15], both subject to design reviews and neighborhood engagement [39:00] [1:37:15]. A motion to defer the case for 15-17 Allston Street to January was approved to allow for clarified site plans [42:13] [59:06] [1:00:12]. Finally, the board voted to approve multi-family housing developments on Charles Road and Bolina Place [2:11:23] [2:30:42] and at 79 to 89 Poker Street [2:48:32] [2:57:28], each subject to Boston Planning & Development Agency design review [2:30:51] [2:57:42].

the reading, drafted by a model — ai:gemini-3.6-flash, labeled · what it meant, who moved it, what to watch · check it against the tape

What it means: The Boston Board of Appeal conducted a virtual public hearing covering a docket of 17 initial cases [4:59] and multiple individual property requests across Boston neighborhoods. The board reviewed and acted on several proposals, including approving a motion for requested extensions [8:43], [9:05], granting zoning relief for an affordable housing project on Hancock Street [11:43], [13:40], approving a roof deck with provisos at 85 Chandler Street [38:08], [39:13], and approving takeout operations for a Kilby Street restaurant [10:60, 10:30]. The transcript does not settle the ultimate outcome or vote counts for every individual docketed address listed during the session [5:20], [8:35].

Who moved it: The proceedings were facilitated by board staff, including Mr. Stebridge [4:13], [8:48], alongside board members identified in roll calls and votes as Miss Barza [4:30], [15:13], Miss Panado [4:44], [15:21], Miss Weell [8:59], [14:09], Miss Turner [41:40], and Mr. Collins [13:36], [14:02]. Individual property owners, project architects, and legal representatives—such as Attorney Lee from Mintz for the Hancock Street affordable housing project [9:49] and Attorney Mark Lacasse for 85 Chandler Street [16:23]—presented the specific variance and conditional use requests.

What to watch: Several cases were granted deferrals to allow applicants to revise project plans or address community feedback, setting up future board reviews. Case BOA 1808917 at 15 Bennett Street was deferred to January 12th [40:49], [41:54], a project involving unpermitted site work and incomplete foundation drawings was deferred to January 12th [59:17], [1:01:00], and case BOA 1803722 was deferred to February 9th [1:41:24], [1:41:46]. Observers should track these upcoming hearing dates for updated architectural plans, revised dimensional drawings, and continued public testimony from local neighborhood groups and the Mayor's Office of Neighborhood Services [24:12], [44:46], [1:21:00].

the moments — the analyzer’s scored read of this meeting; click one to jump the tape

Scored, not chosen for you — the salience bar is a measurement, and every moment is a receipt into the transcript below. With JavaScript on, tick moments to compose a reel — and tick moments on other meetings too; a reel can span the record.

→ the publish kit for this meeting — the clips worth cutting and draft copy, for a producer.

how the meeting framed it — eight civic lenses, counted from its own words
community226· steady
infrastructure141↑ rising
process43↓ fading
environmental38↑ rising
financial33↑ rising
safety29↓ fading
legal24· steady
equity21↑ rising

Counted, not modeled — each lens is a word list; drift compares the first half to the second.

the questions asked — typed by what they ask about
the meeting in words — what was said most; press a word to find every line that says it
streetstreet — 106 mentionsbuildingbuilding — 95 mentionsmissmiss — 91 mentionsdeckdeck — 77 mentionsroofroof — 73 mentionsaddressaddress — 71 mentionsmadammadam — 70 mentionscasecase — 70 mentionsrearrear — 66 mentionsprojectproject — 63 mentionscommunitycommunity — 63 mentionsneighborhoodneighborhood — 62 mentionsofficeoffice — 61 mentionsexistingexisting — 57 mentionsgoodgood — 56 mentionsproposalproposal — 51 mentionsboaboa — 47 mentionsspacespace — 45 mentionsproposedproposed — 45 mentionspleaseplease — 44 mentionsconcernsconcerns — 44 mentionssitesite — 43 mentionsparkingparking — 43 mentionszoningzoning — 41 mentionsendend — 41 mentionsprocessprocess — 40 mentionsdesigndesign — 40 mentionsplanplan — 38 mentionsmorningmorning — 37 mentionssouthsouth — 36 mentionsapplicantapplicant — 35 mentionsunitsunits — 34 mentionscodecode — 34 mentionspropertyproperty — 34 mentionsdecksdecks — 34 mentionssupportsupport — 33 mentionsareaarea — 33 mentionsaccessaccess — 32 mentionsnamename — 30 mentionspresentpresent — 29 mentionsslideslide — 29 mentionssideside — 29 mentionsuseuse — 29 mentionsservicesservices — 29 mentionsassociationassociation — 29 mentionsstructurestructure — 29 mentionsfloorfloor — 28 mentionsreviewreview — 27 mentionshearinghearing — 27 mentionsoppositionopposition — 27 mentionsfirstfirst — 27 mentionshatchhatch — 27 mentionsadditionaladditional — 27 mentionsbostonboston — 26 mentionscollinscollins — 26 mentionssquaresquare — 26 mentionsunitunit — 25 mentionscommentscomments — 24 mentionsturnerturner — 24 mentionsworkwork — 24 mentions
the same, as a table
wordmentions
street106
building95
miss91
deck77
roof73
address71
madam70
case70
rear66
project63
community63
neighborhood62
office61
existing57
good56
proposal51
boa47
space45
proposed45
please44
concerns44
site43
parking43
zoning41
end41
process40
design40
plan38
morning37
south36
applicant35
units34
code34
property34
decks34
support33
area33
access32
name30
present29
slide29
side29
use29
services29
association29
structure29
floor28
review27
hearing27
opposition27
first27
hatch27
additional27
boston26
collins26
square26
unit25
comments24
turner24
work24

↓ this picture, as .svg

“street” came up 106 times. Sized by how often; civic stopwords out. With JavaScript off, a word opens the tape at its first mention.

transcript — select any line to Cite it, click a time to jump; + on a line cuts it into your reel transcript .txtkit .json

1:48 Good morning. The city of Boston zoning

1:50 board review hearing for November 17th,

1:52 2026 is now in session. This hearing is

1:55 being conducted in accordance with the

1:56 applicable provisions of the open

1:58 meeting law, including the updated

1:59 provisions enacted by the legislature

2:02 this year. The new law allows the board

2:04 to continue its practice of holding

2:05 virtual hearings through June 2027. This

2:08 hearing of the board is being held

2:09 remotely via the Zoom webinar event

2:12 platform and is also being livereamed.

2:16 In order to ensure this hearing of the

2:18 board is open to the public, members of

2:20 the public may access this hearing

2:22 through telephone and video

2:23 conferencing. The information for

2:25 connecting to this hearing is listed on

2:26 today's hearing agenda, which is posted

2:28 on the public notices page of the city's

2:30 website, boston.gov.

2:32 Members of the public will enter the

2:33 virtual hearing as attendees which means

2:35 you will not see yourself on the screen

2:37 and you will be muted throughout unless

2:38 administratively un when asked to

2:40 comment. Board members, applicants and

2:42 their attorneys or representatives will

2:44 participate in the hearing as panelists

2:46 and they will appear along presentation

2:49 materials when speaking. Panelists are

2:51 strongly encouraged to keep video on

2:52 while presenting to the board.

2:57 As with our in-person meetings, comments

2:59 and support will be followed by comments

3:01 in opposition. The order of comments is

3:03 as follows: elected officials,

3:05 representatives of elected officials,

3:06 and members of the public. The chair may

3:08 limit the number of people called upon

3:10 to offer comment and the time for

3:11 commenting as time constraints require.

3:13 For that reason, the board prefers to

3:15 hear from members of the public who are

3:17 most impacted by a project. That is

3:18 those individuals who live closest to

3:20 the project.

3:25 If you wish to comment on impe, please

3:26 click the raise hand button along the

3:28 bottom of your screen in the Zoom

3:29 webinar platform. Click it again and

3:32 your hand should go down. When the host

3:34 sees your hand, you will receive a

3:35 request to unmute yourself. Select yes

3:36 and you should be able to talk. If you

3:38 are connected to the hearing by

3:39 telephone, please press star 9 to raise

3:41 and lower your hand. You must press star

3:43 six to unmute yourself after you receive

3:45 the request from the host. Those called

3:47 upon to comment will be asked to state

3:49 their name and address first and then

3:51 can provide comment.

3:54 In the interest of time and to ensure

3:56 that you have enough time to do so,

3:58 please raise your hand as soon as Mr.

3:59 Stebridge reads the address into the

4:01 record. Do not raise your hand before

4:02 the relevant address is called or the

4:05 meeting host will not know to call on

4:06 you at the appropriate time. We ask that

4:08 you keep your comments brief and all

4:09 public testimony will be limited to 90

4:11 seconds per speaker.

4:13 Okay, Mr. Stebridge,

4:19 you are on mute, Mr. Stebridge.

4:22 Good morning, Madam Chair. President

4:25 Good morning,

4:26 Miss Turner.

4:28 Good morning, Madam Chair. President

4:30 Good morning, Miss Barza.

4:33 Morning, Madam Chair. Present.

4:35 Good morning, M. Miss Weell.

4:38 Good morning, Madame Chair. Present.

4:40 Good morning, Mr. Collins.

4:42 Morning, Madam Chair. Present.

4:44 Good morning, M. Miss Panado.

4:46 Good morning, Madam Chair. Present.

4:48 Good morning. Floor is yours. Mr.

4:51 Stbridge,

4:54 we'll begin today's hearings with um

4:57 request for extensions scheduled for

4:59 9:30 a.m. There are 17 cases before us.

5:05 Um the extension requests appear to be

5:07 reasonable. I'll read through them all.

5:11 Um if there are any questions

5:14 uh that you want to address, Madam

5:16 Chair, after that, we'll go from there.

5:20 We'll begin with case BOA

5:23 127 0390

5:27 with the address of 19 Harrison Street.

5:31 Next we have case BOA 152 3713

5:37 with the address of 91 Juan Avenue.

5:41 Next we have case BOA52

5:45 3744

5:48 with the address of 11 Juan Avenue.

5:52 Next we have case BOA52

5:56 3749

5:58 with the address of 171 Juan Avenue.

6:02 Next we have case of BOA

6:05 152

6:07 3753

6:10 with the address of 19 Avenue.

6:14 Next we have case BOA

6:17 1566991

6:21 with the address of 12 to 18 Sawyer

6:24 Avenue.

6:26 Next we have case BOA 1480567

6:32 with the address of 164 Savill Avenue.

6:38 Next we have case BOA103

6:42 569

6:44 with the address of 820 William T. Marcy

6:47 Boulevard Park. Next we have Ace Ba

6:52 155461

6:55 with the address of 62 North Beacon

6:58 Street.

7:00 Next we have case BOA 161 6343

7:06 with the address of 120 Glen Road.

7:11 Next we have case BOA 161 6347

7:17 with the address of 124 on D road.

7:21 Next we have case BOA1507043

7:28 with the address of 688 to 688B

7:32 Columbia Road.

7:34 Next we have case VA 160 0988

7:41 D 2 with the address of 2193 to 2201

7:46 Commonwealth Avenue.

7:49 Next we have case BOA 1341538

7:54 with the address of 2196

7:57 Washington Street.

8:00 Next we have case BOA 1341528

8:05 with the address of 2154

8:08 Washington Street.

8:11 Next we have case BOA 1341524

8:17 with the address of 1121 Harrison

8:20 Avenue. And finally, we have case

8:23 BOA1341518

8:28 with the address of 11:05 Harrison

8:32 Avenue.

8:33 Madam Chair, those are the extensions

8:35 before for us today.

8:37 Thank you. Any questions from the board?

8:41 May I have a motion to grant the

8:43 extensions as requested?

8:45 Motion to grant the extensions as

8:47 requested. Is there a

8:48 second? Mr. Stebridge.

8:52 Yes,

8:54 Miss Turner.

8:55 Yes,

8:56 Miss Better Brazo.

8:57 Yes,

8:59 Miss Weell.

9:00 Yes,

9:01 Mr. Collins.

9:02 Yes,

9:03 Miss Ponado.

9:04 Yes.

9:05 Chair votes yes. The motion carries.

9:11 Move on to board final operative cases

9:14 scheduled for 9:30 a.m.

9:17 There are two cases in front of us

9:19 today.

9:22 The first is case BOA 945890

9:28 with the address of 244 to 250 Hancock

9:33 Street. If the applicants andor the

9:36 representative are present, would they

9:38 please explain case to the board?

9:45 Good morning, Madame Chairman and

9:48 members of the board. My name is Rebecca

9:49 Lee. I'm with the law firm of Mintz. Um,

9:53 and this is a final arbiter request

9:56 relating to the dotbot project. And uh,

10:00 what I'd like to do is to share my

10:03 screen to show you the site plan. Um,

10:06 let me just lower my hand.

10:09 And uh, let's see.

10:14 Do I have the permission to share? uh

10:17 you need to work with what you've

10:19 submitted. So if you could let the

10:21 ambassador know what page you need to

10:23 scroll to. Thank you.

10:24 Yeah, we can scroll to the to the plan

10:26 at the end of this document which is

10:28 subdivision plan. The doc block project

10:30 was approved by the BPDA in in 2019 as a

10:35 four building uh project with

10:37 approximately 484 units and ground

10:41 flooror commercial space. It's a almost

10:43 4 acre site that was formally comprised

10:46 of vacant industrial and commercial

10:49 buildings. The board of appeal provide

10:51 multiple forms of zoning relief in June

10:54 in July of 2019. Two of the buildings

10:57 have been constructed. The two buildings

10:59 on the left uh where lot BA is have been

11:03 constructed or occupied. They have 245

11:06 units and 33 affordable units. The

11:09 project also includes a site drive,

11:11 other landscape improvements in order to

11:15 so this was always conceived as a single

11:18 project and then market forces really

11:21 impelled the developer to move forward

11:23 with the first two buildings and to see

11:25 how market absorption went. And

11:27 meanwhile, um, they got built, they've

11:30 been occupied, and the city, uh, came to

11:33 the developer to ask him to consider

11:35 making the lot B building, the Hancock

11:37 building, an all affordable building.

11:39 And in order to do that, we have to

11:41 subdivide the site and create a separate

11:43 lot for lot B. And that is why we're

11:46 here with the final arbiter hearing.

11:48 We've worked with the city to figure out

11:50 what the program is. It's all affordable

11:52 units. making this an over affordable

11:55 building will double the number of

11:57 affordable units at the dock block

11:59 project. However, we've also worked to

12:01 ensure and work with council to both ISC

12:04 and the board of appeal to ensure that

12:06 by creating these subdivision lines, we

12:08 don't create inadvertent zoning

12:10 infirmities with respect to lot A, lot B

12:14 and lot C. So, these are somewhat

12:17 oddlooking.

12:18 You know, if you look at lot C and it

12:21 has this odd configuration is because we

12:23 needed to have enough land area in each

12:25 lot so that the F remained below the 2.5

12:28 prescribed by the board and we also

12:30 needed to have appropriate setbacks of

12:32 lot A from the lot line because this is

12:35 already built with a lot of fenistration

12:36 on this um on this facade. So, uh, we're

12:41 here before you simply to confirm, uh,

12:44 that there are no new zoning infirmities

12:46 created by the subdivision. We're

12:49 planning for a construction financing

12:51 closing in, uh, February. The capital

12:54 stack is completely assembled and now

12:56 it's a matter of getting all the

12:58 logistics together to close the

13:00 transaction. And we're doing this with

13:01 the support of Mo and the BPDA.

13:06 Thank you. Are there questions from the

13:08 board? Hearing

13:13 none. Is there a motion?

13:15 Madam Chair, I'd like to put for a

13:17 motion of approval.

13:19 Is there a second?

13:20 Second.

13:22 Mr. Stebridge.

13:25 Yes.

13:27 Turner.

13:28 Yes. Ma Brazza.

13:31 Yes.

13:33 Miss We

13:34 Yes.

13:36 Mr. Collins.

13:37 Yes.

13:39 Miss Panado,

13:40 yes.

13:41 Chair votes yes. The motion carries.

13:43 Good luck.

13:48 Uh the second board final operative case

13:51 is case BOA 945

13:56 894

13:58 with the address of 1213 to 1219

14:02 Dorchester Avenue. Uh I believe this is

14:06 attorney We again.

14:09 Uh good morning again madam chair and

14:12 the members of the board. Um I'll spare

14:14 you all the background about the docbot

14:16 project if we just go to that plan. This

14:19 case is about lot C. Uh so the same

14:21 issue we're creating a a completely

14:24 separate um financable lot and by doing

14:28 so uh we have uh worked to ensure that

14:31 it'll be zoning compliant. Um and this

14:33 is going to be the site of a building

14:35 that will front on Dorchester Avenue. Uh

14:38 whereas this building is here in the

14:40 heart of the site and this one will have

14:42 both residential units and ground

14:44 flooror commercial space which is

14:46 similar to the dot north building which

14:47 is here um both on Dorchester Avenue.

14:52 Thank you. Any questions from the board?

14:57 Hearing none. May I have a motion? Madam

15:00 Chair, I'd like to perform a motion of

15:01 approval.

15:02 Is there a second?

15:04 Second.

15:05 Mr. Stembridge.

15:08 Yes.

15:09 Miss Turner?

15:11 Yes.

15:13 Miss Bza?

15:14 Yes.

15:16 Miss Weell?

15:17 Yes.

15:18 Mr. Collins?

15:19 Yes.

15:21 Miss Ponado?

15:22 Yes.

15:24 Chair votes yes. Motion carries. Good

15:26 luck.

15:27 Thank you.

15:30 Next, we'll move on to two building code

15:34 um red discussion cases schedu for 9:30.

15:38 Um madame chair, these cases go

15:42 together, so I will read them in as

15:44 companion cases and then we'll go move

15:47 on from there.

15:49 The first is case BOA 1 190

15:54 6071

15:56 with the address of 85 Chandler Street.

16:01 Along with that, we have case BOA1862080

16:07 also with the address of 85 Chandler

16:10 Street. If the applicants

16:14 and their representatives are present,

16:16 would they please explain these cases to

16:18 the board?

16:21 Yes. Good morning, Madame Chair, members

16:23 of the board. Mark Lcast, Lacass Law,

16:26 177

16:27 Huntington Avenue in Boston. I am the

16:30 attorney for the property owners, Carl

16:33 and Michelle Hediger. Um, the

16:36 presentation, there it is. Excellent.

16:39 That's the one I'd love to show. Um,

16:41 Madam Chair, do you want me to do the

16:42 building code first since it's listed

16:44 first on the docket?

16:46 Sure. Thank you.

16:47 So, the building code refusal is a

16:50 familiar one that occurs in the south

16:52 end and this board has seen many times

16:54 before,

16:55 and that is the inconsistency between

16:57 what the building code requires for

16:59 access to roofs and what the zoning code

17:01 and the south landmark commission

17:03 guidelines require. Um what is proposed

17:07 here is a hatch roof hatch to access the

17:10 roof that is consistent with article 64

17:13 and consistent with the south end

17:16 landmark guidelines and for that

17:19 proposition we require a variance from

17:22 the building code which requires a head

17:24 house. Again it is a familiar

17:27 inconsistency that occurs in the south

17:29 end and this board routinely grants

17:32 building code relief for that item.

17:37 So this is related to of course uh a

17:40 roof deck. If we could stay at the slide

17:41 with the abut circle. Thank you.

17:46 Um as a result of the community review

17:48 process as shown on the um a butterfly

17:53 which ons determined was just a twoe

17:57 comment period rather than at a butter

17:58 meeting based on the prior process. The

18:01 applicant has increased the rear setback

18:03 of the proposed roof deck from 6 in to

18:06 12 in and increased the side setback by

18:09 an additional 16 in to provide greater

18:12 separation from the adjacent roof decks.

18:15 Not surprisingly, as you can see on the

18:17 map, this is a typical rowhouse in the

18:20 south end and is in a densely located

18:24 part of the south end. Um, next slide,

18:27 please.

18:30 Oh, and in connection with this, members

18:32 of the board, what is before you on the

18:34 zoning code part of the case, which I'm

18:36 covering now, is a sole request for a

18:39 conditional use permit under article

18:41 64-34

18:44 for a roof deck. No variances. The decks

18:47 that you'll see on the plans and

18:49 elevations that I'll show you are fully

18:52 dimensionally compliant and otherwise

18:54 satisfy the standards and guidelines of

18:57 the South End Landmarks Commission.

19:00 Um the existing two family townhouse is

19:03 currently under renovation and the pre

19:05 approved use remains unchanged. The roof

19:08 deck is 2510 x 116 privately accessed

19:11 from unit 2 by a full staircase and roof

19:14 hatch assuming the building code relief

19:16 is granted. Setback is 12 in from the

19:19 rear roof edge and 16 in from the shared

19:22 property line which exceeds that which

19:24 is required by the zoning code in terms

19:27 of uh dimensional requirements. The

19:30 proposed deck will be further from the

19:31 property line at 79 Chandler Street at

19:34 every point, providing increased

19:36 separation from the neighboring decks.

19:38 The third floor terrace is a walk out

19:41 from the primary bedroom for unit 2.

19:44 It's constructed over an existing flat

19:46 roof, and there's an existing privacy

19:48 partition between 85 and 79 Chandler

19:51 Street that will remain in place, and I

19:53 have pictures of that as well. Both

19:55 decks again will comply with the

19:56 Southland Landmark Commission

19:58 guidelines. Next slide.

20:04 So the property that is before you is 85

20:07 Chandler Street, which is the shaded

20:09 property in the middle of the screen.

20:11 This is looking at it from an elevated

20:13 view at rear. To the right are

20:16 buildings, as you can see, with lots of

20:18 decks uh side by side by side by side by

20:21 side. And to the left is the building at

20:24 79 Chandler Street which has some

20:27 walkout terraces on the side for each of

20:30 the units and a very large roof deck on

20:32 the top of the building which of course

20:35 79 Chandler Street got the very same

20:37 kind of relief that this uh project

20:39 before you is seeking today and that is

20:41 a conditional use permit under 64-34.

20:45 Next slide.

20:49 Again, here are rear elevations.

20:52 The roof deck sits on the top of that

20:54 opening and then the walkout terrace is

20:56 just behind those skylights and we have

20:59 some better images showing what it will

21:01 look like. Um, again, just in context of

21:05 the neighborhood, you can see there are

21:07 lots of decks on pretty much every

21:09 building. This is this is practically

21:11 the only building that does not have

21:13 decks, just like all the other

21:15 buildings.

