10.21.26 Conservation Commission Public Hearing
words this meeting uses public hearing · public comment · Zoning Board of Appeals (ZBA) — the glossary says what they mean
tap to load the tape · nothing plays until you dothe same, as a table
| time | kind | the moment |
|---|---|---|
| 0:14 | decision | Great, thank you. Okay, I'm calling this public hearing to order at 6:00 p.m. in accordance with the Massachusetts… |
| 3:16 | decision | The project in total is a payment restoration project. It has been before and received order of conditions twice… |
| 11:39 | pushback | Uh uh a bit, yes. We do have hoods proposed at the structures. Um the concern about the catchment in a a form of… |
| 23:29 | decision | Okay, as regarding the fundings, all all fundings are being federal fundings. So, right now the project has no funding… |
| 24:15 | decision | Okay, so with that, I would entertain a motion to continue the hearing. |
| 24:32 | decision | And I vote aye. It carries five nothing. |
| 25:35 | decision | Okay. So, um this this feels like this is much larger than any RDA uh that we have approved as far as the scope of the… |
| 27:05 | pushback | And we went through the emergency certification process with Elena. |
| 28:51 | decision | Sure. Okay, so I'm going to take a quick vote here. |
| 29:10 | decision | And I vote I. That carries five nothing. |
| 32:10 | decision | Sounds like none. So, I entertain a motion to issue a certificate of compliance for DEP file number 0062044 and Boston… |
Cut from the analyzer’s scored moments — a measurement, not a choice made for you. Open a reel and press make this reel yours to re-cut it; tick any moment or transcript line below to cut your own.
On October 21st, 2026, Chair Michael Parker called the virtual public hearing of the Boston Conservation Commission to order [0:05]. The Commission noted that a Notice of Intent for proposed waterline replacement and concrete mattresses from Hull to Georges Island was continued to the November 4th, 2026 meeting [1:48]. Applicants presented a Notice of Intent for pavement resurfacing and stormwater improvements at 135 A Street [2:20], and after requesting additional environmental letters and site information [15:03], the Commission voted five-to-zero to continue the hearing [24:32]. The Commission reviewed a Request for Determination of Applicability for removing mooring structures and timber piles at 220 Victory Road [24:38] and voted five-to-zero to issue a positive determination of applicability [29:10]. Finally, the Commission voted five-to-zero to issue a complete certificate of compliance with perpetual maintenance conditions for 870 Saratoga Street [32:40] and reviewed a draft of the 2027 hearing schedule [32:45].
What it means: The Boston Conservation Commission held a virtual public hearing on October 21st, 2026 [0:21]. The commission continued a waterline project application to November 4th, 2026 [1:48], [2:15]. For a pavement resurfacing and stormwater project at 135 A Street, the commission reviewed a proposal from GM2 on behalf of the United States Postal Service [2:28] and voted 5-0 to continue the hearing so the applicant can provide requested drainage, soil contamination, and vehicle turning radius documentation [9:52], [21:02], [24:32]. For a marine mooring and timber pile removal project at 220 Victory Road proposed by Boston Gas Company [24:42], [25:09], the commission voted 5-0 to issue a positive determination of applicability, requiring a full notice of intent filing due to the scope of work [27:40], [28:52], [29:10]. During the regular meeting, the commission voted 5-0 to approve a complete certificate of compliance with perpetual maintenance conditions for 870 Saratoga Street [31:49], [32:40].
Who moved it: The meeting was led by Commission Chair Michael Parker [1:20], alongside commissioners John Sullivan, Amy Laney, Mike Wilson, and Dave Estevez Marziasi [1:38]–[1:46]. Environment Department staff members Elena Idemarie, Didi Hernandez, and Susana Decebal were present [1:25]–[1:31]. Project presentations were made by Brett Neilan of GM2, Christie Filippo of MMT, and Miguel Castellano of the United States Postal Service [2:48]–[2:52], as well as Matt Wasniak of Boston Gas Company [25:23]. The transcript does not name the individual commissioners who introduced the verbal motions to continue the USPS hearing [24:17], issue the positive determination for Boston Gas [28:58], or grant the certificate of compliance [32:28].
What to watch: The continued hearing for the DCR waterline project is scheduled for November 4th, 2026 [1:52]. The USPS applicant will assemble requested site information and plans before returning to the commission [15:03], [21:02], with construction targeted for spring 2027 pending federal funding approval [23:29], [23:38]. Boston Gas Company is expected to file a notice of intent combining its mooring and pile removal plans [28:31], [28:41]. Commission staff will also release the draft 2027 hearing schedule to the public after commissioner review [32:50], [33:42].
Scored, not chosen for you — the salience bar is a measurement, and every moment is a receipt into the transcript below. With JavaScript on, tick moments to compose a reel — and tick moments on other meetings too; a reel can span the record.
→ the publish kit for this meeting — the clips worth cutting and draft copy, for a producer.
