BPDA Board of Directors Meeting 10-15-26 2026-10-15 [2:34] Good afternoon. My name is Priscilla [2:36] Roas and I am the chair of the BPDA [2:38] board. Thank you for joining the October [2:40] 15, 2026 Economic Development and [2:42] Industrial Corporation of Boston board [2:44] meeting. At this time, the Boston [2:45] Planning and Development Agency is [2:47] hosting public meetings in a hybrid [2:48] setting for the health, safety, and [2:50] accessibility of Boston residents. [2:52] Hybrid means that our board meetings are [2:53] conducted in person at city hall, in our [2:56] boardroom, on the 9th floor, and [2:58] virtually via Zoom in Boston City TV. [3:00] For more information and updates, visit [3:02] bostonplans.org. [3:04] The open public meeting law requires [3:06] that I notify the public that this [3:08] meeting is being recorded. Please be [3:10] aware that an audio and visual recording [3:11] of this meeting is being made and [3:13] broadcast by Boston City TV, which is a [3:15] part of the City of Boston Office of [3:17] Cable Communications at Exfinity channel [3:19] 26, RCN channel 13, and Verizon Fios [3:22] channel 962. It is also being livereamed [3:25] at uh boston.govcable. [3:27] Now, if there's anyone in the audience [3:28] who's recording this meeting, I ask that [3:30] you please identify yourself now. [3:33] Hi. Will you please just identify [3:35] yourself? [3:37] Perfect. Thank you. Anyone else? Okay. [3:41] So, with that, we're going to start the [3:43] meeting with the roll call. Uh, Miss [3:45] Jacqu, [3:46] Miss Bennett, [3:47] present, [3:47] Mr. Shepard, [3:48] present. [3:49] Mr. Omali [3:49] here. [3:50] And I am present. [3:53] Item number one, request authorization [3:55] for the approval of the minutes of the [3:56] September 17th, 2026 board meeting. A [3:59] motion is in order. [4:00] So move. [4:01] Second. [4:02] All those in favor? I opposed. The eyes [4:05] have it. [4:06] Item number two, request authorization [4:08] to enter into a license agreement with [4:10] Topologic Technologies Incorporated for [4:12] storage cage 701A in Suite 701 at 12 [4:17] Channel Street in the Raymond Elf Flynn [4:18] Marine Park for a period of 10 months [4:20] commencing on October 1st, 2026 and [4:23] ending on July 31st, 2027 with one [4:26] 5-year option term. Moren. [4:29] Thank you, Madam Chair, members of the [4:30] board. Uh my name is Moreno Flarity and [4:33] I'm part of the leasing department [4:34] within the planning department. Um sweet [4:37] 70 sweet 7012 channel street is a vacant [4:41] and very raw condition suite. [4:43] Significant investment will be required [4:45] to bring it to marketable and usable [4:47] condition. Staff believe that the most [4:49] cost-effective way to utilize suite 701 [4:52] as well as to address increasing demand [4:54] for storage space within 12 channel [4:56] street is to create individual storage [4:58] units within the suite. Subsequently, [5:01] the BPDA built out a system of chain [5:03] link storage cages. Toba Logic has been [5:05] attended at 12 Channel Street since [5:07] August 2022. The existing lease is [5:10] scheduled to expire on July 31st, 2027 [5:14] with one 5-year option to extend. [5:16] Topologic has requested to license [5:18] storage cage 701A, which consists of [5:22] approximately 237 square ft. [5:26] The 10-month term shall commence on [5:27] October 1st, 2026 and expire on July 20 [5:31] July 31st, 2027 with one 5-year option [5:35] term to extend co-terminus with the um [5:39] lease for their sweet 805. The rent for [5:42] October shall be waved as an incentive [5:44] to license the cage and rent will [5:46] commence on November 1st, 2026. The [5:49] monthly license fee for sweet for cage [5:51] 701A shall be $395 or $3,555 [5:56] over the term. Staff is recommending [5:58] that the director be authorized to enter [6:00] into a license agreement between BPDA [6:03] and Topologic Technologies storage cage [6:06] 701A. Thank you and I'm happy to answer [6:08] any questions. [6:09] Thank you. Uh do we have any questions [6:10] or comments from the board? [6:12] Okay, hearing and seeing none, a motion [6:14] is in order. [6:15] So moved. [6:16] Second. [6:16] All those in favor? I opposed. The eyes [6:19] have it. Motion passes. Um item number [6:22] three, request authorization to enter [6:24] into a license agreement with the Boston [6:25] Balloon and Confetti Company for storage [6:28] cage 701c in suite 701 at 12 channel [6:33] Street in the Rayman Alflyn Marine Park [6:35] for a period of 15 months commencing on [6:37] October 1st, 2026 and ending December [6:39] 31st, 2027 with two single-year option [6:42] terms. Morin, [6:44] thank you. Um, similar to the last [6:47] presentation, uh, this will be regarding [6:49] the cage at 12 Channel Street. Boston [6:51] Balloon has been a tenant since January [6:53] 1, 2025 with the three-year lease [6:56] expiring on December 31st, 2027 with two [6:59] single-year option terms. Boston Balloon [7:02] has requested to license Storage Cage [7:04] 701C, which consists of approximately [7:07] 360 square feet. The 15-month term shall [7:10] commence on October 1st, 2026 and expire [7:13] on December 31st, 2027 and shall be [7:16] co-terminous with the lease for sweet [7:18] 504. [7:19] The two additional single year option [7:21] terms. The rent for October shall be [7:24] waved as an incentive to license the [7:25] cage and rent shall commence on November [7:27] 1, 2026. The monthly license fee for [7:30] cage 701c shall be $550 [7:34] or $7,700 [7:36] over the term of the license. Staff is [7:38] recommending that the director be [7:39] authorized to enter into license [7:41] agreement between BPDA and Boston [7:43] Balloon and the Confetti Company for [7:45] storage cage 701C. [7:48] Thank you. And I'm happy to answer any [7:50] questions. [7:50] Great. Thank you. Any questions or [7:52] comments from the board? Okay. Hearing [7:54] and seeing none, a motion is in order. [7:56] So moved. [7:56] Second. [7:57] All those in favor? I opposed. The eyes [8:00] have it. Motion passes. Thanks. [8:01] Thank you. Item number four, request [8:04] authorization to extend the tenative [8:05] designation status of the Cronin Group [8:07] LLC for the long-term lease and [8:09] redevelopment of 24 Dryd do Avenue [8:12] within the Raymond L. Flynn Marine Park [8:13] and to continue lease negotiations for [8:16] the long-term lease and redevelopment of [8:18] the site for a period of 6 months until [8:20] April 30th, 2027. Stephanie, [8:23] thank you, Madam Chair and members of [8:25] the board. 24 Dryd do located at 24 to [8:28] 26 dry dock Avenue and also known as [8:30] parcel L1 is an approximately 32,000 [8:32] square foot parcel of land with an [8:34] existing three-story building to be [8:36] demolished as part of the proposed [8:37] redevelopment project. This site [8:39] directly abuts dry dock number three, [8:41] the only major dry dock facility in New [8:43] England capable of handling large [8:45] vessels such as military cargo ships and [8:47] cruise vessels. Boston ship repairs work [8:49] at the dry dock provides vessel [8:51] maintenance, repair, overhaul, and [8:52] conversion services for domestic, [8:54] international, and government customers [8:56] and is essential to the mission of EDIC [8:58] and the Raymond Elin Marine Park as well [9:00] as the maritime economy of New England. [9:02] It's estimated that BSR accounts for 100 [9:04] jobs within its leaseold area as well as [9:06] 500 indirect jobs. Following a public [9:09] RFP process for the disposition of the [9:11] 24 dry dock site, the board voted to [9:13] award tenative designation to Cronin in [9:15] January 2020. During their due diligence [9:18] period, North Atlantic Ship Repair LLC, [9:20] a subsidiary of Cronin, purchased Boston [9:23] Ship Repair. This acquisition offered [9:25] the opportunity to expand the proposed [9:27] development in both size and alignment [9:29] with the adjacent dry dock number three [9:31] operations. Both the initial and [9:33] expanded development proposals align [9:35] with the uses identified in the Raymond [9:37] Flynn Marine Park master plan, as well [9:39] as the goal of cultivating and growing [9:41] this marine industrial use. [9:42] Additionally, the team received board [9:44] approval for the expanded building [9:45] proposal in October 2022. Since then, [9:48] the team has sought a pathway to [9:50] financing the proposed project, but like [9:52] many others, has faced headwinds, [9:54] including historically high construction [9:55] costs, a challenging capital market, and [9:57] the cooling life sciences market. For [10:00] this and other reasons, Cronin has [10:01] shifted its approach from seeking a life [10:03] science or related technology tenant to [10:05] exploring the potential for a maritime [10:06] focused third party to invest and [10:08] enhance existing operations at dry dock. [10:11] Number three, a not yet public investor [10:13] has been identified, and while the [10:15] contemplated agreement could be [10:16] finalized as soon as early next year, it [10:19] will require significant negotiation and [10:20] due diligence, hence our request for a [10:22] six-month extension of Cronin's tenative [10:24] designation. Lastly, it's important to [10:26] note that the contemplated investment [10:28] would modernize the facility and certify [10:30] the dry dock for Navy ship repair. Such [10:32] an investment would increase the [10:34] utilization, workforce training [10:35] capacity, and long-term viability of [10:37] this century old site of ship repair [10:40] while supporting up to 1,000 skilled [10:41] industrial jobs. The proposed operator [10:44] strategic fit and vision for the site [10:46] leverages the site's unique attributes, [10:47] including waterfront access, defense and [10:49] maritime connections, heavy industrial [10:52] infrastructure, and proximity to it [10:53] academic ecosystems in Boston. [10:56] Furthermore, it would reinforce maritime [10:57] industrial uses historically cited and [11:00] protected in this designated port area. [11:02] Thank you. And I'm happy to answer any [11:03] questions. [11:04] Great. Thank you. Uh any questions or [11:06] comments from the board? Okay. Hearing [11:09] and seeing none, a motion is in order. [11:10] So moved. [11:11] Second. [11:12] All those in favor? I [11:14] opposed. The eyes have it. Thanks, [11:16] Stephanie. [11:17] Uh item number five, personnel Mike. [11:21] Thank you, Madam Chair, members of the [11:23] board, and Director Shen. We have one [11:25] item for your consideration on the uh [11:27] EDIC [11:29] um agenda with the exact details [11:31] included in the board memos. Uh we have [11:34] one policy and procedure and the office [11:36] of general counsel appointing an acting [11:39] general counsel for conflict of interest [11:41] and signatory power in the absence of [11:44] general counsel. [11:45] Thank you. [11:46] Thank you. Um any questions or comments [11:48] from the board? Hearing and seeing none. [11:50] A motion is in order. [11:51] So moved. [11:52] Second. [11:53] All those in favor? I [11:54] I [11:55] opposed. The eyes have it. Motion [11:57] passes. Thanks, Mike. And I now need a [11:59] motion to adjourn this meeting. [12:01] So moved. [12:02] Second. [12:02] All those in favor. I [12:04] opposed. The eyes have it. EDIC meeting [12:06] is adjourned. [12:08] Okay. We'll start the next portion. [12:10] Thank you for joining the October 15th, [12:12] 2026 Boston Redevelopment Authority [12:14] Board Meeting. At this time, the Boston [12:16] Planning and Development Agency is [12:18] hosting a public meetings in a hybrid [12:20] setting for the health, safety, and [12:21] accessibility of Boston residents. [12:23] Hybrid means that our board meetings are [12:25] conducted in person at city hall in our [12:27] boardroom on the 9th floor and virtually [12:29] via Zoom in Boston City TV at the same [12:31] time. For more information and updates, [12:34] please visit bostonplans.org. [12:37] The open public meeting law requires [12:39] that I notify the public that this [12:40] meeting is being recorded. Please be [12:42] aware that an audio and visual recording [12:43] of this meeting is being made and [12:45] broadcast by Boston City TV, which is a [12:47] part of the City of Boston Office of [12:48] Cable Communications at Exfinity channel [12:50] 26 or CN channel 13 and Verizon Files [12:53] channel 962. It is also being livereamed [12:56] at boston.gov/cable. [12:58] Uh if there's anyone in the audience [13:00] who's recording this meeting, please [13:01] kindly identify yourself now. [13:04] McDonald. [13:06] Perfect. Thank you, Matt. Um, okay. So, [13:10] um, and we also ask that demonstrations [13:12] of approval or disapproval from members [13:14] of the public are not permitted during [13:15] the meeting. So, we're starting the [13:17] meeting with a roll call. Miss Jock, [13:19] present. [13:20] Uh, Miss Bennett, [13:21] present. [13:21] Mr. Shepard, [13:22] present. [13:23] Mr. Ali, [13:23] here. [13:24] And I am present. [13:26] Item number one, request authorization [13:28] for the approval of the minutes of [13:30] September 17th, 2026 board meeting. A [13:32] motion is in order. [13:33] So moved. [13:34] Second. [13:34] All those in favor? I [13:36] opposed. The eyes have it. Motion [13:38] passes. [13:40] Um, okay. Item number two, request [13:43] authorization to schedule a public [13:45] hearing pursuant to sections 80- or [13:47] 80A-2 and ADC-5.4 [13:50] of the zoning code to be held on [13:53] November 12th, 2026 at 5:30 p.m. or at [13:56] such a date and time deemed appropriate [13:58] by the director to consider the first [14:00] amendment to the plan development. [14:03] No. First amendment to the development [14:04] plan for plan development area number [14:06] 48, East Boston Airport Hotel in the [14:09] East Boston neighborhood. It's a [14:11] scheduling request. So a motion is in [14:12] order. [14:13] So moved. [14:13] Second. [14:14] All those in favor? I opposed. The eyes [14:16] have it. Item number three, request [14:18] authorization to extend the license [14:20] agreement with the city of Boston [14:21] property management department for use [14:23] of the parcel located at 559 Columbia [14:26] Road in the Dorchester neighborhood to [14:28] support events and building repairs at [14:30] the Strand Theater until December 31st, [14:33] 2028. Samantha. [14:35] Good afternoon, Madam Chair, members of [14:36] the board. I'm here to request approval [14:38] to enter a license with the city of [14:39] Boston acting by and through its [14:41] property management department for the [14:43] use of the Boston Boston Redevelopment [14:45] Authority owned parcel located at 559 [14:47] Columbia Road to manage employee and [14:49] contractor parking and Strand the [14:51] loading dock access. The Strand Theater [14:53] is a venue for diverse range of [14:54] performing arts, cultural cultural [14:57] programming and community events. Its [14:58] mission is to engage multicultural [15:00] residents of greater Boston and to [15:02] strengthen the foundations of the [15:03] neighborhood. Located at 543 Columbia [15:06] Road, the Strand Theater is owned by the [15:07] city of Boston and managed by the [15:08] mayor's office of arts and culture. The [15:11] Strand Theater must use Barra owned [15:13] parking lot located at 559 Columbia Road [15:15] to access their loading dock. [15:18] On April 13, 2024, the board awarded [15:21] awarded tenative designation status to [15:24] Civicode Development LLC and Dream [15:26] Collaborative LLC. The timeline of this [15:28] proposed license should not interfere [15:30] with the physical development of the [15:31] site which is in its early due diligence [15:33] and permitting stages. The proposed [15:35] developer is aware of this license and [15:36] has no objections. The city of Boston [15:38] property management department at its [15:39] own cost and expense will maintain care [15:41] and custody of the license premise, [15:43] manage parking of the Strand Theater [15:45] employees and contractors and loading [15:47] dock access for the Strand Theater. City [15:50] of Austin Property Management [15:51] acknowledged that the license area is a [15:53] multiple multiple use area under [15:55] designation for the development and that [15:57] it will use its best effort to operate [15:59] with the operate the license activities [16:01] in a manner consistent with the [16:02] community use and development needs of [16:03] the license area. The BPDA and city of [16:06] Boston will hold a temporary 30-day [16:07] license for license premise contingent [16:09] upon board approval of the license term [16:11] shall extend till December 31st, 2028. [16:14] BPDA deserves the right reserves the [16:16] right to terminate the license agreement [16:18] within 3 months of written notice. There [16:19] is no fee for the use of this license [16:21] area. However, the city of Boston [16:22] provide adequate insurance to the BPDA [16:24] during the license term. Thank you. I'm [16:26] happy to answer any questions. Okay. [16:27] Thank you. Any questions or comments [16:29] from the board? [16:31] All right. Hearing and seeing none, a [16:32] motion is in order. [16:33] So moved. [16:34] Second. [16:34] All those in favor? I opposed. The eyes [16:37] have it. Motion passes. Thanks, [16:38] Samantha. Item number four, request [16:41] authorization to enter into a license [16:43] agreement with Boston Harbor Now [16:45] Incorporated for the installation of [16:46] temporary signs on Bar owned property [16:49] located on Long Warf from October 19th, [16:51] 2026 through January 31st, 2027. [16:54] Samantha, [16:56] good afternoon. Member, Madam Chair, [16:57] members of the board, I'm here to [16:58] request approval to enter a license with [17:01] Boston Harbor Now for the installation [17:02] of temporary science, temporary [17:04] informative signs along Brown owned [17:06] property along Longworf. Boston Harbor [17:08] Now is a nonprofit 501c3 organization [17:11] that leads efforts to ensure an [17:13] accessible, resilient, and equitable [17:15] harbor through planning, policy, and [17:17] advoc advocacy work. Their work includes [17:20] operating information centers, running [17:22] several public programming initiatives, [17:24] supporting transportation to the islands [17:27] with the goal of ensuring usage of the [17:29] harbor while simultane simultaneously [17:31] increasing awareness about the [17:32] challenges facing coastal resiliency and [17:35] climate change. The proposed signs are [17:37] intended to bring awareness to the [17:38] forecasted high tides that will be [17:40] taking place directly over major [17:42] upcoming holidays. The signs will also [17:44] include a QR code that patrons can scan [17:46] to learn more and stay informed. Boston [17:48] Harbor Now at its own cost and expense [17:50] will install and maintain the signs on [17:53] Longore from October 19, 2026 through [17:56] January 31st, 2027. There is no fee for [17:59] the use of the license area. However, [18:01] Boston Harbor now will provide adequate [18:03] insurance to the BPDA for the duration [18:05] of this license. Thank you. I'm happy to [18:07] answer any questions. [18:08] Okay. Uh any questions or comments from [18:10] the board? All right. Hearing and seeing [18:12] none, a motion is in order. [18:13] So moved. [18:13] Second. [18:14] All those in favor? I [18:16] opposed. The eyes have it. Motion [18:17] passes. Thanks, Samantha. [18:19] Item number five, request authorization [18:21] to amend and extend the lease agreement [18:24] with Echo Beauty Hair Salon Incorporated [18:26] for the use of suite 101 at two boil [18:29] street, also known as the China Trade [18:31] Center for a period of 5 years [18:32] commencing October 30th, 2026 and ending [18:35] September 30th, 2031. Liz, [18:38] thank you, Madam Chair. Good afternoon [18:39] to members of the board. Um, today we [18:42] are seeking board um authorization to [18:44] enter into a new 5-year lease with Echo [18:46] Beauty Hair Salon, Inc. for suite 101 at [18:49] China Trade Center to Pyson Street in [18:52] Boston. Uh Ekko is an existing tenant [18:54] that has operated a hair salon at the [18:56] property since 2012. Uh the space [18:59] consists of approximately 790 ft. Ekko [19:03] currently pays approximately $3727 [19:06] per square foot or 29,451 [19:10] annually with a 3% annual increases. [19:13] Based on the current market conditions, [19:15] staff determined that Echo's existing [19:17] rent is approximately 15 to 20% above [19:20] market. [19:21] We are proposing a new 5-year lease at [19:23] $32 per square foot um for 25,280 [19:28] annually with a 3% annual increase as [19:31] well. Uh the proposed lease will [19:33] generate approximately 134,220 [19:37] in rental revenue over the 5-year term. [19:41] Although the initial rent represents [19:42] approximately a 15% reduction, retain an [19:46] echo allows us to avoid potential [19:48] vacancy and lose rental income and lost [19:51] rental income, avoid brokerage [19:53] commissions, and tenant improvement [19:55] costs, and maintain a stable long-term [19:58] tenant. The new lease will also require [20:00] ECHO to address electrical upgrades, [20:02] equipment compliance, ventilation, and [20:05] other building safety requirements at [20:06] the tenants's expense. Um, in [20:09] conclusion, uh, the staff recommends [20:11] board approval to enter into a proposed [20:13] 5-year lease with Echo Beauty Hair [20:15] Salon, Inc. Uh, and thank you. I am here [20:17] to answer any questions you may have. [20:18] Okay. Thank you. Uh, questions or [20:20] comments from the board. All right. [20:23] Hearing and seeing none, a motion is in [20:24] order. [20:24] So moved. [20:25] Second. [20:25] All those in favor? I opposed. The eyes [20:28] have it. Motion passes. Thanks, Liz. [20:31] Item number six, request authorization [20:33] to extend the tenative designation [20:34] status of the planning office of urban [20:36] affairs and the Roxbury Stonehouse to [20:38] facilitate the redevelopment and sale of [20:40] the BPDA own uh 7 through9 Westminster [20:44] Terrace property in the Washington Park [20:46] urban renewal area project number Mass [20:48] R-24 in the Roxbury neighborhood for a [20:51] period of 6 months until April 30th, [20:53] 2027. You [20:55] Thank you, Madam Chair and members of [20:57] the board. I am here to request an [20:59] extension to the tenative designation of [21:00] planning office for urban affairs or POA [21:03] and Roxberry Stonehouse or RSH for the [21:06] redevelopment of 7 to9 West Minute Ster [21:08] terrace which consists of 5,761 [21:12] square feet of vacant land owned by the [21:13] BPDA in the Roxbury neighborhood. The [21:16] BPDA started this disposition in 2021 [21:19] and released the RFP in 2023. Uh BPDA [21:23] received one proposal at the April [21:24] deadline that year from POA and the [21:26] Roxbury Stonehouse. Um POA is a [21:29] nonprofit housing developer affiliated [21:31] with the arch dasis of Boston. And RSH [21:34] is a nonprofit organization that cares [21:37] for and protects parents and child [21:39] survivors of domestic abuse and helps [21:41] them rebuild safe, secure, and [21:42] independent lives. POA and RSH's [21:46] proposal seeks to create a 13 unit [21:48] supportive housing and emergency shelter [21:50] building comprised of 11 studios and two [21:52] two-bedroom units. Uh the team was rece [21:56] um the team received tenative [21:57] designation status for the site in [21:58] October 2023. Since then, the last um [22:02] since then and also the last destination [22:04] extension this April, the team has [22:06] continued diligent progress to receive [22:09] um planning department urban design [22:10] approval of their permit set and also [22:13] secure a 2.7 million in um dollars in [22:16] EHLC supportive housing funding. At this [22:20] time, I would like to request an [22:21] additional six-month period of extension [22:23] to their tenative designation status, [22:25] during which time the development team [22:27] aims to select their general general [22:29] contractor, assemble the remaining [22:31] financing, receive their building [22:33] permit, and negotiate the deed and land [22:36] disposition agreement for closing. Thank [22:38] you. And I'm happy to answer any [22:39] questions. [22:40] Thank you. Um, any questions or comments [22:42] from the board? [22:44] Extension. Okay. Uh, hearing and seeing [22:46] none, a motion is in order. [22:47] So moved. [22:48] Second. All those in favor? I opposed. [22:51] The eyes have it. Thanks, Ian. Thank [22:52] you. Item number seven, request [22:54] authorization to award final designation [22:57] status to the Boston Food Forest [22:59] Coalition Incorporated for the sale and [23:01] redevelopment of 82 Mascot Street in [23:03] Dorchester for the creation of public [23:06] open space and community garden. Ben, [23:08] thank you, Madam Chair, members of the [23:10] board. We can go to the next slide. I'm [23:12] here to recommend that final designation [23:14] status be granted to to Boston Food [23:16] Forest Coalition. I'll name it as BFC in [23:19] the rest of my talk. Uh for the sale and [23:21] redevelopment of 82 Mascot Street as [23:23] part of a joint RFP issued by the [23:25] mayor's office of housing for open space [23:27] along with four and city of Boston owned [23:30] parcels at 301, 303, 305, and 307 uh [23:34] Norfolk Street in Dorchester. 