21:16 Next slide.

21:22 So on the left is a rendering of what

21:25 the proposed decks will look like. At

21:27 the top is the roof deck accessed by the

21:30 hatch. And then the lower window are uh

21:34 sliding doors for the walkout terrace

21:37 from the primary bedroom. On the

21:39 existing flat roof shown on the right

21:42 there in that picture of the existing

21:44 conditions. So roof deck on the top,

21:47 walk up terrace below. Sole item for

21:49 relief condition use perma. Next slide.

21:57 This is just sort of a drone view of the

22:01 rendering. On the left you can see the

22:03 roof deck u with the hatch and then the

22:07 lower terrace walkout condition from

22:09 that um primary bedroom.

22:13 Next slide, please.

22:18 We did uh an aerial study of this block.

22:22 The yellow dot sort of in the middle

22:24 left is 85 Chandler Street. The red dots

22:28 represent existing rear decks and roof

22:31 decks in this immediate vicinity. And

22:34 you can see that pretty much 85 Chandler

22:36 Street is like the only building that

22:38 doesn't have decks. So, nothing unusual

22:41 about this request. Entirely consistent

22:43 with the zoning code, entirely

22:45 consistent with the South Landmark

22:47 Commission guidelines. Next slide.

22:54 These are the floor plans. On the left

22:56 is the walkout terrace from the primary

22:59 bedroom. On the right is the proposed

23:01 roof deck with the hatch access.

23:06 Next slide.

23:08 And that's just our required site plan.

23:11 And that concludes our presentation. We

23:14 also have on the call Michelle and Carl

23:17 Haidiger who are the property owners in

23:19 case you have any questions and also our

23:21 architect Shane Losi is on as well. That

23:26 concludes our presentation.

23:28 Thank you.

23:30 Questions from the board.

23:34 Mark, you're you're waiting for um a a

23:37 ZBA um decision before you present in

23:41 front of the Boston Landmark Commission.

23:43 Is that correct?

23:44 Yes, it's a

23:45 prerequisite.

23:47 Okay. Just wanted to clarify. Um I just

23:50 I knew that you you were complying with

23:52 the South End LMAR, but it knew if you

23:55 presented to them yet uh and received

23:57 pre-approval.

23:58 I believe we've done so with staff on an

24:00 informal level which is typically okay

24:02 process we'd like to take

24:03 the process. Okay. Thank you. No further

24:05 questions.

24:07 Thank you. Any other questions from the

24:08 board?

24:11 May I have public testimony?

24:12 Hello madam chair, members of the board.

24:14 My name is Eva Jones representing the

24:15 mayor's office and neighborhood services

24:17 regarding 85 Chandler Street. Our office

24:19 defers to the board's judgment. A

24:21 community process was conducted

24:22 including an abutters meeting held on 78

24:25 uh25 following the ZBA's denial from the

24:31 uh the applicant reached out once again

24:34 requested that the applicant distribute

24:35 a subcommittee flyer to the neighborhood

24:38 which generated several uh letters from

24:40 the community and feedback from

24:43 community members during the community

24:44 comment period. Of these 45 letters were

24:47 in support, six of which were within the

24:50 residence of Butters radius and one as

24:52 well from the former former owner of the

24:54 home stating that the applicants have

24:55 been longtime residents and developers

24:58 in the neighborhood and that the

24:59 proposal is consistent with the

25:00 character of the neighborhood and the

25:02 abuing properties. I also received two

25:04 letters in opposition from their direct

25:06 uh one from their direct abuter and one

25:07 within the abuters's radius expressing

25:10 that the proposal makes minimal changes

25:12 to a project previously rejected by the

25:14 ZBA and that the project still pro

25:16 pososes many safety security and privacy

25:19 concerns fails to adequate adequately

25:21 address direct sight lines into

25:23 neighboring bedrooms and patios and

25:25 provides only a 16-in setback from the

25:28 adjacent patio which the butter argues

25:30 is insufficient to prevent potential

25:32 intrusion.

25:33 The proposal was also brought to the

25:35 Ellis Neighborhood Association where

25:37 they expressed that they do not involve

25:38 themselves in residential proposals. At

25:41 this time, the mayor's office and

25:42 neighborhood services defers to board

25:43 judgment on this matter. Thank you

25:44 everyone for your time and

25:45 consideration.

25:48 Thank you.

25:49 Next, we have Leah Weman.

25:53 Hi there. My name is Leo Weman. I live

25:55 at 79 Chandler Street directly next to

25:58 85. And I'm here about three things.

26:01 primarily privacy, security, and lack of

26:04 coordination. Frankly, uh last year I

26:06 raised significant concerns about

26:08 security and proximity. The board asked

26:12 me during that meeting to have

26:14 developers work together on a mitigation

26:16 plan, and I did not hear from them for

26:18 nearly a year. Just a couple months ago,

26:20 I got a brief email asking for my

26:22 letter, which did outline a mitigation

26:24 plan and privacy uh details. I sent it

26:27 again, heard nothing back, and only this

26:29 week did I get an email saying that they

26:31 would have a safety rail and privacy

26:32 screen. I have seen no design drawings.

26:35 I haven't seen the renderings that were

26:36 just presented. Um, and I am concerned

26:39 about that study given the fact that 85

26:41 Chandler already has a deck and a patio.

26:44 Meanwhile, a hatch has been built onto

26:47 the roof to give it access about a foot

26:50 from my patio. None of the security

26:53 suggestions have been implemented. We

26:55 have had breakins in this building

26:57 through the roof and through the deck.

26:59 And the deck looks directly into my

27:02 bedroom, my bathroom, kitchen, dining

27:06 area, and the entrance to my apartment.

27:08 The proposals outlined don't solve this.

27:11 A 42in guard rail present prevents

27:13 falls. It's not a security barrier

27:15 between two properties. And moving the

27:18 deck 6 in from my property really

27:21 changes nothing. So again, without

27:23 design details, it's really impossible

27:25 to evaluate.

27:27 We have been incredibly reasonable and

27:28 it's been very hard to work with the

27:30 developers. I'm asking that you please

27:32 not approve this deck, especially

27:34 without a detailed enforcable mitigation

27:36 plan. I don't feel conf confident in the

27:39 developers to take our concerns

27:41 seriously. I'm a single woman and again,

27:43 we just want to prevent ongoing breakins

27:46 and some of the issues that we've

27:47 already had. So, thank you.

27:51 Okay, next we have Timothy Scoffield.

27:56 Thank you. Good morning. My name is Tim

27:58 Scoffield, 20 Park Plaza. I'm an

28:00 attorney representing the 79 Chandler

28:02 Condo Association, which is the direct

28:04 butter. Um, I'll be very brief. Others

28:07 will speak to impact. I really just want

28:09 to speak to the idea that this hatch,

28:12 um, this is not a hatch. It's a head

28:14 house. A hatch, we all think it's sort

28:15 of something that just pops up, right?

28:17 We think of a roof hatch. This stands 3

28:19 ft tall and it's already been built. My

28:22 problem with this is this applicant was

28:24 here a year ago, was rejected, told to

28:26 go back, fix, work with the neighbor.

28:29 They barely made any effort to do so,

28:31 and now they've built the head house

28:33 before they've come to you. It's being

28:35 treated like a fat comp plea. Oh,

28:37 they're a bunch of decks. There's still

28:38 a process. The board denied this for a

28:41 reason. They have not addressed those

28:42 reasons and they've built a head house

28:45 without permission. The point is to get

28:47 your approval first and then build the

28:51 head house, not build first and then

28:53 come and say, "Oh, it's done." So that's

28:56 our problem with this. They've been

28:57 disrespectful to the process. They built

28:59 a head house without permission. They

29:01 were denied a year ago and didn't do the

29:03 things they were told to do and treating

29:05 it like a fade to come plea. The board

29:07 should not sanction that kind of

29:08 behavior.

29:12 Thank you.

29:19 Okay, looks like are you?

29:21 Yeah, sorry. Next we have William.

29:27 Mr. William Shortland, if you can unmute

29:29 yourself, please.

29:33 Please unmute yourself. We can't hear

29:35 you. You need to unmute yourself, sir.

29:40 Sorry about that. Dear chairman,

29:43 chairperson, and members of the board,

29:44 my name is William Shortell. I live at

29:46 79 Chandler, number four. I've lived

29:49 here since 2008.

29:51 I'm speaking today to state my formal

29:54 opposition to the proposed roof roof

29:56 deck construction at 85 Chandler Street,

29:58 which directly abuts my existing deck.

30:02 My primary concerns are security. The

30:05 proposed deck is directly adjacent to

30:07 mine, creating a major risk that could

30:10 allow forced entry through my deck door

30:12 or window into my unit. We've had one

30:15 breakin in this building. We've had one

30:17 unauthorized entry where someone killgle

30:19 gated a contractor into the building and

30:22 caused dam property damage to two units.

30:24 My other concern is privacy. There's an

30:26 abuing deck creates clear sight lines

30:28 into my unit, significantly compromising

30:31 my privacy and the enjoyment of my deck.

30:34 The third concern is property value.

30:36 Having an adjacent structure turns my

30:38 private space into basically a pseudo

30:41 shared space, negatively impacting my

30:43 property's value. It might be

30:47 there. There was a comment that there's

30:49 a security wall between my deck and the

30:52 proposed deck. There is a wire fence

30:56 that the contractor removed about

30:58 onethird of it towards my deck. So,

31:01 there's easy access. This is not

31:03 security.

31:04 I've been given very little input on

31:07 this deck, any any input whatsoever. Um,

31:12 as a longtime resident and director of

31:14 butter, I ask the board to take my

31:16 concerns into full consideration and

31:18 deny this proposal.

31:19 Thank you. I'm going to if there are

31:20 more 79 uh Chandler folks, can you

31:23 please add new information? Thank you.

31:26 Next, we have

31:29 Alra, please.

31:31 Hi, good morning. My name is Anra. I

31:33 live at 79 Chandler, Unit 9, right next

31:35 to 85. People on the proposed roof deck

31:38 would have direct unobstructed views

31:39 into the most private areas of my home,

31:42 my primary room, living area, and the

31:44 entrance to the second bedroom. When I

31:46 get out of bed, I would be visible. The

31:48 only doorway from my bedroom to my

31:49 living area is directly exposed. I

31:52 should not have to change out of my

31:53 nightclo to simply walk through my home

31:55 or live behind closed blinds. People on

31:58 the proposed deck would have a direct

31:59 view into my home's entrance, allowing

32:01 them to monitor exactly when I come and

32:03 go. An intruder has already entered my

32:05 home through our roof deck. These

32:07 security concerns are painfully real.

32:09 This board rejected these roof decks

32:11 last year. The changes now proposed are

32:14 teenytiny, measured in inches, and do

32:16 not resolve the privacy, safety, and

32:17 security issues that were raised last

32:19 year, and remain unressed. Please

32:22 protect our privacy and safety and deny

32:24 this proposal.

32:26 Thank you.

32:29 Madame chair, we have um another hands

32:32 on the attend section. Alexander.

32:43 Okay. Hello.

32:45 If not, next we have it. So,

32:48 hi. Uh my name is Ro Friend. I'm a

32:50 resident at 79 Chandler Street, uh unit

32:53 6. The proposed roof deck would provide

32:56 direct sight lines into my 5-year-old

32:58 daughter's room. I find this disturbing

33:00 on a variety of levels, not to mention

33:03 the security issues that it poses

33:06 as it uh to the whole building. Um, I'm

33:09 also really disheartened at um the lack

33:12 of neighborly consciousness when

33:15 readressing the design of the roof deck.

33:19 Minimizing it only just barely seems

33:23 uh in poor spirits. Uh I I'll end my

33:27 time early here. Um thank you so much.

33:32 Thank you.

33:34 Okay, last raised hand. If anyone else

33:36 is from 79, please put your comment in

33:38 the chat.

33:41 The last person is Alexander. Alexander,

33:43 if you can unmute yourself.

33:53 Okay. Wrong case. Okay. Can I ask the uh

33:56 Mr. Cass to please uh provide feedback?

34:00 Yes, madame chair, members of the board.

34:03 The disproportionate nature of the

34:05 opposition is is palpable. Again, as

34:09 shown on the renderings and the

34:11 photographs and the overhead aerial

34:13 shots that I showed you, there is

34:15 nothing unusual about these two proposed

34:18 decks as it relates to all the decks,

34:20 including the decks at 79 Chandler

34:22 Street, which of course got this very

34:25 same type of relief, article 64-34, when

34:28 they were first constructed. The

34:30 security issues are unrelated. There's

34:33 no tie to 85 Chandler Street, nor has

34:35 there ever been any connection to 85

34:37 Chandler Street. Also, as shown on the

34:39 overhead views, you saw lots of decks

34:42 side by side by side by side by side by

34:44 side, which is a very, very, very common

34:47 condition in the South End. And there's

34:48 no rash of breakins from decks in the

34:51 south end. It's simply a fabrication and

34:54 a disproportionate opposition. I'll also

34:57 note that the planning department memo

34:59 before you recommends approval with

35:01 proviso for landmarks review noting that

35:04 the deck satisfies all of the

35:06 dimensional requirements of both article

35:08 6434

35:10 and article 6 for a conditional use

35:12 permit. That's all that is before you is

35:14 a conditional use permit for a deck in

35:16 the south end which to say is a common

35:20 form of relief that's granted is is a an

35:22 understatement at best.

35:25 Can can you speak to the proximity that

35:28 they're referring to? Uh I mean six

35:30 inches or you know

35:32 and also and also to to the roof the the

35:35 hatch already constructed.

35:38 So the roof hatch for access to the roof

35:41 itself is permissible. The roof hatch

35:45 for access to occupiable space like a

35:48 roof deck is the piece that requires

35:50 building code relief. So the hatch in

35:52 and of itself is permissible for access

35:54 to mechanical systems on the roof. Is

35:56 not a head house. It is a hatch just

35:59 like every other hatch just like noted

36:01 in the planning department memo just

36:03 like the South and Landmarks Commission

36:04 guidelines require. It's precisely

36:06 pursuant to those guidelines.

36:09 What was the other

36:13 I think the proximity again proximity is

36:18 uh not only consistent with the

36:20 dimensional requirements of the south

36:21 end zoning code but exceeds them and

36:24 again the proximity proximity if you

36:26 recall that the image of the decks to

36:29 the right of the property those decks

36:31 are all side by side by side by side

36:34 some of these rear decks in the south

36:36 end have zero setback because the

36:39 dimensional requirement for side yard

36:41 setback in the south end is zero

36:42 including for rear decks. So we

36:45 increased the setback and exceed that

36:47 which is required by the code.

36:50 And again nothing unusual about this

36:52 condition of tight row houses adding

36:55 decks in the south end. It's very very

36:57 very common. Again 85 Chandler is like

37:00 the only building in this entire

37:01 proximity that doesn't have decks.

37:03 Nothing unusual.

37:06 And um and you're also looking for a

37:10 relief on building code for the hatch

37:13 because that's typically what's the

37:15 south end commission um

37:18 preferred but the code is actually to

37:21 build a penthouse. So is that correct?

37:24 Yeah. So the building code requires a

37:26 head house if it's occupiable roof.

37:28 I mean a head I meant a head house.

37:30 Correct. If it's occupiable. So the

37:32 hatch is essentially uh lower.

37:35 Yeah. Exactly. Lower. and the zoning

37:37 code is what requires the hatch. So

37:38 there's an inconsistency between the

37:40 building code on the one hand and the

37:42 zoning code.

37:43 Zoning.

37:43 Yeah.

37:44 Got it.

37:45 Thank you.

37:46 So the solution is typically do a hatch.

37:52 Questions from the board.

37:57 May I have a motion?

38:01 Madam Chair, um given the given the

38:04 majority of um support for the project,

38:08 I'm going to put forward a motion um of

38:12 approval with a provisal that addresses

38:14 some of the neighbors concern. Um the

38:17 provisal would be that the roof deck

38:19 undergoes design review to provide um

38:24 screening where it's appropriate. Uh

38:28 and uh the other provisor would be that

38:31 the project undergo Boston landlord's

38:33 commission design review. Thank you.

38:36 Is there a second?

38:38 Second.

38:40 Mr. Stebridge.

38:44 Yes.

38:46 Miss Turner.

38:48 Yes.

38:50 Miss Badazzo.

38:52 Yes.

38:54 Miss Weo.

38:55 Yes. I think this type of outdoor open

38:58 space is pretty prevalent and contextual

39:00 with um the neighborhood and abuing

39:02 properties.

39:04 Mr. Collins,

39:06 yes.

39:08 Miss Ponado,

39:09 yes.

39:11 Chair votes yes. The motion carries.

39:13 Thank you kindly for your time.

39:20 Madame Chair, we'll now move on with the

39:22 hearing scheduled toward 9:30 a.m.

39:26 At this time, we will ask if there are

39:29 any requests for withdrawals or

39:31 deferrals from the 9:30 a.m. hearing.

39:36 Thank you, Mr. Stumbridge. It's attorney

39:37 Richards.

39:45 Can you hear me? Okay. 555 Pennington

39:47 Street.

39:48 We can hear you. Sorry. Yeah. 52 Street.

39:52 Do we have the BOA?

39:56 So So this would be for case BOA

40:00 18914

40:02 22 with the address of 555

40:06 Bennett Street. Go ahead and turn.

40:09 Thank you. Uh for the record and good

40:10 morning, Madam Chair, members of the

40:12 board. Richard Lind, the business

40:13 address at 245 Summer Street in East

40:15 Boston. on behalf of the petitioner. Uh

40:17 we reviewed the planning department's

40:19 recommendation. I think we have some

40:21 additional information regarding the um

40:24 elevation of the building. This is in

40:25 the coastal flood resiliency overlay

40:27 district. We are proposing um some

40:30 habitable space below the uh what is

40:33 alleged to be the DFE. Uh and I think we

40:36 um we'd like to take a look at that a

40:37 little bit more closely. I know we're

40:39 relatively close uh to where the

40:41 boundary is for seaf fraud. So, I think

40:43 there's probably a discussion to be had

40:45 uh with resiliency planning uh to

40:47 address any of those concerns. So, we're

40:49 asking for a brief deferral.

40:52 Okay. Um Caroline or Stephanie Digs.

40:57 All right. We have um

41:01 Sorry about that, Madam Chair. We have

41:04 um availability for

41:07 December 8th

41:10 and then we also have um availability in

41:14 January 12th, January 26 and February

41:17 9th.

41:18 Um can we do January did you say 12th?

41:22 Yes,

41:23 12th would be good.

41:26 Okay. With that, may I have a motion?

41:30 Motion to defer this case until um

41:33 January 12th.

41:35 Second.

41:35 Thank you, Mrs. Stebridge.

41:38 Yes.

41:40 Miss Turner.

41:41 Yes.

41:43 Miss Better Braza.

41:45 Yes.

41:47 Miss Weel.

41:48 Yes.

41:49 Mr. Collins.

41:51 Yes.

41:52 Miss Bonat.

41:54 Yes. Chair votes. Yes. The motion

41:56 carries. See you then.

42:01 Any further requests for withdrawals

42:04 from the 9:30 a.m. area?

42:10 Hearing none, then we will go to the

42:13 first case, case VA

42:16 180 8917

42:20 with the address of 11 Cha Court.

42:24 the applicants and are they

42:26 representative present? Would they

42:28 please explain to the board?

42:30 Yes. Good morning, Madam Chair, members

42:32 of the board. Frank and Nippenberg

42:33 representing uh the owners Lewis

42:35 Matutton, Rory Mendes.

42:39 Um we are here today um seeking approval

42:43 for um new construction at 11 Chiever

42:46 Court. the previous uh structure. Um

42:51 they attempted to make repairs under it

42:53 under issued ALT and it was the the

42:56 building ended up collapsing during

42:57 those repairs

42:59 um

43:01 which has um led us to um this ERT

43:06 proposal here for a new three family

43:08 structure. Um Chver Court is a very

43:12 tight alleyway kind of street dead end.

43:15 Uh this this lot sits at the end of the

43:18 street. Uh access is very tight and the

43:21 lot itself is very tight. Um the

43:26 foundation um was built to the

43:32 um dimensions of the last documented uh

43:35 three family structure on the property.

43:38 Um this this this whole project was done

43:42 kind of backwards unfortunately due to

43:44 the problems um with the uh demolition

43:48 and construction. Uh but we have now

43:50 rectified all of the previous permits uh

43:53 required for demolition with ISD and now

43:56 sit here trying to get this new

43:58 structure approved.

44:00 Um as you can see it's very tight

44:03 dimensionally

44:04 um and it's um a fourstory building. The

44:08 fourth story being u a bonus room with a

44:11 walk out deck.

44:14 Three units would be fully sprinklered.

44:17 Um yeah

44:26 and all all the violations are um

44:29 dimensional related.

44:37 Questions from the board?

44:42 Hearing? None. May I have public

44:44 testimony?

44:45 Hello, madam chair, members of the

44:46 board. My name is Eva Jones representing

44:47 the mayor's office of neighbor services

44:49 regarding 11 chief report. Our office

44:51 differs to the board's judgment. A

44:53 community process was conducted

44:55 including in a letters meeting held on

44:57 Tuesday, March 3rd, 2026 that was well

44:59 attended by the East Boston community.

45:01 The feedback from this meeting was

45:02 opposition regarding the project.

45:04 Community members felt that the

45:05 applicant was not a good neighbor doing

45:07 work outside of permits and not taking

45:09 the necessary precautions during said

45:11 construction causing damage to

45:13 neighboring properties as well as not

45:15 spraying during construction causing

45:16 dust to drift into many abuing yards and

45:19 homes where some neighbors reported

45:20 respirator respiratory issues.

45:22 Additionally, we received three letters

45:24 from Abutters expressing opposition to

45:26 the proposal proposal, citing many of

45:28 the same concerns expressed in the

45:30 Abutters meeting. And the proposal was

45:32 also reviewed by the Jeffre Point

45:34 Neighborhood Association at its meeting

45:35 on Monday, September 14th, 2026, where

45:38 the association expressed opposition and

45:40 submitted a formal letter to the board

45:42 outlining its concerns. Members said

45:44 members raised concerns regarding the

45:46 unconventional construction and

45:47 permitting timeline, the condition of

45:49 the work site and its impact on already

45:51 narrow street and an immediate safety

45:53 concern regarding reduced clearance

45:55 between properties and emergency egress.