Counted, not modeled — each lens is a word list; drift compares the first half to the second.
the same, as a table
| word | mentions |
|---|---|
| commissioner | 25 |
| boston | 22 |
| site | 20 |
| water | 19 |
| number | 19 |
| file | 17 |
| storm | 16 |
| vehicles | 13 |
| catch | 13 |
| parking | 13 |
| facility | 12 |
| basins | 12 |
| good | 11 |
| hearing | 11 |
| commission | 11 |
| elena | 11 |
| great | 9 |
| sullivan | 9 |
| project | 9 |
| believe | 9 |
| aye | 9 |
| dep | 8 |
| vehicle | 8 |
| maintenance | 8 |
| area | 8 |
| property | 8 |
| space | 8 |
| lsp | 8 |
| take | 8 |
| much | 8 |
| wilson | 7 |
| proposed | 7 |
| sure | 7 |
| tell | 7 |
| coming | 7 |
| sump | 7 |
| snow | 7 |
| issue | 7 |
| compliance | 7 |
| conditions | 6 |
| ask | 6 |
| provide | 6 |
| behalf | 6 |
| stormwater | 6 |
| work | 6 |
| existing | 6 |
| left | 6 |
| showing | 6 |
| maybe | 6 |
| letter | 6 |
| structures | 6 |
| construction | 6 |
| wanted | 6 |
| certificate | 6 |
| land | 5 |
| commissioners | 5 |
| postal | 5 |
| service | 5 |
| pavement | 5 |
| miguel | 5 |
“commissioner” came up 25 times. Sized by how often; civic stopwords out. With JavaScript off, a word opens the tape at its first mention.
0:00 Good morning.
0:02 And everybody should be in now.
0:03 Great, thank you. Okay, I'm calling this
0:05 public hearing to order at 6:00 p.m. in
0:08 accordance with the Massachusetts
0:09 Wetlands Protection Act, MGLC 131
0:12 Section 40 in the Boston Wetlands
0:13 Ordinance, Boston City Code Ordinances
0:16 Chapter 7-1.4.
0:18 The Boston Conservation Commission will
0:19 hold a virtual public hearing this
0:21 evening on October 21st, 2026 to review
0:24 the following projects to determine what
0:26 conditions, if any, the Commission will
0:27 impose in order to protect the interest
0:30 of the public and private water supply,
0:31 groundwater, prevention of pollution,
0:33 flood control, prevention of storm
0:35 damage, protection of fisheries and land
0:37 containing shellfish, and protection of
0:39 wildlife habitat. This evening's
0:41 hearings will be followed by our regular
0:42 meeting in accordance with Chapter 107
0:44 of the Acts of 2022, we're conducting
0:46 this meeting online to ensure public
0:48 access to the deliberations of the
0:50 Conservation Commission. The public may
0:51 access this call through telephone and
0:53 video conferencing. And additionally,
0:56 uh the meeting is being recorded. If you
0:58 do not wish to be recorded, please turn
0:59 off your video. Members of the public
1:01 may have an opportunity to ask questions
1:02 and provide public comment on
1:04 applications and discussions. To do so,
1:06 please raise your hand or type in the
1:08 chat in the application via the Zoom
1:09 meeting platform. If you're calling in
1:11 and cannot use the platform, you can
1:12 raise your hand by pressing *9 and *6 to
1:15 unmute yourself or send your questions
1:17 to staff via email at CC@boston.gov.
1:20 Uh for the record, I'm Michael Parker,
1:21 chair of the Commission. Could staff
1:23 please identify themselves?
1:25 Elena Idemarie with the Environment
1:26 Department.
1:28 Didi Hernandez with the Environment
1:29 Department.
1:31 Susana Decebal with the Environment
1:33 Department.
1:34 Great, thank you. I'll call the roll of
1:36 Commissioners present. Commissioner
1:37 Sullivan.
1:38 John Sullivan.
1:39 Commissioner Laney.
1:41 Amy Laney.
1:42 Commissioner Wilson.
1:43 Mike Wilson.
1:44 Commissioner Estevez Marziasi.
1:46 Dave Estevez Marziasi.
1:48 Great, thank you. Okay, first item on
1:49 the agenda tonight has been continued to
1:52 the November 4th, 2026 hearing. That's
1:55 notice of intent for DEP file number
1:57 006-2135
1:58 in Boston file number 2026-032
2:02 from AECOM on behalf of the
2:03 Massachusetts Department of Conservation
2:05 and Recreation for the proposed in-kind
2:07 replacement of a waterline and placement
2:10 of concrete mattresses from Hull to
2:12 Georges Island in Boston Harbor.
2:15 And again, that's been continued to the
2:17 November 4th, 2026 hearing. Second item
2:20 on the agenda, notice of intent for DEP
2:22 file number 006-2149
2:24 in Boston file number 2026-043
2:28 from GM2 on behalf of the United States
2:30 Postal Service for the proposed pavement
2:32 resurfacing and stormwater improvements
2:35 at the Boston Vehicle Maintenance
2:37 Facility located at 135 A Street, South
2:40 Boston Waterfront. The resource area is
2:43 land subject to coastal storm flowage.
2:45 Who's here on behalf of the applicant?
2:48 Good evening. My name is Brett Neilan at
2:50 GM2 Associates. We also have Christie
2:52 Filippo from MMT and Miguel from USPS.
2:56 Great. Floor is yours.
2:59 I appreciate it. Good evening. I I like
3:01 to try and keep this somewhat short.
3:04 This is the 135 A Street facility VMF as
3:08 a shorthand.
3:10 The project in total is a payment
3:12 restoration project. It has been before
3:14 and received order of conditions twice
3:16 before. The latest approval was
3:18 September 2020, which has since lapsed,
3:21 so we are seeking a renewal,
3:23 actually a new application and approval
3:25 technically.
3:27 If we can go to the next slide, I'll
3:28 continue.