82 mascot [23:38] consists of approximately 4,000 square [23:40] feet of vacant land and is approximately [23:43] 131 feet to the west along Norfol Street [23:45] to the Mo parcels uh all in Dorchester. [23:48] Uh in September 2025, Mo issued an RFP [23:51] for open sp open space on 82 mascot and [23:54] the Mo uh Norfolk Street sites. The [23:57] objectives of the RFP emphasize [23:59] community gathering space with edible [24:01] plantings, beautifification of and other [24:03] improvements to the sites, programming [24:05] for all ages, a comprehensive [24:07] maintenance plan, and tree preservation [24:08] and management. Mo and BPDA received one [24:12] proposal in response to the RFP, and [24:14] BFC's proposal was evaluated as highly [24:16] advantageous and awarded tenative [24:18] designation in February. You can go to [24:20] the next slide. BFC proposes an [24:23] accessible open community um space at 82 [24:26] Mascot Street. The property will be an [24:28] area where people in the community can [24:29] gather outdoors uh among native plants [24:31] and trees and harvest and share food [24:33] freely. Uh the BFFC team has finalized [24:37] or is near finalization on their design [24:39] plans, approval from the MBTA given the [24:41] proximity to the railway operations and [24:44] maintenance plan and Boston water and [24:46] sewer permit. The team is applying for [24:48] CPA funds in their uh in this upcoming [24:50] funding round. Um although if they are [24:53] not awarded uh this round, the team has [24:55] the funds to complete the project on [24:57] hand. I will also note that the approval [24:59] for conveyance has already been approved [25:00] by the uh for the Mo sites uh by the by [25:04] the public facilities commission. Uh [25:06] given the progress of the project, our [25:08] team recommends that BFC receive final [25:10] designation for 82 mascot in order for [25:13] the property to be sold and redeveloped [25:14] by them. Um Liz uh their director of [25:17] engagement and food forest construction [25:18] is also here with me tonight in case you [25:20] have any specific questions. But that's [25:22] the whole presentation. [25:23] Yeah. Thank you. Um questions or [25:25] comments from the board? [25:28] I'm just curious um to hear about um you [25:31] know how does the programming of this [25:33] work and just to get just a little bit [25:35] more detail on how um you know the [25:37] public uh would be you know benefit from [25:39] something like this. [25:41] Yeah. So what we're proposing is a food [25:44] forest park. Um the food forest is a [25:47] place people gather and the vegetation [25:50] is edible and so there are places to [25:54] gather and seats and um also a place for [25:58] um if people want to have hear music or [26:01] um and they also learn how to care for [26:03] their site. And so we provide education [26:07] um and support for the care of this [26:10] edible landscape and um we have run 15 [26:14] food forests across the city um and um [26:18] there's a demand for other food forest [26:20] and we're happy to be here to present. [26:22] Thank you so much. Um any additional [26:24] questions or comments from the board [26:27] make a comment. Uh recently I've seen [26:29] something similar at the lower end of [26:31] Blue Hill where they they had you know [26:34] basically you could see them growing [26:35] foods. I'm not sure what type of foods [26:37] but growing foods and then some a stand [26:39] where people can perform live music and [26:42] things of that nature but I seen it [26:43] being utilized and it look nice. It look [26:46] very good for the community. You saw [26:48] people you know engage in talking to [26:50] each other. So definitely nice and good [26:52] to see it popping up everywhere. [26:54] Great. Thank you. [26:55] Great. Additional questions or comments? [26:57] Hearing and seeing none. A motion is in [26:59] order. [26:59] So moved. [26:59] Second. [27:00] All those in favor? I opposed. The eyes [27:03] have it. Motion passes. Thanks so much, [27:04] Ben. [27:06] Oh, wait. One more. Uh, request [27:08] authorization. Item number eight. [27:10] request authorization to approve P10 [27:12] phase 3 LLC as the new redeveloper of a [27:16] portion of parcel 10 within the [27:18] southwest corridor development plan [27:19] known as parcel B and to extend the [27:22] tenative designation of P10 phase 3 LLC [27:25] as the redeveloper of a portion of [27:27] parcel 10 in the southwest corridor [27:30] development plan for a period of 6 [27:31] months until April 30th 2027. Ben, [27:35] thank you Madam Chair, members of the [27:37] board. Parcel 10 is located in Roxberry [27:39] near Newbian Square adjacent adjacent to [27:41] Melnia Cast Boulevard and Washington [27:43] Street at 2085 Washington Street. [27:46] Earlier completed phases of the parcel [27:48] 10 redevelopment includes the Tropical [27:50] Foods grocery store and a mixeduse [27:52] residential building. Parcel B is the [27:54] last remaining area for the [27:55] redevelopment of part on parcel 10. The [27:58] board originally voted to award Madison [28:00] Tropical LLC tenative designation on May [28:02] 15, 2012 and most recently extended the [28:05] designation for parcel B of parcel 10 to [28:08] Madison Trinity 2085 LLC in April 2026. [28:12] Due to litigation, the project has been [28:15] stalled for a few years, but this [28:16] litigation has now been resolved. The [28:18] team can now proceed with the [28:20] development as part on this parcel B. [28:22] Uh, as part of this vote tonight, we are [28:24] requesting the board approve the new red [28:26] the new redeveloper of this portion of [28:28] the project, which is P10 phase 3 LLC. [28:32] This new entity may be a new name, but [28:34] the parties are generally still the [28:36] same. The team consists of Madison uh [28:38] Park Development Corporation, one of the [28:40] original developers uh who responded to [28:42] the original RFP um and BLD properties [28:46] which is an entity set up by the project [28:49] executive from Trinity Financial uh who [28:51] was overseeing the project under that [28:53] prior uh entity which was Madison [28:54] Trinity 2085. So from Trinity uh same [28:58] project manager at least. Uh both [29:00] parties we know well and have been [29:02] working together to try to redevelop [29:03] this property for many years and have [29:05] spent sub and both have spent um uh sub [29:09] substantial financial resources on the [29:11] on the project. The redeveloper is [29:13] proposing to create a mixeduse mostly [29:16] residential building. Since the last [29:17] extension, they have resolved the [29:19] litigation, as I've said before, started [29:21] the NPC process for their updated design [29:23] plans presented at the Roxberry [29:25] Strategic Master Plan Oversight [29:27] Committee, and many other other items. [29:29] I'll not go I will not go into the [29:31] details of the changes of the design [29:32] here since you will those will come [29:34] before you as a notice of project [29:35] change. [29:36] Got it. During the next six-month [29:38] extenative designation period, the [29:39] redeveloper seeks to complete their [29:41] notice of project change, and thus [29:43] present to the board, complete 70% [29:45] construction documents, submit an [29:46] updated funding request to the [29:48] Massachusetts Executive Office of [29:49] Housing Livable Communities and other [29:51] funding sources. [29:53] Uh, it is therefore recommended that the [29:54] board approve the new development entity [29:56] and authorize a six-month extension for [29:58] tenative designation. Thank you, and I'm [30:00] happy to answer any questions. [30:01] Okay. Thank you. Uh, any questions or [30:03] comments from the board? All right. [30:05] Hearing and seeing none, a motion is in [30:07] order. [30:07] So moved. [30:08] Second. [30:08] All those in favor? I opposed. The eyes [30:11] have it. Motion passes. Thanks, Ben. [30:12] Thank you. [30:13] Item number nine, uh, request [30:15] authorization to execute a contract with [30:17] Los Meadows uh, cleaning services [30:20] incorporated for snow clearance and [30:22] salting and sanding uh, services on bar [30:26] owned properties in an amount not to [30:27] exceed $175,000 per year and for a [30:31] contract term of three years with two [30:33] one-year extension options. Chris. [30:36] Good afternoon, Madam Chair, members of [30:37] the board. Director Shen, I'm here today [30:40] to present the awarded bid for snow [30:41] removal services for Bar owned property [30:43] citywide. The selected contractor will [30:46] provide all necessary labor, materials, [30:48] equipment, and related services to clear [30:49] snow and apply salt and sand as needed [30:52] during the during and following each [30:54] snow event. In response to the [30:56] invitation for bids issued on August [30:58] 24th of 2026, the BPDA received and [31:00] opened four bids on September 8th, 2026. [31:03] Of the four bids received, loss Melo's [31:06] Cleaning Services Incorporated was [31:07] determined to to be the most responsible [31:10] and responsive bidder. The contract will [31:12] be awarded for initial three-year term [31:13] at a cost of $525,000 [31:16] with the potential to increase to [31:17] $875,000 if both one-year extension [31:20] options are exercised. The contract will [31:23] be funded through the PPDA operating [31:25] budget and is considered an ongoing [31:27] operating expense necessary to maintain [31:28] safe pedestrian access along browned [31:31] sidewalks throughout the city. Thank [31:33] you. I'm happy to answer any questions. [31:35] Okay. Thank you. Uh any questions or [31:37] comments from the board? [31:38] Right. Hearing Hearing Hearing Hearing [31:39] Hearing Hearing Hearing He and seeing [31:39] none, a motion is in order. [31:40] So moved. [31:41] Second. [31:41] All those in favor? [31:42] I opposed. The eyes have it. Thanks, [31:45] Chris. [31:46] Thank you. Item number 10, uh, request [31:48] authorization to execute a construction [31:50] contract with Unified Contracting [31:52] Incorporated for the construction of the [31:54] Little Mystic Channel Harborwalk [31:56] extension project located on Terminal [31:58] Street in an amount of 5,146,127.71 [32:05] with 5% contingency in the amount of [32:08] $257,36 [32:11] for a total aggregate contract amount of [32:13] $5,43,433. [32:15] $3.71. [32:17] Tyler, [32:18] thank you, Madam Chair. Members of the [32:19] board, you [32:19] always give me these like complicated [32:21] numbers to read out. [32:24] We are we are requesting authorization [32:26] to award and execute a construction [32:28] contract with Unified Contracting, Inc. [32:30] for the Little Mystic Channel Harborwalk [32:31] Extension project on Terminal Street in [32:33] Charles Town. The project will complete [32:35] a missing section of the Boston Harbor [32:37] Walk, providing approximately 1,000 ft [32:39] of shared use pedestrian and bicycle [32:41] path and safe continuous access to the [32:43] waterfront while avoiding busy truck [32:45] routes that lack sidewalks. The project [32:48] will also include seaw wall repairs, [32:50] utility installation, and amenities such [32:51] as an accessible seating, fishing areas, [32:54] exercise equipment, public art, trees, [32:56] fencing, and landscaping. [32:58] The project received six bids through a [33:00] competitive procurement process [33:01] conducted in accordance with master law [33:03] chapter 339M unified contracting [33:06] submitted the lowest bid. The [33:08] construction contract is 5,146,27.71 [33:13] with a 5% contingency of 250 $257,36 [33:18] for a total authorization of [33:20] 5,43,433.71. [33:24] Therefore, staff staff recommends [33:25] authorization to award and execute a [33:27] construction contract with Unified [33:29] Contracting, Inc. for the Little Mystic [33:30] Channel Harborwalk Extension Project. [33:32] Thank you. Happy to answer any [33:33] questions. [33:33] Okay. Thank you. Questions or comments [33:35] from the board. [33:37] Uh hearing and seeing none. A motion is [33:39] in order. [33:39] So moved. [33:40] Second. [33:40] All those in favor? I opposed. The eyes [33:43] have it. Motion passes. Thanks, Tyler. [33:45] Item number 11, a request authorization [33:48] to execute a contract with HDR [33:50] Engineering Incorporated for [33:52] construction management services for the [33:53] Little Mystic Channel Harborwalk [33:55] extension project located at Terminal [33:57] Street in an amount of $380,784 [34:01] with a 10% contingency in amount of [34:04] $38,78 [34:05] for a total aggregate contract amount [34:07] not to exceed $418,862. [34:11] Tyler, [34:12] thank you. Again, we are requesting [34:13] authorization to award and execute a [34:15] construction management contract with HR [34:17] Engineering for the Little Mystic [34:19] Channel Harborwalk extension project on [34:20] Terminal Street in Charlestown. [34:22] Construction management services will [34:23] include part-time resident engineering, [34:25] weekly field reports, submittal reviews, [34:27] responses to requests for information [34:29] and change orders, and project closeout. [34:31] The contract amount is $380,784 [34:35] with a 10% contingency of $38,78 [34:38] for a total authorization of $418,862. [34:42] Therefore, staff recommends [34:44] authorization to award and execute a [34:45] construction management contract with HR [34:48] Engineering for the Little Mystic [34:49] Channel Harborwalk extension project. [34:51] Thank you. Happy to answer any [34:52] questions. [34:53] Okay. Thank you. Quick question. What is [34:55] the estimated um time to completion? [34:58] Just out of curiosity [35:00] at 18 months. [35:01] Okay, cool. That's exciting. Um, that [35:04] was it. Uh, any other questions or [35:06] comments? Hearing and seeing none, a [35:08] motion is in order. [35:08] So moved. [35:09] Second. [35:09] All those in favor? I opposed. The eyes [35:12] have it. Motion passes. Thanks, Tyler. [35:15] Another one. Okay. Uh item number 12, [35:18] request authorization to invitation an [35:21] invitation for bids for construction [35:23] work of the shipyard park waterfront [35:25] repairs project in the Charlestown [35:27] Navyyard. [35:28] Thank you again. We are requesting [35:30] authorization to advertise and issue an [35:32] invitation for bids for the shipyard [35:33] park waterfront repairs project at the [35:35] Charles Charletown Navyyard. The project [35:37] is in the next phase of ongoing [35:39] waterfront infrastructure improvements [35:40] and will address deterioration along [35:42] flagship warf, including critical steel [35:44] bulkhead repairs between peers four and [35:46] five, concrete spall repairs near the [35:49] pier 4 ferry landing, repairs to the [35:51] underside of the pier, and improvements [35:53] to the fendering system and abandoned [35:54] utilities. The total project estimate is [35:57] approximately 5.9 million with 3.33 [36:01] million remaining for the original FY26 [36:03] capital budget after design costs. Staff [36:06] will use a phase procurement approach. [36:08] The base scope is estimated at a 2.9 [36:10] million with prioritized and add [36:12] alternatives that can be incorporated as [36:15] additional funding becomes available. [36:17] The invitation for bid will be publicly [36:19] advertised in accordance with master law [36:21] chapter 30 and 39mm and the construction [36:23] contract will will return to the board [36:24] for approval. Therefore, staff [36:26] recommends authorization to advertise [36:27] and issue an invitation for bids for the [36:29] shipyard park waterfront repairs [36:31] project. Thank you. Happy to answer any [36:32] questions. [36:33] Thank you. Uh questions or comments from [36:35] the board? Right. Hearing and saying [36:37] none. A motion is in order. [36:38] So moved. [36:39] Second. [36:39] All those in favor? I opposed. The eyes [36:42] have it. Item number 13, request [36:44] authorization to execute a construction [36:47] contract with ACK Marine and General [36:49] Contracting LLC for the construction of [36:51] the Long Wararf North boardwalk [36:53] replacement project in the amount of [36:55] $460,410 [36:58] with a 20% contingency in the amount of [37:00] $92,82 [37:02] for a total aggregate contract amount of [37:05] 55 $552,492. [37:08] Tyler, [37:09] thank you again. We are requesting [37:10] authorization to award a construction [37:12] contract to ACK Marine and General [37:14] Contracting LLC for the Longw Warf North [37:17] Boardwalk Replacement Project. The [37:19] project addresses structural defic [37:20] deficiencies along approximately 215 ft [37:23] of the north boardwalk, including [37:24] deteriorating supports, cross bracing, [37:27] and connection hardware. The work will [37:29] replace select supports with adjustable [37:31] screw jacks, repair the existing [37:32] framing, and reinstall the deck boards. [37:34] These improvements will also help bring [37:36] the boardwalk into compliance with state [37:38] accessibility requirements for slopes [37:40] and cross slopes. Four bids were [37:42] received with ACK Marine and General [37:44] Contracting submitting the lowest bid at [37:46] $460,410. [37:48] The contract includes a 20% contingency [37:50] of $92,82 [37:52] bringing the total authorization to [37:54] $552,492. [37:56] Therefore, staff recommends [37:58] authorization to award a construction [37:59] contract with the ACK Marine and General [38:01] Contracting LLC. Thank you. Happy to [38:03] answer any questions. [38:04] Okay. Thank you. Uh questions or [38:06] comments from the board. [38:08] All right. Hearing and seeing none. A [38:09] motion is in order. [38:10] So moved. [38:10] Second. [38:11] All those in favor? I opposed. The eyes [38:13] have it. Um motion passes. Thank you, [38:15] Tyler. [38:16] Thank you. [38:18] Item number 14, request authorization to [38:20] enter into a grant agreement with the [38:22] Lewis D. Brown Peace Institute [38:24] Corporation to provide a one-time grant [38:26] of $250,000 in neighborhood development [38:30] funds to support construction of its new [38:33] center of healing, teaching, and [38:34] learning located at 30 Westville Street [38:37] and the adjacent unnumbered Westville [38:39] Street parcel in Dorchester and to take [38:41] all related actions. Michelle. Good [38:44] afternoon, Madame Chair, members of the [38:46] board, Director Shen. I'm Michelle [38:48] Goldberg, director of finance and the [38:50] planning department. The BPDA and the [38:53] mayor's office of housing jointly manage [38:55] the long-standing neighborhood [38:56] development fund, which may be used to [38:58] support a range of community development [39:01] initiatives, including acquisition, [39:04] economic development, and place-based [39:06] investments. [39:08] Founded in 1994, the