45:58 The association also expressed

45:59 significant concern about retroactively

46:01 approving work already completed, noting

46:04 that doing so could set a precedent for

46:06 future projects to undertake substantial

46:08 construction or deviate from approved

46:10 plans before obtaining the necessary ZBA

46:12 approvals. At this time, the mayor's

46:14 office in neighborhood services differs

46:16 to board's judgment on this matter.

46:17 Thank you everyone for your time and

46:18 consideration.

46:20 Thank you.

46:21 Next, we have Ellie Sanchez from uh

46:24 Councelor Kleta's office.

46:27 Good morning, members of the board.

46:28 Ellie Sanchez here from Councelor Kos

46:30 about office. Um at this time, the

46:32 counselor would like to go on record in

46:34 opposition of this um case. Thank you.

46:38 Next, we have Lisa Maserini.

46:42 Um yes. Hello, my name is Lisa Maserone.

46:44 I My address is 9 Shiver Court in East

46:47 Boston. I am a direct abuter to this

46:49 project as the owner occupant of 7-9

46:51 Shaver Court in East Boston where I have

46:53 lived since 2019. I want to take this

46:55 time to stress my strong opposition to

46:57 this project due to safety concerns. The

46:59 previous structure structure was

47:01 demolished and a foundation was poured

47:02 on the property without the proper

47:04 permits or zoning exemptions which has

47:06 led to reliefs being sought here today

47:07 for being below side and rear yard

47:09 minimum minimums. The routes of

47:11 emergency egress from my property

47:13 include those side and rear yards and it

47:15 is unsafe for them to be reduced in this

47:17 manner. The developer is claiming that

47:19 the newly poured foundation matches the

47:20 previous structure, but having lived

47:22 next to the previous structure for over

47:23 5 years, I can assure you that it is

47:25 not. My fence and pavers had to be

47:27 removed to accommodate the pouring of

47:29 the new foundation, which was done

47:31 without my permission. My concerns have

47:33 been re raised to the developer on five

47:34 separate occasions since March of this

47:36 year, but were not addressed via any

47:38 substantive changes to their proposal,

47:40 such as proposing a structure with a

47:41 smaller foundation footprint that would

47:43 more closely match that of the previous

47:44 structure on the property, which they

47:46 demolished. I have additional concerns

47:48 about the structural soundness of the

47:49 work done to date given that it was

47:51 completed without the necessary

47:52 approvals, permits, or inspections. Um,

47:54 additional reliefs being sought for

47:56 building height and lot coverage are

47:57 also caused for concern with regard to

47:59 infringing on my and other neighbors

48:00 rights to light, air, and privacy, but

48:02 those concerns are secondary to safety

48:04 matters. I appreciate the opportunity to

48:06 speak and I'm asking that you do not

48:08 approve this project without significant

48:09 updates that would ensure everyone

48:10 living on Chver Court's safety. I thank

48:12 the board for your time today.

48:15 Thank you.

48:17 Next we have Alex.

48:23 Hi. Sorry I was trying to unmute. Uh my

48:25 name is Alex Barton. I'm here from My

48:27 Three Sons LLC. We're the owners of 12

48:29 Chver Court. Um our experience in this

48:32 process so far has been uncommunicative.

48:34 Uh and we've been left with the state of

48:36 a of a mess outside on the alleyway uh

48:40 abing all of our properties. The uh

48:42 original construction, the original

48:43 permit pulled for this uh for this

48:45 property was a short farm to redo a

48:47 kinchin. Somehow the owners who are also

48:50 contractors

48:52 uh found reason to demo the entire site,

48:54 pour new foundation, and frame a

48:56 two-story structure before they thought

48:58 it was wise to ask for permission. Um

49:01 they attempted to circumvent the entire

49:04 permitting process and thus brought us

49:06 uh to a stop work order and a state of

49:09 uh uh danger and disrepair. Currently

49:12 the structure sitting there is

49:13 uninspected. Uh has poured a full

49:16 foundation that has no inspections, no

49:19 no oversight, no uh engineering that we

49:21 even know about. Uh the proposed

49:24 structure um from what was a very small

49:27 single family uh home to some long form

49:30 found from 1900. The proposed structure

49:33 is now four three or four times the

49:35 size. Uh the light um and the light that

49:39 will be shining onto my property is

49:41 going to be non-existent. Uh the uh

49:44 parking is going to be overwhelmed. The

49:46 noise, the security, the current way

49:49 they've run the job site, the

49:50 communication. We oppose this from the

49:52 fullest of our our being. Thank you for

49:55 your time.

49:58 Madam Chair, we don't have additional

49:59 comments.

50:01 Can I ask the applicant to respond?

50:04 Yes. Um I would like to respond. While

50:07 we do it, um the owners do realize that

50:10 this was unconventional and um hand a

50:13 little bit backwards. Um the the

50:16 statements that this has been

50:17 uninspected or unsafe at current present

50:21 is not true. ISD has been to the site.

50:23 Um we work with them to make the site

50:26 safe while this process was gone

50:28 through. We've provided them affidavits

50:30 from structural engineers and all

50:32 required all requested documents that

50:34 they have provided to this date have

50:36 been provided to them and have met their

50:38 needs um to to make the safe the safe

50:40 site uh the site safe. Um, regarding the

50:44 egress, um, the the applicants could

50:48 very well put a fence down the property

50:50 line and further reduce it, um, to

50:54 eliminate the safe. The building is

50:55 being fully sprinklered to um to meet

50:58 requirements and also reduce the fire

51:00 risk. Um, you know, we the the owners

51:03 are committed to uh getting this project

51:06 started and being more communicative

51:08 and, you know, running the site a little

51:10 cleaner, a little better in the tight

51:12 area. Most of the objection cited and in

51:16 the neighborhood is issues with process,

51:19 issues with construction, not you know,

51:22 what we would consider a reasonable

51:24 complaint regarding the zoning. Um, the

51:27 owners did receive an ALT issued in uh

51:30 May of 2024

51:32 uh for the renovation. So, you know, the

51:35 claim that it was a short form is uh not

51:37 true. And that the legal occupancy

51:39 listed uh is a three family on that

51:43 which led to some confusion from um from

51:46 the owners at the time.

51:50 Questions from the board.

51:54 So are does the can you talk about the

51:56 dimensional uh variances and whether

52:01 it's compliant with EBR3

52:05 subd district here?

52:07 Uh they are I mean all of the variances

52:09 are

52:11 um do require really front yard,

52:13 sideyard, rear yard um building height

52:16 and lot coverage. It's just a it's a

52:18 very tight lot. sort of build anything

52:20 on that space. Um because of the way the

52:23 lot is situated, there is a large

52:26 granite or concrete wall, you know,

52:29 retaining wall that's there on the back

52:31 on the left side of the property. It's

52:33 it's it's a very tight space to begin

52:35 with. So,

52:37 yeah. And we typically are are try to

52:39 stick to the East Boston zoning since

52:42 it's something that is relatively new

52:44 and and went through a lot of community

52:46 process.

52:49 And are you um familiar with the

52:52 planning department recommendation on

52:54 this?

52:55 Yeah, we are familiar. This is I would

52:57 call this just a unique lot being at the

52:59 end of this this dead end 4ft wide path.

53:05 It's a It's a very unique situation for

53:09 this location.

53:17 Other questions from the board?

53:23 Hearing none. Is there a motion?

53:35 Real quick, Madam Chair. So, I I'm

53:37 looking at a plan for your existing your

53:39 existing plot plan with your foundation

53:41 marked out, and you're saying that the

53:43 new foundation that was supposedly just

53:45 poured is in the same exact location.

53:48 Correct.

53:50 Uh, it is to the dimensions of the last

53:53 three family on

53:56 on file. I I cannot state that it's in

53:58 the exact same location. It is

54:00 dimensionally the same that was last on

54:03 the permit.

54:05 And Hansi, correct me if I'm wrong, but

54:07 is there normal there's normally a

54:09 proposed foundation plan as well?

54:11 Correct.

54:12 Yeah, I'm kind of looking the reason

54:14 it's taking me a lot of response is

54:17 because I'm kind of looking at the EBR3

54:20 um zoning guidelines because I think

54:21 that's what's missing just kind of as

54:23 zoning reference on a title block. Um

54:28 and so I think what's what's challenging

54:32 is that these drawings are are drawn

54:34 almost as if it's an kind of isolation.

54:38 Um and it's hard to see what was

54:42 existing. Typically you have an existing

54:44 survey plot plan even if the foundation

54:47 was poured.

54:49 Uh we would see what was poured. So like

54:53 almost as built drawings and was being

54:55 proposed. So there's a lot of

54:57 incompleteness in in the drawings. Um,

55:02 and so you know I was looking like you

55:04 have four stories that's kind of allowed

55:06 up to three to well

55:08 three to six but up

55:09 no the height

55:11 high 35 ft

55:16 I'm sorry

55:18 it's 35T

55:20 30 the building's 33 feet

55:22 I know right so that's in compliance and

55:26 you have four units right

55:28 three units

55:30 You have three units.

55:31 Yeah. The the top unit is a B level.

55:35 It's a what?

55:35 The top unit's a a B level unit.

55:38 Oh, by level. Okay. Um I I just think

55:42 you have you need kind of better

55:44 drawings to just ensure that there's no

55:47 encroachment on your on your neighbors.

55:50 So, you know, in the site in the site PL

55:53 plan, you would typically see the

55:56 adjacent

55:58 the adjacent

56:00 um buildings, which which we do, we I

56:02 guess we see 7 to nine.

56:06 That's

56:06 the only building adjacent aside from

56:07 the one in the rear. So,

56:09 right. But with a 1 foot4 and typically

56:13 you're doing a setback violation,

56:14 correct? Very

56:16 viol. Yep. Correct.

56:17 Yeah. Usually we want to build things 3

56:19 ft away from a property lot line just to

56:24 provide access. Um,

56:27 so

56:29 I I'm sorry I didn't answer your

56:31 question, did I? No, I guess I'm trying

56:33 to figure out if that existing

56:36 foundation plan, right,

56:38 was there at the time of their filing

56:41 for their ATL permit, but I don't know

56:43 that you can answer that or

56:46 the there was actually no and they part

56:49 of the structural issues that led to the

56:51 collapse of the building was there was

56:54 an inadequate foundation with the the

56:56 last structure there.

56:58 No, I get it. But when you file for an

56:59 ALT permit, you need a proposed plot

57:01 plan, an existing plot plan. So, I'm

57:03 trying to find out

57:04 that's true

57:04 where those are as opposed to yours is

57:06 dated 10 2025,

57:09 which would have been after your ALT

57:12 permit was

57:15 correct.

57:16 Correct. That ALT was the one Yeah. The

57:18 51324 plan was the one issued. Then the

57:22 then the demolition happened and then

57:25 the ELT the ERT was filed.

57:27 Yeah. So I guess where's the existing

57:29 plot plan from the ALT

57:32 that was submitted to ISD for the ALT

57:34 originally?

57:34 I will have to locate that. Yeah.

57:37 Yeah. And should we assume we're

57:39 assuming that you're building right on

57:42 the existing foundation?

57:46 We're building.

57:48 It's a new foundation that is on meeting

57:51 the dimensions of the last permit.

57:55 Let me just clarify. Are you building in

57:58 the same footprint as what your previous

58:00 foundation used to kind of be or be

58:03 located in?

58:05 That is what

58:05 is it an equal match

58:08 from the last one on file? the the the

58:11 structure that was demolished

58:13 was I don't even know how that structure

58:15 got there but it was not that footprint

58:18 is probably a little bigger than the

58:19 last structure that was there that

58:21 can I also just add so between plans

58:24 within the plan set the certified plot

58:28 plan that's the first page in our PDF

58:30 file versus a-1

58:35 that show the cover page that the

58:37 proposed three unit it does seem a

58:39 little off dimensionally. And I'm not

58:42 sure what these are supposed

58:43 That's not Yeah, that's not a servant

58:45 pop land though.

58:46 No, it's a one.

58:47 It's not. But it's What is it

58:49 illustrating?

58:52 Some just where it sits on the lot, I

58:54 guess. Yeah. But

58:56 but it doesn't match the first one. So

59:01 I I guess, you know, because we don't

59:03 have this much information, I'm almost

59:06 I'm almost leaning towards a deferral to

59:10 get accurate documentations for the

59:13 project. Th this this feels like we

59:17 don't have all the information to be

59:19 able to put forward a motion, but my

59:21 colleagues can,

59:24 you know,

59:26 can either agree or not agree, but I I I

59:29 find myself not having enough

59:31 information.

59:32 I agree.

59:34 Okay. Sounds like

59:37 Yeah. Almost like Yeah. Almost. I

59:39 actually I almost feel like what I need

59:41 is accurate documentation of what was

59:43 there exist existing prior to the

59:46 demolition.

59:49 Uh and then what is being proposed and a

59:52 really good set of drawings and a good

59:54 set of survey drawings to tell the tell

59:57 the tell the picture.

1:00:01 Yeah. So, so is that information the

1:00:04 applicant is able to provide uh during

1:00:06 the period of the the deferral?

1:00:10 Yes, we'll be able to provide that.

1:00:12 Yeah. And and please put put a zoning

1:00:14 chart. Um please connect with our

1:00:17 ambassador and just show like what was

1:00:20 existing and what you know what was old

1:00:22 and previously

1:00:24 it was a non-conforming structure.

1:00:25 Yeah. If it was a nonforming structure

1:00:27 set of plans. So there is one. We'll get

1:00:29 it.

1:00:31 I'd like to make a motion for deferral.

1:00:33 Second.

1:00:35 Okay. Uh, Mr. Sbridge,

1:00:39 yes.

1:00:41 Miss Turner,

1:00:42 yes.

1:00:44 Better Brazo?

1:00:45 Yes.

1:00:46 Miss Weo?

1:00:47 Yes.

1:00:48 Mr. Collins?

1:00:50 Yes.

1:00:51 Miss Panado?

1:00:52 Yes.

1:00:53 Chair votes yes. The motion carries.

1:00:55 Cameron, can we get a date? Um it will

1:00:58 either be um we can give him January

1:01:00 12th, January 26th, February 9th,

1:01:02 February 23rd, or if he needs time into

1:01:04 March, we can also accommodate that.

1:01:06 No, we'll take the earliest date

1:01:07 available.

1:01:09 Uh so that's January 12th at 11:30.

1:01:13 Okay, we'll see you then.

1:01:15 Thank you.

1:01:21 Next case has been deferred. So that

1:01:24 takes us to case BOA.

1:01:27 1 1905476

1:01:31 with the address of 691 Saratoga Street.

1:01:36 If the applicant and a representative

1:01:38 are present, will they please explain to

1:01:40 the board?

1:01:41 Yes, Mr. Stemers. Thank you. And again,

1:01:43 good morning, Madam Chair. Members of

1:01:44 the board, Richard Lind, 245 Summer

1:01:46 Street, East Boston on behalf of

1:01:48 petitioner. I believe we provided a deck

1:01:50 for the board. Um, probably easiest to

1:01:53 jump right down to slide number

1:01:57 if that's the deck I provided, but there

1:01:59 it is. Uh, right down to slide 12, I

1:02:02 think, is probably the easiest place to

1:02:03 start. It's a relatively simple,

1:02:04 straightforward proposal. Um, I I may

1:02:08 have spoken too soon based on the last

1:02:10 few hearings. Um, so this is a

1:02:13 pre-existing u non-conforming structure

1:02:16 in the East Boston section of the city.

1:02:18 Um this was uh approved with renovations

1:02:22 to the existing structure to convert

1:02:24 from a two to a three family dwelling.

1:02:26 Um the roof that was the original roof.

1:02:29 I do have the photos of the former um

1:02:32 views of the building. Uh was pitched.

1:02:35 It's now flat. Uh that was all permitted

1:02:38 under the new east Boston zoning as a

1:02:39 matter of right. Uh no dimensional

1:02:41 relief or use relief or parking relief

1:02:44 was necessary. Um with respect to any

1:02:47 proposed roof deck, article 53 still

1:02:49 requires a conditional use permit um

1:02:51 because it's a restricted roof structure

1:02:54 district. Um so any alteration of the

1:02:56 roof line uh does require um a

1:02:59 conditional use permit. So in this

1:03:01 particular case, we are proposing an

1:03:02 exclusive roof deck for unit 3. It is

1:03:05 accessed by a head house. All of that is

1:03:07 permitted um and it does not count

1:03:09 towards the height of the building. Uh

1:03:11 however uh there is a conditional use

1:03:13 permit requirement for this particular

1:03:16 uh addition to the building. We did have

1:03:18 a community process. The only issue that

1:03:20 was raised was some screening concerns

1:03:22 from the butter to our right. We've

1:03:24 agreed to incorporate uh screening. We

1:03:27 can address that through design review.

1:03:29 U but we had no issue with addressing

1:03:31 their privacy concerns by uh adding some

1:03:33 screening on the right side of the

1:03:35 building. Uh the next slide does show

1:03:37 the dimensions of the roof deck. These

1:03:39 are consistent with article 53's

1:03:41 requirements when it comes to roof decks

1:03:42 and headous with all the appropriate

1:03:44 setbacks both front, side, and rear. And

1:03:47 then the size of the head house that's

1:03:48 proposed being consistent uh with the

1:03:51 section of article 53 permitting and

1:03:53 authorizing uh roof structures. Uh in

1:03:56 this regard, I'm happy to pause there

1:03:58 and answer any questions of the board.

1:04:01 Thank you. Questions from the board

1:04:05 hearing? None. May I hold the testimony?

1:04:07 Hello, Madam Chair, members of the

1:04:09 board. My name is Eva Jones representing

1:04:10 the mayor's office in eer services

1:04:12 regarding 691 Saratoga Street. Our

1:04:14 office defers to the board's judgment. A

1:04:16 community process was conducted,

1:04:18 including an abutters meeting held on

1:04:20 Wednesday, September 16th, that was

1:04:22 lightly attended by the East Boston

1:04:23 community. During the meeting, one

1:04:25 director expressed opposition due to

1:04:27 concerns that the proposed deck could

1:04:29 allow someone to look through the

1:04:30 skylight and into his bedroom. In

1:04:33 response, the applicant's attorney

1:04:35 indicated that they would review

1:04:36 potential screening options or consider

1:04:38 shifting the deck closer to the front of

1:04:40 the building. The proposal was also

1:04:42 reviewed by the Harborview Civic

1:04:44 Association at their October 5th meeting

1:04:46 and the association voted for in support

1:04:49 and 11 in opposition. At this time, the

1:04:51 mayor's office of neighborhood services

1:04:52 defers to the board's judgment on this

1:04:54 matter. Thank you everyone for your time

1:04:55 and consideration.

1:04:57 Thank you,

1:04:58 Madame Chair. There are no additional

1:05:00 comments.

1:05:01 Can you uh respond to whether there were

1:05:04 any adjustments based on that a better

1:05:06 feedback?

1:05:08 Um yes, Madam Chair, the commitment was

1:05:10 to incorporate um screening uh when we

1:05:13 went for our final meeting before the

1:05:15 honor reunion association that was

1:05:17 present. Uh and we addressed that uh

1:05:20 concern specifically and made that

1:05:22 commitment at that meeting. Uh and I

1:05:24 indicated we would uh add that through

1:05:26 the design review component that's

1:05:27 typically attached to a zoning decision

1:05:29 if approved.

1:05:31 Thank you. Any other questions from the

1:05:34 board?

1:05:36 Is there a motion?

1:05:45 I'll make a motion to approve with

1:05:47 design review.

1:05:49 Second.

1:05:49 Braza. Second.

1:05:52 Mr. Stebridge.

1:05:54 Yes.

1:05:55 Miss Turner.

1:05:56 Yes.

1:05:57 Miss Better Braza.

1:06:00 Yes,

1:06:00 Miss Weo.

1:06:02 Yes,

1:06:03 Mr. Collins.

1:06:04 Yes,

1:06:06 Miss Miss Ponado.

1:06:08 Yes,

1:06:09 chair votes yes. The motion carries.

1:06:11 Thank you.

1:06:14 Next, we have case BOA 1 1907096

1:06:21 with the address of 44 Kilby Street.

1:06:25 If the applicant and other

1:06:27 representative are present, would they

1:06:28 please explain?

1:06:31 Yes. Uh good morning uh madame chair and

1:06:34 members of the uh board. Uh my name is

1:06:38 Carlos Shabira. Um I'm speaking on on

1:06:41 behalf of Luis Attenia and Elsa and

1:06:44 Boston LLC. Um, we would like to ask for

1:06:49 uh uh the takeout provisors that are on

1:06:54 on this uh property to uh be removed uh

1:06:58 so we can uh perform

1:07:01 uh take out for all the uh customers

1:07:05 that will hopefully come into our our uh

1:07:10 restaurant. Um we are taking over a

1:07:13 kebab post kebab uh on 44 Kilby Street.

1:07:17 Um

1:07:19 um and we are hoping to like I said um

1:07:23 be able to provide um takeout service to

1:07:28 our customers moving forward.

1:07:32 Thank you. Any questions from the board?

1:07:35 I have public testimony.

1:07:45 Hello. Hello, Madam Chair. Thank you for

1:07:48 passing it over to me. This applicant

1:07:50 was reached out to our office, but we do

1:07:52 not run a process on this type of

1:07:54 proposal, and our office is unaware of

1:07:56 any concerns in the neighborhood at this

1:07:58 time.

1:07:59 Thank you,

1:08:01 Madame Chair. We don't have additional

1:08:03 comments.

1:08:05 That may I have a motion?

1:08:06 Motion to approve.

1:08:08 Have a second.

1:08:10 Second.

1:08:12 Mr.

1:08:14 Yes.

1:08:16 Miss Turner.

1:08:17 Yes.

1:08:18 Miss Ba Brazza.

1:08:20 Yes.

1:08:21 Miss Weo,

1:08:22 yes.

1:08:23 Mr. Collins,

1:08:25 yes.

1:08:26 Miss Pado,

1:08:27 yes. Chair votes yes. The motion

1:08:30 carries. Good luck, sir.