3:32 So, these are the vicinity maps and
3:36 a general idea of where the project is
3:37 bounded by.
3:39 It is bounded by Hall Road, Richard
3:41 Street, Medallion Avenue to the west,
3:43 and West Service Road Extension to the
3:45 north. It is
3:48 and actually just the next slide will
3:49 probably be the best one.
3:54 And this is generally why we are
3:56 presenting today. This is the land
3:58 subject to coastal storm flow. This is
4:00 an excerpt from the FEMA
4:02 flood map, which indicates zone AE at
4:06 10. With the conversion, that's roughly
4:08 the city of Boston elevation 16.5.
4:11 In relation to the outside topography,
4:14 which varies between 12.5 to 16.
4:18 Also identified on the project plans
4:20 provided.
4:21 We could jump to the next.
4:27 This is the aerial imagery of the
4:29 facility indicating it is 100%
4:32 impervious with some slight vegetation
4:35 on the perimeters and the boundaries
4:38 between the property lines.
4:40 The site reconnaissance was completed
4:43 with the commission on the 15th of this
4:47 month, October 15th, I believe. A couple
4:50 items to bring up that were identified
4:53 and commented on were tree protection
4:55 really I believe along Medallion Avenue
4:58 is the only trees really in the vicinity
5:00 of the project itself. Um
5:03 Those trees may be protected. The work
5:05 limits are generally bounded by the
5:07 existing asphalt, which is just a
5:09 resurfacing and restoration itself. But
5:13 we will provide notations as recommended
5:16 to ensure those are protected fully.
5:19 Another comment was the green space
5:22 as indicated is 100% impervious area
5:24 today
5:26 and due to the facility itself, which
5:29 I'll indicate on the next slide and the
5:31 operations, we are proposing to maintain
5:34 the 100%.
5:36 And thank you for that.
5:37 So this is again just a snapshot in time
5:40 from Google Maps from 2026, but it shows
5:42 that there are vehicles double parked
5:45 Um,
5:46 on the white those white vans,
5:48 uh, personal vehicles are double parked
5:50 in the image to the left. Um, the
5:53 vehicles in themselves are not
5:55 technically in a spot on the USPS side,
5:58 as well as some personal vehicles
6:00 getting creative. So, the request to
6:03 seek green space is something that the
6:05 USPS cannot accommodate due to facility
6:09 operations.
6:11 We can jump to the next.
6:15 Watch the money you make every
6:16 These are a couple photographs provided,
6:19 um, to support the application itself.
6:21 These are excerpts from the stormwater
6:23 report showing the poor pavement
6:25 conditions,
6:27 um, and the intentions and the need,
6:30 truly, to restore the, uh, the pavement
6:33 throughout the facility.
6:36 And the last slide, I believe.
6:41 Uh, in addition to the pavement
6:44 resurfacing and restructuring that is
6:46 proposed, um, there are also 10
6:48 proprietary stormwater devices proposed,
6:51 uh, both in line in addition to the
6:54 existing system. As shown on the left
6:57 side of the screen is an excerpt from a
7:01 the plans themselves showing that
7:02 there's an in-line, uh, proprietary
7:06 in, uh,
7:07 designed. Uh, the intention here is that
7:10 an LSP has reviewed the project itself
7:13 and that stormwater infiltration would
7:15 be in violation of the regulatory
7:17 standards. So, we have sought the
7:19 stormceptors, uh, throughout the site to
7:22 provide the TSS removal, as well as a
7:25 form of stormwater treatment. Um, the
7:28 contaminated soil and groundwater, uh,
7:31 as noted, exceeds the reportable, uh,
7:34 two standards, so RCW,
7:37 RCGW2
7:39 and RCS2.
7:41 Um, I believe that's
7:43 the conclusion of the presentation and
7:45 I'd like to open it to any Q&A's.
7:48 Okay, good. Thank you. Okay, um, so I
7:51 know we're going to have a lot of
7:52 questions about storm water.
7:54 Um, as far as the um
7:58 uh, why don't you just do set the table
8:00 maybe focus on the um
8:04 uh, ground water uh, improvements you're
8:06 making. I know you're talking about a
8:08 oil water separator, a grit separator.
8:11 Um, just if for like 2 minutes if you
8:13 could go into more detail about what
8:15 improvements you're making to the uh,
8:17 water quality.
8:19 Uh, well, that's generally what we're
8:21 doing. We're providing 10 systems 10 of
8:23 those grit storm water storm separator
8:25 systems themselves uh, throughout the
8:27 facility
8:29 to provide that TSS and uh, sediment
8:32 removal as a form of storm water and
8:34 water quality improvement.
8:36 Okay, so those are in addition to what's
8:38 there now?
8:40 That's correct.
8:41 Okay, is are there any systems there now
8:43 that uh, need to be upgraded or going to
8:45 be upgraded as part of this?
8:48 No, it is purely the conveyance system
8:50 itself and then we are adding in the 10
8:52 proprietary as in line treatment.
8:55 Okay. And um, is there an AUL on the
8:58 property?
8:59 Yes, there is.
9:01 Okay. What what are the contaminants in
9:03 the soil?
9:04 Uh, I don't have that in front of me,
9:06 but I do believe it was provided in the
9:07 storm water report.
9:09 Okay.
9:10 Okay. Elena, what do you have on this?
9:15 Thank you. Uh, we had uh, some of the
9:17 questions that we had were addressed in
9:19 the presentation. Um, so the the
9:21 question of any alternative layouts um,
9:24 to reduce impervious area on site was
9:26 something that we were curious about.