Louise D. Brown [39:12] Peace Institute provides healing [39:14] centered services, education, training, [39:17] and advocacy for families and [39:19] communities affected by murder, trauma, [39:21] grief, and loss. The Peace Institute is [39:24] advancing a new permanent home that will [39:27] expand its capacity to serve survivors [39:30] and families, train providers and [39:32] community partners, and convene [39:34] residents around healing and violence [39:36] prevention. The proposed project will be [39:39] located on two city-owned parcels at 30 [39:43] Westville Street and the adjacent [39:45] unnumbered Westville Street parcel in [39:47] the four corners area of Dorchester. The [39:50] parcel totals approximately 23,056 [39:54] square ft. The Public Facilities [39:57] Commission tentatively designated the [39:59] Peace Institute as developer in March [40:02] 2023 [40:04] and in March 2026 extended the tentative [40:07] designation and intent to sell period [40:10] through March 15, 2027 to allow the [40:13] organization additional time to advance [40:16] project financing, permitting, and [40:17] pre-construction activities. The Peace [40:20] Institute proposes uh to construct a [40:23] threestory center of healing, teaching, [40:26] and learning with an estimated total [40:28] development cost of 17.5 million. [40:32] The new facility is intended to include [40:35] private meeting rooms, exhibit space, [40:37] yoga studios, and so on. Um the project [40:42] is being coordinated with Mo and remains [40:45] subject to the city's land disposition, [40:47] design review, permitting, financing, [40:49] and construction requirements. The [40:52] proposed NDF grant will provide a [40:54] one-time capital contribution towards [40:57] the construction of the new facility. [41:00] Dis uh dispersement of the NDF funds [41:02] will be contingent upon receipt of [41:05] written confirmation of the BPDA and [41:07] peace institute has hired a general [41:09] contractor and is scheduled to break [41:11] ground on site. Therefore, we seek your [41:13] approval to enter into this grant [41:15] agreement and I can answer any questions [41:17] you have. Thank you. [41:18] Thank you. Uh questions or comments from [41:20] the board? [41:21] No, no uh questions, Madam Chair. Just a [41:24] comment. wanted to uh thank the team for [41:26] this work and and just how important [41:28] this is and what an inspiration Tina [41:30] Cherry is. Um Tina, as many of you know, [41:32] was uh Louis was is Lewis D. Brown's [41:34] mother. Um many of us can remember [41:37] vividly when he lost his life. Um it [41:39] struck with me. We were the same age. I [41:41] think he was a couple months older than [41:42] I was. And um Tina has channeled I think [41:46] that unimaginable loss and just made it [41:48] such uh helped countless lives um in his [41:51] honor, in her son's honor. Um, so it's [41:53] it's wonderful to see this work continue [41:56] nearly 40 years after the fact. [41:59] Thank you for that. Uh, additional [42:00] questions or comments? Hearing and [42:02] seeing none, a motion is in order. [42:04] So moved. [42:04] Second. [42:05] All those in favor? I opposed. The eyes [42:07] have it. [42:08] Uh, motion passes. Thanks, Michelle. [42:10] Thank you. Item number 15, request [42:12] authorization to enter into a grant [42:14] agreement with the American City [42:15] Coalition for the purposes of [42:17] commissioning a market analysis of [42:19] Nubian Square using $67,000 of [42:22] neighborhood development funds and to [42:23] take all related actions. Michelle, [42:25] thank you, Madam Chair, members of the [42:27] board. Director Shen, second request [42:29] here for NDF funds is for the American [42:32] Coalition of Cities, referred to as TAC, [42:35] founded in 1994. The American City [42:38] Coalition or TAC is a Roxberry based [42:40] 501c3 organization committed to [42:43] providing thought leadership and [42:45] technical assistance uh to advise [42:49] multis- sector and multistakeholder [42:51] partnerships that focus on investments [42:53] and improve the quality of life for [42:55] Roxberry families. In 2020, TAC [42:58] completed a market analysis that sought [43:00] to identify factors that distinguish [43:02] Nubian Square as a location capable of [43:06] attracting outside investors, recommend [43:09] strategies to improve the business [43:11] district's commercial viability, and [43:14] help inform the future conversations [43:16] about improving the neighborhood. [43:19] It follows the board's adoption of plan [43:23] Nubian Square, originally called Plan [43:25] Dudley Square in 2019, which serves as a [43:27] community anchored implementation plan [43:30] for the disposition and redevelopment of [43:32] vacant parcels. [43:34] With the creation of the Nubian Square [43:37] Economic Activation Task Force in spring [43:40] 2026, city staff and community [43:43] stakeholders have identified a need for [43:45] an updated market study. TAC Nubian [43:49] Square action analysis and prospectus [43:52] would serve as an up-to-date strategic [43:55] roadmap to attract investment support [43:57] business growth strengthen commercial [44:00] and cultural viability uh creating a [44:03] thriving neighborhood ground all [44:04] grounded in rigorous analysis and [44:06] community voice. The total cost of the [44:09] market analysis and prospectus would be [44:13] 187325. [44:15] TAC has requested grant support from the [44:18] BPDA of 67,000, one-third of the total [44:21] project cost to begin working on this [44:24] study. An additional 75,000 has been [44:28] secured via external sources and TAC is [44:31] actively fundraising for the remaining [44:33] portion. Therefore, we seek your [44:35] authorization to enter into a grant [44:37] agreement and can answer any questions [44:39] you may have. Thank you. [44:40] Okay. Thank you. Any questions or [44:42] comments from the board? [44:44] All right. Hearing and seeing none, a [44:46] motion is in order. [44:46] So moved. [44:47] Second. [44:47] All those in favor? I opposed. The eyes [44:50] have it. Motion passes. Michelle. [44:53] Okay. So the next two items will be um [44:57] presented jointly with separate uh votes [45:00] to follow. So I'm going to read both [45:01] agenda items right now and uh then we'll [45:04] go into the presentation. So, uh, item [45:07] number 16 requests authorization to [45:09] adopt the Clearary Square squares and [45:11] streets small area plan, which will [45:14] guide future development, direct capital [45:16] investments to design safer streets, [45:18] enhance the public realm, and advance [45:20] policies and programmatic investments to [45:22] increase small business uh, longevity [45:24] and housing supply and affordability [45:27] within the Clearary Square squares and [45:28] streets study area through [45:30] recommendations for a land use and [45:32] design framework, targeted programmatic [45:34] and policy investment, ment and [45:36] regulatory mechanisms. [45:38] Item number 17 is request authorization [45:40] to petition the zoning commission to [45:42] adopt map amendments to zoning map 12 [45:44] and the associated text amendment to [45:46] article 69 to establish squares and [45:48] streets districts that are regulated by [45:50] article 26 and associated base codes [45:53] base code articles within clearary [45:55] square and to remove named neighborhood [45:58] business subdists which are overwritten [46:01] by the newly mapped squares and streets [46:04] districts and to add language to [46:06] maintain application of the existing [46:08] neighborhood design overlay district in [46:11] newly in newly mapped squares and [46:13] streets district and to revise outdated [46:15] language. Okay, Maya. [46:18] Thank you. Uh thank you Chief Shen Chair [46:20] Roas and members of the board. My name [46:22] is Maya Kerold and I'm a planner one on [46:24] the zoning form team and I will be [46:25] presenting on Clearary Square and [46:27] streets small area plan and the related [46:28] resoning. Um before my presentation, I [46:31] would like to share that we received a [46:33] joint letter of support for the plan and [46:35] zoning from councelor Pepen and [46:37] representative Consalvo and we've [46:39] appreciated their participation and [46:41] support for this process. Um first slide [46:44] please. [46:46] Um for some background, Squares and [46:48] Streets is a planning and zoning [46:49] initiative focused on transit accessible [46:51] mixeduse areas. The goal is to grow [46:54] housing in these areas that have an [46:55] abundance of commercial, civic, [46:57] cultural, and transportation resources [46:59] by reforming zoning and coordinating [47:01] investment across city departments. Next [47:04] slide, please. [47:08] Uh, Clearary Square is a mixeduse area [47:11] in Hyde Park. It has existing transit [47:13] resources such as two commuter rail [47:15] stations and numerous bus lines. It also [47:18] has a walkable main street area with a [47:20] variety of retail and restaurants. It [47:23] also has various amenities such as the [47:25] High Park Library, the High Park [47:26] Municipal Building, and the Neponza [47:28] River. Next slide. [47:33] We started this process in early 2024 [47:36] and have heard from the community [47:37] through a wide range of events, which [47:39] you can see a snapshot of in this slide. [47:42] Um, in 2025, we took a pause on the plan [47:44] as we worked with a group of community [47:46] members to add two new zoning districts [47:48] to the code to provide more zoning [47:50] options. That amendment was adopted by [47:53] this board last November. Next slide, [47:55] please. [47:57] Throughout the planning process, we've [47:59] made an effort to hear from people that [48:00] we don't often hear from at traditional [48:02] planning departments, community [48:03] meetings. This included having meetings [48:06] on specific topics that were important [48:08] to the people and populations in [48:09] Clearary Square, having language [48:11] specific focus groups in Haitian, [48:13] Creole, and Spanish, and talking to [48:15] people in a variety of formats, [48:16] including virtual meetings, inerson [48:18] meetings, informal events like pop-ups, [48:20] tables, tableabling, and block walks. [48:23] Next slide, please. [48:25] In the plan, we have recommendations [48:27] focused on five topic areas. Those are [48:29] the land use and design framework, [48:31] housing and real estate, small business, [48:34] arts and culture, transportation, open [48:36] space and resiliency. [48:38] Um, and for each of those topics, uh, [48:41] the chapter contains a summary of the [48:42] existing conditions, what we heard from [48:44] the community engagements and the [48:46] resulting recommendations. [48:48] Additionally, we are bringing you a [48:50] zoning map that includes the proposed [48:53] districts in the planning area. Next [48:55] slide, please. [48:57] As some of the highle outcomes of the [48:59] plan, Clary Square tomorrow will have an [49:01] arts corridor that connects the artistic [49:03] and cultural identity, opportunities for [49:05] small businesses and housing growth, [49:07] reduce barriers to transportation, [49:10] potentially 30 to 60 units of new [49:12] affordable housing on city-owned [49:14] parcels, and new and improved public [49:16] open space throughout the square, [49:18] including a new park, which would allow [49:20] the community to have access to the [49:21] Neponza River, um, which is currently [49:24] not possible in this area. Next slide, [49:26] please. [49:29] Um, our transportation recommendations [49:31] seek to update the transportation [49:32] network to make Clearary Square safer [49:34] for pedestrians, have better and wider [49:36] sidewalks, and support faster transit [49:38] service. For example, um, new safer bus [49:42] routing and improved curb design on Hide [49:44] Park A, Dana A, and Pingry Street [49:46] intersection will provide faster and [49:48] more reliable bus service on Hide Park [49:50] A. [49:52] We're also proposing a new sidewalk on [49:54] Walnut Street. Walnut Street is an [49:56] important pedestrian connection to Fair [49:58] the Fairmont Commuter Rail Station and [50:01] it currently has no sidewalk. So adding [50:03] that is a very important recommendation [50:04] for improving pedestrian con uh [50:07] conditions. [50:08] Um, lastly for transportation [50:10] recommendations to highlight, we're [50:12] proposing exploring the reconfiguration [50:14] of the intersection in front of the High [50:16] Park Municipal Building to simplify bus [50:19] operations, improve safety, and create [50:22] an opportunity for additional public [50:23] space. This would potentially occur by [50:26] closing the slip lane and adding curb [50:28] extensions, though there will need to be [50:30] additional study before closing the slip [50:32] lane. Next slide, please. [50:36] for open space. Some of the key [50:38] recommendations are expanding and [50:39] improving improving the pocket park at [50:42] the corner of High Park A and River [50:43] Streets by transferring ownership to the [50:45] parks departments, potentially creating [50:48] a new plaza in front of the High Park [50:50] municipal building following the [50:52] intersection reconfiguration, [50:54] and creating a new public park and [50:55] connection to the Neponza River on the [50:57] former Lewis chemical site. Next slide, [51:00] please. [51:02] One of the key recommendations for arts [51:04] and culture is creating an arts corridor [51:06] to help strengthen and connect the arts [51:09] identity in the square. Uh this would [51:11] include introducing cohesive signage and [51:14] wayfinding, installing more public arts, [51:16] and designating the pocket park on River [51:18] Street as a pre-permitted entertainment [51:21] license site, which would make it easier [51:22] to hold events and performances there. [51:25] Next slide, please. [51:28] For small businesses, a few of the [51:30] recommendations include reszoning to [51:32] allow for the types of businesses that [51:34] we heard community members want to see, [51:36] including indoor recreation for youth, [51:39] entertainment, affordable grocery [51:40] stores, retail, and restaurants. We also [51:43] are recommending creating a welcome to [51:45] Clearary Square marketing booklet to [51:47] help potential developers and business [51:48] owners understand the area and encourage [51:50] development of uh desired community [51:53] uses. The plan also recommends providing [51:56] technical assistance for first and [51:57] second generation business owners. Next [52:00] slide, please. [52:03] For housing and real estate, there are [52:04] two city- owns lots which were [52:07] recommending starting community [52:08] disposition processes to potentially [52:10] redevelop for affordable housing. The [52:13] plan also highlights that the city [52:14] should support and advance tenant [52:16] protection measures as part of the [52:17] anti-displacement action plan which is a [52:20] city-wide plan as you know aimed to [52:22] prevent displacement. Next slide. [52:27] Um as part of the land use and design [52:28] framework section of the plan, we have [52:31] sections about we have a section about [52:33] sites that we're calling catalytic [52:34] sites. By catalytic sites, we mean that [52:37] they are likely to change in the [52:38] near-term future, and the development of [52:40] the sites will help drive change and [52:42] achieve the goals of the plan. On this [52:45] map, um the sites in orange are likely [52:48] to change in the near-term future, um [52:51] orange or pink, uh they're likely to [52:53] change in the near-term future, either [52:55] because they are city-owned and this [52:57] plan recommends potentially using that [52:58] land to develop for affordable housing, [53:01] or they're private property. And um [53:03] there is uh the owner has expressed some [53:06] interest in redevelopments. [53:08] Um the the ones in pink are actually [53:12] have been approved by the BPDA but [53:15] haven't started construction. [53:17] All of the green and blue parcels are um [53:20] particularly unlikely to develop anytime [53:22] soon for a variety of reasons, including [53:25] being city-owned with no plans for [53:27] changes, recent developments, or being [53:29] too small without a single owner. [53:33] Um this includes the municipal parking [53:35] lot off of High Park A, which the plan [53:38] recommends maintaining as parking for at [53:40] least 5 years. [53:42] Uh the reason we're including this [53:43] section in the plan is to help the [53:45] public understand what type of [53:46] developments they can really expect and [53:48] it because it allows us to include [53:50] really sightsp specific design [53:52] guidelines that can be used during the [53:54] article 80 process. [53:56] Next slide please. [53:59] Um this brings us to the proposed zoning [54:02] map. Um, as you can see here, the [54:03] majority of the map is uh zoned as the [54:07] S36 active use uh active main street [54:11] district. That's the one in pink. Um, [54:13] and the SC shopping commercial nodes [54:15] district, that's the one in orange. Um, [54:18] these are the two districts that we [54:19] worked with the community to create and [54:21] add to the zoning code last year. Um, [54:25] I'm going to walk through this in more [54:26] detail on the following slides, but [54:27] quickly how we got here. Uh in the plan [54:31] there's a section called the land use [54:33] and design framework. Uh it outlines [54:36] what we heard from the community [54:37] throughout the planning process in terms [54:38] of what types of land uses, buildings, [54:40] and design features people want to see [54:42] throughout the area. Um this zoning map [54:45] translates that community vision into [54:47] zoning rules. In addition, the plan also [54:50] contains design guidelines which can be [54:52] used in article 80 or smallcale design [54:55] review and also supports the zoning [54:57] rules. Next slide, please. [55:02] Um, first looking at this area around [55:04] the commercial stretch of High Park A, [55:07] we have a goal here to retain or expand [55:08] the commercial character as well as [55:10] allow housing growth in this area which [55:12] is right next to the Hide Park commuter [55:14] rail station. The S36 active main street [55:18] district helps accomplish this because [55:19] it allows mixeduse buildings up to six [55:22] stories and has a requirement that the [55:24] ground floor contains active uses which [55:26] includes things like re restaurants and [55:28] retail. In addition, the SC shopping and [55:32] commercial nose districts, dwelling [55:34] units on the ground floor facing the [55:36] streets require a conditional use [55:38] permit. This helps encourage more [55:40] commercial activity in the future [55:42] without making the existing residential [55:44] uses forbidden. Um, we also heard some [55:48] more concern from the community in this [55:50] area about heights in particular on [55:52] river streets and so the SC district [55:55] limits heights to four stories while [55:57] still allowing a wide range of [55:59] commercial uses. [56:01] Um, we also have two open space urban [56:04] plaza districts mapped here. One over [56:06] the pocket park and one over the [56:08] municipal parking lots. Um, the pocket [56:11] park zoning affirms this is open space [56:14] and the municipal lot zoning affirms the [56:16] plan recommendation to not develop this [56:19] parking lot um and retain the existing [56:21] parking for at least 5 years. Next [56:23] slide, please. [56:27] This next area has most of the historic [56:29] buildings in the area like the Everett [56:31] Square Theater and the High Park [56:32] Municipal Building um as well as narrow [56:35] streets. So, we heard that people wanted [56:37] to maintain the existing um building [56:39] heights here. We therefore mapped SC [56:42] which allows up to four stories. This is [56:45] the same height allowed in the existing [56:46] zoning. [56:48] SC also allows the majority of [56:50] commercial uses and requires conditional [56:52] use permits for dwelling units along the [56:54] main streets which helps the goal of [56:56] retaining the existing commercial [56:57] character here. Next slide [57:02] in this area near Fairmont Station. We [57:05] heard that people wanted to allow for [57:07] more housing near the station. We also [57:11] uh wanted to allow for the potential of [57:13] structured parking built here which [57:15] could accommodate both residents and [57:16] commuter rail riders. We therefore [57:19] mapped S36 which allows larger floor [57:22] plates which could potentially allow for [57:24] parking layouts and housing. [57:26] Additionally, if there were development [57:28] here, we would need a new road and [57:30] pedestrian connection to Fairmont [57:32] Station. Um, and S36 requires outdoor [57:36] amenity space which can be used for [57:38] sidewalks and other public open space to [57:40] access and improve Fairmont Station. [57:43] Next slide, please. [57:47] The next area to walk through includes [57:49] most of the parcels along the Neponzip. [57:52] Because this area is near the river, [57:53] it's important to improve permeability [57:55] to prevent flooding. All of the new [57:57] squares and streets districts help this [57:59] by requiring permeable area which the [58:01] existing zoning does not do. We also [58:04] want to increase open space and overall [58:07] um allow new connections to the river [58:10] which is why most of this area is zoned [58:12] as open space including a new open space [58:14] district mapped over the new park to be [58:16] created on the Lewis chemical site. This [58:19] area also includes Walnut Street, which [58:21] as mentioned earlier does not currently [58:23] have a sidewalk, which creates dangerous [58:25] conditions for pedestrians walking to [58:27] and from Fairmont Commuter Rail Station. [58:30] We mapped Walnut Street as the S1 main [58:32] street living district, which allows [58:34] primarily residential development up to [58:36] four stories with