1:08:31 Thank you. Appreciate it. Thank you so

1:08:33 much.

1:08:36 Next we have case BOA

1:08:39 1887139

1:08:43 with the address of 210 Hover Street. If

1:08:47 the applicants and or their

1:08:48 representative are present, would they

1:08:50 please explain to the board?

1:08:53 Hi, good morning. Robert Rudolph Rudolph

1:08:55 Freiedman LLP on behalf of uh two time

1:08:57 Hanover Street the applicant uh Hamill

1:09:00 Properties LLC. Uh with me are John

1:09:02 Hamill, property owner as well as the

1:09:04 operator of the restaurant that is going

1:09:06 into the space, Charles Terrell. Uh we

1:09:08 are seeking a change of use and

1:09:09 occupancy of the for the building from

1:09:11 restaurant with accessory office to

1:09:13 restaurant with takeout and an accessory

1:09:15 office. Um we believe that it is

1:09:18 consistent with the neighborhood in

1:09:19 Hover Street that it will add uh an

1:09:22 amenity to the residents and neighbors

1:09:25 on Hover Street. It will not adversely

1:09:27 uh impact the neighborhood. Um it will

1:09:30 create no hazard to the vehicles or

1:09:32 pedestrians. Uh the restaurant will

1:09:33 remain the same. The floor plan will

1:09:35 remain the same. It will remain

1:09:36 principally a sitdown restaurant. Um

1:09:40 there will be no exterior modification

1:09:43 and there will be no takeout window. Uh

1:09:45 we did go through the community process

1:09:47 as part of the uh tenants CE license

1:09:50 application. Uh we held a meeting

1:09:53 through the mayor's office of

1:09:54 neighborhood services. We held a meeting

1:09:56 with the North and the Waterfront

1:09:58 Neighborhood Council. We also held a

1:10:00 meeting with the Northland Waterfront

1:10:01 Residents Association zoning, licensing,

1:10:03 and instruction committee, which issued

1:10:05 a no uh objection letter at the time the

1:10:08 CV license was applied for. All of those

1:10:11 community uh meetings, the notices for

1:10:13 those meetings included disclosure that

1:10:15 the um there would be a future request

1:10:19 to add takeout. Uh and there was no

1:10:20 objection to that. I'm happy to answer

1:10:22 any questions that you have.

1:10:24 Thank you. Any questions from the board?

1:10:28 May I have public testimony?

1:10:30 Hello, Madam Chair, members of the

1:10:31 board. My name is Eva Jones representing

1:10:33 the mayor's office of neighbor services

1:10:35 regarding 210 Handover Street. Our

1:10:36 office differs to the board's judgment.

1:10:38 A community process was conducted,

1:10:40 including an upd meeting held on

1:10:42 Tuesday, December 2nd, 2025. That was

1:10:44 well attended by the North End

1:10:46 community. Feedback from this meeting

1:10:47 was mixed uh support for the applicant

1:10:49 in their restaurant with concerns for

1:10:51 the proposal's business name being

1:10:53 closely shared with a longstanding and

1:10:55 well-loved business in the north end as

1:10:57 well as the idea that the business would

1:10:59 have extensive opening hours. The

1:11:01 applicant has since agreed to change

1:11:03 their name based on community feedback.

1:11:05 The proposal was also reviewed by both

1:11:07 Nurra who provided a letter of

1:11:09 non-oposition after the applicant agreed

1:11:11 to amend their hours to midnight and

1:11:13 Munich at their meeting on 12825 where

1:11:16 they supported the proposal. At this

1:11:18 time, the mayor's office of neighborhood

1:11:19 services defers to the board's judgment

1:11:20 on this matter. Thank you everyone for

1:11:22 your time and consideration.

1:11:24 Thank you.

1:11:25 Next, we have Ellie Sanchez from Kleta

1:11:28 Zapata's office.

1:11:29 Good morning, Madam Chair, members of

1:11:31 the board. Ellie Sanchez from Councelor

1:11:32 Kleta Zapata's office. At this time, the

1:11:34 counselor would like to go on record and

1:11:36 support. Thank you.

1:11:38 Thank you.

1:11:40 Madam Chair, we don't have additional

1:11:42 comments.

1:11:43 With that, may I have a motion?

1:11:47 I put forward a motion of approval.

1:11:50 I have a second.

1:11:51 Second.

1:11:53 Mr. Stebridge.

1:11:55 Yes.

1:11:57 Miss Better Braza?

1:12:00 Miss Turner?

1:12:01 Yes. Miss Weo,

1:12:03 yes.

1:12:04 Mr. Collins,

1:12:05 yes.

1:12:06 Miss Panado,

1:12:08 yes.

1:12:08 Chair votes yes. The motion carries.

1:12:11 Good luck.

1:12:11 Thank you.

1:12:15 Next, we have two companion cases. The

1:12:19 first is case BOA 1837259

1:12:26 with the address of 168 West Street.

1:12:30 Along with that is case BOA 1835525

1:12:36 also with the address of 168 West Street

1:12:42 the applicant and their representative

1:12:44 present will they please explain to the

1:12:47 board?

1:12:48 Yes. Good morning madame chair members

1:12:50 of the board. Pardon me. Mark Lcast

1:12:53 Lcast Law 177 Huntington Avenue in

1:12:56 Boston.

1:12:58 I represent David and Lisa Casparian who

1:13:01 are the homeowners as this is their

1:13:03 single family residence in the south

1:13:04 end. Also with us is Matthew Ryder, the

1:13:08 architect who will walk you through the

1:13:10 floor plans and the proposal. Just

1:13:12 wanted to highlight the relief that is

1:13:15 being sought today. On the zoning case,

1:13:18 we are seeking two conditional use

1:13:20 permits. one for a rear deck extension

1:13:24 at level 83 as you'll see on the plans

1:13:26 and elevations and the other for a roof

1:13:30 deck on the top of the building. So, two

1:13:33 conditional use permits for rear deck

1:13:35 and roof deck

1:13:37 and the building code item of relief is

1:13:40 a familiar one in the south end and that

1:13:43 is that the there's an inconsistency

1:13:46 between the building code and the zoning

1:13:48 code and the south end landmark

1:13:50 guidelines. The building code requires

1:13:53 roof access to be through a head house

1:13:56 whereas the zoning code requires roof

1:13:58 access to be through a hatch. So we are

1:14:01 seeking building code relief in the form

1:14:03 of a variance to permit roof access via

1:14:07 a hatch to be consistent with the zoning

1:14:09 code and the south end landmark

1:14:12 guidelines. Um on the other two items,

1:14:16 um I'll note that we have gone through

1:14:18 an extensive community process.

1:14:21 Um this pardon me, this project has gone

1:14:25 through a series of iterations as a

1:14:28 result of the community process

1:14:30 including a butter meetings, direct

1:14:31 meetings with the butters and meetings

1:14:33 with the civic association.

1:14:36 uh significant revisions and changes

1:14:38 have been made to the plans and a

1:14:40 revised set of plans was submitted to

1:14:42 ISD for its review resulting in the

1:14:44 revised zoning code refusal letter that

1:14:46 only contains those two items of relief.

1:14:48 In all other respects, the proposal is

1:14:52 um compliant with the use regulations of

1:14:55 the southern zoning code as well all the

1:14:58 dimensional requirements. So, the

1:15:00 changes made included withdrawing a

1:15:02 permit for a companion rear garage in

1:15:05 the rear yard. We've scratched that. We

1:15:08 withdrew a rear deck on an upper level

1:15:10 on top of a extension to the building.

1:15:14 We reduced the rear uh size of the rear

1:15:16 yard extension from uh 21 ft by 3 ft

1:15:21 over four levels to 21 by 2'4 in on

1:15:26 three levels. We reduced the size of the

1:15:29 rear deck from 21x 6 to 19x5 with

1:15:34 clipped corners to take into account the

1:15:36 concerns of the neighbors regarding

1:15:39 proximity. Um, no additional square

1:15:41 footage is proposed. The existing 147

1:15:45 square ft from a an existing two-story

1:15:48 greenhouse, which you'll see on the

1:15:51 plans and elevations, uh, which extends

1:15:53 15 ft into the yard. We're removing that

1:15:56 and redistributing

1:15:58 um that space to the rear extension on

1:16:01 the building. That does not result in

1:16:03 any increase in square footage. Uh we

1:16:06 changed some of the materials standing

1:16:08 seam siding to brick using and matching

1:16:11 the original brick and we redesigned the

1:16:13 HVAC system to reduce from four rooftop

1:16:17 condensers to two. And I'll note that

1:16:19 one of the items in the planning

1:16:21 department memo which recommends

1:16:23 approval with provisos is a request that

1:16:27 the applicant uh move at least 5 ft from

1:16:31 the roof edge the condensers which my

1:16:34 client is prepared to do.

1:16:37 Um this is a great summary right here of

1:16:40 the existing conditions on the left. Um

1:16:44 at the bottom two floors you'll see sort

1:16:46 of looks like a giant window. Um, I

1:16:48 believe we have some photographs. It's

1:16:50 actually a 1980s vintage twostory curved

1:16:54 greenhouse that extends 15 feet from the

1:16:57 rear of the building. That's being

1:16:59 entirely removed as is the small oral

1:17:01 above it. And on the right represents

1:17:04 the condition that will exist. Um, the

1:17:07 lower three levels is being extended

1:17:09 from the rear facade to feet 4 in. And

1:17:14 the deck on level A3 is being proposed.

1:17:17 And you can see on the roof there's a

1:17:19 roof deck as well. Um,

1:17:22 this point I'd like to just turn it over

1:17:24 to Matthew Ryder, the architect, to have

1:17:26 him walk through some of the other

1:17:28 items. Um, and then can get back to any

1:17:31 questions you have about the zoning code

1:17:33 relief that's being sought. Matthew,

1:17:37 thank you. Mark, Matthew Ryder with

1:17:38 Niche Architecture and Interiors. Our

1:17:40 office is at 399 Boilson Street in

1:17:42 Boston. Um I think Mark touched on a lot

1:17:45 of the the important architectural

1:17:46 points and a lot of the updates we've

1:17:48 made as going through the extensive

1:17:50 community process. Uh a few additional

1:17:52 points that I would like to add. Um that

1:17:54 the materials for the deck on A3 level

1:17:57 are be consistent with the south end

1:17:58 landmarks district of black iron um eBay

1:18:01 deck boards as well as the roof deck

1:18:04 materiality will be uh black iron uh

1:18:06 with eBay deck boards. Um and as Mark

1:18:09 highlighted, we we have reduced the

1:18:11 number of condensers up on the roof um

1:18:12 from 4 to two. And the the other leading

1:18:15 edge was determined based on the

1:18:17 existing chimney stack, which again is

1:18:19 consistent with the South End Landmarks

1:18:21 uh district. The other point I'd like to

1:18:24 know about the roof is that it will be a

1:18:25 flat roof hatch. It won't have a pitch

1:18:28 um like some of the other uh roof

1:18:30 hatches in the south end. So this will

1:18:32 be flat um not visible from a public

1:18:34 way. Um,

1:18:36 and Mark, I think you touched on all the

1:18:38 other points that I was going to make.

1:18:41 Any other slides that you wanted to draw

1:18:43 attention to? Perhaps could you scroll?

1:18:45 Can

1:18:46 you show us any like the bumpout that uh

1:18:49 is mentioned? There's like a 40 foot

1:18:52 bumpout.

1:18:53 Yeah. So, Madam Chair, on the right

1:18:56 elevation that you can see there where

1:18:58 it's um shaded a little darker than the

1:19:01 rest of the building. So that that is

1:19:03 extending from the existing building 2

1:19:05 feet 4 in from the existing facade. So

1:19:08 coming out 2 feet 4 in that is being

1:19:10 done as of right. Um there's no zoning

1:19:13 relief required for that is

1:19:14 dimensionally compliant is F compliant.

1:19:17 So that portion of um the case is as of

1:19:20 right. What is required is a conditional

1:19:23 use permit for the deck that is shown

1:19:25 there at the A3 level.

1:19:30 questions from the board.

1:19:33 Can you speak to whether the deck meets

1:19:35 the uh South End Landmarks

1:19:39 requirements?

1:19:42 So, rear decks not facing a public way

1:19:45 are not reviewed by the South End

1:19:47 Landmarks Commission. They only have

1:19:49 jurisdiction on rear facades to the

1:19:52 extent it is above the cornis line and

1:19:55 visible from a public street away. So

1:19:58 rear decks are typically never reviewed

1:20:01 um by the landmarks commission because

1:20:03 they don't have jurisdiction. What does

1:20:05 exist however um Miss Pado is a

1:20:09 longstanding Boston planning department

1:20:11 design review proviso which is typically

1:20:14 where these end up and the um the

1:20:18 standard is that it extend no no more

1:20:22 than 6 ft from the rear facade of the

1:20:24 building and be supported by can lever

1:20:26 brackets. And considering that the

1:20:28 bumpout is as of right and the deck

1:20:32 extends no more than 6 ft from the

1:20:34 bumpout, we believe that it meets the

1:20:36 BPD um guidelines for rear decks in the

1:20:40 south end.

1:20:42 Thank you.

1:20:44 Thank you. Any other questions from the

1:20:46 board?

1:20:49 May I have public testimony?

1:20:51 Yes, madame chair, members of the board,

1:20:53 my name is Connor Newman, representing

1:20:55 the mayor's office of neighborhood

1:20:56 services regarding the proposal for 168

1:20:59 West Canton Street. Our office would

1:21:00 like to formally express its opposition

1:21:01 to this proposal. A community process

1:21:04 was conducted, including two of Butter's

1:21:06 meetings. The first was held Thursday,

1:21:07 April 30th. It was exceptionally well

1:21:09 attended. More than 50 residents were

1:21:11 present. Overwhelmingly, the majority of

1:21:14 residents voiced strong opposition to

1:21:15 the proposal, particularly directs who

1:21:18 raised serious concerns regarding the

1:21:20 proposed garage and its impact on sight

1:21:22 lines within the shared alleyway. Uh

1:21:24 what they felt was a potential

1:21:26 miscalculation of the proposed increase

1:21:27 in F, as well as the 7 uh foot and 4in

1:21:31 rear uh deck projection, which exceeded

1:21:33 the 6T standard historically upheld by

1:21:35 the board. Following this meeting, the

1:21:37 applicant withdrew the garage proposal

1:21:39 and instead proposed a carport uh

1:21:41 enclosure with a green roof. The rear

1:21:43 extension was reduced from four levels

1:21:45 to three uh and the rear bumpout was

1:21:47 reduced to uh projected uh 2'4 in from

1:21:51 the existing rear facade and the overall

1:21:53 gross floor area was reduced by 54 ft

1:21:56 bringing the proposed F uh from 2.08 to

1:21:59 2.05. After these revisions, our office

1:22:02 uh requested an additional community

1:22:03 meeting be held, which was done on

1:22:05 Thursday, July 9th. This meeting was

1:22:07 also well attended. Uh residents

1:22:09 continue to express uh many of the same

1:22:10 significant concerns that they had.

1:22:12 Following that meeting, the applicant

1:22:13 withdrew the carport application

1:22:15 entirely and eliminated the proposed

1:22:16 roof deck on the fourth floor uh level

1:22:18 extension and further reduced the width

1:22:20 of the bump out by a total of 2 ft, 1

1:22:23 foot on either side across three levels.

1:22:26 Throughout the community process, our

1:22:27 office received five letters of support.

1:22:30 uh one of which was from a direct

1:22:31 abutter uh and then 35 letters in

1:22:33 opposition approximately 25 of which

1:22:35 came from residents within the abutter

1:22:37 radius of 300 ft. Beyond their specific

1:22:39 concerns with this proposal, residents

1:22:41 expressed considerable frustration,

1:22:42 exhaustion with the repeated community

1:22:44 process surrounding a similar year,

1:22:47 excuse me, rear yard extension uh

1:22:49 proposal uh which the neighborhood had

1:22:51 previously dealt with one second

1:22:54 uh which was previously approved by the

1:22:55 board uh despite um objections and

1:22:58 concerns raised by residents. Residents

1:23:00 noted that these ongoing discussions

1:23:01 have spanned nearly four years,

1:23:02 beginning with 170 West Canyon, and

1:23:04 emphasized the strain uh the recurring

1:23:06 disputes placed on the neighborhood

1:23:08 relationships, creating tension among

1:23:10 neighbors, contributing to a growing

1:23:11 sense of division within the community.

1:23:13 Many express frustration repeatedly uh

1:23:16 having to revisit the same concerns and

1:23:17 navigate contentious discussion with

1:23:19 fellow residents over proposal that they

1:23:20 feel threatened the character and

1:23:22 cohesion of their neighborhood.

1:23:23 Residents have repeatedly emphasized

1:23:25 their deep appreciation for the South

1:23:26 End's historic character and

1:23:28 responsibility they feel to preserve the

1:23:29 neighborhood they call home. Residents

1:23:31 have expressed growing concern that the

1:23:32 very outcomes they feared are beginning

1:23:34 to materialize, setting a precedent for

1:23:36 more of these type of proposals. Concern

1:23:38 is not simply about one individual

1:23:39 addition, but about the long-term

1:23:41 consequences of allowing more of these

1:23:42 to occur. Proposal was also reviewed by

1:23:45 the Pilot Block Neighbor Association

1:23:46 which voted to oppose uh the proposal.

1:23:49 The association submitted a formal

1:23:50 letter to the board outlining concerns

1:23:52 the proposed rear yard extensions

1:23:54 exceeding the allowable F limits and

1:23:56 improperly converts existing

1:23:57 non-conforming space potentially

1:23:59 requiring variance rather than

1:24:00 conditional approval being sought. Uh

1:24:03 association argued that the seven four

1:24:05 deck projection the threetory rear

1:24:08 edition exceed the established CDA

1:24:10 standards granting significant concerns

1:24:11 regarding neighbors privacy, access to

1:24:13 light and views. um establishing maybe

1:24:16 further proposals uh on this stretch.

1:24:19 Although the applicants made several

1:24:20 revisions through the community process,

1:24:22 important to recognize these changes

1:24:23 have not resolved the fundamental

1:24:24 concerns raised by some of the

1:24:26 surrounding community members. Uh

1:24:28 despite two well attended meetings,

1:24:29 multiple rounds of revisions, and

1:24:30 extensive correspondence residents

1:24:32 opposition has remained substantial and

1:24:34 consistent. At this time, the mayor's

1:24:36 office of neighborhood services like to

1:24:37 formally express its opposition to this

1:24:39 proposal. Respectfully urge the board to

1:24:41 give considerable weight uh to the

1:24:43 overwhelming sustained opposition

1:24:44 expressed by the surrounding community.

1:24:46 Thank you for your time and

1:24:47 consideration.

1:24:49 Thank you.

1:24:51 Next we have

1:24:57 Madam Chair and board. Uh my name is

1:24:58 Adam Lipworth. I'm speaking on behalf of

1:25:00 myself and my wife Annie Weiss in

1:25:02 opposition to 168 West Canton Street. We

1:25:05 are the owners of 166 West Canton Street

1:25:07 and uh the director Butter of 168.

1:25:10 First, the proposal exceeds the far

1:25:12 limit. Their plans include new

1:25:13 construction of 199 ft internal to the

1:25:16 building where there currently exists a

1:25:17 void. This proposed floor space is

1:25:20 presented in the plans as existing

1:25:21 space, but it is not existing space. It

1:25:24 has added floor space well in excess of

1:25:25 the square footage being reallocated

1:25:27 from the greenhouse nonconformity.

1:25:29 Second, the reallocation of the twotory

1:25:31 existing non-conformity into a

1:25:33 three-story nonconformity will be much a

1:25:35 much greater non-conformity than what

1:25:37 currently exists, extending up to the

1:25:39 parlor level and significantly impacting

1:25:41 our privacy, sunlight, and sight lines

1:25:43 from the main family living area of our

1:25:44 home. Because the rear deck extends off

1:25:47 of this extension, this bumpout, it will

1:25:49 extend 7'4 in from the existing wall at

1:25:52 the parlor level. well beyond the 6ft

1:25:54 standard from the existing rear wall.

1:25:56 This is our kitchen and living room

1:25:58 floor, our main family living area. If

1:26:00 the deck is approved, the applicants

1:26:02 will be able to see directly into this

1:26:03 floor because it extends 2 and 1/2 ft

1:26:05 beyond the 6t allowance. We shouldn't

1:26:07 have to keep our blinds closed to

1:26:09 preserve the the privacy of our three

1:26:11 three children and ourselves. For these

1:26:13 reasons, we believe the ZBA committee

1:26:15 should reject this the plans. We've

1:26:17 spoken to the homeowners at length about

1:26:19 the proposals o for over a year and have

1:26:21 expressed our opposition in person many

1:26:23 times. We thank the board very much for

1:26:24 your time today.

1:26:26 Thank you.

1:26:28 Okay, next we have um Will,

1:26:33 if you can unmute yourself, please.

1:26:38 Hi, good morning. You able to hear me?

1:26:41 Yes, we can s please.

1:26:43 Well, good morning. My name is Will

1:26:45 Reed. I'm currently at 35 FA Street and

1:26:48 previously at 97 Waltham Street, both in

1:26:51 the South End. My wife and I have owned

1:26:53 a home in the South End for 25 years. We

1:26:56 love everything about the neighborhood

1:26:57 and the community, including the

1:26:59 aesthetic character. We've known Dave

1:27:01 and Lisa as close friends for more than

1:27:03 15 years. We've seen the property and

1:27:06 their plans in detail and the redesigned

1:27:09 rear of the building, rear deck, and

1:27:11 roof deck are all fitting based on what

1:27:14 we've seen elsewhere in the

1:27:15 neighborhood. We also understand, as

1:27:17 mentioned, they've made significant

1:27:19 revisions based on feedback from

1:27:21 neighbors. All said, my wife and I fully

1:27:24 support the proposed renovations.

1:27:28 Thank you.

1:27:31 Um, next

1:27:33 we have Michael Cargo.

1:27:37 Hi, good morning everyone. Uh, I'm

1:27:40 Michael Cargo. Uh, I am the homeowner

1:27:42 directly abuing 168 West Kenton at 170

1:27:46 West Kitten. I have been a homeowner in

1:27:48 the South End for 11 years and the

1:27:51 homeowner of 170 West Kitten since July

1:27:53 of 2025.