9:28 Um, and we also had question about
9:30 questions about additional opportunities
9:31 for storm water infiltration. Um, but I
9:34 will uh, I to the commission on any
9:36 further information that's needed on
9:38 those two topics.
9:39 Okay.
9:41 Uh and on Q, I think we'll go to
9:43 Commissioner Sullivan. I think he'll
9:44 delve into the stormwater issues here.
9:46 Yeah, my only comments were I I didn't
9:49 see anything documenting the AUL.
9:52 Um I didn't see the LSP letter. I did
9:55 see the you gave the license number of
9:57 the LSP.
9:59 Uh you know, which I confirmed it's it's
10:00 all active and all that, but I didn't
10:02 see his stamped sign letter
10:05 telling us that you cannot take very
10:07 virtually clean rainwater
10:10 and put it on the site and what that
10:12 might do with migration of uh whatever
10:14 contaminated water that was there. And
10:17 it did mention that it exceeded um
10:21 regulatory numbers,
10:23 but I didn't see what the numbers were.
10:25 Um so
10:27 I'm sure he has that. And so the letter
10:29 stamped by that uh LSP
10:32 um would would go forward. Other than
10:35 that, I can't tell what's going on.
10:37 The second thing is I can't tell with
10:38 your catch basins. You look like it
10:40 looks like your catch basins are in-line
10:43 catch basins. In other words, there's
10:45 upstream water that comes into a catch
10:47 basin. I can't tell if your catch basins
10:49 have hoods to slow the water down and
10:52 keep grit in each of the catch basins.
10:55 Besides the fact you've got the storm
10:57 septors. Rather than having the storm
10:59 septors
11:01 work as the uh primary grit separator.
11:04 Uh so your civil engineer
11:07 gives a phone call over the water and
11:08 sewer commission. We can do it over the
11:09 phone really quick. Just show me that in
11:12 fact those catch basins, they look like
11:14 drop inlets basically, manholes that
11:16 have
11:17 uh the ability for the water to drop
11:19 into them, but I don't see that the
11:21 catch basins are doing much catching.
11:23 Now, the storm septors may do some, but
11:26 I'm not sure they're properly placed
11:27 then if they're if it's built that way.
11:29 Do Do
11:31 all that concern?
11:33 Uh uh a bit, yes. We do have hoods
11:36 proposed at the structures. Um
11:39 the concern about the catchment in a a
11:42 form of drop-in that I'll have to look
11:45 at the drawings a little closer to see
11:46 where that can common is coming from.
11:48 Yeah.
11:49 Um but I these proprietary devices are
11:52 right from the manufacturer and really
11:54 the intention is
11:56 the storm flow
11:57 kind of goes linear through, so we can't
12:00 provide it on an angle. So, that's why
12:02 some of them are in line and some of
12:03 them are in addition to
12:05 Right.
12:05 looking at the drawings. Um so, I don't
12:07 know if that's maybe part of the the
12:09 comment itself.
12:11 Yeah, yeah, I can't tell that, you know,
12:13 if you've got deep sump catch basins.
12:14 It's just you've got it looks to me like
12:17 they're basically manholes that that you
12:19 put a grade on top of it, so water can
12:20 get into it rather than a device
12:23 designed, you know, I don't know what
12:25 the invert is of the pipe coming in and
12:27 out of that structure.
12:28 Um somebody may know that, your civil
12:31 may know that, they maybe checked it
12:33 out. You'll know where the hoods are
12:34 going. I couldn't tell where you were
12:35 putting hoods on them, which ones have
12:37 them, which ones don't. I couldn't tell
12:39 where the roof leader from the um
12:41 building is and where that enters it.
12:44 So, that that's you know, you I know you
12:48 it says in the thing you're promising
12:49 you'll do the right thing. Well, we we'd
12:51 like to see the documentation of that
12:53 promise of what's going on. So, an LSP
12:55 letter uh
12:57 uh the
12:58 uh information showing us that there is
13:00 an AUL on the property
13:02 and um
13:03 you know, the storm step the stuff is
13:05 all fine. I looked at that. That's all
13:07 okay. But it's just the existing
13:09 structural um drainage system you have
13:12 proving that those basins have deep
13:14 sumps, or else they're not basins.
13:16 They're simply drop inlets.
13:18 Oh, I apologize, Mr. Sullivan. So,
13:19 you're actually questioning the existing
13:22 structures themselves, not the proposed.
13:24 Okay.
13:24 That's right. No, you you proposed are
13:26 all fine.
13:27 Okay.
13:27 That's all that's all good.
13:28 We we did open those. uh I can provide
13:30 additional photographs
13:32 as supplemental, but I believe they were
13:34 catch basins, not just drop inlets.
13:36 Yeah, I mean sure you have that
13:38 information somewhere. I'm looking
13:40 forward to the right.
13:41 I could add all the inverts and the sump
13:43 elevations are shown on the existing
13:45 catch basins on the grading and drainage
13:48 plan.
13:50 So the inverts are showing their pipe
13:52 inverts or their
13:53 the invert of the sump, bottom of the
13:55 sump.
13:55 No, it is the pipe inverts.
13:58 In and out orientation.
14:01 And sump elevation of the structure.