some smallcale uh [58:39] ground flooror commercial allowed. This [58:41] allows new residential developments, [58:43] which can help support construction of a [58:45] new sidewalk. Next slide. [58:50] These sections of River Street are [58:53] primarily residential and start to [58:55] connect Clearary Square to other nearby [58:57] commercial areas. Here we mapped S0 [59:00] transitional residential and S1 main [59:02] street living to support the existing [59:05] residential uses and allow the [59:06] possibility of mixeduse development to [59:09] connect the existing commercial areas. [59:11] We also mapped SC which supports some [59:13] existing small-cale commercial on that [59:16] block. Next slide. [59:20] Uh lastly, there are a few transitional [59:23] residential areas that we have mapped S0 [59:25] and S1. This allows residential growth [59:28] and some small-cale commercial uses in [59:30] these areas with the greatest access to [59:33] the commercial and mixeduse center of [59:34] Clearary Square. Zoning for the rest of [59:37] the residential areas in Hyde Park to [59:39] accommodate ADUs and contextual infill [59:42] will be updated in the future through [59:43] the neighborhood housing zoning [59:45] initiative. [59:46] Next slide. [59:49] So, we released the first version of [59:51] this map, which you can see on the left, [59:53] in March, um, and made a number of [59:55] changes in response to public feedback [59:58] to highlight the major changes. Uh, [1:00:00] firstly, in response to community [1:00:01] concerns about the allowed height in the [1:00:03] proposed zoning, we removed all the [1:00:05] previously proposed sevenstory S4 [1:00:08] district. [1:00:09] Um this was replaced by S36 which allows [1:00:12] up to six stories and SC which allows up [1:00:15] to four stories. We also removed the [1:00:18] squares and street zoning from a few [1:00:20] residential areas so that these will [1:00:22] maintain their existing residential [1:00:24] zoning. [1:00:26] Uh lastly, we added the open space urban [1:00:29] plaza district on the municipal parking [1:00:31] lots to affirm the plan recommendation [1:00:33] to not develop this lot for at least 5 [1:00:35] years. Thank you and I'm happy to take [1:00:37] any questions. [1:00:39] Okay. Thank you. Um, questions or [1:00:42] comments from the board? [1:00:43] Thank you, Madam Chair. Um, you know, [1:00:46] it's [1:00:47] often easy in government to do nothing. [1:00:50] It's seldom the right policy or the [1:00:52] right thing to do, but it's typically [1:00:54] easy. So, I really appreciate this [1:00:55] administration uh and this team that has [1:00:59] engaged in a process where we're talking [1:01:01] about change. We're talking about [1:01:02] development. Um, and I believe this is [1:01:04] our third Squares and Streets project [1:01:06] that we're voting on. Um it seems like [1:01:08] the process gets better and better with [1:01:10] each each iteration. Um there have been [1:01:13] some dramatic changes from uh St. [1:01:15] Patrick's Day when the first map came [1:01:17] out and that's a direct feedback of good [1:01:20] engaged citizens uh and residents who [1:01:23] are are coming together. So I I think [1:01:24] this is a far better project. I also [1:01:26] appreciate knowing Clary Square as well [1:01:28] as well as some of my colleagues up [1:01:30] here. But um it's a wonderful part of [1:01:32] the community. Uh, and you know, when we [1:01:35] talk about squares and streets, [1:01:37] obviously people often think of density [1:01:38] and that and housing and businesses and [1:01:40] that's important if done right and when [1:01:42] done right as I believe it is here. Uh, [1:01:44] but it's also about the open space that [1:01:46] we're now introducing. It's about the [1:01:47] civic space, the MUN, the library. It's [1:01:49] about the the uh cultural space with the [1:01:52] Riverside Theater, you know, and so many [1:01:53] other wonderful parts of the community. [1:01:55] So, I am proud to support this. Thank [1:01:57] you for your effort. I know it's not [1:01:59] easy. Um, but it's it's the right thing [1:02:01] to do. And I think the fact that that [1:02:03] the uh so many residents have been part [1:02:05] of this conversation and quite frankly [1:02:07] helped shape a better end product uh has [1:02:10] proved positive why this is working and [1:02:12] why um I look forward to seeing continue [1:02:15] squares and streets in the weeks and [1:02:16] months ahead. Thank you. [1:02:18] Great. And before we uh continue with [1:02:20] board with board questioning um we are [1:02:22] just going to um give the floor to [1:02:25] councelor Bippen. Um if you'd like to [1:02:27] give some some comments. We'll take you [1:02:29] out of order. [1:02:31] Yes. Thank you. Can you guys hear me? [1:02:33] Well, [1:02:34] totally. Yep. [1:02:36] Thank you. Um, first of all, thank you [1:02:37] all so much for hosting this this board [1:02:39] meeting tonight. Um, this is this [1:02:41] project in particular has been one that [1:02:43] I have been dealing with for the [1:02:46] personally for the past two and a half [1:02:47] years. It's been on my desk since the [1:02:49] first day I got into office and it's [1:02:50] been nothing but a pleasure to be [1:02:52] working with both the community and the [1:02:54] planning department on this. But I have [1:02:56] a statement that I would like to read [1:02:58] now. I said, "I support the Clearary [1:03:00] Square Squares and Street Small Area [1:03:02] Plan, which is a modern vision for Hype [1:03:04] Park that brings flexibility and [1:03:06] opportunity for residential and [1:03:08] commercial development in Clearary and [1:03:09] Logan squares. This plan has been [1:03:12] created after 2 and 1/2 years of [1:03:13] community collaboration, bringing a map [1:03:16] that embraces High Park's character and [1:03:19] future growth. I have been supportive of [1:03:21] the squares and streets initiative since [1:03:22] entering office as I believe it is very [1:03:25] important tool to increase the housing [1:03:27] supply, combat the housing crisis and [1:03:30] break down Boston's dense and outdated [1:03:32] zoning. For too long, our zoning and [1:03:34] plans have kept our communities from [1:03:36] growing, leading to the displacement of [1:03:38] longtime residents and small businesses [1:03:40] who once called Boston home. As housing [1:03:43] and construction prices continue to rise [1:03:45] to unprecedented levels, it is not only [1:03:47] necessary but crucial we remove barriers [1:03:50] at the city level to allow the [1:03:52] construction of much needed housing in [1:03:54] our city. I want to take a moment to [1:03:56] thank the Hyper community leaders that [1:03:58] led many meetings engaging residents to [1:04:01] help draft the neighborhood maps and [1:04:03] voice ideas in this process. Their [1:04:06] efforts really did gather advocates of [1:04:07] hide parks, whether small businesses, [1:04:10] historic preservation, green and open [1:04:12] spaces, and affordable housing to engage [1:04:14] with the planning department. I thank [1:04:16] the squares and streets team for [1:04:17] collaborating with them in good faith [1:04:18] that led to the final map. The Clearary [1:04:21] Square squares and streets small area [1:04:23] plan is critical piece of zoning reform [1:04:24] that will strengthen the economic hub of [1:04:26] High Park, inviting more small [1:04:28] businesses and families to live for [1:04:29] generations. As a Boston city council [1:04:31] for district 5, I hear concerns from [1:04:33] everyone about affordability. I truly [1:04:36] believe that the Clearary Square squares [1:04:37] and streets small area plan will propel [1:04:40] new and lively chapter in the history of [1:04:42] Hyde Park in its neighborhood. Uh please [1:04:44] consider approving this project and [1:04:46] thank you for your consideration. And [1:04:48] before I end, I just want to thank um [1:04:50] the team of the planning department that [1:04:52] work very closely on this. I know that [1:04:54] um people like Caitlyn Coer um Chief [1:04:58] Kyro Shan and and many other folks for [1:05:00] if I'm forgetting their names I [1:05:01] apologize but just thank you for taking [1:05:03] this so serious. Uh I think the board [1:05:05] member Sir Ali said that you know this [1:05:09] is a good example of what planning [1:05:11] should be and it really was um a lot of [1:05:14] feedback was taken from my residents and [1:05:15] were implemented into this map and I [1:05:17] greatly appreciate that because I know [1:05:19] that a lot of residents are thankful for [1:05:21] this. So, and if and if there's any [1:05:22] residents on the call as well, just [1:05:23] thank you for their work. But that's it [1:05:25] for me. Thank you. [1:05:26] Great. Thank you, counselor. Do we have [1:05:28] anyone else that take out of order? [1:05:30] Okay. Uh, okay. Resuming with board [1:05:32] questioning. Any additional questions or [1:05:33] comments, please. [1:05:34] Uh, through the chair. Um, like to thank [1:05:36] the counselor and thank the former [1:05:38] counselor. Um, I think this is great to [1:05:41] see the access to the river that I've [1:05:43] heard about. That's that would be great [1:05:45] to [1:05:45] to see coming in the future. right now. [1:05:48] Currently, I have two children at the [1:05:50] MUN waiting for my wife to pick them up. [1:05:52] Um, and when it comes to density, you [1:05:54] mentioned density. Um, there's a lot of [1:05:56] small businesses in the Clary area that [1:06:00] haven't survived. You know, we need the [1:06:02] foot traffic. We need the density in the [1:06:05] High Park area to bring those smaller [1:06:08] business in businesses in to survive. [1:06:10] So, this is a great plan and I can't [1:06:13] wait to see it come to fruition. [1:06:16] Great. Thank you. [1:06:18] Yeah, I I agree with everything that's [1:06:20] um that's been said tonight. [1:06:22] Congratulations on getting to this [1:06:23] point. Um I guess my only comment is to [1:06:26] encourage [1:06:28] um that folks in the department continue [1:06:32] to evaluate the impacts of squares and [1:06:35] streets. Um we all know that there's [1:06:38] been many unintended consequences from [1:06:40] zoning initiatives in the past. this all [1:06:44] I think is headed in the right direction [1:06:46] and I just think we need to continue to [1:06:49] um evaluate things as they as they [1:06:52] unfold but uh congratulations on all the [1:06:55] work. Thank you. [1:06:57] Okay. Um additional questions or [1:06:59] comments? Um okay, so I have a couple. [1:07:02] Um so let's start. Um you know I'll echo [1:07:06] all the kudos. Uh definitely plus one [1:07:08] for me on that. um particularly the [1:07:10] evolution of our public engagement um [1:07:12] process. Uh again, I've been on the [1:07:15] board for almost 11 years um and it's [1:07:17] come a long way. So, just want to um [1:07:19] thank you for that um and encourage you [1:07:21] to keep um uh keep up with you know um [1:07:26] the uh communication needs and channels [1:07:28] of uh that are kind of uh most used in [1:07:31] in each neighborhood. So something I [1:07:33] definitely saw and have seen over the [1:07:35] squares and streets, different ways that [1:07:37] you are um using by neighborhood to [1:07:40] engage with with residents. So um so [1:07:42] just keep up the good work on that. Um I [1:07:45] did want to um kind of piggybacking a [1:07:48] little bit off of um uh Miss Bennett. So [1:07:52] how do these planned, right, these [1:07:55] zoning uh recommendations, how does that [1:07:58] eventually get realized? Right. So we've [1:08:00] got a plan. this is what we would like [1:08:02] to see. Um, how does, you know, how do [1:08:05] some of those benefits end up coming um [1:08:08] to fruition? [1:08:15] And what does this vote do to kind of [1:08:16] help move that process or speed up that [1:08:18] process along? But we can [1:08:22] I think Caitlyn will help answer that [1:08:24] question. [1:08:26] Hi guys, Caitlyn Copinger, deputy [1:08:28] director of comprehensive planning. Um [1:08:30] so the first thing that this plan will [1:08:31] actually do is take the step to go [1:08:33] towards um zoning commission where the [1:08:35] zoning will actually get realized. Uh so [1:08:37] when a project does want to come forward [1:08:39] we're kind of removing some of the [1:08:40] barriers to existing um development such [1:08:43] as uh variances for height use things [1:08:46] like that. So uh what we've seen in [1:08:48] other squares and streets districts to [1:08:50] be able to move forward is that we [1:08:51] actually have a lot of new businesses [1:08:52] opening first uh without actually any [1:08:54] development happening. Um and then if a [1:08:57] project does want to move forward, um we [1:08:59] are able to kind of bring that process [1:09:01] forward and they don't actually have to [1:09:02] go through the zoning board of appeals. [1:09:04] Uh the squares and streets districts do [1:09:06] still have to uh for the most part go [1:09:07] through article 80. So they'll come [1:09:09] through this board and go through a [1:09:10] public process. Um but one of the things [1:09:12] that you'll actually see realized first [1:09:14] is the uh Pinky Street parcel is owned [1:09:16] by the BPDA and uh once we have this [1:09:19] process move forward, we're going to uh [1:09:20] put that forward for disposition for [1:09:22] affordable housing. [1:09:23] Okay. Great. Great. um and um [1:09:28] definitely acknowledge that a lot of [1:09:30] conversation with the community was had [1:09:32] and and a back and forth. Um kind of if [1:09:34] you could just go over, you know, some [1:09:36] of the major points of um maybe initial [1:09:39] opposition or or items that you um you [1:09:42] know really worked with the residents to [1:09:44] kind of come to a consensus. and of that [1:09:47] are particularly of interest for me was [1:09:49] you know this fear of um the commercial [1:09:51] gentrification or the displacement right [1:09:53] of the existing small businesses that [1:09:55] are there and um [1:09:58] uh you know many of them [1:10:00] immigrant-owned. Um also um trying to [1:10:04] get a sense of the the height limits. I [1:10:05] know there was a lot of discussion and [1:10:07] changes on that. So just an overview of [1:10:10] um that uh issue and and mitigation. Um, [1:10:15] and then finally, the Winthrop Street [1:10:18] Lot. Um, so just want to get an overview [1:10:20] of why uh, you know, why we're pausing [1:10:24] development on that win on that street [1:10:25] lot for the 5 years. Um, that was a lot [1:10:28] I know. So, we can chip away. [1:10:31] Yeah. I I think your your last question [1:10:33] is also part of the answer to your first [1:10:35] question because that was um like we had [1:10:38] discussed whether that was one of the [1:10:40] lots that we should discuss for [1:10:43] disposition, you know, developing that [1:10:45] for affordable housing while maintaining [1:10:46] some of the parking, but that was [1:10:48] something that was a big priority for [1:10:49] the community to maintain that parking. [1:10:52] There's like BTDA lots on BTD lots in [1:10:56] the area that you have to pay for. So, [1:10:58] um, that law is really important to [1:11:00] people because it's free, which is a [1:11:03] really, you know, obviously an important [1:11:04] priority. Um, so that was one. Um, I [1:11:09] think the the things that I went through [1:11:11] with the zoning like, um, on I guess [1:11:14] this wasn't, uh, one of the highlighted [1:11:17] ones on the last zoning slide, but the, [1:11:20] um, river streets, we had initially uh, [1:11:23] proposed as S4 and then S36. Um, but the [1:11:29] the narrowness of that street and a lot [1:11:31] of the small businesses there, people [1:11:33] were really concerned about allowing [1:11:35] that level of density and that's why it [1:11:36] is now SC. [1:11:39] Okay. Um, and how about the um what was [1:11:44] the other one? Oh, the height the height [1:11:46] limits um [1:11:48] or did you just answer that and I I [1:11:51] don't really know what all the [1:11:52] Oh, yeah. I should say and all the [1:11:55] things. [1:11:55] So we had initially proposed for like [1:11:57] reverse street we were proposing seven [1:11:59] stories. We also discussed six stories [1:12:02] um and we ended up with four stories [1:12:04] because the that is a area where people [1:12:06] are particularly sensitive about the [1:12:07] height and density. [1:12:09] So with that so is four stories is that [1:12:11] what's kind of already there? [1:12:15] That's what's already allowed there. The [1:12:16] actual um buildings are one two stories. [1:12:20] Okay. So we're not really are we [1:12:22] creating ability for additional density [1:12:25] in other areas? [1:12:26] Yeah, with that zoning there, we're not [1:12:29] expecting um like development. [1:12:31] Okay. [1:12:32] Because it's it's very similar to the [1:12:34] existing zoning. [1:12:36] Okay. Um but from a from a density [1:12:39] perspective, so here's here's I'm not [1:12:40] going to think this. I see that there [1:12:43] are so many transit oriented transit [1:12:46] nodes, right? And obviously, you know, [1:12:48] transit based development is um is what [1:12:52] uh we've been been pushing. So, I'm just [1:12:54] trying to get a sense of like is this [1:12:56] density the right density, right, for um [1:13:01] this type of these type of uses, right? [1:13:03] And and from a transportation [1:13:05] perspective, just given that there's [1:13:07] just a lot of access here. Um but I'm [1:13:10] not totally Yeah. Anything you can say [1:13:12] on that? Yeah, I think a lot of the [1:13:13] areas where we still have S36 zoned is [1:13:16] where we [1:13:17] which is what S36 [1:13:18] the sixstory district. [1:13:20] Okay. [1:13:20] Um which is all the pink on the right [1:13:23] hand side. [1:13:24] Um is a lot of the places that we has a [1:13:27] lot that like higher density potential. [1:13:30] Um like that also includes the Pingri [1:13:32] lot that that Caitlyn highlighted one of [1:13:34] our disposition lots that's on going to [1:13:37] be right off of High Park A in one of [1:13:39] the sixstory areas. Um, also on Walnut [1:13:43] Street that's four stories, but um, [1:13:47] currently a lot of those lots are [1:13:49] vacant, so four stories is actually a [1:13:51] lot more potential for for um, [1:13:54] residential development. [1:13:55] Okay. [1:13:57] Okay. Um, I'm going to add one um, small [1:13:59] point. So the SC district is something [1:14:01] that the High Park community really [1:14:03] wanted to to maintain the existing kind [1:14:06] of fabric of Clearary Square without [1:14:08] potentially adding um you know what they [1:14:11] consider significant density. I think [1:14:13] that what we consider significant [1:14:14] density changes across the city and who [1:14:16] you actually talk to. But the SC really [1:14:19] does uh maintain that true commercial [1:14:21] core. And we wanted to focus the density [1:14:24] along kind of um High Park AB and the [1:14:26] intersection of River Street right [1:14:27] there, which is why you see the [1:14:29] difference between SC and the S36 kind [1:14:32] of in that that core um as well. And um [1:14:35] a lot of the existing uses there will [1:14:37] now become allowed uses. So we are [1:14:39] allowing for businesses to stay and kind [1:14:41] of grow. [1:14:42] Yeah. [1:14:43] Cool. So I think that's I think that's [1:14:45] really great great great great progress [1:14:47] right and um um but just to kind of note [1:14:51] from a board perspective trying to kind [1:14:53] of compare right um how we're selecting [1:14:56] these squares and streets why we [1:14:57] selected these particular corridors as [1:15:00] um as opportunity for density. Um so [1:15:04] again happy that you know that the [1:15:07] process went and and if so if something [1:15:10] were if we if and a developer wanted to [1:15:12] increase right that density from what [1:15:14] that is what process would that would [1:15:17] that go under for specific project. [1:15:19] Um so if a project is zoned as of right [1:15:21] under the new zoning they're able to [1:15:23] move forward um with the article 80 um [1:15:25] trigger if they see fit. Uh we have [1:15:28] talked to some developers where they're [1:15:30] like, "Hey, what if we do want to come [1:15:31] in higher?" We're happy to have that [1:15:33] conversation and potentially reszone for [1:15:35] a project once it goes through the [1:15:37] article 80 process. Uh we're happy to, [1:15:39] you know, have that conversation if the [1:15:41] project is in support of the community. [1:15:43] Okay. Um great. And I'm just going to [1:15:46] challenge us all as an agency and as a [1:15:49] um as a community and and fellow [1:15:51] residents to um you know as we come to [1:15:54] these consistent consensus be thinking [1:15:56] about the entire housing need that we [1:15:59] need not just for this particular you [1:16:01] know um we need to make available for [1:16:03] this particular neighborhood but across [1:16:05] the city and what that the the the [1:16:07] magnitude of what that is. So just [1:16:09] keeping that in mind of the size of the [1:16:11] the um challenge that we have as we are [1:16:14] going through these processes. Again we [1:16:16] we're I think it's been you know a great [1:16:18] process and I love uh what we're coming [1:16:20] up on but um it's just something that [1:16:22] I'm kind of uh yeah you know looking at [1:16:26] to make sure that when we're doing this [1:16:28] zoning right that we are um allowing for [1:16:31] that capacity and we're not just [1:16:33] recreating the same like well then [1:16:35] everything else needs to get go through [1:16:37] this variance process. So, I'm just [1:16:38] going to challenge us a little bit [1:16:40] overall on that. But I think this is [1:16:41] fabulous. Um, and really excited about [1:16:45] um all of this in the catalytic areas um [1:16:49] uh parcels in particular. Um I think [1:16:51] it's going to bring some really great [1:16:53] things. So, any other questions? [1:16:57] Hearing and seeing none. Uh motion is in [1:16:59] order. [1:16:59] Excuse me. [1:17:00] Oh, no. I have to read one and then I [1:17:03] have to read another one. So, I'm going [1:17:04] to read the first one first. Ah, what [1:17:07] would I do without Bridget? Okay. Item [1:17:10] number 16, request authorization to [1:17:12] adopt Clearary Square, Clearary Square [1:17:14] squares and streets small area plan, [1:17:17] which will guide future development, [1:17:18] direct capital investments to design [1:17:20] safer streets, enhance the public realm, [1:17:23] and advance policies and programmatic [1:17:25] investments to increase small business [1:17:26] longevity and housing supply and [1:17:28] affordability within the Clearary Square [1:17:30] squares and streets study area through [1:17:32] recommendations for a land use and [1:17:34] design framework, targeted programmatic [1:17:36] and policy investments, and regulatory [1:17:38] mechanisms. [1:17:39] A motion is in order. [1:17:40] So moved. [1:17:41] Second. [1:17:41] All those in favor? I opposed. The eyes [1:17:44] have it. Item number 17, request [1:17:46] authorization to petition the zoning [1:17:48] commission to adopt map amendments to [1:17:50] zoning map 12 and the associated text [1:17:52] amendment to article 69 to establish [1:17:55] squares and streets districts that are [1:17:57] regulated by article 26 and associated [1:17:59] base code articles with clear square and [1:18:02] to remove named neighborhood business [1:18:05] subdists which are overwritten by the [1:18:07] newly mapped squares and streets [1:18:09] districts and add language to maintain [1:18:11] application of the existing neighborhood [1:18:14] design overlay district in newly mapped [1:18:16] squares and street district and to [1:18:18] revise outdated language. A motion is in [1:18:20] order. [1:18:21] So move. [1:18:21] Second. [1:18:22] All those in favor? I opposed. The eyes [1:18:24] have it. Motion passes. Um thank you [1:18:27] very much for your presentation. Thank [1:18:29] you. [1:18:30] Okay. [1:18:32] Item number 18. No. Yes. Yes. Item [1:18:35] number 18th. request authorization to [1:18:37] position the zoning commission to adopt [1:18:39] text amendments for the Boston zoning [1:18:41] code that update the zoning definitions, [1:18:43] remove redundancy, and streamline the [1:18:45] code structure related to dimensional [1:18:48] requirements. Maya, [1:18:50] hi. Um to reate for the record, my name [1:18:52] is Maya Catler Golds. I'm a planner on [1:18:54] the zoning reform team. Um I will now be [1:18:56] presenting uh zoning amendments to [1:18:59] update the dimensional definitions and [1:19:00] code structure. [1:19:02] Um so the Boston zoning code currently [1:19:05] contains sections explaining what [1:19:07] dimensions are and how they are measured [1:19:09] in various articles throughout the code. [1:19:11] This is mostly in article 2 which is the [1:19:13] definitions article but these are but [1:19:15] there are also similar information in [1:19:17] article 12 uh through 22 as well as the [1:19:20] neighborhood district articles. Many of [1:19:22] these articles contain redundant text [1:19:24] which and which sections apply to which [1:19:27] districts of the city is unintuitive. [1:19:30] In addition to these structural issues, [1:19:32] many of these definitions and provisions [1:19:34] are outdated. [1:19:35] With these issues in mind, the goals of [1:19:37] this zoning amendment uh before you [1:19:39] today are to remove the redundancy and [1:19:42] streamline code structure for def um [1:19:44] dimensional measurements, add visual [1:19:47] diagrams, and update the language to [1:19:48] make the zoning easier to understand, [1:19:51] and update outdated definitions and [1:19:53] provision to align with our current [1:19:55] practice and planning goals. Next slide. [1:20:01] Um we did a lot of collaboration across [1:20:03] teams and departments to arrive at the [1:20:05] draft we have today. This included a [1:20:08] number of focus group meetings with [1:20:10] staff in the urban design division and [1:20:12] the in inspectional services departments [1:20:14] and review from staff on those teams as [1:20:16] well as planning and zoning. In terms of [1:20:19] external review, in addition to a public [1:20:21] meeting and weekly office hours during [1:20:23] the seven-week comment period, we had [1:20:25] four focus group meetings with land use [1:20:27] attorneys and designers which yielded [1:20:29] really helpful feedback. Um, next slide. [1:20:34] Uh, to give you a sense of the scope of [1:20:36] this project. Um, in this proposed text [1:20:39] amendment about 23 definitions are being [1:20:41] amended in a substantive way. [1:20:44] 20 uh definitions are just being updated [1:20:47] without changing the meaning but just [1:20:49] clarifying. 25 definitions are having [1:20:53] visual diagrams added. 23 definitions [1:20:57] are being deleted. Most of those are for [1:20:59] terms that are actually not used in the [1:21:01] code. Um and additionally nine articles [1:21:03] are being deleted because we're [1:21:04] consolidating them into a single [1:21:06] article. Next slide. [1:21:10] first to explain the code streamlining [1:21:12] part of this amendment. This text [1:21:14] amendment includes a major [1:21:15] simplification to the code structure by [1:21:17] consolidating the original base code [1:21:20] articles into a single article. [1:21:22] Currently, articles 12 through 22 in the [1:21:25] code are part of the original uh zoning [1:21:27] code that was written in 1965. So, 1964. [1:21:31] Uh these are sometimes referred to as [1:21:33] the base code because they used to apply [1:21:35] to the whole city. However, these [1:21:37] articles have now been superseded in [1:21:38] most of the city by the neighborhood [1:21:40] articles and newer city-wide districts, [1:21:43] meaning these articles only apply to a [1:21:45] few older parts of the city such as [1:21:46] Beacon Hill and Backbay. As part of this [1:21:49] amendment, we are consolidating these [1:21:50] articles into one article to simplify [1:21:53] the code and remove redundancy while [1:21:55] keeping the existing regulations in [1:21:57] place. Most of this existing text is [1:21:59] already repeated in article 2 or is [1:22:02] outdated and therefore can be deleted. [1:22:04] The text which is specifically needed to [1:22:06] regulate these existing base code [1:22:08] districts is being moved to a new [1:22:10] consolidated article 13. Next slide. [1:22:16] As I mentioned before, we're adding many [1:22:19] diagrams throughout the definitions. Um [1:22:21] this is to give you a sense of what they [1:22:23] look like. We try to give clarity to the [1:22:26] definitions by showing examples of [1:22:28] various lot shapes and showing things in [1:22:30] three dimensions as needed. Next slide. [1:22:35] Um, in addition to the structural and [1:22:37] clarifying updates, this amendment makes [1:22:39] various refinements to align the [1:22:41] definitions with current practice or [1:22:44] planning goals. I'll walk through the [1:22:46] most consequential in the following [1:22:47] slides um at a very high level. Uh, but [1:22:51] we have summary slides that go through [1:22:52] these on in much more depth on our [1:22:54] websites and I can of course answer [1:22:56] questions at the end. Next slide. [1:23:01] Um, we made various refinements to lot [1:23:04] lines and yard designations to simplify [1:23:06] zoning and improve outcomes for [1:23:08] irregular lots. This includes making it [1:23:11] so the lot line designation and the yard [1:23:13] designation is always the same and [1:23:15] clarifying that additional frontages on [1:23:18] streets over 20 ft always require a [1:23:20] front yard. [1:23:22] We also removed the exemption that [1:23:24] allowed building elements such as bay [1:23:26] windows, porches, and balconies to [1:23:27] encroach into required yards. [1:23:30] This means that yards will be open to [1:23:31] the sky and not contain substantial [1:23:33] building elements, which is more [1:23:35] consistent with how residents generally [1:23:37] view yards and open space. Um, as we [1:23:40] reszone, we will continue to rightsize [1:23:42] yard requirements so that these types of [1:23:44] building elements can be built without [1:23:46] having to encroach into required yards. [1:23:49] Additionally, we are making things like [1:23:51] porches and balconies excluded from the [1:23:53] measurements of building dimensions such [1:23:55] as building floor plates and building [1:23:56] width, which makes these structures [1:23:58] easier to build and maintain maintain. [1:24:01] Next slide. [1:24:04] Um, moving on to a few updates related [1:24:07] to lot measurements. Um, this amendment [1:24:09] clarifies that floor area ratio is [1:24:12] calculated using the definition of lot [1:24:14] area. This is important because the [1:24:16] definition of lot area specifies [1:24:19] exclusions such as open water. So using [1:24:22] this term in the definition of F will [1:24:24] create a more clear and consistent [1:24:26] interpretation of how to calculate it. [1:24:29] Um this amendment also updates the lot [1:24:31] area definition to no longer exclude [1:24:34] publicly accessible sidewalks on private [1:24:36] property. This is to avoid penalizing [1:24:39] property owners who creates new publicly [1:24:42] accessible sidewalks on their property. [1:24:45] Lastly, we updated the permeable area of [1:24:48] lot definition to include area in the [1:24:50] public right ofway created by an article [1:24:53] 80 or article 28 project in order to [1:24:55] give a zoning benefit to property owners [1:24:58] for creating a new public benefit in the [1:25:00] public right ofway. [1:25:02] Next slide. [1:25:06] This amendment updates the building [1:25:07] height definition to be measured to the [1:25:10] exterior rather the interior rather than [1:25:12] the interior of the roof which aligns [1:25:15] with the building code as well as visual [1:25:17] perception. [1:25:18] We also expanded heights exemptions to [1:25:21] allow for rooftop solar and roof decks. [1:25:24] We also made the heights definition more [1:25:26] consistent across the city by removing [1:25:29] an exemption which only applied in [1:25:30] downtown which is also no longer [1:25:33] necessary given given the updated [1:25:35] skyline and Chinatown zoning. Next [1:25:37] slide. [1:25:40] Lastly, we created a new definition for [1:25:42] a sloped roof story. This is to use for [1:25:45] the new dormer districts that are being [1:25:47] drafted as part of the neighborhood [1:25:49] housing zoning initiative. The purpose [1:25:51] of the sloped roof story requirement is [1:25:53] to use instead of a halfstory [1:25:55] requirement because during neighborhood [1:25:57] housing engagement, we heard that [1:25:59] requiring this design feature of a [1:26:01] sloped roof is important in some areas [1:26:04] more so than limiting the usable area [1:26:06] with a halfstory requirement. [1:26:09] Next slide. [1:26:11] Um so to briefly recap this amendment um [1:26:14] achieves we're removing redundancy and [1:26:16] streamlining the code by consolidating [1:26:18] the base code articles from 10 to one. [1:26:21] We added diagrams for 25 definitions and [1:26:24] additionally clarify the language for 20 [1:26:26] definitions. We updated about 23 [1:26:30] definitions to better align with current [1:26:32] practice and planning goals. Thank you [1:26:34] and I'm happy to take any questions. [1:26:36] Thank you. Any questions or comments [1:26:38] from the board? [1:26:41] Excellent work. Um but uh a motion is in [1:26:45] order. Yeah. [1:26:46] So moved. [1:26:46] Second. [1:26:47] All those in favor? I opposed. The eyes [1:26:50] have it. Motion passes. Thank you very [1:26:51] much, Maya. Good job. [1:26:54] Okay. Item number 19, request [1:26:57] authorization to adopt a text amendment [1:26:59] to article 68 and a map amendment to [1:27:02] zoning map 4f to allow for plan [1:27:05] development areas to be permitted in the [1:27:08] waterfront manufacturing subdist and [1:27:10] clarify the boundary between the first [1:27:12] street local industrial and the [1:27:15] waterfront manufacturing subdists. [1:27:17] Michelle, good afternoon chair, members [1:27:19] of the board and director Shan. My name [1:27:21] is Michelle Ye and I am a planner on the [1:27:23] planning review team coming to you with [1:27:25] a little bit different than what I'm [1:27:26] usually here for. So today I'll be [1:27:28] presenting an administrative update to [1:27:30] article 68 and map 4f. As part of this [1:27:33] process, we had a public meeting on [1:27:35] September 22nd and offer two office hour [1:27:38] sessions to present the proposed [1:27:40] amendments and provide an opportunity [1:27:42] for the public to ask questions and [1:27:44] share feedback. Article 68 was initially [1:27:46] codified through the 2011 East and West [1:27:49] B Street Planning and Zoning Initiative. [1:27:51] This map from the Boston Zoning Viewer [1:27:53] shows where PDAs are currently allowed [1:27:55] near the reserve channel. The area that [1:27:57] we are discussing today is the [1:27:59] waterfront manufacturing or WM subdist [1:28:02] where PDAs are not currently allowed. [1:28:05] Planning department staff recommend an [1:28:07] amendment to section 68-24 of article 68 [1:28:10] which identifies the subdists where PDAs [1:28:13] may be proposed. [1:28:14] Specifically, the amendment would add [1:28:16] waterfront manufacturing or WM to that [1:28:19] list. Next slide, please. [1:28:24] To accompany this text amendment, we are [1:28:26] also proposing an amendment to map 4F. [1:28:28] On the left is the current zoning and on [1:28:30] the right is the proposed zoning. As you [1:28:32] can see, the main difference is that the [1:28:34] boundary for the WM subdist will be [1:28:36] extended to West First Street. This [1:28:38] change will help align the boundary [1:28:40] between the west between sorry between [1:28:42] the first street local industrial and [1:28:44] the WM subdists with current and [1:28:46] projected land use patterns. The [1:28:48] proposed amendments would allow PDAs to [1:28:50] be proposed within the WM subdist which [1:28:53] is not currently permitted. This would [1:28:55] allow for greater flexibility for [1:28:57] complex development proposals and allow [1:28:59] for the consideration of public benefits [1:29:01] through the PDA develop through the PDA [1:29:03] process. To this end, my planning [1:29:06] department colleagues from development [1:29:08] review are currently facilitating a [1:29:10] public review process for the reserve [1:29:12] channel development project. Tonight's [1:29:14] amendment are an enabling step that [1:29:16] would allow a PDA to be proposed by the [1:29:18] reserve channel project. Upon conclusion [1:29:21] of the community process for the reserve [1:29:22] channel project, sorry, for the reserve [1:29:25] channel project, staff will return to [1:29:27] the board to present the actual content [1:29:28] of the reserve channel development [1:29:30] proposal for your review. And thank you. [1:29:32] I'm happy to answer any questions that [1:29:34] you may have. [1:29:34] Okay. Thank you. Questions or comments [1:29:36] from the board? [1:29:39] All right. Hearing and seeing none, a [1:29:40] motion is in order. [1:29:41] So moved. [1:29:41] Second. [1:29:42] All those in favor? I opposed. The eyes [1:29:45] have it. Thank you, Michelle. Item [1:29:47] number 20. request authorization to [1:29:49] grant permission to the director of [1:29:51] planning and zoning to sign the [1:29:53] municipal plan board notification form [1:29:56] on behalf of the board signifying that [1:29:58] the board has been notified of the [1:30:00] intention of Clippershift Warf [1:30:02] Multifamily Holdings LLC to file a [1:30:05] chapter 91 license amendment application [1:30:07] with the Department of Environmental [1:30:09] Protection. Ted, [1:30:12] good afternoon, Chair Rojos, Chief Shen, [1:30:14] and members of the board. My name is Ted [1:30:16] Schwarzburg. I'm the assistant deputy [1:30:18] director for planning review. My I'm [1:30:20] here to inform you that Clippership [1:30:22] Multif Family Holdings LLC has submitted [1:30:25] an application to the state department [1:30:27] of environmental protection to amend its [1:30:30] chapter 91 license. As you'll see in the [1:30:32] image on the left, uh there are two [1:30:34] peers to this building. Uh the one on [1:30:37] the right was designed as a restaurant [1:30:38] space and the one on the left was [1:30:40] designed as a kayak rental facility. Uh [1:30:43] in the near 10 years since this board [1:30:45] originally approved this project, the [1:30:47] property owner has been unable to find [1:30:49] uh a tenant to operate the kayak rental [1:30:52] facility and subsequently rented out [1:30:54] that space for use as a restaurant which [1:30:56] is in operation today. Uh the property [1:30:59] owner now seeks to amend their license [1:31:01] and the vote before you today uh is to [1:31:04] signify that I've made you aware of [1:31:06] this. Uh and while this board is not [1:31:08] reviewing or approving this application [1:31:10] that is being done by the state, uh I [1:31:13] went out to to this site with the uh [1:31:16] director of the waterways program at the [1:31:17] state uh just to make sure that all [1:31:19] their harbor walk and public access [1:31:21] signage comports with what's required [1:31:23] and he's going to make sure that those [1:31:25] signs are adjusted to uh facilitate [1:31:28] public access in all the places where it [1:31:29] should be allowed. Uh so that is all I [1:31:32] have for you and happy to answer any [1:31:33] questions. Thank you. Okay. Questions or [1:31:36] comments from the board? [1:31:37] So, what are we voting on? [1:31:39] So, you're voting [1:31:39] Sorry, a little bit. I was just like, [1:31:41] can you Yeah, [1:31:42] you're voting to uh allow Chief Shen to [1:31:46] sign a form that says that I've told you [1:31:49] that uh this group is applying to amend [1:31:51] their license, [1:31:52] right? They're applying to amend. And [1:31:55] so, are there current [1:31:58] because they're changing the use of the [1:32:01] canoe thing, the kayak thing, [1:32:02] right? They couldn't find a tenant to [1:32:04] operate the kayak facility and they went [1:32:07] ahead and rented it out to a restaurant [1:32:08] which is actually maybe not such a bad [1:32:10] thing because that's still a way of [1:32:12] bringing people to the waterfront and [1:32:13] allowing them into a space that's open [1:32:15] to the public. Uh and um this is maybe a [1:32:18] compromise that's the next best thing. [1:32:21] Uh and uh they're now applying after the [1:32:23] fact to have their license with the [1:32:25] state reflect the condition on the [1:32:26] ground. [1:32:27] Okay. Um All right. So, uh, we're [1:32:31] and I'm just here to notify you. [1:32:34] Notify. Okay. [1:32:35] Yeah. [1:32:36] Understood. [1:32:36] So, Madam Chair, if we were to vote no, [1:32:39] then Chief Shed could not sign the [1:32:41] letter. And what would happen to the [1:32:43] restaurant? [1:32:45] Well, uh, [1:32:47] it's it's a, uh, the restaurant has been [1:32:49] in operation now for a few years, uh, in [1:32:52] in a way that's not consistent with [1:32:54] their license. Um, and, um, I I have [1:32:58] actually notified you. So, uh, I think [1:33:00] that [1:33:01] half would probably at their discretion, [1:33:03] uh, look at the record of what's [1:33:05] happening tonight, uh, to to understand [1:33:08] if it's appropriate to amend the license [1:33:09] or not. [1:33:10] Well, I I will be voting yes, but [1:33:12] perhaps this could be some when we're [1:33:14] the the the department is doing such a [1:33:15] great job cleaning up some of the [1:33:17] antiquated language and codes. Maybe [1:33:18] this is uh worthy of a discussion going [1:33:20] forward because it seems um needlessly [1:33:23] ownorous, but I will happily support. [1:33:25] Yes. So that Chief Shen can sign off. [1:33:28] Okay. Just for the record, I can't do [1:33:29] anything without your authority. [1:33:31] You can't. You can't. [1:33:34] Um, okay. Any additional questions or [1:33:37] comments? [1:33:39] Okay. Um, a motion is in order. [1:33:41] So, moved. [1:33:42] Second. [1:33:42] All those in favor? I opposed. The eyes [1:33:45] have it. Motion passes. Thanks for the [1:33:47] notification. [1:33:49] All right. Item number 21. requests [1:33:51] authorization to issue a certificate of [1:33:53] completion for the successful completion [1:33:55] of the phase 3 landmark center [1:33:57] redevelopment project located at 421 [1:34:00] Park Drive in the Fenway neighborhood in [1:34:02] accordance with section C.4 of the [1:34:04] cooperation agreement by and between the [1:34:06] Boston Redevelopment Authority doing [1:34:08] business as the Boston Planning and [1:34:09] Development Agency and AR-MA [1:34:13] region number 112 owner LLC dated [1:34:17] December 20th 2022. This is certificate [1:34:21] of completion. So there's no [1:34:22] presentation. A motion is in order. [1:34:25] So moved. [1:34:25] Second. [1:34:26] All those in favor? I oppose. The eyes [1:34:28] have it. Motion passes. Okay. So now [1:34:32] we're going to go through. Okay. I'm [1:34:34] going to announce the next four items [1:34:36] are going to be presented jointly with [1:34:38] separate board votes to follow. [1:34:41] So I will read each one first and then [1:34:44] we'll do the presentation and then we'll [1:34:46] take the board after that. The vote [1:34:47] after that. [1:34:49] Um, all right. Item number 22. Request [1:34:52] authorization to adopt a demonstration [1:34:55] project plan under Massachusetts General [1:34:57] Law Chapter 121B [1:34:59] section 46F for the proposed project [1:35:02] located at Alustin Yards uh, building D [1:35:06] in Alustin. Should we take a break? [1:35:09] Do you need to take a break? [1:35:12] No, no, no, no, no, no. But maybe we [1:35:15] could all take a break though. Can we [1:35:16] take a fivem minute break just before we [1:35:18] get into this big long thing [1:35:19] if you would like [1:35:20] just so that we can all before because [1:35:22] the rest of the meeting is going to be a [1:35:24] little longer. So we usually break uh we [1:35:26] have no public hearings today so we're [1:35:27] just going to take a five minute break. [1:35:28] Sorry. Um sorry not sorry we need to [1:35:31] take a little break. Um but we'll be [1:35:34] back in five minutes. Um and then we'll [1:35:35] we'll resume the next one just because [1:35:37] it's a big one. Sorry. [1:35:42] Wait a second. I got to go. [1:46:33] through items number 22, 23, 24, and 25. [1:46:37] Um, I'm going to read them all and then [1:46:38] we're going to have one presentation. [1:46:40] Item number 22, request authorization to [1:46:43] adopt a demonstration project plan under [1:46:45] Massachusetts General Law, chapter 121B, [1:46:48] section 46F for the proposed project [1:46:50] located at Alustin Yards, building D in [1:46:52] Alustin. [1:46:54] uh to adopt certain findings related to [1:46:57] the demonstration project plan, [1:46:59] including without limitation that the [1:47:01] proposed project constitutes a [1:47:03] demonstration project and authorize the [1:47:05] director to enter into a contract for [1:47:07] payment in lie of taxes agreement [1:47:09] pursuant to MGL chapter 121B section 16 [1:47:14] as amended between the city of Boston, [1:47:16] the BRA and the proponent in connection [1:47:18] with the proposed project and to [1:47:20] authorize a director to execute and the [1:47:22] BRA to accept a quick claim deed for [1:47:25] temporary limited property interest in [1:47:27] the project site and to enter into an [1:47:30] indemnification agreement with the [1:47:32] proponent and to take all related [1:47:34] actions. Item number 23, request [1:47:36] authorization to adopt a demonstration [1:47:38] project plan under Massachusetts General [1:47:40] Law Chapter 121B section 46F for the [1:47:43] proposed project located at 83 Leo [1:47:45] Birmingham Parkway in Brighton and to [1:47:47] adopt certain findings related to the [1:47:49] demonstration project plan and authorize [1:47:52] the director to enter into a contract [1:47:54] for payment in lie of taxes between the [1:47:56] city of Boston, the BRA and the [1:47:58] proponent in connection with the [1:47:59] proposed project and to authorize the [1:48:02] director to accept a quick claim deed. [1:48:04] for a certain temporary limited property [1:48:06] interest in the in the project site and [1:48:08] to take all related actions. Item number [1:48:11] 24, request authorization to adopt a [1:48:13] demonstration project plan under [1:48:15] Massachusetts General Law, Chapter 121B, [1:48:17] section 46F for the proposed project [1:48:20] located at 22 through 24 Pratt Street in [1:48:22] Alustin, and to adopt adopt certain [1:48:25] findings related to the demonstration [1:48:27] project plan and to authorize the [1:48:29] director to enter into a contract for [1:48:31] payment in lie of taxes between the city [1:48:33] of Boston, the BRA, and the proponent in [1:48:35] connection with the proposed project and [1:48:37] to authorize the director to accept a [1:48:40] quick claim deed for a certain temporary [1:48:43] limited property interest in the project [1:48:44] site and to take all related actions. [1:48:47] And then finally, item number 25, [1:48:50] request authorization to adopt a [1:48:52] demonstration project plan under [1:48:53] Massachusetts General Law, Chapter 121B, [1:48:56] section 46F for the proposed project [1:48:58] located at 1 Mystic Avenue in [1:49:00] Charleston, and to adopt adopt certain [1:49:03] findings related to the demonstration [1:49:05] project plan, and to authorize the [1:49:07] director to enter into a contract for [1:49:09] payment and low of taxes between the [1:49:11] city of Boston, the BRA, and the [1:49:13] proponent in connection with the [1:49:14] proposed project, and to authorize a [1:49:16] director to accept a quick claim deed [1:49:18] for a certain temporary limited property [1:49:21] interest in the project site and to take [1:49:22] all related actions. [1:49:26] Oh, but before we do that, uh we have [1:49:29] councelor uh Breeden who uh is here that [1:49:32] we were going to take out of order and [1:49:34] um yeah, the floor is yours, counselor. [1:49:38] Oh, [1:49:38] off mute. You're can't hear you yet. [1:49:45] Still on mute. [1:50:16] There we go. Yeah, we got it. [1:50:18] Technical difficulties. Good afternoon. [1:50:21] Uh, thank you, chair, for allowing me to [1:50:23] come in and speak out of order. Um, and [1:50:26] thank you members of the board uh for [1:50:28] having me today. As the Boston City uh [1:50:31] council president um and also as the [1:50:34] councelor representing Alustin Brighton, [1:50:37] I'm here today to express my support for [1:50:39] the three projects in District 9 seeking [1:50:42] approval as demonstration projects. If [1:50:45] approved by the board, the BPDA and the [1:50:48] city of Boston will be authorized to [1:50:50] offer targeted tax relief to these [1:50:52] important projects, enabling their [1:50:55] construction. In the midst of an acute [1:50:57] housing shortage, Boston is has been [1:51:00] housing has seen housing construction [1:51:03] stall due to factors that include high [1:51:05] interest rates, rising construction [1:51:08] costs, tariffs, and broader economic [1:51:10] conditions. These three projects located [1:51:13] in Alustin Brighton under consideration [1:51:15] for demonstration project status and [1:51:18] associated tax abatements today are 83 [1:51:21] Leo Birmingham Parkway, 22 to 24 Pratt [1:51:25] Street and building D of the larger [1:51:27] Alustin Yards project. In total, these [1:51:31] three developments will bring [1:51:32] development projects will bring nearly [1:51:34] 1,000 muchneeded housing units to [1:51:36] Alustin, Brighton, and to Boston while [1:51:39] also delivering income restricted [1:51:41] housing, public realm improvements, and [1:51:44] transportation benefits. These approved [1:51:47] projects have broad neighborhood [1:51:48] support, and our community looks forward [1:51:51] to seeing them realized. However, they [1:51:54] have not yet been able to break ground. [1:51:57] The tax relief proposed for these [1:51:59] projects is a sensible proactive tool [1:52:02] that will enable these developments to [1:52:03] begin to struct construction next year. [1:52:07] The city must use all available tools to [1:52:10] increase housing production and get and [1:52:12] get stalled housing projects moving and [1:52:15] I'm very pleased to see that these two [1:52:17] 121B agreements under consideration by [1:52:20] the board and I fully support their [1:52:23] approval. Thank you so much for your [1:52:24] time this afternoon. Okay. Thank you, [1:52:26] councelor. Um, do we have anyone else [1:52:29] take out of order? [1:52:30] Nobody. [1:52:31] We're good. Okay, perfect. Um, Ruben, [1:52:33] floor is yours. [1:52:34] Thank you, Joe Rojos. Members of the [1:52:37] board, Chief Shen, um, my name is Ruben [1:52:39] Caner. I'm the senior policy adviser for [1:52:41] the the planning department. Uh before [1:52:44] uh I get into the slides really quickly [1:52:46] just agenda setting we're going to talk [1:52:47] a little bit about sort of why the city [1:52:50] is doing this what the parameters are [1:52:52] that are being considered and then we'll [1:52:54] dig into the um each of the four [1:52:55] projects. I also think it's worth [1:52:57] stating from the outset this is a [1:52:59] multi-jurisdictional effort. It wasn't [1:53:01] just the planning department alone. [1:53:03] Although this matter is before you, the [1:53:05] the um the besides the planning [1:53:07] department, mayor's office of housing, [1:53:09] the finance cabinet, the chief of [1:53:10] policy, the um the Boston Housing [1:53:13] Authority, there were a lot of uh of [1:53:15] staff that were involved in in putting [1:53:16] this together. And so with our gratitude [1:53:18] uh that we got to this point. Um so I [1:53:21] want to start by showing a little bit [1:53:22] about the economic conditions of the [1:53:24] city. Please uh go to the next slide. [1:53:27] So I want to start with rents. What [1:53:30] you're seeing here uh is some of the [1:53:32] dramatic rent increases that we have [1:53:34] experienced in the city in the last six [1:53:35] years. Onebs are up by 17% while four [1:53:38] bedrooms are up a pretty remarkable uh [1:53:40] almost 40% in the last 6 years. You [1:53:43] know, this is really having uh a pretty [1:53:46] uh big impact on the ability of our [1:53:48] residents to stay here in the city. Um [1:53:51] what I do want to point out really [1:53:52] briefly is if you look at from 2019 to [1:53:55] 2021 how rents were a little bit flat [1:53:57] and I think that can be explained a [1:53:59] little bit on the next slide if you can. [1:54:02] So what we see in the next slide is [1:54:04] vacancy rates uh over the last six years [1:54:06] have been consistently under 4%. Ex [1:54:10] except that brief period that I just [1:54:12] pointed out um in early 2020 into 21 [1:54:16] when we lost a lot of our student [1:54:17] population in the early days of COVID. [1:54:19] Um, so we saw students leave, rents [1:54:22] flatten, students came back. That's [1:54:24] that's not an anti- studentent thing. [1:54:25] That is just reality of of how the city [1:54:28] was impacted and how uh sort of the [1:54:30] direct correlation between vacancy rate [1:54:33] and uh and the rents. 4% vacancy rate [1:54:36] puts us among the lowest uh in the [1:54:39] country on par with cities like San [1:54:41] Francisco and New York that also have [1:54:42] the kinds of of challenges in their [1:54:44] increasing rents that we have. You know, [1:54:46] we would love to be up in that 6 7% [1:54:48] area, but right now we're targeting [1:54:50] just, you know, all the tools in the [1:54:52] tool belt to move us up just a little [1:54:53] bit to get over 5% where we think we can [1:54:55] start to really stabilize a lot of our [1:54:57] rents. Next slide, please. [1:55:01] So, because of the increasing uh rents [1:55:04] and increase in cost of living, you uh [1:55:06] have been made aware of the um the [1:55:09] city's first anti-displacement action [1:55:10] plan. I know that executive director [1:55:12] Lusk has been in here um to update you [1:55:15] on the details of that really quickly. [1:55:17] You know, we know about the four the [1:55:19] four Ps, right? The um the protect uh ex [1:55:22] existing renters, preserving existing [1:55:25] units, uh prospering, and in other [1:55:27] words, giving people an opportunity to [1:55:29] build uh wealth and build uh income to [1:55:32] be able to stay here, and what we're [1:55:34] talking about today, production. Uh from [1:55:36] the planning department, there are three [1:55:37] main initiatives uh really on on [1:55:39] production. um the housing accelerator [1:55:42] fund which we was announced a couple of [1:55:44] years ago, the office of residential [1:55:46] conversion program that is now in the [1:55:48] process of building about 2500 units of [1:55:50] of housing or in the pipeline to to [1:55:52] build 2500 units. Um and this new [1:55:55] initiative tax relief um to spur new [1:55:57] development. You know, this discussion, [1:56:00] you know, is is really focused obviously [1:56:02] on that third pillar. Um, and this again [1:56:04] just is one part of a larger plan to see [1:56:07] if we can sort of build more and and uh [1:56:10] sort of impact that supply demand curve. [1:56:12] Next slide, please. [1:56:15] So, what we're seeing here is just how [1:56:18] challenged the housing market has been [1:56:20] over the last 3 years. Between 2015 and [1:56:23] 2022, we were building on average over [1:56:26] 4,000 units of housing. Uh, we were [1:56:28] starting, I should say, construction on [1:56:29] between on over 4,000 units of housing. [1:56:32] uh in 23 24 and 25 that number dropped [1:56:35] to under 2500 units on the market rate [1:56:38] aside alone that's the blue line that is [1:56:41] a 50% reduction we have had the good [1:56:44] fortune of federal funds that have kept [1:56:46] uh our pipeline of affordable units [1:56:48] going um but those federal funds are [1:56:50] going to start drying up um as uh also [1:56:54] other sources of funds like linkage that [1:56:56] are starting to to dissipate um over [1:56:58] time u so really concerned about this [1:57:02] drop and how it's going to be able to [1:57:03] impact the city's ability to maintain uh [1:57:06] stable rents as well as the population [1:57:08] growth. I do think that the population [1:57:10] growth also is really a big part of it. [1:57:12] You know, in that same period of time [1:57:14] where we were building 4,000 units a [1:57:16] year, we also had about uh in the [1:57:18] 15-year period, we had a a 100,000 [1:57:21] person population increase in that same [1:57:23] time period. So, we were just barely [1:57:25] keeping up with the population growth um [1:57:27] due to a lot of the economic activity [1:57:28] that we see in the city. Next slide [1:57:31] please. [1:57:34] So a number of months ago we wanted to [1:57:37] really dig in and try to understand what [1:57:39] was happening in the construction [1:57:41] market. Why was development becoming so [1:57:43] challenge challenged and when did that [1:57:46] start? And in doing our internal sort of [1:57:48] analysis over time we found that uh [1:57:51] there was a big shift between 2021 and [1:57:54] 2022. And what we saw is you from 2015 [1:57:57] to present construction costs are now up [1:58:00] 38%, interest rates up 69%, actually [1:58:03] with the new interest rates that have [1:58:04] just gone up in the last uh few weeks, I [1:58:07] think that number is probably even [1:58:08] higher now. Uh and mortgage interest pay [1:58:10] payments over more than double 133%. And [1:58:14] meanwhile, rents are up 35%. 35% is a [1:58:17] big increase. We're certainly not [1:58:18] advocating that we want rents to be [1:58:20] higher, but what we can see here is the [1:58:22] revenues just aren't keeping up with [1:58:24] costs for developers. And that's the [1:58:26] challenge that we felt like we needed to [1:58:27] to start to to tackle. [1:58:30] And you know, these these costs are [1:58:32] impacted by many things. Uh, you know, [1:58:34] in addition to the interest rate [1:58:36] increases, there's the inflationary [1:58:38] impact on material costs. We had the [1:58:40] supply chain shortages and now deal [1:58:42] dealing with tariffs, a huge increase in [1:58:44] in construction, labor costs due to [1:58:47] rising cost of living, shortages in the [1:58:49] labor market that resulted from the [1:58:50] great retirement um that was, you know, [1:58:52] had hit the construction industry pretty [1:58:54] hard. You know, these are really some of [1:58:56] the challenges that that we're facing [1:58:58] here in Boston, macro challenges that we [1:59:00] face here locally. Next slide, please. [1:59:05] So for larger buildings of the size that [1:59:07] we're talking about today, we're [1:59:09] talking, you know, these are 100, 200, [1:59:11] $300 million developments, developers [1:59:14] don't have this money sitting in a bank [1:59:16] account waiting to to build. They need [1:59:18] to entice investment. And the only way [1:59:21] we're going to build these larger [1:59:23] buildings is if investors are willing to [1:59:25] invest in the city. And investors can [1:59:26] invest anywhere they want on any of a [1:59:28] number of things. So, one of the the [1:59:30] tasks that we put had before us is, you [1:59:33] know, what are some of the the um the [1:59:35] key metrics that investors are looking [1:59:37] at in deciding how to invest in Boston. [1:59:40] We picked two return on investment and [1:59:43] the spread between the return on cost [1:59:44] and treasury. And then we correlated [1:59:46] that to the actual housing start. So, [1:59:48] another uh um you chart showing housing [1:59:51] starts and the correlation between just [1:59:54] how bad the return on investment and the [1:59:56] return on cost to treasury spread is. [1:59:58] You can see just a very clear [1:59:59] correlation that when when those numbers [2:00:01] reduced, housing starts reduced as well. [2:00:03] That's the challenge that we're trying [2:00:05] to solve for today. [2:00:07] Next slide, please. [2:00:11] All right. So, I've shared a little bit [2:00:13] about why we're doing this. Now, we're [2:00:14] going to go a little bit more into what [2:00:16] we're preparing to to offer. Um, and I [2:00:19] really want to emphasize that first [2:00:21] bullet point. In these challenging times [2:00:23] with budget constraints the way that [2:00:25] they are right now for the city, we made [2:00:27] it as a foundational value of this that [2:00:30] we were not going to have anyone pay [2:00:32] less in taxes than they pay today. No [2:00:34] one is going to be paying less than they [2:00:36] pay at this at this time. Um so what is [2:00:40] being proposed here is to postpone those [2:00:43] increases during construction and for a [2:00:46] few years after. This would only be [2:00:48] offered for projects that could start [2:00:50] construction in the next year, 12 to 15 [2:00:52] months. Developers were had to show us [2:00:54] their financial details and we would [2:00:56] have an independent real estate [2:00:58] professional that would evaluate their [2:01:00] um their projects and and their [2:01:01] performs. Um and we were studying the [2:01:04] data and our data showed that projects [2:01:06] under a 100 units, we there were a [2:01:09] number of them were that were able to go [2:01:10] forward. And so we wanted to target this [2:01:12] to projects over a 100 units because we [2:01:14] were seeing only three projects a year [2:01:17] were had gone forward in the last four [2:01:19] years and we haven't had a project [2:01:22] over 300 units start construction in [2:01:24] over four years and all four of the [2:01:26] projects before you today are over 300 [2:01:29] units. [2:01:30] Next slide please. [2:01:34] So we had a few conditions for any uh [2:01:36] developer that wanted to be a part of [2:01:38] this project had to be approved. [2:01:40] couldn't uh couldn't have started [2:01:41] construction, can't still be in the [2:01:43] process with the BPDA. Had to have a a [2:01:45] BPDA board approval. That had to be the [2:01:47] current status. Can't be receiving other [2:01:49] forms of city subsidy with the exception [2:01:51] of the accelerator fund, which is an [2:01:53] investment fund and not a subsidy. Uh we [2:01:56] they would need to be able to begin [2:01:57] construction within the next 12 to 15 [2:01:59] months. Again, more than 100 unit [2:02:00] buildings. Properties must be in good [2:02:02] standing with the city, which means they [2:02:04] can't owe back taxes or back fines. Um, [2:02:06] and the projects uh should have income [2:02:08] restricted housing, meet high energy [2:02:10] efficiency standards, and have a [2:02:12] positive contribution to the community. [2:02:15] Next slide, please. [2:02:17] All right. Now, we're getting into the [2:02:18] details of what the city is offering. [2:02:21] So, [2:02:22] I think to start, let me just say it's [2:02:25] important to understand how the assessor [2:02:27] does uh his job. And I don't want to [2:02:29] play the role of the assessor, but I'm [2:02:30] going to, you know, pretend a little [2:02:32] bit. You know, once a building pulls a [2:02:34] building permit, that is the point at [2:02:36] which the assessor then will start to [2:02:38] ramp up taxes. He will evaluate uh what [2:02:41] the full taxes will be and he'll start [2:02:43] um ramping up taxes during construction [2:02:45] to that point. So the beginning for both [2:02:47] parameters is construction um during [2:02:50] construction taxes remain flat at their [2:02:52] current rate what they're paying today [2:02:54] and then we'll go into the two different [2:02:56] versions from there. So in parameter [2:02:58] number one, the certificate of after [2:03:00] certificate of occupancy, the taxes [2:03:03] increase by 2 and a.5% annually for 5 [2:03:05] years. So as an example, uh in this [2:03:08] case, you know, we have $100,000 um that [2:03:10] the project is paying today and let's [2:03:12] say full taxes eventually are going to [2:03:14] be $2 million once the project is [2:03:16] completed. Um so after construction is [2:03:18] complete, the taxes will then increase [2:03:20] by about $2,500 annually. So 102,500 in [2:03:24] year 1, 105 in year two, etc. And then [2:03:28] after the fifth year, it goes on to the [2:03:29] full tax roles at that full $2 million [2:03:32] amount um that you see in the the end of [2:03:33] the first bullet. So that's parameter [2:03:36] number one. In parameter number two, the [2:03:38] certificate of occupancy then creates we [2:03:41] would create a 10-year deal that the [2:03:44] assessor evaluates that $2 million full [2:03:46] tax amount and he creates a ramp at a [2:03:49] 50% abatement on what that full tax [2:03:52] amount would be. So in year one it would [2:03:54] be lower. In year 10 it would be higher. [2:03:56] So in that same example above maybe the [2:03:58] project would pay $200,000 in taxes in [2:04:01] year 1 and ramp up each year to 1.6 [2:04:03] million in year 10. In our evaluation of [2:04:06] these two parameters, the value was [2:04:08] actually considered to be um pretty much [2:04:10] equal. And what you'll see in the four [2:04:12] projects today is three of them chose [2:04:14] parameter one and one chose parameter 2. [2:04:17] Next slide, please. [2:04:19] All right. So before I go into the [2:04:22] details on the projects, I thought I'd [2:04:24] pause there and see if you have [2:04:26] questions on the data, the reasons we're [2:04:29] doing this, the requirements, or the [2:04:31] parameters that have been um shown to [2:04:34] you so far. [2:04:34] Okay, great. Uh questions