1:27:55 Since uh we took over ownership of the

1:27:58 home, Dave and Lisa have been completely

1:28:00 transparent with us about their plans

1:28:02 and have sought our feedback. Uh we note

1:28:05 that they've made uh tremendous

1:28:07 revisions based on feedback from the

1:28:09 neighborhood and have gone through

1:28:10 exhaustive efforts to accommodate

1:28:13 feedback. Uh we have never felt and do

1:28:16 not feel that this poses any uh

1:28:19 constraints on our property and fully

1:28:21 support the proposal.

1:28:24 Thank you.

1:28:27 And um we have Patrick.

1:28:34 Yeah. Hi. I just raised my hand just to

1:28:37 um be elevated to panelists. That's all.

1:28:40 Oh. So, Madame Chair, I don't see

1:28:43 additional hands raised.

1:28:44 Wait, wait, wait. What about me?

1:28:49 Hi, Nola.

1:28:51 I've been raising my hand. My hand.

1:28:52 Okay. Can I go?

1:28:54 Yes,

1:28:54 please.

1:28:55 All right. Nicola Troop and President

1:28:57 Pot Lock Neighborhood Association. The

1:28:59 strong opposition to this proposal, the

1:29:01 numbers letters of opposition, including

1:29:03 the 25 from directs and from the

1:29:05 neighborhood association is not based on

1:29:08 a desire to resist construction. Indeed,

1:29:10 we reached out early and often to assist

1:29:12 the proponents. Plenty of additions and

1:29:14 decks have been supported by pilot block

1:29:16 residents when they remain within the

1:29:18 historic standards as they apply to

1:29:20 extensions into rear yards. In our

1:29:22 experience, these standards have been

1:29:23 reliably upheld in practice by prior

1:29:26 appeals boards for the historic

1:29:27 district. The consistent application of

1:29:29 these standards, 50 square ft of

1:29:31 building addition and a maximum 6ft

1:29:33 extension from the deck of the rear

1:29:35 building is critical to limiting

1:29:37 negative impacts on butter's privacy in

1:29:39 such densely built areas and to maintain

1:29:42 clear standards within which all

1:29:45 residents operate, mitigating

1:29:47 unproductive neighborhood controversy

1:29:49 that results from extension sizes that

1:29:51 are viewed as negotiable. In addition,

1:29:54 ISD missed violations, making the

1:29:56 refusal letter on which this hearing is

1:29:58 based inaccurate. The plan shows 199

1:30:01 square feet of additional floor area

1:30:03 incorrectly presented as existing floor

1:30:05 area. The proponent asserts that this

1:30:07 space can be converted via article

1:30:09 643711b.

1:30:11 However, this space does not meet any of

1:30:14 the four explicit definitions of the

1:30:16 types of existing space which may be

1:30:18 converted. We request the application be

1:30:20 denied on its merits. Further, a variant

1:30:23 should be required rather than

1:30:24 conditional approval given the

1:30:26 mislication of the zoning regulation

1:30:28 used to increase square footage in

1:30:29 excess of the FAR limit. We would

1:30:31 strongly request that the board

1:30:33 seriously address these concerns before

1:30:35 they decide the case. Thank you.

1:30:37 Thank you.

1:30:39 Can I ask the applicant to follow up,

1:30:42 please?

1:30:42 Um, we have one more comment.

1:30:44 Oh, okay. I did not see a raised hand.

1:30:47 Last comment.

1:30:49 Um, sorry about that. Uh, so I I think

1:30:51 I'm going to reiterate everything that

1:30:53 that others have have said. I I oppose

1:30:55 for all the reasons that that have been

1:30:57 offered. My name is Nol Blair. I live at

1:30:58 175 West Brookline Street across the

1:31:00 alley. I want to make one correction and

1:31:03 and talk about the BBD guidelines for

1:31:05 for decks above the first floor and

1:31:06 extensions into the rear yard. Um, so

1:31:09 one correction is that Mark Lass said

1:31:11 that this this is a dimensionally comp

1:31:14 compliant proposal. It that is not true.

1:31:16 It's it's not F compliant. I think as

1:31:19 somebody mentioned that the F was was

1:31:22 above two still um for the proposal. So

1:31:24 the the the the reason why they're able

1:31:28 to do this as of right is because

1:31:30 they're converting a con a pre-existing

1:31:32 nonconformity which is the greenhouse on

1:31:34 the basement level to what's a greater

1:31:37 nonconformity extending the extension up

1:31:40 the back of the house three floors. A

1:31:42 smaller extension but up three floors

1:31:44 with a of a a 5'4 in deck on the back of

1:31:47 that. So, a greater nonconformity

1:31:49 relative to privacy, relative to

1:31:51 building bulk than what you would see

1:31:54 with this 15 uh foot greenhouse in the

1:31:57 basement level. Um, so that's that's one

1:32:00 thing. It's not compliant um from from a

1:32:03 dimensional perspective, but they do

1:32:05 have the ability to convert uh although

1:32:07 it's agreed on non-conformity. The other

1:32:09 piece is the BPD guidelines around

1:32:11 extensions into the rear yard. Most

1:32:13 frequently what we see is a sixoot ext

1:32:17 which has see-through um railings and

1:32:20 and can levered support. This is meant

1:32:22 to to remove privacy issues, remove bulk

1:32:26 issues. What we have here is 7'4 in. We

1:32:30 must maintain the standard um for for

1:32:33 the community.

1:32:35 Sorry.

1:32:35 Thank you. Please wrap up. Thank you.

1:32:38 Okay. We must maintain the standard for

1:32:40 the community of the six feet. They can

1:32:42 easily build a standard six-foot deck

1:32:44 here like everybody else. Proper

1:32:46 renovation of this building does not

1:32:47 require relief from these.

1:32:49 Thank you.

1:32:52 Can we please hear from Mr. Lass?

1:32:55 Yes, madame chair.

1:32:57 Um just want to cover all the points

1:32:59 raised because

1:33:00 please do.

1:33:01 Yes. So the first one is the F not cited

1:33:04 by ISD.

1:33:06 um the abuters and the neighborhood

1:33:08 association

1:33:10 uh affirmatively raised that with ISD on

1:33:13 multiple occasions and you'll see on the

1:33:15 revised refusal letter dated September

1:33:18 3, 2026, which was the final review of

1:33:21 the revised plans after all the changes

1:33:23 were made that there is no citation for

1:33:26 F whatsoever with respect to any aspect

1:33:30 of this project. So while they keep

1:33:32 saying it, it is simply not true because

1:33:35 the regulatory authority responsible for

1:33:37 making that determination here ISD does

1:33:40 not agree with them and did not cite it

1:33:42 in the in the refusal letter. Moreover,

1:33:45 that issue is not before you because it

1:33:47 has not been appealed by them as a

1:33:50 result of the revised zoning code

1:33:52 refusal letter. It was simply not an

1:33:54 issue that is before this board.

1:33:57 Um next was the whole

1:34:01 recitation of the history of the project

1:34:03 by ONS. The garage was removed. F again

1:34:08 has been reviewed by ISD and is not

1:34:11 cited in the refusal letter. There is no

1:34:14 variance request before you because none

1:34:17 was cited by ISD.

1:34:20 Um again there was a comment about it

1:34:22 exceeds F. This this notion again was

1:34:25 rejected by ISD after multiple review of

1:34:29 these plans. The greenhouse it keeps

1:34:32 being referred to as a pre-existing

1:34:34 nonconformity.

1:34:36 We had several of Butters meetings where

1:34:38 this issue was exhaustive exhaustively

1:34:42 covered and reviewed. The greenhouse was

1:34:44 permitted by a prior homeowner developer

1:34:48 and we had the entirety of that

1:34:53 uh permit application from the 1980s

1:34:55 when the greenhouse was built before

1:34:56 them. It was a permitted project, not a

1:35:00 non-conforming project. It was fully

1:35:02 permitted by ISD and constructed

1:35:04 pursuant to the approved plans. And what

1:35:07 we are doing is we are taking that major

1:35:10 twostory

1:35:11 large bumpout in the rear of this

1:35:13 property and pulling it closer into and

1:35:17 expanding it up the side of of the up

1:35:19 the rear of the building. All of which

1:35:21 again has been reviewed by ISD on

1:35:23 multiple occasions. The only items that

1:35:26 are before you are conditional use

1:35:27 permit for the rear deck, the bumpout is

1:35:30 being done as of right, and the

1:35:32 conditional use permit for the roof

1:35:34 deck, and the corresponding building

1:35:36 code for the roof hatch. Those are the

1:35:39 only items before you. In all other

1:35:41 respects,

1:35:43 the proposed decks are and all of the

1:35:46 other work is dimensionally compliant.

1:35:48 There are no dimensional compliance

1:35:50 issues raised in the revised zoning code

1:35:52 refusal letter. Um, we believe that the

1:35:55 removal of the 1980s era large two-story

1:35:59 greenhouse and what is going to replace

1:36:01 it represents a substantial improvement

1:36:04 to the property.

1:36:06 And let's see. I think that's all the

1:36:10 comments that I have in my notes.

1:36:12 Madam Chair, I have one other question

1:36:15 for for Mark. Um, Mark, did you also do

1:36:19 informal design review with the South

1:36:21 End Landmark Commission to review your

1:36:23 project?

1:36:24 We have and there's lots of on the

1:36:27 building that um is subject to the

1:36:30 commission's review.

1:36:31 Okay, great. So, we would need Okay,

1:36:33 that sounds good. Thank you so much for

1:36:35 clarifying. I'll note that the planning

1:36:37 department memo recommends approval with

1:36:39 provisos uh subject to the condensers

1:36:42 being moved at least 5 ft from

1:36:43 Yeah, they didn't mention the south end,

1:36:45 but I'll I will make sure to mention

1:36:46 that. Okay, thank you.

1:36:48 Sure. Thank

1:36:50 um that concludes my comments, Madam

1:36:52 Chair.

1:36:53 Thank you. Are there other questions

1:36:55 from the board?

1:36:59 Is there a motion?

1:37:04 Madame Chair, I'd like to put forward um

1:37:07 a motion with two proviso. One that the

1:37:10 project or

1:37:12 I'm sorry, a motion of approval with two

1:37:15 proviso that the project undergoes

1:37:17 Boston Lamont Commission's design review

1:37:19 and the second one being that any

1:37:21 mechanical units on the roof deck be set

1:37:25 back at least 5T from the sideyard.

1:37:30 From the roof edge, I believe.

1:37:31 From the roof edge. on the roof edge.

1:37:34 There a second.

1:37:44 Mrs. Stebridge.

1:37:47 Yes.

1:37:49 Miss Turn.

1:37:50 No.

1:37:53 Miss Better Braza.

1:37:54 Yes.

1:37:57 Miss Weell?

1:37:58 Yes.

1:38:00 Mr. Collins?

1:38:04 Are you on mute? You're on mute, Mr.

1:38:06 Collins.

1:38:08 Sorry. Yes.

1:38:10 Miss Parado.

1:38:14 Yes.

1:38:16 Chair votes yes. The motion carries.

1:38:19 Thank you. Kindly

1:38:24 chair. At this point, we've passed the

1:38:26 11:00 hour, so we will ask if there are

1:38:30 any requests for withdrawals or

1:38:33 deferrals from the 11:00 hour.

1:38:38 Uh, good morning, Madam Chair, members

1:38:40 of the board. Um, 87 West 7th Street.

1:38:44 Mr. Stebridge is the first one on the 11

1:38:47 a.m.

1:38:48 So that would be for case BA

1:38:52 1888 718

1:38:56 with the address of 87 West 7th Street.

1:39:01 Go ahead.

1:39:05 Thank you Mr. Stebridge. Yes. Good

1:39:07 morning madam chair members of the

1:39:08 board. Attorney Nick Suzula, repair

1:39:10 McQuilty, Miller, and Hanley, 28 State

1:39:12 Street, requesting a deferral for 87

1:39:15 West 7th. We got a uh VPDA

1:39:18 recommendation at the end of last week

1:39:21 um that we need to address and revise

1:39:23 some plans uh in accordance with that

1:39:25 recommendation. So, we need a little

1:39:27 time to meet uh with planning staff and

1:39:30 address those those issues uh and then

1:39:32 return to the board.

1:39:36 So, we're seeing deferral as a result.

1:39:38 Sorry, Madam Chair.

1:39:39 That's okay. Cameron, do we do we have

1:39:41 dates?

1:39:42 Yep, we have January 12th, January 26,

1:39:45 February 9th, and February 23rd coming

1:39:47 up.

1:39:49 Any preferences?

1:39:51 Um, January 12th would be great, Madam

1:39:54 Chair. Uh, if that would be available.

1:39:56 Okay. May I have a motion?

1:39:59 Motion to defer this case until January

1:40:02 12th.

1:40:03 Second,

1:40:05 Mr. Stebridge.

1:40:07 Yes,

1:40:08 Miss Turner.

1:40:10 Yes,

1:40:11 Miss Bennett Brazza.

1:40:13 Yes,

1:40:14 Miss Weel.

1:40:15 Yes,

1:40:16 Mr. Collins.

1:40:17 Yes,

1:40:19 Miss Pado.

1:40:20 Yes.

1:40:22 Yes. The motion carries.

1:40:24 Thank you.

1:40:26 Attorney Burn.

1:40:28 Yes, Mr. Stebridge. Uh, we are seeking a

1:40:31 deferral on 51 Buttonwood.

1:40:34 So this request is for case BOA

1:40:38 1803

1:40:41 0.

1:40:43 The address with 51 Buttonwood Street.

1:40:46 Go ahead.

1:40:48 Thank you Mr. Stebridge. Uh good morning

1:40:50 Madam Chair, members of the board

1:40:51 attorney Justin Burns with Penini Norton

1:40:53 business address 10 Forbes Road,

1:40:54 Brainer, Massachusetts. Uh in light of

1:40:57 internal discussions with the

1:40:58 development team as well as the

1:41:00 reception of the BPDA recommendation, uh

1:41:02 we are contemplating revisions to the

1:41:04 project in relation to its density and

1:41:05 height. Um so we're going to need a

1:41:07 little bit of time to implement those

1:41:09 revisions and uh you know inform the

1:41:10 neighborhood of them. So we are seeking

1:41:12 a deferral at this time.

1:41:14 Okay. Did any of the dates mentioned uh

1:41:16 work for you?

1:41:17 Uh yeah, I I think that February 9th

1:41:19 date would be good for us.

1:41:21 Okay. May I have a motion? Motion to

1:41:24 defer this case until February 9th.

1:41:28 There a second.

1:41:29 Second.

1:41:30 Mr. Stebridge.

1:41:32 Yep.

1:41:34 Turner.

1:41:35 Yes.

1:41:36 Miss Brazzo.

1:41:38 Yes.

1:41:39 Miss. We

1:41:40 Yes.

1:41:41 Mr. Collins.

1:41:42 Yes.

1:41:43 Miss Panado.

1:41:45 Yes.

1:41:46 Votes yes. Motion carries. See you then.

1:41:48 Thank you very much.

1:41:50 Any

1:41:52 further request for

1:41:55 a withdrawal or deferral from the 11:00

1:41:58 hour?

1:42:01 Hearing none, we'll return to the cases

1:42:04 scheduled for 9:30 and we will go to

1:42:07 case BOA

1:42:10 1 1907336

1:42:14 with the address of 399 Boilson Street.

1:42:19 If the applicant andor their

1:42:21 representative are present, would they

1:42:23 please explain to the board?

1:42:26 Uh, thank you, Madam Chair, board

1:42:28 members. Uh, Daniel Brennan here, agent

1:42:30 for Menoscino Farms. Uh, here today for

1:42:33 a new restaurant at 399 Boilston, a

1:42:36 formerly Cozy Restaurant, then it was

1:42:38 converted to Beet Neck. It's currently

1:42:41 vacant. Our proposal is to occupy this

1:42:44 space as a restaurant with 38 interior

1:42:46 seats and 30 seasonal patio seats. Um

1:42:51 there's an existing zoning decision with

1:42:53 a proviso for this petitioner only. Um

1:42:56 so we're requesting um removal of that

1:42:59 proviso so we can move forward with a

1:43:01 plan review with ISD. Um there's many

1:43:04 other restaurant uses in the area. It

1:43:06 fits well within the neighborhood. I'm

1:43:08 happy to answer any questions.

1:43:11 Thank you. Questions from the board.

1:43:15 I have public testimony.

1:43:18 Madame chair and board member. Sigy

1:43:20 Johnson with the office of neighborhood

1:43:21 services. This proposal is in a

1:43:23 commercial area where these uses are

1:43:25 prevalent. Our office is not aware of

1:43:26 any community concerns. And with that

1:43:28 background, we defer judgment to the

1:43:30 board. Thank you,

1:43:33 Madame Chair. We don't have additional

1:43:35 comments.

1:43:36 May I have a motion?

1:43:40 Make a motion of approval.

1:43:42 Is there a second?

1:43:43 Second.

1:43:44 Mr.

1:43:50 Okay.

1:43:52 Miss Miss Turner.

1:43:54 Yes.

1:43:56 Miss Better Braza.

1:43:57 Yes.

1:43:59 Miss Weel?

1:44:00 Yes.

1:44:01 Mr. Collins?

1:44:02 Yes.

1:44:04 Miss Bonado?

1:44:05 Yes.

1:44:06 Chair votes? Yes. The motion carries.

1:44:13 Next we have case BOA 187 8924

1:44:19 with the address of 68 Grand Pian Way.

1:44:23 If the applicants know that

1:44:26 Representative present would they please

1:44:28 explain?

1:44:30 Yes. Thank you Mr. Stebridge Madam Chair

1:44:32 members of the board. Attorney Ryan

1:44:33 Spitz with Adams and Moranti. business

1:44:35 address of 1688 Street, first floor,

1:44:38 South Boston. Joining me today is the

1:44:40 owner, Andrew Olrich. This is a proposal

1:44:42 to extend the living area of an existing

1:44:45 three family dwelling into an existing

1:44:47 enclosed rear rear porches, renovate

1:44:49 front porches, and internally renovate

1:44:51 the basement storage spaces. This is an

1:44:54 existing building. There is no change to

1:44:55 the number of units. All the new floor

1:44:58 area is created inside the existing

1:45:00 building. The rear porches are already

1:45:02 enclosed. We are simply bringing them

1:45:04 into living space and then filling the

1:45:06 exterior wall to match the existing

1:45:07 siding. There is no change to the

1:45:09 footprint, the height or any of the

1:45:11 setbacks. The building stays at three

1:45:13 stories and approximately 33 ft with a

1:45:16 12.7 ft front yard, sideyards of 8.7 ft

1:45:19 and 11.2 ft and a 40ft rear yard. All of

1:45:23 which are existing conditions. Each unit

1:45:25 will have three bedrooms the same as it

1:45:27 is today. Unit one on the first floor

1:45:29 approximately 1262 ft. Unit two on the

1:45:33 second floor approximately 1379 square

1:45:35 ft and unit 3 on the third floor

1:45:38 approximately 1470 square ft. The

1:45:41 extended space allows for a primary

1:45:42 bedroom suite with its own bath and a

1:45:44 walk-in closet for each unit. In the

1:45:46 basement, the storage spaces are

1:45:48 reorganized for for storage for each

1:45:50 unit and a common basement area with a

1:45:52 new egress window. The building will

1:45:54 also become fully sprinkler and alarmed.

1:45:57 These are familysized three-bedroom

1:45:59 units in an existing building near

1:46:01 transit and the project improves them

1:46:02 without adding any bulk to the street or

1:46:04 change in the building's footprint. We

1:46:06 have the following violations F. We're

1:46:08 proposing a 0.91 and a point4 is what is

1:46:11 allowed. The existing F is pre-existing

1:46:14 non-conforming at a 78. So this is an

1:46:16 increase approximately 672 ft all within

1:46:20 the existing building shell. The

1:46:22 proposed F is consistent with the

1:46:23 surrounding FS and the project adds bulk

1:46:26 lean in the rear without triggering a

1:46:28 rear yard violation which maintains the

1:46:30 building's alignment within its context.

1:46:32 Next we have and finally the extension

1:46:35 of a non-conforming building. The

1:46:36 building's F is a pre-existing

1:46:38 non-conformity and under section 9-1

1:46:40 extending it requires board approval. Uh

1:46:43 this is a conditionally used component

1:46:44 of the relief. At this point, Madam

1:46:46 Chair, I'm going to turn it over to you

1:46:47 and the board for any questions or

1:46:49 comments.

1:46:50 Thank you. Are there questions from the

1:46:52 board?

1:46:55 May I have public testimony?

1:47:03 Liam, do you want to go?

1:47:05 Hello, Madam Chair, members of the

1:47:07 board. Liam Remis from Council

1:47:08 Fitzgerald's office let go of records

1:47:11 for this proposal. Thank you.

1:47:13 Thank you.

1:47:17 Any other raised hands? Madam Chair, we

1:47:20 don't have additional comments.

1:47:21 That's good.

1:47:22 Sorry, members of the board. My name is

1:47:24 Eva Jones representing the mayor's

1:47:25 office of neighborhood services uh

1:47:27 regarding 68 Grampian Way. Our office

1:47:29 defers with the board's judgment. A

1:47:31 community process was conducted

1:47:32 including the distribution of a

1:47:34 subcommittee flyer on 8626. During the

1:47:37 community comment period, I did not

1:47:38 receive any emails regarding the

1:47:40 proposal. The proposal also met with the

1:47:42 Columbia 7 Hill Civic Association and

1:47:45 they voted 13 in support, two in

1:47:47 opposition and one abstain. At this

1:47:49 time, the mayor's office of neighborhood

1:47:50 services defers to the board's judgment

1:47:52 on this matter. Thank you everyone for

1:47:53 your time and consideration.

1:47:57 Madam Chair, no additional comments.

1:48:00 With that, may I have a motion?

1:48:04 I'll make a motion of approval with um

1:48:07 planning department design review to

1:48:09 ensure alignment with the neighborhood

1:48:11 design overlay standards.

1:48:14 There second.

1:48:15 Second.

1:48:17 Mr. Sambridge.

1:48:19 Yeah.

1:48:20 Miss Turner.

1:48:21 Yes.