14:04 Okay, but you know the the plans I have
14:06 on my iPad, you you've got to be
14:09 Superman with x-ray vision to see what
14:11 what those numbers are. Because when I
14:13 blow it up, I can't read it. It's all
14:14 muddy.
14:15 Yeah, thanks for jumping in there,
14:17 Chris. Looking at the existing
14:18 conditions, that is something that
14:20 survey did catch. So they do have catch
14:22 basin rims.
14:23 It then it documents the invert for say
14:26 the 15-in RCP that I'm looking at, and
14:28 then it documents the sump. So the sump
14:31 here is at least 3 ft, 3 and 1/2 ft
14:34 below the invert on the one example I'm
14:36 looking at.
14:37 So maybe I can get some cleaner
14:40 plans.
14:42 Can you get those over to Elena and she
14:44 can forward them over to me?
14:45 Yeah, I think we could maybe just give
14:47 you like blow ups and
14:49 of those areas.
14:51 Yeah, no, that'd be fine. And then if we
14:52 could show where the the roof
14:54 is is coming in from the building.
14:58 We can document that.
14:59 Yeah.
15:00 And then the LSP letter and the AUL.
15:03 I just need all that.
15:04 Okay.
15:06 Okay, good. Thank you. So Brett, you've
15:09 got some homework there.
15:11 Um
15:12 and I'm especially interested in the LSP
15:14 letter.
15:16 Um Commissioner Linette?
15:19 Yeah, can you just uh a little bit about
15:21 the snow management um of the site. I'm
15:24 assuming that
15:25 um Elena, correct me if I'm wrong,
15:27 there'll be a requirement for a a snow
15:29 management plan submission.
15:31 Uh yes, that would be one of the prior
15:33 to construction items. And then that
15:34 snow management plan would also be a
15:35 perpetual maintenance condition.
15:40 Uh thank you. Um
15:42 Kristen, Miguel, would you like to take
15:44 this on for what the facility currently
15:46 does for snow management?
15:48 This is a
15:50 full site. They do not stockpile site uh
15:52 stockpile snow on this site. They do not
15:54 have the room to stockpile snow, so they
15:57 um have a
16:00 national contractor annually on this
16:02 site that's responsible for this
16:04 property as well as um
16:06 the uh
16:07 property just to the north of it, which
16:09 is their employee parking lot.
16:11 And um
16:13 this particular site um
16:16 all snow is uh
16:18 uh collected and hauled away.
16:23 Great. And then do they use a a deicer
16:26 or
16:28 They do not use a deicer at this site,
16:29 no.
16:31 Okay. Great. Thank you.
16:33 Thank you. Commissioner Wilson.
16:37 Uh yeah, no further questions.
16:38 Appreciate my fellow commissioners
16:40 asking this. Okay.
16:41 Sure. Commissioner Assis Marjazi.
16:43 What I was having some difficulty
16:46 understanding, given the large amounts
16:48 of circulation space, why it wasn't
16:51 possible to rearrange the parking and
16:56 remove some of the impervious
16:58 surface. If if you wanted to go back to
17:01 a couple of those sketches where you
17:03 were showing it,
17:05 um and maybe talk a little bit about why
17:07 there's so much circulation space.
17:11 Just seemed like the the given the
17:12 amount of spots, space on the the land,
17:16 that a good parking lot designer ought
17:18 to be able to
17:20 make some some edges that are available
17:23 for him for pervious. Go back one more.
17:28 So, on some of these I'm looking like
17:30 the the one on the left seems like
17:32 there's an enormous amount of
17:34 space down the middle that's not
17:37 needed for circuit really needed for
17:39 circulation.
17:41 So, correct me if I'm misunderstanding
17:43 how the the space is used.
17:47 Uh I'll take a shot at this and then
17:49 Miguel and Chris if you want to jump in,
17:50 but the large consideration is the
17:53 turning radius of these vehicles
17:55 and kind of the irregular uh orientation
17:58 of the parking lot where there is an
17:59 angle or towards the top of the screen.
18:01 So, a vehicle coming in from Medallion
18:03 Avenue and coming down and circling over
18:06 um
18:08 and you can see that everything is
18:09 backed in. Um so, with those vehicles
18:12 having to back into these stalls with a
18:14 lot of operation ongoing at the same
18:16 time, it gets very congested.
18:19 Um so, there's not necessarily an
18:21 opportunity to pinch in this parking lot
18:24 within without hindering some of the
18:26 operation.
18:30 [laughter]
18:31 I'm having a hard time with that. I'm
18:33 even just looking at the sort of
18:35 uh map north section which is much
18:37 smaller than the map south south
18:40 section.
18:41 Um
18:42 It doesn't feel like anybody was being
18:44 creative here.
18:45 I can tell you that the Postal Service
18:48 has investigated and has laid out the
18:51 parking in this site um
18:54 in probably 10 years ago they re-laid
18:57 out all of this.
18:59 Mhm.
18:59 And the parking that you see is the
19:02 maximized parking that they can get on
19:04 this property.
19:06 Any
19:07 pinching of the uh truck parking area to
19:11 on the left image
19:13 would result in a reduction in parking
19:15 and they maximize every bit of
19:17 impervious area here on the site
19:20 for uh
19:21 vehicle storage.
19:26 I I guess we'll have to take you at
19:28 their at the post office's word on that,
19:30 but it
19:31 There's There's two operations at this
19:33 site. The The south end of the site,
19:35 which is your left image, is uh postal
19:38 delivery vehicles and this is their
19:40 parking storage area for them.