1:48:22 Miss Bzo.

1:48:24 Yes.

1:48:25 Miss Weo.

1:48:26 Yes.

1:48:27 Mr. Collins.

1:48:29 Yes.

1:48:30 Miss Panado.

1:48:32 Yes. Chair votes. Yes. Motion carries.

1:48:34 Good luck.

1:48:35 Thank you.

1:48:38 Next we have case BO8

1:48:41 187527

1:48:45 with the address of 68 Clarkson Street.

1:48:48 If the applicant and with a

1:48:50 representative are present, would they

1:48:52 please explain to the board?

1:48:56 Yes. Thank you, Mr. Secretary, and good

1:48:58 morning, Madam Chair, members of the

1:48:59 board. For the record, my name is Matt

1:49:01 Eckl and I'm an attorney with Fletcher

1:49:03 Tilton on behalf of the applicant, the

1:49:05 business address of 100 Franklin Street

1:49:07 in Boston. Joining me today is Eric

1:49:10 Zacherson, the project architect, uh,

1:49:12 from Context. We're here this morning

1:49:15 seeking approval to erect a new

1:49:18 residential building, which you can see

1:49:19 on the screen there, with four units and

1:49:21 four parking spaces in the rear of the

1:49:23 site on a currently vacant lot. The

1:49:26 project site is located at 68 Clarkson

1:49:28 Street which is within the Bowden Geneva

1:49:31 area of Dorchester.

1:49:33 Uh the neighborhood currently contains a

1:49:35 mixture of small commercial uses as well

1:49:37 as uh predominantly residential uses

1:49:39 including row houses, two family, three

1:49:41 families and multifamily dwellings. Uh

1:49:45 this section of Clark Street, excuse

1:49:47 Clarkson Street is unique in that there

1:49:50 are sever several different types of

1:49:52 architectural styles of homes. Uh but

1:49:54 what makes us unique is they're all kind

1:49:56 of paired up with the Abutter. So they

1:49:57 go almost 2x two or 3x3. Um so the uh

1:50:01 original concept and design of this

1:50:03 building as you can see is to largely

1:50:05 mimic uh the building to the left. Uh as

1:50:08 you'll see as we move forward in the

1:50:10 aerial shot, you can see a little bit

1:50:11 more what I mean uh as you look down at

1:50:13 the aerial uh down at the property

1:50:15 there. You can stay on that slide if you

1:50:18 can go back up a little bit. You can see

1:50:19 how again they're kind of designed uh

1:50:21 again right next to and complimentary to

1:50:24 the direct to butter and uh 68 Clark and

1:50:27 Clarkson our proposed building is in

1:50:29 that vacant area which is kind of the

1:50:31 missing tooth currently on the street.

1:50:34 Um the site has great access uh to bus

1:50:38 transit along Columbia Road and Bowden

1:50:40 Street and is less than a half a mile

1:50:41 from the four corners Geneva MBTA

1:50:44 commuter rail station. This would create

1:50:46 four new home ownership units on, as I

1:50:49 mentioned, a currently vacant lot. Just

1:50:51 to go through the floor plans briefly,

1:50:53 uh all all four units will have an open

1:50:56 concept living room, dining room, and

1:50:58 kitchen uh with some dedicated outdoor

1:51:01 living space uh either in the form of

1:51:03 patios or rear decks. Uh the first floor

1:51:06 which is on your bottom right there as a

1:51:09 sprinkler room as this building will be

1:51:11 uh fully sprinklered as well as unit one

1:51:14 which is a,020 square foot unit with

1:51:16 three bedrooms, two baths and access to

1:51:19 the patio out the rear. Uh units 2,

1:51:22 three, and four will be located on the

1:51:24 second, third, and fourth floor

1:51:26 respectively. Uh the second and third

1:51:28 unit will both be three-bedroom, two

1:51:30 bath units. And the fourth floor unit

1:51:32 will be two bedrooms, two baths at about

1:51:34 a 945 square ft. All three of those

1:51:37 units will have rear decks along with

1:51:39 their second means of egress coming out

1:51:41 the back. The applicant attended in a

1:51:44 butters meeting and met twice with the

1:51:46 greater boat in Geneva Neighborhood

1:51:47 Association answering all their

1:51:49 questions. Uh we also submitted two

1:51:51 letters of support including one from

1:51:53 our director Butter. But with that, I'll

1:51:55 pause and take any questions the board

1:51:57 may have.

1:51:58 Thank you. Are there questions from the

1:52:00 board?

1:52:02 May I have public testimony?

1:52:07 Madam Chair and members of the board,

1:52:09 for the record, my name is Jeremy

1:52:10 Benbury. I am the Dorchester Community

1:52:12 Engagement Specialist for the Office of

1:52:13 Neighborhood Services. The applicant has

1:52:15 completed the community process which

1:52:17 consisted of an abot meeting facilitated

1:52:19 on August 6th with two aboters in

1:52:21 attendance. All questions and inquiries

1:52:22 were addressed during the meeting. One

1:52:24 director Butter voiced support for the

1:52:26 proposal and no concerns or opposition

1:52:27 were expressed. Next, the proponent was

1:52:29 encouraged to connect and present to the

1:52:31 Civic Association, Greater Board, and

1:52:32 Geneva Neighborhood Association, and

1:52:34 upon doing so completed the community

1:52:36 process. To date, our office has

1:52:37 received two letters in support of the

1:52:39 proposal, calling it an appropriate use

1:52:41 of the vacant lot. Thank you for your

1:52:42 time in the Mayor's Office of Neighbor

1:52:44 Services would like to defer to the

1:52:45 board for their judgment.

1:52:48 Thank you, Madam Madam Chair. We don't

1:52:50 have additional comments.

1:52:52 With that, may I have a motion?

1:53:03 M. I'd like to put forward a motion of

1:53:04 approval.

1:53:06 Second.

1:53:09 Mr. Stebridge.

1:53:12 Yes.

1:53:14 Miss Turner.

1:53:15 Yes.

1:53:17 M

1:53:17 Brazzo.

1:53:19 Yes.

1:53:20 Miss Weel.

1:53:21 Yes. Mr. Collins,

1:53:23 yes.

1:53:25 Mado,

1:53:26 yes.

1:53:28 Yes. The motion carries. Good luck.

1:53:30 Thank you very much.

1:53:34 Next, we have case BOA1855660

1:53:40 with the address of 179 to 195 free.

1:53:46 If the applicants and or their

1:53:49 representative are present, would they

1:53:50 please reply?

1:53:53 Hello, my name is Josh Kber. I'm a

1:53:56 business development manager with

1:53:57 Resonant Energy, uh the solar developer

1:54:00 that is working with the nonprofit Work

1:54:02 Incorporated on this proposed solar

1:54:04 canopy. Um, we're here today to request

1:54:07 a variance to change the conditional use

1:54:09 of uh the of the parcel which is

1:54:11 currently being used as a parking lot

1:54:14 across the street from their main

1:54:15 facility.

1:54:17 Um, yes, thank you for bringing up the

1:54:19 slide deck. If you could uh move forward

1:54:21 uh two slides.

1:54:23 Uh, thank you. So, first just a little

1:54:26 bit about work inc which is the

1:54:28 nonprofit that would primarily benefit

1:54:30 from this solar installation. They were

1:54:32 founded in 1965 and support individuals

1:54:35 with disabilities through employment,

1:54:37 residential uh employment, residential

1:54:39 services, dehabilitation,

1:54:41 dehabilitation, and many other services.

1:54:44 They currently serve over 1,500

1:54:46 individuals with disabilities. You can

1:54:48 see their mission there on screen. Uh if

1:54:51 you want to just jump I'm sorry, I am

1:54:53 trying to go a little quickly just given

1:54:55 the time uh already, but uh if you could

1:54:57 just jump to the next slide.

1:54:59 Uh this project would cover 100% of

1:55:02 their electricity use at their main

1:55:04 facility at uh 205 Freeport Street and

1:55:08 is a long-term investment to support

1:55:09 their work uh in Dorchester and support

1:55:12 their mission. It also will help uh the

1:55:15 organization comply with Berto meeting

1:55:17 their electric their renewable energy

1:55:19 requirements well and increase uh the

1:55:21 safety in the parking lot by providing

1:55:24 uh coverage from snow reducing their

1:55:26 costs due to uh snow clearing um and

1:55:30 having better lighting and uh making it

1:55:33 easier to see in the parking lot. If you

1:55:35 go to the next slide,

1:55:38 uh this is just a little bit more

1:55:39 information about uh about Berto, but

1:55:42 like I said, this project is critical to

1:55:44 work inc's ability to comply with Berto

1:55:47 um which for those who don't know

1:55:49 essentially imposes requirements on

1:55:50 buildings uh that are 20,000 square ft

1:55:53 or larger um to reduce their greenhouse

1:55:56 gas emissions and to increase their

1:55:58 renewable energy use. And um a little

1:56:01 bit of history on the project. We had

1:56:03 initially looked at building a rooftop

1:56:05 pro uh solar array at the the at 205

1:56:08 Freeport Street, but given the age of

1:56:10 the roof and some of the structural

1:56:12 concerns, we moved uh to look at a

1:56:14 canopy instead, which is how we uh

1:56:17 landed on this proposed project that we

1:56:19 are talking about today. Um a little bit

1:56:21 about the project. Like I said, it's we

1:56:23 estimate it'll offset close to 100% of

1:56:26 the electricity use at the building.

1:56:28 This is the equivalent of over 200,000

1:56:30 lbs of coal being burned annually or

1:56:32 enough to power about 62 homes each

1:56:35 year. And we estimate that their

1:56:37 lifetime savings will be nearly $4

1:56:39 million across 25 years. And this is in

1:56:42 addition to an uh $60,000 per year that

1:56:45 they're currently spending on snow

1:56:47 removal that they'll no longer have or

1:56:49 they'll probably have smaller they'll

1:56:50 still have to spend a little bit on snow

1:56:52 removal, but it'll be significantly less

1:56:53 than what they're paying for uh right

1:56:56 now. Uh if you want to jump forward to

1:56:58 the next slide, I'm also joined uh today

1:57:00 by my colleague Greg Capola who will

1:57:03 talk a little bit more about sort of the

1:57:04 technical layout and the technical specs

1:57:06 of the project.

1:57:08 Thank you Josh. Uh Greg Capola, resident

1:57:10 energy solar developer as you mentioned.

1:57:12 Um so next couple slides are going to be

1:57:14 on the installation part of it and the

1:57:15 actual design. So this is we're

1:57:17 installing 722 modules for a total

1:57:21 system size of 425 kW DC. There'll be

1:57:24 two arrays as you can see there in this

1:57:26 uh 3D rendering. Uh the tilt will be

1:57:28 about 3° so roughly flat. Um it's a

1:57:32 double post T structure system which

1:57:34 I'll go into more detail um in the

1:57:36 following slides. But overall there's

1:57:38 going to be uh excuse me 22 foundations.

1:57:41 Uh what you see here is an aerial view

1:57:44 of the proposed array um from the Beach

1:57:47 Street uh location. As you could see um

1:57:49 on the far left is actually the

1:57:51 headquarters for gank where the the

1:57:53 production is actually going to offset

1:57:54 their usage. Um what I mean by double

1:57:57 double post system here and um I

1:57:58 obviously don't have my cursor to show

1:58:00 you uh is that there will be two

1:58:02 foundations that land perfectly on the

1:58:05 TE of the parking spots as the cursor is

1:58:07 is roughly around. Um and it'll be a

1:58:09 there'll be no gap in between the solar

1:58:11 canopy or carport system. So it'll be

1:58:14 that's what makes it a double post

1:58:15 system is that it expands across uh two

1:58:17 or three uh rows of parking spaces. Next

1:58:21 slide please.

1:58:24 This is another 3D rendering but from

1:58:26 the pre-port street as you can see here

1:58:29 uh headquarters to the right port to the

1:58:31 left and they own that parcel as well.

1:58:33 Uh next slide

1:58:36 for a more realistic visual this is a

1:58:38 carport that we installed last year in

1:58:40 uh New Bedford. This is a single post T

1:58:42 system. Uh so the only difference is

1:58:44 that it'll span a little bit further to

1:58:46 the left and then obviously have another

1:58:48 foundation uh connecting the two. Uh a

1:58:51 couple important aspects about this this

1:58:53 design is that no parking spaces will be

1:58:55 lost or minimized by the array. As I

1:58:56 mentioned before, all of those um those

1:58:58 circles which you can see by the red

1:59:00 arrows uh land perfectly at the the T uh

1:59:03 of the parking spaces on the stripes and

1:59:06 they will not like I said create reduced

1:59:08 spaces or eliminate any parking spaces

1:59:10 which was an importance of work in. Uh a

1:59:13 couple other site improvements that

1:59:14 we're making with this with this design

1:59:16 um if approved. So um there's currently

1:59:19 several light poles and overhanging

1:59:20 wires in the parking lot that will be

1:59:21 taken down and buried. Uh we're going to

1:59:24 uh exchange those for under canopy

1:59:25 lights that would actually provide more

1:59:27 greater light exposure. Um obviously as

1:59:30 Josh mentioned there will be snow

1:59:31 protection which will have financial

1:59:32 benefit for work inc and for all of

1:59:34 those who visit um this nonprofit or

1:59:36 work there. And then obviously in the

1:59:38 summer um some shade protection as well.

1:59:40 Next slide please. We had a phototric

1:59:44 plan or a lighting plan get done. Um,

1:59:46 one thing I want to point out before I

1:59:48 go into the details is that um, the

1:59:50 designer who made this could not

1:59:51 actually also factor in the trees that

1:59:54 um, separate the parcels. So, if you can

1:59:56 actually go one slide more, you'll see

1:59:58 that there are uh, apologies. Um,

2:00:03 two, oh, sorry, it is a um, one, two,

2:00:06 three, four, five, uh, six slides up.

2:00:09 Oh, that that one's actually perfect. Um

2:00:11 you'll see that there's a lot of trees

2:00:13 on the edge of the parcel that shade out

2:00:15 um as well that are not factored into

2:00:16 the photoometric plan. So if you can go

2:00:18 back to the phototric plan please.

2:00:22 Yeah. Uh slide 14. Um

2:00:26 thank you. Um the zero uh the blue uh

2:00:30 data points uh that say zero essentially

2:00:32 signify the lack of any exposure or

2:00:35 lighting um that leaks out from the

2:00:38 parcel due to those new under canopy

2:00:40 lights. Um you'll see there's some

2:00:42 definitely some leakage out into the to

2:00:44 the public right away which is totally

2:00:45 fine and then some onto the adjacent

2:00:47 parking lot which as you can see in the

2:00:49 3D renderings are just another parking

2:00:50 lot. Uh though again this does not

2:00:52 factor in the shading that will come

2:00:54 from the trees that divide those two

2:00:55 parcels. Um, and then I have some other

2:00:58 slides as well, but I will leave the

2:01:00 rest of those for Q&A if there are any

2:01:02 um that are those slides.

2:01:05 Any questions from the board?

2:01:08 Uh, Madame Chair, just curious um how

2:01:11 would how long will it take to put this

2:01:13 in place?

2:01:15 Uh, take the to install.

2:01:18 Yeah.

2:01:19 Um, roughly about 1 month. So, there

2:01:21 will be a disruption to the parking lot.

2:01:23 Uh we can definitely do it in segments

2:01:25 if needed um by you or the client and um

2:01:28 it should would it would result in um a

2:01:31 temporary disturbance for about roughly

2:01:32 one month.

2:01:34 Thanks.

2:01:36 Any other questions from the board?

2:01:39 I have public testimony.

2:01:41 Hello madam chair, members of the board.

2:01:43 My name is Eva Jones representing the

2:01:44 mayor's office of neighborhood services

2:01:46 regarding 195 free port street. Our

2:01:48 office differs to the board's judgment.

2:01:50 A community process was conducted

2:01:52 including an abutters meeting held on

2:01:53 July 15th that was well attended by the

2:01:55 community who expressed resounding

2:01:57 support for the project as well as the

2:01:59 nonprofit that provides crucial services

2:02:01 to people with disabilities that reside

2:02:03 in the city. They felt that this project

2:02:05 would support reducing the

2:02:06 organization's operating costs and

2:02:08 allowing it to expand its services as

2:02:10 well. The proposal was also reviewed by

2:02:12 the Columbia 7ill Civic Association. Its

2:02:14 planning committee voted unanimously to

2:02:16 recommend support to its general

2:02:18 membership which subsequently voted

2:02:20 unanimously to support the project as

2:02:22 well. At this time, the mayor's office

2:02:23 of neighborhood services defers to the

2:02:25 board on this matter. Thank you everyone

2:02:27 for your time and consideration.

2:02:30 Next, we have Lean Remis.

2:02:33 Hello, Madam Chair, members of the

2:02:35 board. Liam Remis from Council

2:02:36 Fitzerald's office. The council like

2:02:38 records for this proposal. Thank you.

2:02:40 Thank you,

2:02:41 Madam Chair. We don't have additional

2:02:43 comments

2:02:45 with that. May I have a motion?

2:02:49 Make a motion to approve.

2:02:51 Thank you.

2:02:52 Mr. Spebridge,

2:02:54 yes.

2:02:56 Miss Turner,

2:02:57 yes.

2:02:58 Miss Peter Brazzo,

2:03:00 yes.

2:03:01 Miss Weel,

2:03:02 yes.

2:03:03 Mr. Collins,

2:03:04 yes.

2:03:06 Miss Ponado,

2:03:07 yes.

2:03:08 Chair votes yes. The motion carries.

2:03:10 Good luck.

2:03:12 Thank you very much.

2:03:13 Thank you.

2:03:17 Next we have case BOA

2:03:20 187 8927

2:03:23 with the address of 1970 Dorchester

2:03:26 Avenue.

2:03:27 If the applicant andor their

2:03:29 representative are present, would they

2:03:31 please explain?

2:03:33 Yes. Thank you, Mr. Stebridge, Madam

2:03:35 Chair, members of the board. Attorney

2:03:36 Ryan Spitz with Adam Morancey, business

2:03:38 address of 168A 8th Street, First Floor,

2:03:41 South Boston. Uh, joining me today is

2:03:43 the operator Tony Woo. This is a

2:03:45 proposal to change the occupancy of an

2:03:47 existing groundf flooror retail space to

2:03:49 a sitdown restaurant with a tech

2:03:51 component by the name of Tory Japan

2:03:54 located within an MFRLS subdist. This is

2:03:57 an existing five-story mixeduse building

2:03:59 at the corner of Dorchester Avenue and

2:04:01 and Bale Street with commercial space on

2:04:03 the ground floor and residential above.

2:04:05 This is a tenant fit out only. There are

2:04:07 no changes to the masting footprint,

2:04:09 height or setbacks of the building and

2:04:11 all other occupancies in the building

2:04:13 will remain the same. The site sits

2:04:15 directly across from Ashwan station and

2:04:17 its busway, the red lining terminus and

2:04:20 a major bus in Matapan trolley hub. As

2:04:22 the planning department notes, the area

2:04:24 around Ashmont has become a commercial

2:04:27 hub over the past 20 years with retail,

2:04:29 commercial, and highdensity residential

2:04:31 uses and many restaurants and takeout

2:04:33 venues within a block to Aratus. The

2:04:36 rest upon the restaurant occupies

2:04:38 approximately 1560 ft of lease area.

2:04:42 That includes a dining room of about a

2:04:43 400 square f feet with table and chair

2:04:45 seating for approximately 27 people. A

2:04:48 740 foot commercial kitchen with a

2:04:50 walk-in cooler and a separate men's and

2:04:52 women's restrooms. Total occupancy load

2:04:55 is approximately 31. There are two exit

2:04:57 onto the Dorchester Avenue where only

2:04:59 one is required. This project puts an

2:05:02 active neighborhood serving use into a

2:05:03 ground floor storefront on the

2:05:05 Dorchester Avenue quarter at Ashmont.

2:05:08 Consistent with the other restaurants

2:05:09 already operating around it. We have

2:05:11 violations for a forbidded use large

2:05:14 restaurant. A large restaurant is

2:05:16 forbidden in MF in an MFRLS subdist with

2:05:19 about 27 seats and roughly 1560 square

2:05:22 ft. This is a modest neighborhood

2:05:24 restaurant that fits the context, but

2:05:26 because it's over 1,000 square ft, it is

2:05:28 considered a large restaurant. We have a

2:05:30 conditional use for the takeout portion.

2:05:33 Takeout component is conditional in this

2:05:34 subdist. Takeout is an ancillary to the

2:05:36 sitown restaurant and the location

2:05:38 directly across from Mashmon Station

2:05:40 surrounded by other takeout venues is an

2:05:43 appropriate site for this. Lastly, we

2:05:45 have off- streetet parking and

2:05:46 sufficiency. The use would require

2:05:48 approximately eight spaces and zero are

2:05:50 provided. There is no ability to add

2:05:52 parking within the existing building and

2:05:54 the transportation department guidelines

2:05:56 recommended parking ratio of zero in

2:05:58 this area. The site is across the street

2:06:00 from Ashwan station and on street

2:06:02 parking is the predominantly form in the

2:06:04 neighborhood. At this point, Madam

2:06:05 Chair, I'm going to turn it over to you

2:06:06 and the board for any questions.

2:06:09 Thank you. Are there questions from the

2:06:10 board?

2:06:12 Hi, Madam Chair. I do actually have

2:06:13 several questions.

2:06:15 Um the first being uh what are the hours

2:06:19 of this establishment? Um and I know

2:06:22 that you're doing takeout. Are you also

2:06:24 planning on doing um

2:06:27 uh like delivery or with any of the

2:06:29 apps? And along those lines, what is

2:06:32 your plan for parking and loading?

2:06:37 Yeah, thank you.

2:06:38 Uh Mr. Turner, good question. So, the

2:06:39 hours of operation will be Monday

2:06:41 through Saturday 11:00 a.m. to 11:00

2:06:43 p.m. and Sunday 11:00 a.m. to 10:00 p.m.