19:43 Mhm.
19:43 Image on the right is the vehicle
19:46 maintenance facility on the north end of
19:48 the property and it is surrounded by
19:51 employee vehicles for the vehicle
19:54 maintenance facility and storage of
19:56 in-service vehicles that the vehicle
19:59 maintenance facility is servicing.
20:01 That's why you see the double-loaded
20:03 parking condition.
20:04 Yeah, I I I I got the the image on that
20:06 side looked like it was more efficiently
20:08 laid out. The one on the the left seemed
20:11 like it was there was opportunities
20:13 there, but
20:15 Yeah, no it
20:16 Well, you know, speaking to what Brett
20:18 said about the uh the turning radius the
20:21 of these vehicles, any
20:24 any uh narrowing of the circulation
20:28 space
20:29 would
20:30 uh result in a loss of uh
20:32 vehicle spaces and the postal service,
20:36 again, wanted to be able to get more
20:38 vehicles on this lot than they could and
20:40 and they did maximize this to the
20:42 greatest extent possible.
20:45 Okay. Why don't we do this? Um we're
20:48 we're going to uh likely be continuing
20:50 this because we need to see the um
20:52 MCP information regarding the AUL, the
20:55 um LSP. Commissioner Sullivan asked for
20:58 some other information. Um so, if you
21:02 could just put together a could be a
21:04 sketch plan showing the vehicle radius
21:07 uh turns
21:09 uh that we can verify that next hearing.
21:13 That'd be great.
21:14 Okay.
21:16 Great.
21:17 Is that it for you?
21:19 Yes. Thank you.
21:21 Thank you. Okay, Elena, did we get
21:23 anyone from the public raise their hand?
21:25 I'm not seeing any hands and we did not
21:29 receive anything in our inbox or the
21:32 Oh, apologies.
21:34 There is
21:35 a question in the chat and Emily, I
21:37 don't know if you want to come off of
21:40 mute to ask this question or if I can
21:42 read it into the record.
21:48 Great.
21:49 So, the question is
21:51 thank you for your presentation. I'm
21:52 hoping you can speak briefly on the
21:54 funding source permitting timeline and
21:56 community benefits.
21:57 Okay.
21:58 I hate to say this. This is not within
22:01 our jurisdiction. So,
22:04 it can it you know, up to the applicant
22:06 if they want to talk about this, but
22:09 we're focused on the wetlands resource
22:11 areas not necessarily the community
22:12 benefits and funding and um
22:15 the timeline
22:17 for construction is a fair question to
22:20 ask at this hearing.
22:21 What's the timeline for construction?
22:25 Next spring.
22:28 And how long?
22:30 We're expecting them to do this in
22:33 multiple phases due to the 24-hour
22:36 operation of this site. And so, this is
22:39 going to take somewhere in the range of
22:41 4 to 6 months to complete.
22:43 Okay.
22:44 And also,
22:47 I think we'd appreciate it if you could
22:50 contact Emily or
22:52 respond to her in the chat regarding her
22:54 questions, but
22:56 it's not part of our hearing.
22:58 Yeah, and I'll defer to Miguel
23:00 Castellano from the United States Postal
23:02 Service
23:03 regarding that question.
23:04 Okay, Miguel.
23:07 Can you hear me?
23:08 Yes.
23:09 Okay, as regarding the fundings, all all
23:12 fundings are being
23:14 federal fundings. So, right now the
23:18 project has no funding assigned it. So,
23:21 I'm
23:22 requesting the construction funds to our
23:26 internal committee. So,
23:29 I hope to get those funds approved by
23:31 the end of the year.
23:33 Okay, thank [clears throat] you.
23:35 That will be able to start this project
23:38 at the spring, next spring 2027.
23:42 Okay.
23:43 Okay, Elena, anyone else?
23:47 Yes, I did want to flag just in case, I
23:50 don't know that this comment is it
23:52 wasn't specifically directed to the
23:54 filing, but it was from a resident
23:57 asking about the lights and the glare
24:00 from the lights to adjacent properties.
24:02 Again, I think that this may fall
24:04 outside of ConCom jurisdiction, but what
24:07 I can do is connect the resident with
24:10 the project team.
24:11 Okay, thank you.
24:13 Okay, so with that, I would entertain a
24:15 motion to continue the hearing.
24:17 So moved.
24:19 Do we have a second?
24:21 Second.
24:22 Thank you, Commissioner Sullivan.
24:24 Aye.
24:24 Commissioner Lanney.
24:26 Aye.
24:27 Commissioner Wilson.
24:29 Aye.
24:29 Commissioner Assesmardziazi.
24:31 Aye.
24:32 And I vote aye. It carries five nothing.
24:34 Okay, thank you.
24:35 Appreciate it, thank you.
24:36 Sure. Okay, next item on the agenda,
24:38 request for a determination of
24:40 applicability from LEC Environmental
24:42 Consultants Inc. on behalf of the Boston
24:43 Gas Company for the removal of three
24:46 deteriorating marine mooring structures
24:48 and 40 timber piles. Actually, Elena, I
24:51 think we're up to 124 or something like
24:54 that.
24:55 This point?
24:56 I believe so, yeah. And that be a
24:57 clarifying question is whether the 80
24:59 was the total number. I believe it was
25:01 the um 80 plus in addition to the uh
25:03 ones related to the docks themselves.
25:05 Okay. We'll ask about that. Uh and this
25:07 is located at the Boston Gas Company
25:09 Commercial Point LNG facility located at
25:11 220 Victory Road in Dorchester. Um
25:14 okay, who's here on behalf of the
25:16 applicant? And before you get into the
25:18 presentation, I want to ask you a few
25:19 questions.
25:22 Uh good evening. My name is Matt
25:23 Wasniak. I'm an environmental engineer
25:25 with Boston Gas Company.
25:27 Okay. So, um this this feels like this
25:31 is much larger than any RDA uh that we
25:35 have approved as far as the scope of the
25:37 work here.
25:38 Uh and so, first question is uh 40
25:41 timber piles and three structures using
25:43 barge and a crane
25:45 uh
25:46 was enough of a flag. Um how many timber
25:49 piles are you proposing to remove?
25:52 So,
25:53 originally we started out there's three
25:56 dilapidated mooring structures that pose
25:59 a a public safety risk and we wanted to
26:03 have them removed. So, we had an
26:05 engineer come out and do an assessment
26:08 and they're in critical condition. While
26:10 we were out there at low tide, we saw
26:12 some additional historical wharf piers
26:16 in the 40 to 60 range. Um those are from
26:20 the 19
26:22 eight or sorry, 1800s
26:24 and we thought it would make sense while
26:26 we were mobilized to the site to just
26:29 clean up all those historic uh timbers
26:32 and get them out of the way.
26:33 Um but I if that poses
26:37 uh some concerns for the commission, you
26:40 know, we our our main objective was
26:43 these three mooring structures that are
26:45 dilapidated that we want to get removed
26:48 um from our property.
26:50 Yeah, I mean, even that uh you're going
26:52 to be using a barge uh and a crane,
26:54 correct?
26:56 That is correct, yeah. Uh 2 years ago we
26:58 had a structure
27:01 not unlike these, a little bit smaller,
27:03 but it fell into the water.
27:05 And we went through the emergency
27:07 certification process with Elena.
27:10 Yeah, different situation though. Yeah,
27:12 I get it.
27:12 Yes, understood. So, that's that's why
27:14 we filed the RDA this time.
27:16 Okay.
27:17 You know, we we did that safely and and
27:19 quickly and we're hoping to do the same
27:21 thing for this.
27:22 Yeah, understand. Uh and again, this is
27:24 this is just a lot of work for an RDA.
27:26 We don't typically see this.
27:28 Um
27:28 uh so, um
27:30 just to save you the time here, I'm
27:32 going to um just quickly go around to
27:34 the commissioners and ask them uh for a
27:36 quick um
27:37 their quick reaction. Uh my reaction to
27:40 this is to issue a negative determinate
27:42 I mean a positive determination of
27:44 applicability. Uh we've all reviewed the
27:46 files here uh just because there's so
27:48 much work
27:49 uh and again, you're using a barge. So,
27:51 um Commissioner Sullivan, quick thoughts
27:53 on this?
27:54 I think we can go positive if it's not
27:57 like an emergency that's going to be
27:58 done immediately. Uh we can move this
28:00 right along.
28:01 Yeah.
28:02 For the positive.
28:03 Yeah.
28:03 Okay.
28:04 Um Commissioner Lenay?
28:06 I had the same uh thought when I was
28:08 reviewing it as well.
28:10 Okay. Commis- Commissioner Wilson?
28:12 Same here. Thanks.
28:14 Yep. Commissioner Assesmardjazi?
28:16 I I could go either way, but I I I'd
28:19 lean towards saying positive
28:20 determination. Yes.
28:22 Okay.
28:23 Okay. Um
28:25 yeah, I think I think we have the answer
28:26 here. Uh and I understand that uh you
28:29 anticipated that an NOI might be uh in
28:31 the works here. So, um and I think it um
28:35 uh it would be efficient and to
28:37 everyone's benefit if you included in
28:39 the NOI uh the other work that you
28:41 wanted to do um as opposed to splitting
28:44 it up here.
28:46 Okay. Thank you very much for your time.
28:49 Sure. Okay, so I'm going to take a quick
28:51 vote here.
28:52 So I'd entertain a motion to issue a
28:54 positive determination of applicability.
28:58 So moved.
28:59 Do you have a second?
29:00 Second.
29:01 Okay, Commissioner Sullivan.
29:02 Hi.
29:03 Commissioner Laney.
29:04 Hi.
29:05 Commissioner Wilson.
29:06 Hi.
29:07 Commissioner Estes Marjiaz.
29:09 Hi.
29:10 And I vote I. That carries five nothing.
29:12 Okay, thank you.
29:16 Thank you. Have a good night.
29:17 Yep.
29:18 Okay, well now we'll begin our regular
29:20 meeting.
29:21 And so Elena, looks like we have
29:24 certificates of compliance.
29:27 What do we have that's active? It's just
29:29 Brandywine, right?
29:30 It is. It's just the last one on the
29:31 list.
29:32 Okay.