2:06:47 Uh and that's a good question. Yes, they

2:06:49 will be uh accepting third party

2:06:51 deliveries. Uh, and that was the one

2:06:53 question that did come up. Um, and the

2:06:55 district city councelor Morell, his

2:06:57 office has offered to take it up with

2:06:59 the city about trying to file for an

2:07:02 application. If in fact it is approved,

2:07:04 uh, they would take upon them themselves

2:07:06 at the office file an application to

2:07:08 allow some sort of commercial pickup and

2:07:10 drop off spot in front of the restaurant

2:07:12 use. But again, the use of, you know,

2:07:14 for the takeout is very consistent. We

2:07:16 have American Provisions directly across

2:07:18 the street. There's another restaurant

2:07:19 called Tvalo directly across the street.

2:07:21 So, as far as contextually, uh, it's

2:07:23 very similar to the other uses operating

2:07:25 on this street as well.

2:07:30 Any other questions from the board?

2:07:33 I have public testimony.

2:07:35 Hello, Madam Chair, members of the

2:07:36 board. My name is Eva Jones representing

2:07:38 the mayor's office and neighborhood

2:07:39 services regarding 170 Dorchester

2:07:41 Avenue. Our office differs to the

2:07:43 board's judgment. A community process

2:07:45 was conducted, including an abutards

2:07:47 meeting held on August 24th that was

2:07:49 well attended by Dorchester community

2:07:51 members. During the meeting, residents

2:07:52 expressed support for welcoming a new

2:07:54 restaurant into the neighborhood and

2:07:56 having an additional dining option in

2:07:58 the area. But they did also raise

2:08:00 concerns regarding the absence of a

2:08:02 property owner or a restaurant

2:08:03 representative in the meeting and

2:08:05 requested further communication

2:08:06 regarding daily operations, including

2:08:08 deliveries, trash collection, rodent

2:08:10 mitigation, and parking management.

2:08:12 Additionally, concerns were also raised

2:08:14 about the condition of the building's

2:08:15 bee street facing facade, including the

2:08:18 unfinished exterior, lack of a secure

2:08:20 enclosure for the residential trash and

2:08:22 recycling area, and landscaping that has

2:08:24 yet to be installed. The resident

2:08:26 emphasized the importance of addressing

2:08:27 these conditions given the bill street

2:08:29 uses and heavily trafficked pedestrian

2:08:32 route to the Ashvon MBTA station. The

2:08:35 applicant has been connected with the

2:08:36 Ashon Adam Civic Association and

2:08:38 communication is ongoing. At this time,

2:08:40 the mayor's office and neighborhood

2:08:41 services defers to the board's judgment

2:08:43 on this matter. Thank you everyone for

2:08:44 your time and consideration.

2:08:46 Thank you.

2:08:47 Next, we have Liam Grimas.

2:08:50 Hello, Madam Chair, members of board.

2:08:52 Liam Remis from councelor Fitzro's

2:08:53 office. Council wants to go in record

2:08:55 this proposal. Thank you.

2:08:57 Thank you,

2:08:58 Madam Chair. We don't have additional

2:08:59 comments.

2:09:01 With that, may I have a motion?

2:09:05 Motion to approve.

2:09:06 There a second.

2:09:09 Second,

2:09:11 Mr. Stumbridge.

2:09:14 Yes,

2:09:16 Miss Turner.

2:09:17 Yes,

2:09:19 Mr. Brazza.

2:09:20 Yes,

2:09:22 Miss Weell.

2:09:23 Yes,

2:09:24 Mr. Collins.

2:09:26 Yes,

2:09:27 Miss Ponado.

2:09:29 Yes.

2:09:31 Yes. The motion carries. Good luck.

2:09:35 All

2:09:38 right. Next, we have 13 companion cases

2:09:46 um in conjunction with the mayor's

2:09:49 office of housing.

2:09:52 Um, so these so these are case BOA

2:09:59 188

2:10:01 1 9 28 with the address of 183 North

2:10:06 Street.

2:10:08 Next we have case BOA

2:10:11 1881 930

2:10:14 also with the address of 183 North

2:10:18 Street.

2:10:20 Next we have case BOA 1881

2:10:25 933

2:10:27 with the address of 183A

2:10:30 North Street.

2:10:32 Next we have case BOA 1881

2:10:36 937

2:10:39 with the address of 183B North Street.

2:10:43 Next we have case BOA 1881 938

2:10:49 with the address of 183

2:10:52 North Street.

2:10:54 Next we have case BOA 1881 939

2:11:00 with the address of 183D

2:11:03 North Street.

2:11:05 Next we have case BOA 1881941

2:11:11 with the address of 185 185 North L

2:11:15 Street.

2:11:17 Next we have a BOA

2:11:20 1881 942

2:11:23 with the address of 1 Charles Road.

2:11:27 Next we have case BOA1 1881 946

2:11:32 with the address of 3 Charles Road. Next

2:11:36 we have case BOA 1881 945

2:11:41 with the address of 5 Charles Brook.

2:11:44 Next we have case BOA 1881 944

2:11:50 with the address of 7 Charles Brook.

2:11:54 Next we have case BOA181950

2:11:59 with the address of 10 Bolina Place.

2:12:05 And finally we have case BOA

2:12:10 1881 948

2:12:13 with the address of 12's R holding

2:12:16 place.

2:12:18 If the applicant and the representative

2:12:21 are present, would they please explain

2:12:23 these to the board?

2:12:25 Thank you, Mr. Pembridge. Uh, good

2:12:27 morning, Madam Chair, members of the

2:12:29 board. Attorney Derek Small. I'm a

2:12:31 business address of 51 Doson Road Tree

2:12:33 Bass. Madam Chair, we're here today

2:12:36 seeking relief to combine parcels and

2:12:40 erect 12 one family dwellings with five

2:12:43 parking spaces on a vacant lot that will

2:12:47 be um over 19,000 square ft.

2:12:51 Um we are working with Mo. Again, this

2:12:53 project is in is in conjunction with Mo

2:12:57 and it's going to be um home ownership

2:13:00 100% affordable and over 100% AMI.

2:13:05 So here the zoning the zoning

2:13:07 subdistrict is the 3F5000 and again on

2:13:10 lot sizes in excess of 19,000 square ft.

2:13:15 Um the violations are um two more

2:13:18 dwellings on the same lot as we are

2:13:20 combining the three parcels into one.

2:13:23 And then we have a couple of uh

2:13:24 dimensional violations with sideyard,

2:13:26 rear yard, front yard, and open space.

2:13:30 So, if we'll get right into it with

2:13:32 regard to the site plan, if you can

2:13:33 enlarge the site plan just a little bit.

2:13:35 Um, Mr. Ambassador, we can go over the

2:13:38 site plan and give you guys a better

2:13:41 idea of what's going on here. So um

2:13:44 Northolk Street is the main street and

2:13:48 it's accessible Balina Place and Charles

2:13:50 Road which are both deadend streets. In

2:13:53 the rear of the property we are bounded

2:13:55 by uh MBTA uh train tracks. So access to

2:14:01 the site will be off of Bolina Place. Um

2:14:04 and parking in the rear closest to the

2:14:06 MBTA tracks. We're proposing five

2:14:09 parking spaces in the rear and we have

2:14:12 to conduct a 25 fire lane in the rear of

2:14:15 the property so that um fire department

2:14:18 has access to all of the buildings.

2:14:22 Also, um if you see there's a courtyard

2:14:24 down the middle uh and in between the

2:14:27 buildings that also will be used as a

2:14:29 fire lane um giving access to fire

2:14:33 department in case of emergencies um

2:14:36 throughout the throughout the site and

2:14:38 accessing all of the buildings. That

2:14:41 courtyard again um will be will consist

2:14:44 of paths, green space. Uh we are working

2:14:47 with the landscape architect to do um

2:14:50 trees, shrubs and plantings within that

2:14:52 courtyard. Um so that that each of the

2:14:55 units or the dwellings have um open

2:14:58 space attributed to each of the units.

2:15:01 Um with regard to the um we've had a

2:15:06 number of community meetings with regard

2:15:08 to this project. Um and some of the

2:15:10 issues that have come up uh number one

2:15:12 is parking. Parking is an issue all over

2:15:14 the city and as we know and we are

2:15:16 providing five parking spaces um with

2:15:20 the 12 units. Other issue that K came up

2:15:23 during uh community process was um storm

2:15:26 water and drainage. Right now because

2:15:29 the site is vacant um I think there are

2:15:31 a number of issues on Galina Place and

2:15:33 on Charles Road with regard to um

2:15:36 drainage and the lack thereof. Um again

2:15:40 with this development proposal, we will

2:15:41 be required to um implement a

2:15:45 comprehensive uh Washington water and

2:15:46 sewer plan to that agency that will um

2:15:51 address a lot of the storm water and

2:15:53 drainage issues for our site. But I

2:15:55 think that um the um the plan will also

2:15:59 help address a lot of the issues that

2:16:01 are currently existing um at the site

2:16:04 and in the area with regard to storm

2:16:06 water and drainage. um green space. Um

2:16:10 again, we have the um courtyard running

2:16:13 down the middle um of the site um giving

2:16:17 fire access, but that also will serve as

2:16:20 um green space as we keep it open and we

2:16:23 are working with landscape architects to

2:16:26 um institute trees and shrubs within

2:16:28 within the site.

2:16:31 Um the the units themselves, Madam

2:16:34 Chair, members of the board, are three

2:16:35 bedroomedroom, two bath and are

2:16:37 approximately 1,152.

2:16:40 Mr. Small, Mr. Small, I'm sorry. Do do

2:16:42 you have any are there any other

2:16:44 pictures that show like any renderings

2:16:47 or is this it?

2:16:49 That's the That's it for the site plan.

2:16:51 We do have an updated site plan um that

2:16:54 came in last week, but we weren't able

2:16:55 to submit it because um it wouldn't meet

2:16:58 the timeline in terms of

2:16:58 But no no renderings. We don't see.

2:17:00 Yes, we do. If you scroll. Yep. We're

2:17:03 going to scroll through.

2:17:04 Okay. Cuz I only see one side.

2:17:06 Yeah.

2:17:08 And so

2:17:10 there should be um

2:17:14 architectural renderings of the

2:17:15 building. Yep. So that's the the

2:17:16 building itself. That's the uh floor

2:17:19 plans. So again, we um have three

2:17:22 bedroomedroom, two bath, and each of the

2:17:25 units will be approximately 1,150

2:17:28 square ft.

2:17:30 Um

2:17:32 there are some renderings here

2:17:36 shown that you requested. Um and the um

2:17:41 the city of Boston, we've reviewed it

2:17:43 with uh BPD and we're currently working

2:17:46 with BPD on um the site plan. So again,

2:17:50 we've had a number of meetings. I know

2:17:51 there's some issues with regard to the

2:17:53 design and we will continue to work with

2:17:56 BPD and community folks um as the

2:17:59 project moves forward in design review.

2:18:02 Um I can stop there madam chair and we

2:18:04 can answer any questions that the board

2:18:06 may have.

2:18:08 Thank you. Yeah. Yeah. There was some

2:18:10 feedback. You commented on some of it

2:18:12 like parking for example and then

2:18:13 designed uh what was it a question or an

2:18:17 issue like why 12 separate um

2:18:22 building you know bu buildings instead

2:18:24 of some other configuration. I don't

2:18:26 know if you want to get that. And so I I

2:18:28 I think to to to answer that, Madam

2:18:30 Chair, we are working with Mo and one of

2:18:33 the first things that we've hear in

2:18:34 every neighborhood when we're doing

2:18:36 projects is that we're looking for and

2:18:38 the city's looking for um home ownership

2:18:40 opportunities and that are affordable.

2:18:43 Again, these will be 100% affordable at

2:18:47 over 100% AMI and they are home

2:18:50 ownerships opportunities for for folks

2:18:52 in the community. I think that's in line

2:18:55 with U Boston 2030's housing goals and

2:18:59 that's something that in discussions

2:19:01 with the city um we we wanted to try to

2:19:04 to to implement.

2:19:06 Thank you. Other questions from the

2:19:08 board?

2:19:10 Can I can I just quickly ask who's the

2:19:12 developer of this project and and talk a

2:19:15 little bit about their experience? Yes,

2:19:18 Origin North Capital um has experience

2:19:21 in doing um they're out of the

2:19:23 Southshore. They have experience doing

2:19:25 uh housing along the Southshore. We have

2:19:28 a couple of projects in the works in

2:19:30 Boston currently as well.

2:19:34 Mr. BA.

2:19:36 Yes, I did note uh notice that the um

2:19:40 BPD put feedback in regards to building

2:19:44 lo building orientation and also trash

2:19:47 and I'm and I'm wondering if you can

2:19:49 speak on um what's the strategy for

2:19:54 getting trash out from each of these

2:19:57 units?

2:19:59 Well, the strategy right now in terms of

2:20:01 getting trash out to the units is ob

2:20:03 obviously their individual um one family

2:20:06 dwellings. Um folks will be able to roll

2:20:09 their bar bins and barrels out onto

2:20:11 Charles Road and on to Bolina Place. Um

2:20:15 with regard to normal pickup and we are

2:20:18 discussing with developers because it's

2:20:21 going to be a a co-op situation. I think

2:20:23 that we we're gonna be looking at

2:20:25 possibly a private trash pickup once a

2:20:28 week as well.

2:20:29 That's right.

2:20:31 Yeah. So, you might you might have to in

2:20:34 regards to site planning put a kind of

2:20:36 an aisle away and you might need to lose

2:20:39 uh a parking space. Who are the parking

2:20:41 spaces for? Well, that's something

2:20:44 that's come up in the community process

2:20:46 as well and something that we've been

2:20:48 talking with the city about because what

2:20:50 we're going to do for these home

2:20:52 ownership opportunities is we're going

2:20:53 there's going to be a lottery system in

2:20:56 conjunction with the city and I think on

2:20:58 a couple of the of the sites and the

2:21:01 houses, they're going to come um with

2:21:03 the lottery system with a parking space

2:21:06 for for those um individual homes and

2:21:09 some will be without parking space.

2:21:12 So, um I I mean I I want to commend this

2:21:16 project. I I find it like urbanistically

2:21:19 a really interesting urban planning and

2:21:22 and it provides a lot of home ownership

2:21:25 opportunities. I am reminded that you

2:21:28 have this beautiful aisle and it lends

2:21:31 itself up to potentially a combined open

2:21:34 space for children and families and the

2:21:36 elderly elderly to walk around versus a

2:21:40 predetermined path. So, um I think it

2:21:44 would be good for you to work with the

2:21:45 landscape architect and the BPD and Mo

2:21:48 to continue communal open space usage.

2:21:52 Um I don't have any other other comments

2:21:55 other than I think this is a very unique

2:21:58 and interesting project. Thank you.

2:22:01 Thank you. Any other questions or

2:22:02 comments from the board?

2:22:05 I have public testimony.

2:22:07 Madam Chair and members of the board,

2:22:08 for the record, my name is Jeremy

2:22:10 Benbury. I am the Matipan community

2:22:11 engagement specialist for the office of

2:22:13 neighborhood services. Dam Lincoln has

2:22:15 completed the community process which

2:22:16 consisted of an abundance meeting

2:22:17 facilitated on April 28th whereas

2:22:20 expressed appreciation for the workforce

2:22:21 housing concept and indicated greater

2:22:23 support for affordable home ownership as

2:22:25 opposed to rentals. However, some

2:22:27 concerns were raised regarding the

2:22:29 proposed design use of space

2:22:31 insufficient parking and the placement

2:22:32 of the proposed fire lane in front of a

2:22:34 neighboring home. Another resident also

2:22:36 questioned whether the number of parking

2:22:38 spaces provided would adequately

2:22:39 accommodate the proposal. Following the

2:22:41 aboters meeting, the opponent was

2:22:43 connected and presented to Takaba North

2:22:45 Triangle, completing the community

2:22:47 process. To date, our office has

2:22:49 received two letters stating concerns

2:22:50 echoing the abot concerns previously

2:22:52 mentioned. Thank you for your time in

2:22:53 the mayor's office of neighborhood

2:22:54 services would like to defer to the

2:22:55 board for their judgment.

2:23:00 Next we have um Paige Rosa from the

2:23:04 mayor's office of housing.

2:23:06 Thank you. Uh thank you for this

2:23:09 presentation. Um and it's nice to see

2:23:12 you members of the zoning board of

2:23:13 appeals on behalf of the mayor's office

2:23:15 of housing and chief Sheila Dylan. I

2:23:17 write in support of the zoning variances

2:23:20 uh needed to make the construction of 12

2:23:21 new homes at 183 Norfolk Street

2:23:24 possible. This unique proposal would

2:23:26 create four-stell homes affordable to

2:23:28 middle-income families without any city

2:23:30 subsidy. And this is particularly

2:23:32 significant because at a time when

2:23:34 financing new construction without we

2:23:36 put in, you know, hundreds of thousands

2:23:38 of dollars right now to create

2:23:40 affordable forale homes, um, market rate

2:23:44 construction and the terms of financing

2:23:46 right now really only allow the most

2:23:48 lucrative projects to proceed. So we

2:23:51 feel strongly that we need to be

2:23:52 supporting developers who are doing just

2:23:54 this um who are employing innovative

2:23:56 approaches to create affordable housing

2:23:58 opportunities without relying on public

2:24:00 subsidy which is in very limited supply.

2:24:02 So we want to thank you for your

2:24:04 consideration of this project and please

2:24:06 feel free to contact me if you have any

2:24:08 questions.

2:24:09 Thank you.

2:24:11 Next um we have Ben Cy.

2:24:16 Hi. Can you hear me?

2:24:17 Yes sir.

2:24:18 Good morning. Thanks for the opportunity

2:24:20 to share. My name is Ben Cressy. I'm a

2:24:21 butter at 15 Bolina Place. I'm also a

2:24:23 trustee of the Bolina Place Condo

2:24:26 Association. Uh for context, the condo

2:24:29 association is made up of five families,

2:24:32 all who purchase homes through an

2:24:33 affordable home ownership program in the

2:24:36 last eight years in partnership with

2:24:38 Habitat for Humanity Greater Boston. So,

2:24:40 at the time of purchase, none of us were

2:24:41 earning over 80% AMI. Um, everyone on

2:24:46 our street, including an additional

2:24:48 voting family not part of our condo

2:24:50 association, is in support of the

2:24:52 concept of affordable home ownership.

2:24:54 Our concerns are with the

2:24:59 process that has transpired

2:25:02 previous to this meeting um between the

2:25:06 developer and community associations

2:25:10 um and of Butters and the conclusions

2:25:14 through which the design were arrived

2:25:16 at. Um, when we live on the street and

2:25:18 we experience day-to-day life as a

2:25:19 residents and a Butters, uh, we would

2:25:22 welcome the opportunity to have more

2:25:24 neighbors in affordable home ownership

2:25:26 across the board. Um, we do feel like

2:25:28 the design underutilizes the parcel. Um,

2:25:32 and does not really take quality of life

2:25:34 constraints into account in a number of

2:25:36 ways. We expect everyone will have a

2:25:38 car. We know that's not altruistic. Um,

2:25:41 the design eliminates parking spaces on

2:25:43 Bolina Place and also turns Bolina Place

2:25:45 into an access road for people to go in

2:25:47 and out when it's currently a dead end.

2:25:49 I have more in writing that I have

2:25:51 shared with the board.

2:25:52 Thank you.

2:25:52 Thanks.

2:25:54 Uh, next we have Yousef Abdullah.

2:26:01 Hi all, Ysef Abdullah from City Council

2:26:03 Brian Wells office. Uh the city council

2:26:06 would like to go on record asking that

2:26:08 uh this CBA hearing be pushed back to

2:26:11 the December 3rd or 8th meeting uh given

2:26:13 opposition from the community

2:26:14 specifically around design. We support

2:26:17 the affordable housing concept. Um we

2:26:19 like the overlay as is. It's just there

2:26:22 are some uh design uh questions from the

2:26:25 community. We think we just need a

2:26:26 little more time to hammer out from the

2:26:28 developer.

2:26:31 Thank you.

2:26:33 Next. Um, we have a poll mus.

2:26:39 Yes. Good morning. Can you hear me?

2:26:41 Yes, we can.

2:26:42 Yeah. Great. Um, so I've been asked to

2:26:44 speak uh on behalf of four budding civic

2:26:47 associations that uh surround this

2:26:49 project. The Talbet Norfolk Triangle,

2:26:52 uh, Community Improvement Association,

2:26:54 uh, Dorchester United Neighbors, and the

2:26:56 Redefining Our Community Association.

2:26:59 in all four civic groups uh oppose uh

2:27:02 the proposed development in its current

2:27:04 form. Um the proposal calls for the 12

2:27:08 detached single unit structures. Uh but

2:27:10 we feel like the current design does not

2:27:13 fit um the current uh character and feel

2:27:16 of the neighborhood. Uh as mentioned

2:27:19 already, residents have also raised

2:27:21 concerns about outdoor uh space,

2:27:23 parking, flooding. Uh snow removal,

2:27:26 trash is another good one that we hadn't

2:27:28 thought about yet. Um and uh part part

2:27:32 of the dilemma is has just been the

2:27:34 process. So we did meet with the

2:27:35 developer back in April of 2026.

2:27:39 Uh we raised concerns with uh with the

2:27:42 developer and questions. And then uh we

2:27:44 never heard from the developer until

2:27:46 just this past week at our request. Uh

2:27:49 and we were able to meet with Derek

2:27:51 Smalls just a few days ago. uh that huge

2:27:54 gap eliminated the opportunity for

2:27:57 neighbors to be able to work with um the

2:27:59 developer

2:28:01 uh to create something as we've done

2:28:03 with a lot of affordable developers in

2:28:04 our neighborhood that actually works

2:28:06 well both for the residents and the

2:28:08 future residents that are coming. So we

2:28:10 just ask that we have a 90-day uh delay

2:28:13 um so that we can work with the

2:28:15 developer. Thank you.

2:28:18 And we have Alise Nelson.

2:28:25 Yes.

2:28:26 Yes. Can you hear me?

2:28:28 I echoing echoing the voice of the

2:28:30 community. I live down the street at 217

2:28:32 Norfolk Street. Um it's a joy to see

2:28:34 some affordable housing going in. Um,

2:28:37 but the design I think that it feels

2:28:40 like the mayor's office is pushing this

2:28:41 through and uh things are going fast

2:28:44 past the residents that and a Butters

2:28:47 spoke to a Butters a week ago and uh

2:28:49 three or four of them hadn't even heard

2:28:50 about it. So I don't know how many

2:28:52 people showed up at that abutters

2:28:54 meeting. So um we're feeling like it's

2:28:56 being shoved down our throats, but we

2:28:58 want affordable development. We like

2:29:00 some of the ideas, but we think there

2:29:02 could be some deeper collaboration to in

2:29:05 design. That's all.