29:33 So I'll just quickly call out
29:37 these are all been continued. So request
29:39 for a certificate of compliance for
29:41 Boston file number 2024-008,
29:44 certificate of compliance for DEP file
29:46 number 0061762
29:48 and Boston file number 2021-003,
29:51 DEP file number 0061963
29:54 and Boston file number 2023-053,
29:57 DEP file number 006
30:00 11816
30:02 and Boston file number 2021-042,
30:06 and DEP file number 0061830
30:09 and Boston file number 2021-054
30:13 are not ready to be issued so they'll be
30:15 continued. What we have in for
30:17 consideration tonight is request for a
30:19 certificate of compliance for DEP file
30:21 number 006 2044 and Boston file number
30:24 2025-016
30:26 from Nitsch Engineering on behalf of
30:27 Brandywine Village Company Limited
30:29 Partnership for the construction of a
30:31 new trash and recycling area including
30:33 the installation of asphalt pavement,
30:34 concrete pads and bollards, an
30:36 underground conduit and hand hole, and a
30:39 storm water management system at 870
30:41 Saratoga Street in East Boston, resource
30:43 area land subject to coastal storm
30:45 flowage. Elena,
30:47 how's this looking?
30:48 [laughter]
30:49 So, unlike the rest of them, we we
30:51 believe that we have everything needed
30:53 to recommend that the commission issue a
30:56 complete certificate of compliance. We
30:58 conducted a site visit on October 15th,
31:01 and the site has also been inspected and
31:03 signed off on by Boston Water and Sewer
31:04 Commission.
31:06 There was also a collaboration with Tree
31:08 Eastie. Tree Eastie provided some trees
31:10 that have been planted and now the
31:13 the maintenance team at the community is
31:15 going to be
31:17 taking care of those and they've been
31:18 watering them since they've been
31:19 planted. Things are looking good. There
31:21 haven't been any flooding issues since
31:23 the construction of the parking lot, so
31:25 it seems to have addressed the issues
31:26 that were there before. And then
31:29 there were the one discrepancy is that
31:31 there were originally two bollards on
31:32 the plans and instead there were three
31:34 to protect the equipment from any
31:36 passing vehicles or you know, vehicles
31:38 coming by to either collect trash or
31:40 drop it off. That being said, it doesn't
31:42 change the permeability on the site, so
31:44 we don't see that as an issue. We're
31:47 happy to answer any questions, but we we
31:49 do recommend that the commission issue a
31:51 complete certificate of compliance with
31:53 perpetual maintenance conditions 59, 66,
31:57 76, and 83.
32:00 Okay, thank you. Any questions from any
32:03 commissioners?
32:06 Nope.
32:07 Sounds like none. So,
32:10 I entertain a motion to issue a
32:12 certificate of
32:14 compliance for DEP file number 0062044
32:17 and Boston file number 2025-
32:20 [snorts]
32:20 016 with retaining the perpetual
32:24 maintenance conditions 59, 66, 76, and
32:26 83.
32:28 So moved.
32:29 Do we have a second?
32:30 Second.
32:31 Thank you. Commissioner Sullivan?
32:33 Aye.
32:34 Commissioner Lenae?
32:35 Aye.
32:35 Commissioner Wilson?
32:37 Aye.
32:38 Commissioner Assesmargezi?
32:39 Aye.
32:40 Hi. Vote uh that carries five nothing.
32:42 Okay, next uh administrative updates.
32:45 Elena, do you have anything?
32:46 Uh yes. So, as we reach the end of the
32:48 calendar year, uh we have drafted our
32:50 2027 uh schedule of hearing dates.
32:54 Uh we have added it to the drive folder
32:56 for the commission's review. Of course,
32:58 these dates are subject to change. Um
33:00 but, if uh the commissioners have time
33:02 to take a look at them in the coming
33:04 week or so, let us know if anything
33:05 stands out as a glaring issue. Uh we've
33:08 taken into account uh
33:10 most holidays uh that are that are
33:12 recognized, and then uh we have also
33:15 adjusted slightly if there are some days
33:16 that we're expecting people to be out um
33:19 around those holidays. There are a few
33:21 months that have a strange uh or not a
33:24 straight Well, yeah, I guess a strange
33:25 distribution of hearings, but again,
33:27 that's uh on those months where we have
33:29 five Wednesdays. So, we're still keeping
33:31 to uh two hearings per month.
33:35 Okay. We'll take a look at it. Thank
33:36 you.
33:37 Thanks so much. And then, um assuming
33:39 that there aren't any major issues with
33:40 it, uh we're planning on sending it out
33:42 to the people in our newsletter uh in
33:45 about a week and a half, and then we'll
33:46 also be publishing it on our website.
33:49 Fantastic. Thank you.
33:51 Um okay, uh there are no meeting
33:53 minutes, uh I hear.
33:55 There are not.
33:56 I think we broke the system with the
33:58 last hearing.
33:59 Um okay. So, with that, I think we're
34:02 finished here tonight. Anybody object to
34:04 uh
34:04 Mr.
34:05 Mr. Chair, I would request that all
34:07 future meetings you sit inside a car
34:09 with a suit on.
34:11 [laughter]
34:11 Thank you. Appreciate that. I'm actually
34:14 I'm actually going to go to a ZBA
34:16 hearing in a neighboring municipality,
34:18 and I'm sure I'm going to get um
34:20 uh beat up, uh and you'd all You'll all
34:22 love to hear that.
34:23 Yeah, no, you don't You don't have to go
34:25 to any meetings. I just want you to be
34:26 sitting in a car with a suit. That's
34:28 all.
34:28 I just wanted to give you process. I
34:30 just wanted to give you some added
34:31 pleasure. Okay, thank you. Everybody
34:34 have a good day. Night.
34:36 Thanks so much.
34:38 I guess.
AI-touched surfaces are labeled; verify against the official record. The tape is embedded from YouTube, never rehosted.