2:29:07 Thank you,

2:29:09 Madam Chair. I see additional hands

2:29:11 raised at the

2:29:13 Can I ask the applicant to talk about

2:29:15 the

2:29:16 Can I respond, Madam Chair?

2:29:18 Yes, please.

2:29:19 So, again, we started this process a

2:29:23 while ago and we had a bud meetings and

2:29:26 we met with three different neighborhood

2:29:27 groups regarding this project. We met

2:29:30 with TNTCIA, Dunn. We met with the

2:29:33 greater manipan neighborhood council. We

2:29:35 met with the rock. We had aners meeting.

2:29:37 And again, we had another uh butterers

2:29:40 meeting as late as this past Wednesday

2:29:43 on on Veterans Day. Um again, I think

2:29:46 that some of the issues with regard to

2:29:49 design can be worked out and we're

2:29:51 willing to go back and meet with

2:29:52 community folks in design review. Uh but

2:29:56 we need this project to move um forward

2:30:00 in terms of ZBA approval um and and

2:30:03 funding as as it is timesensitive. Um

2:30:06 again, we're willing to go back. We'll

2:30:07 meet with folks um in design review to

2:30:10 talk about and discuss the design more

2:30:12 in depth. Um but we're looking to

2:30:15 proceed uh today um and move the project

2:30:18 forward.

2:30:21 Other questions or comments from the

2:30:23 board? Hearing

2:30:29 none. Is there a motion?

2:30:32 Madam Chair, I'd like to put forward a

2:30:35 motion of approval with approvise that

2:30:38 the project undergoes BPD design review.

2:30:42 There a second.

2:30:43 I'm going to second that. I'm not

2:30:45 hearing anything that kind of raises

2:30:47 serious concern that warrants a delay.

2:30:50 And I think a lot of the issues can be

2:30:51 worked out in design review.

2:30:56 Mr. Penbridge.

2:30:59 Uh, yeah.

2:31:02 Miss Turner.

2:31:03 Yes.

2:31:05 Miss Brazza.

2:31:06 Yes.

2:31:08 Miss Weedwell?

2:31:09 Yes.

2:31:11 Mr. Collins?

2:31:12 Yes.

2:31:14 Miss Panado?

2:31:16 Yes.

2:31:17 Chair votes yes. The motion carries.

2:31:20 Thank you, Madam Chair. Repres have a

2:31:22 good day.

2:31:23 You're welcome. I'm going to suggest a

2:31:25 15minute break and we can we'll be we'll

2:31:28 be back in 15 minutes.

2:31:32 Recording stopped.

2:47:32 Miss Turner,

2:47:35 Miss Better Brazza,

2:47:37 present.

2:47:39 We

2:47:40 present.

2:47:41 Mr. Collins,

2:47:45 Miss Panado,

2:47:46 present.

2:47:49 Miss Turner,

2:47:53 apologies, I'm here.

2:47:54 Okay, thank you. Mr. Collins,

2:48:02 but I'll wait on Mr. Collins. Um,

2:48:08 Mr. Stebridge, if you'd like to read

2:48:10 that into the record and let's see if he

2:48:13 comes back on

2:48:15 with that. Uh, we'll move on to I'm

2:48:19 sorry. Uh before I go there, uh what

2:48:23 we're looking at next is case BOA

2:48:27 1 190

2:48:29 206

2:48:32 with the address of 79 to 89 Poker

2:48:36 Street.

2:48:40 And

2:48:45 and with that we'll ask if there are if

2:48:48 the applicant or the representative is

2:48:53 present.

2:48:54 Thank you Miss Stembridge. Thank you

2:48:55 madam chair members of the board. Jeff

2:48:57 Drago with Drago and Tusano on behalf of

2:49:01 the applicant. Uh with us we also have

2:49:03 Eric Zacherson who's the architect of

2:49:06 the project. Uh this is a project at

2:49:08 79-89

2:49:10 Ochre Street in Alustin, Mass. Um what

2:49:14 you're looking at on the screen is a

2:49:16 proposed rendering uh of the site. We're

2:49:19 proposing to raise the existing

2:49:21 multifamily residential dated structure

2:49:24 that has a parking lot next to it and

2:49:27 create six family town houses. Uh this

2:49:30 would be familysized housing um with

2:49:33 singlecar interior garage for each of

2:49:36 the units with uh exclusive roof deck

2:49:39 space access by a hatch on the top of

2:49:42 each unit for additional uh outdoor

2:49:44 space and then a uh a rear yard for each

2:49:48 of these units uh to go along with it.

2:49:51 Uh all of these will be fully

2:49:52 sprinklered as well. If we could go to

2:49:56 the uh next slide please. Uh Mr.

2:49:58 Ambassador, thank you. Um, this is just

2:50:01 a site map. So, on the left hand side,

2:50:04 the board can see the size uh and square

2:50:07 footage of the lot. This is 10,635

2:50:11 square ft. So, it's one of the larger

2:50:12 lots uh in this area. And on the right,

2:50:16 although it is in a 2F5000 district,

2:50:18 there is a mix of housing stock. There's

2:50:21 both multifamily residential existing

2:50:24 and also a mix of twos and threes in the

2:50:27 area with a public park right down the

2:50:30 street. Uh which makes it great for

2:50:32 those folks that are living there. Um

2:50:35 the if we can go to the next slide

2:50:37 please. These are just uh existing

2:50:40 conditions. So you can see the existing

2:50:42 structure off to the side and the large

2:50:44 hot top area. This uh area is completely

2:50:47 hot topped. Uh this new project would

2:50:50 actually provide open space uh with the

2:50:52 familysized housing as well. Uh next

2:50:56 slide so we get into the plans. We go to

2:50:58 the next slide too. Uh all of these town

2:51:01 houses are a similar design. They are

2:51:04 all 1970

2:51:06 square ft. They have a singlecar

2:51:09 interior garage for each of them. These

2:51:11 would be three bedroomedroom with four

2:51:13 baths. Uh they also have a small rear

2:51:16 deck uh and exclusive roof deck I had

2:51:19 mentioned as well. They have courtrooms,

2:51:22 office, nursery area for those folks

2:51:24 with children. And you can see in this

2:51:26 site we're actually keeping there is an

2:51:29 existing 20ft curb cut. So even though

2:51:32 these are individual garages, we're able

2:51:34 to just keep the existing curb cut that

2:51:36 would have access to each of the

2:51:38 enclosed driveways that would lead to

2:51:40 the um parking space inside. If we can

2:51:43 go to the next slide, please.

2:51:47 Uh, this just shows the the layout and

2:51:50 the site plan of the six town houses.

2:51:53 Um, we can go to the next slide, too. We

2:51:55 get into the floor plans. Level one is

2:51:58 the single car garage with bedroom,

2:52:01 bathroom, and coat room. When we go up

2:52:04 to uh level two, we've got rear deck uh

2:52:07 in the back, dining room, living room,

2:52:10 kitchen, utility room, and a bathroom.

2:52:12 And then on level three, we've got two

2:52:15 additional bedrooms, office, nursery

2:52:17 area, laundry room, walk-in closets, and

2:52:20 two bathrooms. When we go up to the top,

2:52:23 the there are the exclusive roof decks.

2:52:26 If you go to the next slide, I believe.

2:52:29 Yeah, this shows each unit would have an

2:52:31 exclusive roof deck access by hatch. Um,

2:52:34 for each of those units, we also have,

2:52:37 as I mentioned, that green space and

2:52:39 back, if we go to the keep going through

2:52:41 the slides, Mr. ambassador and that at

2:52:43 its smallest point is 10 ft and then

2:52:45 goes up slightly um for each of those

2:52:48 units. This shows the um elevations as

2:52:52 well. Uh we're proposing 35 ft which is

2:52:56 allowed in this particular area. The

2:52:58 variances that uh would be needed would

2:53:01 be for F. We're at 1.13. What's allowed

2:53:05 is 6. Um, we all, as I mentioned, we

2:53:08 already have a multifamily residential

2:53:11 dated structure that's on there. Now,

2:53:13 um, we meet the height, uh, limitation

2:53:16 in feet of 35 ft, although this is a 2

2:53:19 and 1/2tory uh, area, so we would need

2:53:22 relief for that additional half story.

2:53:25 Um, sideyard is 10. We're at 6'7 in. And

2:53:30 then rear yard would be 30. We've got 10

2:53:33 in the back, but that increases uh

2:53:35 because the lot is sort of at an angle

2:53:37 with the layout. And then we do provide

2:53:39 one spot as I mentioned uh for each of

2:53:42 these buildings uh which comes to six,

2:53:45 but 1.75 would be required under the

2:53:48 code. This has great Taxis. It's uh.9 mi

2:53:52 away from the green line and has two bus

2:53:55 routes within 100 ft as well, making it

2:53:57 great for commuter access as well. These

2:54:00 are going to be sold as townhouse home

2:54:03 ownership. Um, and we worked with both

2:54:05 civic associations, both the Alustin

2:54:08 Civic Association and the BIA to get

2:54:11 their input. They were happy to see

2:54:13 green space in the rare of the project

2:54:15 and something different rather than just

2:54:18 a a box of condos. These would be

2:54:20 individual town houses, which we hear uh

2:54:22 time and time again to have more family

2:54:25 uh housing in the community. Uh, with

2:54:28 that I can pause to answer any questions

2:54:30 that the board may

2:54:32 Thank you. Are there questions from the

2:54:34 board?

2:54:38 Can you talk about Well, I'm curious

2:54:40 about the garage access from the front

2:54:43 of the building.

2:54:44 Yeah. So, I are you referring to the um

2:54:47 recommendation?

2:54:48 I think that's what I'm seeing. Yeah.

2:54:49 But I also I'm seeing a lot of garages

2:54:52 in the front of the building. I'm

2:54:55 designing decision.

2:54:56 Sure. So, there's one large curb cut

2:54:58 that's existing that we're keeping. Uh

2:55:00 we didn't want to have in working with

2:55:02 the community, we didn't want individual

2:55:04 curb cuts uh up and down the corer. So,

2:55:07 we've got the one and then you would

2:55:08 drive in and that would access cuz it's

2:55:10 big enough for ingress and egress. The

2:55:13 recommendation that we saw that and I

2:55:16 think that was incorrect. Uh and in

2:55:18 talking with the BPD, um it there would

2:55:21 be no way to bring that in the back. We

2:55:24 only have 6' 7 in on the sideyard. And

2:55:27 if we were to access it through the

2:55:29 rear, we would either have to flip the

2:55:30 buildings around or we would take all of

2:55:33 the green space in the back for

2:55:36 turnaround area. So, uh I'm not sure

2:55:38 what that was about, but um in working

2:55:41 with both civic associations, this is uh

2:55:44 the plan that everyone liked uh because

2:55:46 it is townhouse, but there's only the

2:55:48 one uh the one driveway access.

2:55:53 I hope that answers your question, Miss

2:55:55 Panel.

2:55:56 Yes.

2:55:58 Any other questions from the board? Oh,

2:56:00 go ahead.

2:56:01 Did Did you want to add anything, Miss

2:56:02 Pano?

2:56:02 No, it's just an unusual design, but

2:56:05 thank you

2:56:06 there. Um, with that, may I have public

2:56:09 testimony?

2:56:11 Madame Chair and board members, Sigy

2:56:13 Johnson with the Office of Neighborhood

2:56:15 Services. This applicant completed the

2:56:16 community process. Our office hosted in

2:56:18 a butters meeting on July 28th at which

2:56:21 there were questions about the design

2:56:22 and massing of the proposal as well as

2:56:24 questions about whether there was an

2:56:25 affordable component to this project.

2:56:27 There was no direct opposition stated.

2:56:29 The applicant met with the Alustin Civic

2:56:31 Association. That group has submitted a

2:56:33 letter in support to the board, but has

2:56:35 requested every effort be made by the

2:56:37 applicants to include a restriction in

2:56:39 the bylaws of the condominium that the o

2:56:41 that the units be owner occupied due to

2:56:43 the low rate of owner occupied units in

2:56:46 the Alston neighborhood. With that

2:56:48 background, ONS defers judgment to the

2:56:50 board. Thank you,

2:56:53 Madam Chair. We don't have additional

2:56:55 comments.

2:56:57 Do you want to comment just about the

2:56:59 owner occupancy? Is that something you

2:57:01 agreed to or?

2:57:02 Sure, we can certainly put that in the

2:57:05 condo docs. We haven't heard it yet, but

2:57:08 that's not a problem. And I also just

2:57:09 want to point out the BIA also went in

2:57:12 support of the project for a vote.

2:57:16 Thank you. Any other questions or

2:57:18 comments from the board?

2:57:22 May I have a motion?

2:57:28 Madam Chair, I'd like to put forward a

2:57:30 motion of approval with a proviso that

2:57:33 the project undergoes BPD design review

2:57:36 to review site planning in regards to

2:57:39 vehicular access and also to um just

2:57:42 review the orientation of the building

2:57:44 relative to the corner street as it

2:57:47 deals with um frontage uh facades, the

2:57:51 design of the of those facades. Thank

2:57:53 you.

2:57:54 Is there a second?

2:57:56 Second.

2:57:57 Mr. Sbridge,

2:58:00 yes.

2:58:01 Miss

2:58:01 Turner,

2:58:02 yes.

2:58:03 Miss Bavarza,

2:58:05 yes.

2:58:07 Miss Wheelo,

2:58:08 yes.

2:58:09 Mr. Collins,

2:58:11 yes.

2:58:12 Miss Bonado,

2:58:14 yes.

2:58:16 Votes yes. The motion carries.

2:58:18 Thank you very much.

2:58:25 With that, We'll move on to the hearing

2:58:28 schedule for 11:00 a.m.

2:58:31 Uh the first two

2:58:35 hearing first two cases have been um

2:58:39 deferred.

2:58:41 So that will take us to two companion

2:58:44 cases. Those being

2:58:48 case BOA 1 19070

2:58:54 with the address of 1025 to 1027 River

2:58:59 Street

2:59:01 and along with that is case BOA

2:59:05 1 19071

2:59:10 with the address of 1029 to 1031 River

2:59:16 If the applicant andor their

2:59:18 representative are present, will they

2:59:20 please explain the cases to the board?

2:59:23 Thank you, Mrs. Sebridgeidge. Um, good

2:59:25 afternoon, Madame Chair, members of the

2:59:27 board, Attorney John Puljini, uh, on

2:59:29 behalf of the applicant for 1025, 1027,

2:59:33 and 1029, 1031 River Street High Park.

2:59:36 I'm joined this afternoon by Alex

2:59:38 Aguilar, the owner of the property,

2:59:40 along with Michael Kim, the project's

2:59:42 architect. Uh the zoning uh for this

2:59:44 property is two family 5000. The lot

2:59:47 size is 12,66

2:59:49 square ft. This property sits on River

2:59:52 Street in High Park at the corner of

2:59:54 Arlington Street. We propose to raise

2:59:56 the existing vacant building, subdivide

2:59:59 the lot into two, and build a two family

3:00:03 duplex downhouse on each new lot. After

3:00:07 the subdivision, the lot at the corner

3:00:10 of Arlington Street will be

3:00:12 approximately 6,275

3:00:14 square ft and will be improved by a

3:00:17 twounit duplex and that will be known

3:00:19 and numbered as 1029 1031 River Street.

3:00:23 The lot to the right will be

3:00:25 approximately 6,330

3:00:27 square ft and will also contain an

3:00:29 identical duplex building and will be

3:00:32 known and numbered as 1025-1027

3:00:36 River Street. So they're pretty much

3:00:38 identical buildings. Each unit will be

3:00:39 approximately 1500 square 1560 ft. It'll

3:00:43 have five beds, three baths as the

3:00:45 development contemplates housing

3:00:47 intergener intergenerational living.

3:00:50 Additionally, each unit will have two

3:00:53 garage parking spaces uh internal to the

3:00:56 building and it will also have two

3:00:57 common spots to prevent on street

3:00:59 parking. Access to this parking will be

3:01:02 through an existing shared curb cut on

3:01:04 Arlington Street side of the property.

3:01:07 Additionally, these new buildings will

3:01:09 be green, including 100% electric

3:01:11 rooftop solar panels, 3150 ft of open

3:01:15 space, and the garages will be equipped

3:01:16 with level two charging stations.

3:01:19 uh we underwent a full community process

3:01:21 received the support from the high park

3:01:23 central neighborhood group as well as

3:01:25 from council Enrique Pepin we provide

3:01:27 the board additionally we've provided

3:01:29 the board uh I think somewhere between

3:01:31 12 and 15 uh support letters from

3:01:33 abutters and neighbors at this point

3:01:34 I'll turn it over to Michael Kim to go

3:01:36 through the plans but we appreciate the

3:01:38 opportunity to present uh Michael

3:01:53 elevated to panelists

3:01:56 unmute.

3:01:58 Okay.

3:01:59 Um as um

3:02:03 as attorney John um represented uh we

3:02:06 are proposing um two

3:02:10 identical duplex homes. Um we scroll

3:02:13 through that we uh we they have been

3:02:16 carefully designed to meet the um

3:02:19 prevailing zoning um and to the square

3:02:23 foot. Um we believe that it is both

3:02:27 buildings are two and a half stories um

3:02:30 and very though the computation is is u

3:02:34 uh is involved uh and it meets all the

3:02:38 other uh requirements resulting with the

3:02:40 possible exception of the um uh of the

3:02:44 basement bulkheads which we consider

3:02:47 stairs uh uh and therefore um eligible

3:02:51 to be in the sideyard setbacks. Um

3:02:57 uh as I said they they are designed to

3:02:59 conform um as as closely as possible to

3:03:03 the prevailing zoning

3:03:09 questions from the board.

3:03:14 Hearing none may have public testimony.

3:03:20 Madame chair and members of the board

3:03:21 for the record my name is Jeremy

3:03:23 Benbury. I am the hide park community

3:03:24 engagement specialist for the office of

3:03:26 neighborhood services. The applicant has

3:03:28 completed the community process which

3:03:29 consisted of an abberas meeting

3:03:30 facilitated on October 8th where one

3:03:33 expressed support for the proposal while

3:03:34 others raised concerns regarding the

3:03:36 architectural design preservation of

3:03:38 existing buildings and mensaw roof and

3:03:40 whether the proposed development would

3:03:41 be consistent with the character of the

3:03:43 neighborhood. The primary concerns

3:03:44 focused on the intersection of River

3:03:46 Street and Allington Street where

3:03:47 community members noted a history of

3:03:49 accidents and expressed concern that the

3:03:51 proposed development particularly at

3:03:52 setbacks could further obstruct

3:03:54 visibility in crate traffic and even

3:03:56 worse safety issue than currently exist.

3:03:59 Questions were also raised regarding the

3:04:01 adequacy of off- streetet parking and

3:04:03 questioned if providing potential

3:04:05 offflow overflow parking was a

3:04:07 possibility. Lastly, the director Butter

3:04:10 voiced concerns for the impact of

3:04:11 demolition on his land. if the

3:04:13 proposal's proximity to the property

3:04:14 line and the structure. To date, our

3:04:17 office has received one letter of

3:04:18 opposition echoing concerns raised by

3:04:20 our voters and 13 letters of support for

3:04:22 the proposal. Thank you for your time in

3:04:23 the mayor's office and neighborhood

3:04:24 services would like to defer to the

3:04:25 board for their judgment.

3:04:28 Thank you,

3:04:30 Madame Chair. There are no additional

3:04:31 comments.

3:04:33 Any other questions, comments from the

3:04:35 board? I have a motion.

3:04:42 I'll make a motion to approve.

3:04:44 Is there a second?

3:04:45 Second.

3:04:47 M.

3:04:49 Yeah.

3:04:51 Miss Turner.

3:04:52 Yes.

3:04:54 Miss Fabraza.

3:04:55 Yes.

3:04:56 Miss Weel?

3:04:58 Yes.

3:04:59 Mr. Collins?

3:05:01 Yes.

3:05:02 Miss Ponado?

3:05:04 Yes.

3:05:05 Chair votes yes. The motion carries.

3:05:07 Thank you everybody. Have a great

3:05:08 Thanksgiving. Thank you,

3:05:13 Mr. Excuse me. I'm sorry. It's Attorney

3:05:16 Linds. Did you call 11:30 deferrals? I'm

3:05:19 sorry if I missed it.

3:05:21 Um,

3:05:22 I don't think so.

3:05:24 We hadn't yet. Um, and go ahead.

3:05:29 I'm sorry. Yeah, just a quick deferral

3:05:31 on 722

3:05:33 um Truman. I believe we already have a

3:05:34 date. There was a renotice issue for

3:05:36 GPOD.

3:05:38 the date. Um, yes, Madam Chair, there

3:05:41 will be a deferral has been requested

3:05:43 for this case. Uh, and that is until

3:05:47 December 8th. So,

3:05:50 um, basically it has to be

3:05:52 reappvertised. So,

3:05:54 Madam Chair, I need to recuse from this

3:05:55 one.

3:05:56 Okay. With that, is there a motion?

3:06:00 The motion is to defer uh this this

3:06:04 case, I'm sorry, case BO8189

3:06:09 4474

3:06:12 with the address of 722 Newman Highway.

3:06:16 Uh Madam Chair, I make the motion to

3:06:18 defer this case until

3:06:21 December 8th.

3:06:23 Thank you. Second, Mr. Stebridge.

3:06:26 Yes.

3:06:28 Miss Turner.

3:06:29 Yes.

3:06:30 Miss Barbraza,

3:06:32 yes.

3:06:33 Miss Weo,

3:06:34 yes.

3:06:35 Mr. Collins. Oh, Miss Panado,

3:06:39 yes.

3:06:40 Votes yes. The motion carries. See you

3:06:42 then.

3:06:42 Thank you very much. Have a good

3:06:44 Thanksgiving everyone.

3:06:45 Okay. And with that, thank you everyone

3:06:47 and have a thank have a great

3:06:49 Thanksgiving.

3:06:50 Thank you. You too. Holiday.

3:06:52 Take care. Folks,

3:06:54 recording stopped.