or comments [2:04:37] from the board on this section so far? [2:04:42] Ruben, I would just ask is is the so [2:04:45] you're saying it's a developer choice in [2:04:47] terms of parameter one or two or Okay, [2:04:51] they they will come to us and tell us [2:04:53] what what works for them and then we'll [2:04:55] have our financial uh people look at it [2:04:57] and we'll um we'll get together and and [2:04:59] determine and I will say we've had more [2:05:01] than four projects come forward. Um [2:05:02] these are just the first four uh the [2:05:04] four of the largest um that we wanted to [2:05:06] start with. you know, I don't think I [2:05:08] don't expect that this will be the only [2:05:09] round that we're coming to you with. [2:05:11] Thank you. [2:05:13] Um on can you talk a little bit about [2:05:15] the the process and kind of in the [2:05:18] population right that we're talking [2:05:20] about um with regard to this so the [2:05:23] process on how we you know came to uh [2:05:26] identify those parameters. [2:05:28] Absolutely. And um yeah. [2:05:30] Okay. Well, what I I would start with is [2:05:32] when when we were first looking at this, [2:05:34] we didn't want to have, you know, [2:05:36] something that was going to be really [2:05:37] costly and really challenging for the [2:05:39] city. So, we wanted to create this is [2:05:40] what I would consider a very modest um [2:05:42] tax uh relief offer. Um and so when we [2:05:46] started running the early numbers um [2:05:48] based on a lot of work that we did, a [2:05:49] lot of data work, a lot of study that we [2:05:51] did, we found that this small modest [2:05:54] relief would actually have an impact of [2:05:56] of 2 to 4,000 units um a year that we [2:06:00] thought and you what I will say is, you [2:06:02] know, we've talked to a lot of [2:06:04] developers. I think between um Chief [2:06:05] Shen and myself, we probably talked to [2:06:07] at least 40 developers and a lot of them [2:06:10] said we need two, three, four times this [2:06:12] amount to make our projects work. And [2:06:14] that just wasn't on the table for us. [2:06:16] This is not a program. It's not a [2:06:18] program at all. This is not a parameters [2:06:19] or an initiative um to uh to fix every [2:06:23] proforma. If you have a huge gap, the [2:06:26] city's not coming in and fixing that [2:06:27] problem for you. If you are close, if [2:06:29] you are in that range where you just [2:06:31] need a little bit of bump to get your [2:06:32] investors in, that's where this comes uh [2:06:35] to to bear. So what I think what what uh [2:06:38] I would say for for for us is when we [2:06:40] had these conversations, we were able to [2:06:42] weed out the people who just it just [2:06:43] wasn't wasn't going to work. And then [2:06:45] out of that group, then we found these [2:06:47] four all above 300 units as as our first [2:06:50] round. But we have about 10 to 12 that [2:06:53] are actively interested for uh for our [2:06:54] future rounds. And so we'll continue [2:06:56] those conversations and figure out what [2:06:57] round two looks like. [2:06:58] Okay. All right. Sounds good. And go [2:07:00] ahead. Yeah. Go. [2:07:02] Keep going. [2:07:03] Okay. [2:07:04] um too polite to each other. Um okay, so [2:07:07] can you go back to the the um the ROI [2:07:11] and uh and return on capital and [2:07:13] treasury slide? [2:07:17] Danielle, can you go back? [2:07:18] Yeah, if you can just go back to to that [2:07:20] one. Um can you break that down um a [2:07:22] little bit more um and maybe a little [2:07:24] less non- you know financial jargon of [2:07:26] like what does that really mean? [2:07:29] Uh boy, you're you're you're asking me [2:07:31] to play the role of a financial expert. [2:07:33] Um I mean ultimately what it means is [2:07:36] that um investors need to make a certain [2:07:39] level of profit, right? They can invest [2:07:41] in other cities and the the ROC to [2:07:43] treasury spre spread. If I'm going to if [2:07:46] I can invest in a bond at the Treasury [2:07:48] that has zero risk versus investing in [2:07:51] housing that does have some risk, I need [2:07:54] to make a little bit more profit, right? [2:07:56] And I can't just be saying I'm going to [2:07:57] make no profit or 1% profit. That's just [2:07:59] not worth it. So that that risk profile [2:08:02] is worth something to developer to sorry [2:08:04] to investors and investors need to hit [2:08:06] like at least 2% uh or more is what we [2:08:09] were hearing over and over again. And [2:08:10] the ROI again like you know we're [2:08:12] looking at different metrics and there [2:08:14] are a lot of different metrics. A lot of [2:08:15] investors have different ones they look [2:08:16] at but ultimately if they're not making [2:08:18] um return on their investment at a rate [2:08:20] that they want then they'll choose to [2:08:22] invest somewhere else and then we don't [2:08:23] get the housing here. Yeah. Okay. Good [2:08:26] job. [2:08:27] All right. [2:08:28] As a former auditor of real estate [2:08:30] investment trust, I think that was fine. [2:08:32] Thank you. Um for that, but just wanted [2:08:34] to make sure that [2:08:35] you should have answered that question. [2:08:36] Yeah. Well, you know, that's I'm [2:08:37] evaluating your answer, you know. No. Um [2:08:40] and then can you comment on you know, [2:08:42] you said we used uh did some internal [2:08:44] analysis and some some external analysis [2:08:47] as a requirement. Can you talk a little [2:08:49] bit about um about the analysises [2:08:52] that we did? Can you talk about the [2:08:54] independent analysis? [2:08:55] Yeah. So the independent and then kind [2:08:56] of who was uh involved in like in the um [2:08:59] the internal analysis. [2:09:01] Sure. So we had um you know at the at [2:09:04] the mayor's instruction really we put [2:09:05] together a team. Um we actually put [2:09:08] together two teams what we call the [2:09:09] negotiating team and the chief's team. [2:09:11] The the negotiating team involved many [2:09:13] departments including the city assessor [2:09:15] uh legal and and all the departments I [2:09:18] mentioned earlier. Um there were real [2:09:20] estate finance experts at BHA, at Mo, [2:09:23] and so they were really valuable in [2:09:25] addition to our our independent [2:09:27] consultant. Um and so really sort of I [2:09:30] thought it was a really important sort [2:09:32] of critical thinking exercise where we [2:09:34] really challenged in many cases we went [2:09:36] back to developers and said we need you [2:09:37] to change this. This isn't going to [2:09:39] work. And so we we kind of got them to a [2:09:41] point where we were more comfortable in [2:09:42] some cases. Um so I thought that was a [2:09:44] really part of important part of the [2:09:46] process. And then we would, the [2:09:47] negotiating team would then make a [2:09:49] recommendation up to the chiefs. Um, and [2:09:50] then we would have that conversation [2:09:52] with the chiefs. And in some cases, the [2:09:53] chiefs came back and said, "Yeah, we [2:09:55] still want a little bit more, something [2:09:56] a little different." And so we really [2:09:58] challenged uh some some of the folks, [2:09:59] some of the folks in this room um to [2:10:01] make some some modifications to their [2:10:03] asks until we got comfortable with them. [2:10:04] So that's kind of how the process went. [2:10:07] Thank you. Thank you. Um, and who did we [2:10:08] use for our external financial [2:10:10] independent? [2:10:11] So his name is Brian A. Um, and he had [2:10:15] been the CEO at Fallon, um, and, uh, [2:10:18] came on as a consultant with us for, uh, [2:10:20] for a while and did some really [2:10:21] phenomenal work. [2:10:22] Okay, good. Um, all right. Any other [2:10:25] questions up until so far? Yes. [2:10:27] Just a quick one. Thank you, Ruben, for [2:10:29] explaining this very thoroughly. Um, if [2:10:32] a developer was to sign onto the [2:10:34] program, is there what is the timeline [2:10:37] if there is of shovels being in the [2:10:40] ground? [2:10:40] Yeah, we expect shovels in the ground in [2:10:42] 12 to 15 months. that'll be a part of [2:10:44] the the 120 umb actual executed [2:10:48] agreement. So, what we're voting what [2:10:50] we're asking you to vote on today is to [2:10:51] give the BPDA and the assessing [2:10:53] department the right to enter into [2:10:55] negotiations with the um the uh the [2:10:58] proponents these um the parameters [2:11:01] that's more or less set, but there are a [2:11:02] lot of details that need to get worked [2:11:04] out. And one of those details is that [2:11:06] they have to commit to to getting a [2:11:07] shovel on the ground in 12 to 15 months. [2:11:09] So, we're expecting all these projects [2:11:10] to start construction. the the ones that [2:11:12] you're seeing today should start [2:11:14] construction towards the end of 2027. [2:11:16] Thank you. [2:11:17] Okay, [2:11:17] great. Additional questions. [2:11:20] Okay, let's move on. [2:11:21] All right, next slide, please. All [2:11:23] right, we're going to talk about the [2:11:25] four projects now. Three of them in [2:11:27] Alustin Brighton, um as Council [2:11:29] President Breeden mentioned, and one in [2:11:30] Charle Town. The there were two [2:11:32] community meetings. The September 28th [2:11:34] community meeting was done for all three [2:11:36] of the um the Brighton um Austin [2:11:38] Brighton projects and October 7th we had [2:11:40] held the community meeting for Charles [2:11:42] Town. I will also note that for all four [2:11:44] projects it was required that they [2:11:46] provide an application with a blight [2:11:48] finding and the information from those [2:11:50] blight findings are included in the in [2:11:52] the memos for each of these projects. [2:11:54] Next slide please. [2:11:57] So I think what I'm doing is I'm going [2:11:59] slide by slide. We'll just go through [2:12:00] all four kind of Yeah. each. Yeah. Each [2:12:03] project. [2:12:03] Okay. [2:12:04] So, Austin Yards building D, this was uh [2:12:06] approved in uh 2019. Uh it's currently [2:12:10] paying $92,000 in taxes. Um the estimate [2:12:13] estimate for full taxes is $1.8 million. [2:12:17] Is that for one year? Those are numbers [2:12:19] for one year. [2:12:20] Yes. Sorry, one year. I just want to [2:12:21] make sure. Yep. So, this is 341 units, [2:12:24] 18% inclusionary, um eight stories. [2:12:27] Quickly going through some of the [2:12:29] project benefits. Um, you know, there's [2:12:31] a significant contribution. This is a [2:12:33] five-phase project. This is actually the [2:12:34] second phase, I believe, of the five [2:12:36] project. Um, the whole project is [2:12:38] contributing $20 million in [2:12:40] transportation. $750,000 going to the [2:12:43] Alson Brighton homeowner fund. Uh, an [2:12:45] MBTA contribution, $300,000 uh for [2:12:48] Alustin Brighton shuttles and shuttle [2:12:50] services, $200,000 for public realm fund [2:12:53] for local nonprofits and organizations, [2:12:55] and $40,000 to Boston parks. and it has [2:12:57] significant uh green building design [2:12:59] construction and lead V4 um certifiable [2:13:02] standards. [2:13:04] Next slide please. [2:13:05] Just real quick on this one. So for the [2:13:06] project benefits um are those the [2:13:09] project benefits that we've already [2:13:11] that were part of the original approval [2:13:13] or those like additional things? [2:13:15] Those are in the original. [2:13:16] That's the original approval. That's [2:13:17] what we approved. [2:13:18] Yeah, we are we part of this is we're [2:13:20] not mitigating we're not changing the [2:13:22] mitigation and community benefits [2:13:23] packages. So, so in many cases, [2:13:25] community has been waiting for a lot of [2:13:26] these these benefits to come in this [2:13:28] case since 2019. And I think there's a [2:13:30] lot of excitement about finally getting [2:13:32] um some of these underway. [2:13:34] Okay. So, this would unlock the [2:13:36] availability or us to be able to start [2:13:38] to realize those benefits if we Okay, [2:13:40] got it. [2:13:41] Any other questions on Austin? Sorry, I [2:13:43] should pause for a second. [2:13:45] Uh, no. Okay. [2:13:47] 83 Leo Birmingham Parkway. Um, this is [2:13:51] approved in 2025. [2:13:53] $210,000 of the current taxes. $1.8 [2:13:56] million is the full taxes at the at the [2:13:58] at the end of the deal. It's 333 units, [2:14:02] 16% inclusion area and eight stories. [2:14:05] And this project, the multimodal ba uh [2:14:07] bike multimodal path, I should say, [2:14:09] connecting a DCR multi-use path in the [2:14:11] front and the Riverside bike path. That [2:14:13] was the thing that we heard over and [2:14:15] over again from from electeds and from [2:14:17] the community members how important that [2:14:18] was to them. Um, so I really wanted to [2:14:20] emphasize that it preserves a sign [2:14:23] significant grove of trees, 100% passive [2:14:26] house design, blue bike station, uh, new [2:14:29] pedestrian connections and plazas um, [2:14:31] and uh, and lead registered and and [2:14:34] really great uh, energy efficiency um, [2:14:36] standards in their uh, in their [2:14:38] development. [2:14:40] Next slide, please. [2:14:43] So 22 24 Pratt Street. This is the only [2:14:45] one of the four projects to go with [2:14:47] parameter number two, the construction [2:14:49] plus 10ear. Um, this was approved in [2:14:51] 2024. [2:14:53] It's currently paying just over $200,000 [2:14:55] in taxes. Full tax would be 1.9 million. [2:14:58] It's $318 units. So, in this case, uh, [2:15:02] they are also asking for a 50% u buyout [2:15:05] on their inclusion area. That's about [2:15:07] $8.1 million. It's a 16story building. [2:15:10] Um, really transforms an underutilized [2:15:12] industrial parking site. um with new [2:15:15] housing creates 30,000 square ft of open [2:15:17] space, a dark dog dog park and other [2:15:19] public realm improvements, a very low [2:15:22] parking ratio um plus uh bike storage [2:15:25] and a blue bike station and significant [2:15:28] um green development standards. [2:15:31] Next slide, please. [2:15:34] The last of our projects in Charles Town [2:15:36] is one Mystic. This was uh approved [2:15:39] first in 2023 and it came back for an [2:15:41] NPC last year um to actually change the [2:15:44] uh program to the program you see now, [2:15:46] the rental condo program. Um it's [2:15:49] currently paying $70,000 in taxes. The [2:15:51] future tax would be 1.6 million. Really, [2:15:54] this is the biggest increase of um a [2:15:56] multiple increase of all of our [2:15:58] projects. It's a little unique. So on [2:16:00] the the 408 units, 227 of them are [2:16:05] rental and all of the inclusionary, so [2:16:07] the 20% um are going on the rental side. [2:16:11] On the 181 condos, they're paying a $14 [2:16:14] million buyout for the inclusionary [2:16:17] portion that was agreed to last year um [2:16:19] by this body. [2:16:21] Um so project is in line with plan [2:16:23] Charles, $48 to units, uh a million [2:16:27] dollars of tax revenue on the condo [2:16:29] side. So the condo side of this project [2:16:31] will actually go on the tax roles at COO [2:16:34] because we can only do these tax deals [2:16:36] on the on rentals. So after construction [2:16:38] is complete, we'll get not quite a [2:16:40] million dollars of annual tax revenue [2:16:42] that starts in three uh in three years [2:16:44] and the other tax revenue is postponed [2:16:46] till the end of the the 5 years after [2:16:48] COO. [2:16:50] There are rent to own options, passive [2:16:52] house, um, NCC compliant, bike and [2:16:55] transit, uh, investments, um, job [2:16:58] creation, and public realm connectivity. [2:17:01] So, I'm happy to answer any questions [2:17:02] you have about these projects. Again, [2:17:04] all these are BPDA board approved, so [2:17:06] we're here just talking about the tax [2:17:08] portion, um, the tax relief that we're [2:17:09] asking for to get these under [2:17:11] construction in the next 12 months. [2:17:12] Okay. Questions or comments from the [2:17:14] board? [2:17:16] Thank you, Madam Chair, and Ruben. Thank [2:17:18] you. Um [2:17:20] this is uh as Chief Shen is always [2:17:22] interested to know the this series of [2:17:24] votes are my favorite things to vote on [2:17:25] today. I am an enthusiastic yes and it's [2:17:28] for one very very simple reason and that [2:17:30] is this the ven diagram of economic [2:17:32] growth and public benefits is a circle. [2:17:34] They go hand in hand and right now we [2:17:37] are facing unimaginable uh challenges. [2:17:40] every city is we feel it with you've [2:17:42] talked about the rising construction [2:17:43] costs, high interest rates, other [2:17:45] financing challenges, uh uh tariffs, [2:17:48] uncertainty at the federal level, you're [2:17:50] seeing projects that that have one [2:17:53] broad-based support being stalled out. [2:17:55] And this is one way to help those [2:17:57] projects. Um and it, let me be clear, [2:18:00] targeted tax relief is not uh it's not a [2:18:02] giveaway, it's an investment. It's [2:18:04] precisely what we are doing and we [2:18:06] should be doing right now because these [2:18:08] are projects that unlock private [2:18:10] capital. They create good paying jobs. [2:18:12] They help grow our housing stock and [2:18:14] they expand our tax base. You can see [2:18:15] the numbers there. That's that's such an [2:18:17] interesting thing to see how when these [2:18:19] will be fully realized what that means [2:18:22] for our city. So I am very uh happy to [2:18:25] see these four. They are incredibly [2:18:27] worthy projects. Three of the four I [2:18:28] happen to vote on and so I'm proud to [2:18:30] see you know hopefully this will be the [2:18:32] impetus that they need. Um, but we need [2:18:34] to have pragmatic solutions uh when [2:18:36] we're dealing with such so many [2:18:38] challenges uh in the housing and the [2:18:39] development market. So, I think this was [2:18:41] very thoughtful. This was smart. Huge [2:18:43] kudos to you and your team and the [2:18:44] mayor's team for um working highlighting [2:18:47] these and and I look forward to seeing [2:18:49] more to come. Thank you. [2:18:51] Any additional questions or comments? [2:18:54] I would just echo uh what what Matt is [2:18:57] saying and and you know I I think it's a [2:19:01] very um thoughtful and yet um the fact [2:19:06] that it's so narrowly defined I think [2:19:09] for the for the pilot really makes sense [2:19:11] and you guys have clearly done a lot of [2:19:13] work to ensure that it's you know sort [2:19:16] of but for this small um additional [2:19:21] pilot investment that these projects [2:19:23] wouldn't be going forward. And so just [2:19:26] uh appreciate that a lot and all the [2:19:29] effort that went into this through [2:19:30] throughout city hall [2:19:33] and through the chair [2:19:35] and not to be redundant, I just [2:19:37] definitely want to emphasize on the [2:19:40] growth of the construction. If you look [2:19:42] back, if you see in like 2020, 2016, [2:19:45] excuse me, a lot of men and women in the [2:19:47] city of Boston chose construction as a [2:19:49] pathway to be part of the middle class. [2:19:52] And as we see it decline, um, this is a [2:19:55] great opportunity for us to create ways [2:19:58] to get our men and women back to work. [2:20:00] So, I think this is a great idea. [2:20:03] Great. Additional questions or comments? [2:20:06] Um, all right. I think you know [2:20:09] definitely echo what my fellow board [2:20:10] members um are saying. Um you know but I [2:20:14] mean as a you know as a member of this [2:20:16] board we have a fiduciary responsibility [2:20:19] um you know to thoroughly um you know [2:20:22] take this proposal um seriously and and [2:20:24] look at at the the details of it. Um so [2:20:27] I want to you know thank you for you [2:20:30] know again all the work that went into [2:20:32] this but for I like the way uh Mr. Mali [2:20:36] uh presented as as this as a tax relief [2:20:39] investment, an investment, right? That [2:20:41] this vote is what it's doing, right? [2:20:43] It's allowing this investment in this [2:20:45] timebound period, right? For these [2:20:48] specific projects that meet these [2:20:50] specific requirements. Um and you know, [2:20:54] no investment is without risk, right? [2:20:56] That's just that's just what it is. But [2:20:58] I do appreciate the um the minimization [2:21:03] of the downside risk that you've done [2:21:05] with all of these parameters. Um so I'm [2:21:10] poked as many holes as I as I could in [2:21:12] this throughout the entire process to [2:21:14] again because this is this is you know [2:21:16] this is revenue. We have a fiduciary [2:21:17] responsibility over it. um to um so I [2:21:20] just want to thank you for again making [2:21:23] that you know crystal clear on what um [2:21:26] you know what the estimated you know [2:21:29] current taxes which is you know for this [2:21:31] one particular $70,000 a year and then [2:21:33] what we unlocked very clearly with the [2:21:36] estimated full tax you know of $1.6 $6 [2:21:38] million um a year annually. So um again, [2:21:45] you know, difficult exercise, but I [2:21:49] appreciate the outcome of it and, you [2:21:51] know, hope that it's, you know, clear um [2:21:54] to the, you know, to the public of, you [2:21:56] know, what we had to weigh here as far [2:21:58] as this decision, but but what this a [2:22:01] vote like this could unlock. Um and and [2:22:04] this is a uh an investment and and we'll [2:22:06] take a vote on it. Um, I think that's [2:22:09] it. So, uh, a motion is an Oh, no, no, [2:22:13] no. Hold on. We got a bunch of votes. [2:22:14] Hold on. We got a bunch of votes. Okay. [2:22:17] So, I'm going to take one at a time, uh, [2:22:20] and then we'll vote on each one. Oh, [2:22:22] hold on. [2:22:26] All right. Item number 22, [2:22:29] request authorization to adopt a [2:22:31] demonstration project plan under [2:22:33] Massachusetts General Law Chapter 121B [2:22:36] section 46F for the proposed project [2:22:39] located at Alustin Yards building D in [2:22:41] Alustin and to adopt certain findings [2:22:43] related to the demonstration project [2:22:45] plan, including without limitation that [2:22:47] the proposed project constitutes a [2:22:49] demonstration project and to authorize [2:22:51] the director to enter into a contract [2:22:54] for payment in lie of taxes agreement [2:22:56] pursuant to MGL chapter 121B section 16 [2:23:00] as amended between the city of Boston, [2:23:02] the BRA and the proponent in connection [2:23:04] with the proposed project and to [2:23:06] authorize a director to execute and the [2:23:08] BRA to accept a quick claim deed for [2:23:11] temporary limited property interest in [2:23:14] the project site and to enter into an [2:23:15] indemnification agreement with the [2:23:17] proponent and to take all related [2:23:19] actions. A motion is in order. [2:23:21] So moved. [2:23:21] Second. [2:23:22] All those in favor? I opposed. The eyes [2:23:24] have it. Item number 23, request [2:23:27] authorization to adopt a demonstration [2:23:29] project plan under Massachusetts General [2:23:31] Law, Chapter 121B, section 46F for the [2:23:35] proposed project located at 83 Leo [2:23:37] Birmingham Way Parkway in Brighton and [2:23:40] to adopt certain findings related to the [2:23:42] demonstration project plan and to [2:23:43] authorize a director to enter into a [2:23:45] contract for payment in lie of taxes [2:23:48] between the city of Boston, the BRA and [2:23:50] the proponent in connection with the [2:23:51] proposed project and to authorize the [2:23:53] director to accept a quick claim deed [2:23:56] for a certain temporary limited property [2:23:59] interest in the project site and to take [2:24:00] all related actions. A motion is in [2:24:02] order. [2:24:02] So moved. [2:24:03] Second. [2:24:03] All those in favor? [2:24:04] I [2:24:05] uh opposed. The eyes have it. I voted I [2:24:08] too. I don't know. Anyway. Okay. Item [2:24:10] number 24. Request authorization to [2:24:13] adopt a demonstration project plan under [2:24:15] Massachusetts General Law Chapter 121B [2:24:18] section 46F for the proposed project [2:24:20] located at 22 through 24 Pratt Street in [2:24:22] Olston and to adopt certain findings [2:24:25] related to the demonstration project [2:24:26] plan and to authorize a director to [2:24:29] enter into a contract for payment in lie [2:24:30] of taxes between the city of Boston, the [2:24:33] BRA and the proponent in connection with [2:24:35] the proposed project and to authorize a [2:24:37] director to accept a quick claim deed [2:24:39] for a certain temporary [2:24:41] limited property interest in the project [2:24:43] site and to take all related action. A [2:24:44] motion is in order. [2:24:46] So moved. [2:24:46] Second. [2:24:47] All those in favor? I opposed. The eyes [2:24:50] have it. Item number 25. to request [2:24:52] authorization to adopt a demonstration [2:24:54] project plan under Massachusetts General [2:24:56] Law Chapter 121B section 46F for the [2:24:59] proposed project located at 1 Mystic [2:25:00] Avenue in Charleston and to adopt [2:25:02] certain findings related to the [2:25:04] demonstration project plan and to [2:25:05] authorize a director to enter into a [2:25:07] contract for payment in LO of Texas [2:25:09] between the city of Boston, the BRA and [2:25:11] the proponent in connection with the [2:25:13] proposed project and to authorize a [2:25:15] director to accept a quick claim deed [2:25:17] for a certain temporary limited property [2:25:19] interest in the project site and take [2:25:21] all related actions. A motion is in [2:25:23] order. [2:25:23] So move. [2:25:23] Second. [2:25:24] All those in favor? I oppose. The eyes [2:25:26] have it. Motion passes. Thank you. [2:25:29] Thank you. And I was remiss. I also want [2:25:31] to thank the project managers who did [2:25:32] some amazing work helping us get through [2:25:34] this. So really from the development [2:25:35] review team, thank you very much. So [2:25:37] yay. [2:25:39] Okay. [2:25:41] Item number 26, [2:25:43] request authorization to issue a scoping [2:25:46] determination. [2:25:47] We're just going to give everybody a [2:25:48] second. That was a popular vote. [2:25:53] The development teams. [2:25:59] Good. You guys are nice and quiet, so we [2:26:01] can go ahead. Okay. Item number 26. [2:26:03] request authorization to issue a scoping [2:26:05] determination waving further review [2:26:06] pursuant to article 80B-5.3D [2:26:09] large project review of the zoning code [2:26:11] for the proposed construction of 145 [2:26:14] residential rental units including 29 IZ [2:26:17] units and 17 176 bicycle parking spaces [2:26:21] located at 20 through 207 [2:26:24] uh Brighton Avenue and to issue one or [2:26:26] more certifications of compliance or [2:26:28] partial certifications of compliance [2:26:29] pursuant to section ADB-6 of the code [2:26:33] upon successful completion of the [2:26:35] article ADP large project review process [2:26:37] and to execute a cooperation agreement [2:26:40] and a transportation access plan [2:26:41] agreement and to take all related [2:26:43] actions. Dan, [2:26:44] good evening. Thank you, Madam Chair [2:26:45] Roas, members of the board. Director [2:26:47] Shen, my name is Daniel Palano, project [2:26:49] manager for the proposed article a large [2:26:51] project before you tonight at 201207 [2:26:53] Brighton Avenue located in the Austin [2:26:55] neighborhood. The pro proponent 2011 uh [2:26:58] Brighton LLC DND Homes proposes to [2:27:01] construct a new six-story mixeduse [2:27:03] building uh totaling approximately [2:27:06] 103,847 [2:27:08] gross square ft. The proposed project [2:27:10] will include 145 residential uh units [2:27:13] comprised with 72 studio units, 48 [2:27:16] one-bedroom units, 15 two-bedroom units, [2:27:18] and 10 three-bedroom units along with [2:27:20] approximately uh 1,853 [2:27:23] ft of ground for uh floor use retail [2:27:26] space. The project will also provide a [2:27:28] total of 25 units. Of those 20 uh% of [2:27:31] the total units, 17 uh% units will will [2:27:34] be made available to households or no [2:27:36] more than 60% of the area medium income. [2:27:39] Um and 3% of those units must be [2:27:41] reserved for households who qualify for [2:27:43] mobile housing vouchers as part of the [2:27:45] public uh benefits and mitigation. The [2:27:47] proposed project would provide [2:27:48] significant neighborhood and public [2:27:49] realm improvements, including a [2:27:51] contribution of approximately $100,000 [2:27:53] to Boston Parks and Recreation [2:27:55] Department for the purpose of improving [2:27:56] parks within Austin Bright neighborhood. [2:27:59] Additionally, the project will also [2:28:00] contribute funds to als brighten main [2:28:02] streets and with the Austin brighten [2:28:04] youth programs, sport programs as well. [2:28:07] As part of the article 80 process, uh [2:28:09] the project held an impact advisory [2:28:10] group meeting on March 30th, 2026, [2:28:12] following that with a virtual public [2:28:14] meeting on March uh uh March 31st, 2026 [2:28:18] to present and discuss the project uh in [2:28:20] detail. A second IG meeting was held on [2:28:22] August 5th, 2026 to review the revisions [2:28:25] of the proposed project and re and [2:28:26] review additional feedback from the IG [2:28:29] members and public. The virtual public [2:28:31] meetings were advertised in relevant in [2:28:33] the relevant neighborhood planning [2:28:34] department website as a calendar [2:28:36] notification was sent to all uh Austin [2:28:38] Bry neighborhood updates uh subscribers. [2:28:40] Thank you for your time and [2:28:41] consideration for the project before you [2:28:43] tonight. I have the development team [2:28:44] here to answer uh any questions you may [2:28:46] have. I will now turn over to Michelle [2:28:48] to discuss the plan in context. Thank [2:28:50] you. Thank you. [2:28:52] Thank you, Dan. My name is Michelle and [2:28:54] I am the planner assigned to this [2:28:56] project. The proposed project at 2011 [2:28:58] 207 Brian Avenue is located within the [2:29:00] Alustin Brian neighborhood zoning [2:29:02] district within the Harvard Avenue [2:29:04] Community Commercial or CC1 zoning [2:29:06] subdist. The proposed project is located [2:29:08] along Brian Avenue, one of Alston's main [2:29:11] commercial corridors, and the proposed [2:29:13] mixeduse building will serve as a [2:29:14] transition between the existing [2:29:16] residential neighborhood and the [2:29:17] surrounding commercial areas. In terms [2:29:19] of transportation, there's a blue bike [2:29:21] station 0.2 miles from the site at Union [2:29:23] Square. And the project site has access [2:29:25] to multiple MBTA bus routes, including [2:29:28] the 57, 64, 66, and 501. Next slide, [2:29:32] please. [2:29:34] The proposed project also falls within [2:29:36] the study area of two planning [2:29:38] initiatives. The Alustin Brian mobility [2:29:40] plan, which was adopted by the BPDA [2:29:42] board in May 2021, and the Alson Brian [2:29:44] needs assessment, which was adopted by [2:29:46] the board in January 2024. Both of these [2:29:49] plans highlighted the need to create a [2:29:50] more attractive and comfortable walking [2:29:52] and bicycle environment. To align the [2:29:54] proposed project with these goals, the [2:29:56] proponent worked closely with staff from [2:29:58] planning, transportation, and public [2:30:00] works departments to incorporate public [2:30:02] realm and sidewalk improvements that are [2:30:04] consistent with complete streets [2:30:05] guidelines and best practices that [2:30:07] currently inform the current staff work [2:30:09] on the draft Austin Brighton community [2:30:11] plan. Specifically, the rear driveway, [2:30:14] which was pre previously used for [2:30:16] parking, will now include a curved [2:30:17] sidewalk connecting Cambridge Street to [2:30:19] the proposed project. This will provide [2:30:21] residents with additional safe access to [2:30:23] the site while maintaining the driveways [2:30:25] function as a loading area. In the near [2:30:27] term, these improvements will enhance [2:30:29] the pedestrian experience within the [2:30:31] site and in the long term will support [2:30:33] broader transportation on public realm [2:30:35] goals for Austin Brighton as reflected [2:30:37] within the draft Austin Brighten [2:30:38] community plan. The proposed project [2:30:40] will need variances for dimensional [2:30:42] regulations, including height, F, and [2:30:44] minimum open space. And these variances [2:30:46] are consistent with the criteria of [2:30:48] section 7-3 of the zoning code due to [2:30:51] the highly irregular dimensions of the [2:30:53] law. As you can see here, highlighted in [2:30:56] red, the law has a long rear driveway [2:30:58] that extends to Cambridge Street. While [2:31:00] the number of off- streetet parking [2:31:02] spaces is set through article ADB large [2:31:04] project review, the proposed zero zero [2:31:07] parking design is consistent with Boston [2:31:09] Transportation Department's guidelines. [2:31:11] Additionally, the proposed project is [2:31:13] also well served by multiple transit [2:31:14] options. And thank you. And now I'll [2:31:16] turn it over to the development team to [2:31:18] present the project in more detail. [2:31:20] Thank you. [2:31:24] Thank you, Madam Chair, members of the [2:31:26] board, Director Shen, Jeff Drago, [2:31:28] attorney on the project. um with Drago [2:31:31] and Tuscano. Uh here on behalf of D&D [2:31:33] Homes, who's the project developer with [2:31:35] me, I also have John Williams from DMS [2:31:38] Design, who put this project uh design [2:31:40] and architectural plans together. You'll [2:31:42] hear from in a few slides. Uh we're [2:31:45] excited to bring this mixeduse project [2:31:47] uh before you tonight. Uh the proposal [2:31:50] as you can see from the rendering on the [2:31:52] right uh is located on a 27,516 [2:31:57] square foot lot or two parcels combined [2:32:01] for this project. Right now there is a [2:32:04] this is a commercial uh building on the [2:32:06] lot. It's inactive right now sitting [2:32:08] idle. Uh this project you see will [2:32:11] combine residential housing along with [2:32:13] commercial space and a lot of amenity [2:32:15] space at the ground level. Um, the [2:32:18] proposed project would create a new [2:32:20] six-story mixeduse building and that'll [2:32:23] be include 145 residential units and [2:32:26] approximately 1,853 [2:32:29] square ft of commercial space on the [2:32:32] ground level, which when we worked with [2:32:33] the community, we found that was [2:32:35] important given that this is in a [2:32:36] community commercial area. Although [2:32:39] there's a lot of commercial around us, [2:32:41] there's also a lot of new residential [2:32:43] development that we see popping up uh in [2:32:46] this area. This particular project falls [2:32:49] along Brighton Nav and Cambridge Street, [2:32:51] which are two busy uh areas in Alustin. [2:32:55] Um as we we also I just want to go over [2:32:58] some of the amenity space that this [2:33:00] project includes uh that we feel is [2:33:02] beneficial to the residents. There's [2:33:03] going to be a fitness center, a [2:33:05] co-working space, family wreck room, [2:33:08] plenty of storage space on site, and a [2:33:10] dedicated bike room on site as well. We [2:33:13] also have a strong unit mix uh that [2:33:16] includes 72 studios, 48 onebedrooms, 15 [2:33:20] twobedrooms, and 10 threebedrooms on [2:33:23] site. We also have 29 uh affordable [2:33:26] units as part of the inclusionary [2:33:27] development as well. As part of this [2:33:30] project, um we had a a strong uh [2:33:33] community engagement process and we're [2:33:36] happy uh to say that we worked closely [2:33:38] with councelor Braden's office, [2:33:40] obviously the BPD on design of this [2:33:43] project, making modifications, as well [2:33:46] as the Brighton Improvement Association, [2:33:49] the ACA, and our I A that all gave us [2:33:53] comments that brought the project that [2:33:55] you see uh tonight. Um I'm now going to [2:33:58] turn it over. One other point and I know [2:34:01] if we can go to the next slide. Um [2:34:05] this just shows some of the context of [2:34:08] the commercial around us but also the [2:34:10] residential so the board can see. And if [2:34:12] we can go to the next slide please. Uh I [2:34:15] know it was mentioned but this is [2:34:16] particular location is great for public [2:34:18] transit. Uh we're less than a 15minute [2:34:21] walk to the MBTA green line. uh access [2:34:24] to the MBTA bus routes uh right along [2:34:27] both Brightnav and Cambridge A, making [2:34:30] this great for those folks that are [2:34:32] commuting uh into the city uh when this [2:34:35] building becomes occupied. With that, [2:34:37] I'm going to turn it over to John to go [2:34:40] over his architectural plans. Thank you. [2:34:45] Good evening. [2:34:46] Thank you everyone for your time [2:34:48] tonight. Um so we're looking right now [2:34:50] at the ground fuller landscape plan. Um [2:34:51] BrightNAB is to our left. Um we've [2:34:53] widened that sidewalk there to um to [2:34:55] comply with the complete streets and [2:34:57] we're actually a little bit wider um [2:34:58] than what would really be needed. Um and [2:35:00] on Brighton Nav the entire frontage [2:35:02] that's where we have our our retail [2:35:04] space. Um we can look at that more in [2:35:06] the next slides. Um in actually could [2:35:09] you go back one side please? [2:35:11] Thank you. Um as you continue um into [2:35:14] the site from Brighton Nav um is where [2:35:16] you'll find our residential entrance and [2:35:18] also where the primary um bike entrance [2:35:20] is and that's kind of where that green [2:35:21] space is in the middle. So, we do have a [2:35:23] little outdoor space uh tucked in there [2:35:24] as well. Um and then from Cambridge [2:35:27] Street where we have that uh drive aisle [2:35:29] that gives us access for both trash, [2:35:31] fire access, um some pedestrian access, [2:35:34] but also it helps mitigate access um [2:35:36] traffic on BrightNav by allowing for [2:35:39] deliveries and Uber Eats and ride shares [2:35:41] to be picked up at that point as well. [2:35:42] Okay, [2:35:43] next slide, please. [2:35:46] Um then, as we were saying, so BrightNav [2:35:48] is on the left here. Um all of our [2:35:49] retail space is out front. We've [2:35:51] designed that to be able to be broken up [2:35:52] into three different spaces um depending [2:35:55] on who would want to be renting the [2:35:57] space or it could be a single space as [2:35:58] well. Um and the green area is our [2:36:01] residential entry. Um and then going [2:36:03] back the pink area is our first floor [2:36:06] ground level um bike storage room. And [2:36:08] when we get to the basement plan, you'll [2:36:09] see that that that expands extensively. [2:36:12] Um and we also have a dedicated elevator [2:36:14] for that bike storage itself. Um, and [2:36:17] then that purple area, that's what we're [2:36:18] calling our our Uber lounge where people [2:36:20] can wait for their food deliveries or [2:36:22] ride share pickups. The next slide, [2:36:24] please. [2:36:27] Uh, so this is down in the basement [2:36:28] where we have all of those amenities [2:36:30] that Jeff had spoken about, the [2:36:31] co-working space, uh, fitness center, [2:36:34] um, pet wash, family recreation room, [2:36:37] and then the pink area again, um, that's [2:36:39] the remainder of the bike storage space. [2:36:41] Next slide, please. [2:36:44] our floors two through six all primary [2:36:47] primarily residential and so that's what [2:36:49] we're looking at here. Uh next slide [2:36:53] and then up to the roof plan. So we have [2:36:55] two very large amenity spaces um to give [2:36:58] the the residents um just a place to get [2:37:00] outside because the irregularity of our [2:37:02] site we weren't able to get as much on [2:37:04] the ground level as we wanted. So we [2:37:05] wanted to provide that up on the up on [2:37:07] the roof area. Um, and then we will have [2:37:09] plenty of area for mechanicals and then [2:37:11] also we're a solar ready uh project and [2:37:14] um so we have plenty of space up there [2:37:16] for that as well. Uh, next slide please. [2:37:20] Um, so this is just a rendering from [2:37:22] Brighton Avenue looking at the front of [2:37:23] our building with our ground floor [2:37:25] retail and then our residential above. [2:37:27] Uh, next slide please. And this is just [2:37:29] from the other angle on Brighton A. [2:37:33] And with that we will happy to answer [2:37:35] any questions you may have. [2:37:37] Okay, great. Thank you. Um, questions or [2:37:40] comments from the board. [2:37:45] Yeah, I don't really have any either. [2:37:47] Okay, a motion. [2:37:49] Okay, [2:37:49] this is it was great project. You [2:37:51] answered a lot of the questions already. [2:37:53] It was a really great presentation. Um, [2:37:55] so uh not a reflection of the quality of [2:37:58] the project, but I think we're just [2:37:59] we're ready for a vote. So motion is in [2:38:01] order. [2:38:02] So moved. [2:38:02] Second. [2:38:03] All those in favor? I opposed. Uh the [2:38:05] eyes have it. Great project. [2:38:07] Congratulations. Good luck. [2:38:08] Thank you very much. And to the project [2:38:09] managers that helped us as well. [2:38:11] Okay. Great. Item number 27. Request [2:38:14] authorization to issue a scoping [2:38:16] determination waving further review [2:38:18] pursuant to article ADB-5.4D 4D of the [2:38:21] zoning code for the creation of two new [2:38:24] self- storage buildings, [2:38:26] 17 car parking spaces, and 20 bicycle [2:38:29] parking spaces located at 50B Park [2:38:31] Street, and to issue a certificate of [2:38:33] compliance or certification of [2:38:35] compliance under section 80B-6 of the [2:38:38] zoning code upon successful completion [2:38:40] of the article 80B large project review [2:38:42] process and to execute a transportation [2:38:44] access plan agreement and a cooperative [2:38:46] agreement or cooperation agreement and [2:38:48] to take all related actions. Tyler. [2:38:51] Good evening. Thank you, Madam Chair, [2:38:53] members of the board, and director Shen. [2:38:55] My name is Tyler Ross. I'm a senior [2:38:56] project manager in the development [2:38:57] review division. The proposal for you is [2:39:00] the 50B Park Street um project and [2:39:03] article 80 large project located in the [2:39:05] Dorchester neighborhood. On June 22nd, [2:39:07] 2026, [2:39:09] the developer filed a project [2:39:10] notification form for the project. The [2:39:13] proposed project consists of replacing [2:39:15] the existing vacant office building with [2:39:17] two new self- storage buildings. uh [2:39:19] comprising of up to 144,000 square ft. [2:39:23] The main building will be uh four [2:39:25] stories while the out building will be a [2:39:27] single story. The proposed project will [2:39:30] include accessory uses such as office [2:39:32] and restroom approximately 17 surface [2:39:34] parking spaces and eight exterior bike [2:39:36] parking spaces. Additionally, uh the [2:39:39] planning department held IG and public [2:39:41] meeting on July 9, 2026, which was well [2:39:43] attended and advertised on the planning [2:39:45] department's website. With that, I'll [2:39:48] now turn it over to Ford from the [2:39:49] planning division to discuss the [2:39:50] planning context for the project before [2:39:52] the development team begins the [2:39:54] presentation. Lastly, I want to thank [2:39:56] the members of the public, elected [2:39:58] officials, and city agencies who help [2:39:59] review the project. Thank you. [2:40:01] Thanks, Tyler. [2:40:03] Thank you. Perfect. That's the right [2:40:05] slide. Uh, hello. My name is Ford [2:40:07] Delveio and I am the planning reviewer [2:40:08] for this project. The proposed self- [2:40:10] storage facility is located in a local [2:40:12] industrial subdist neighborhood zoning [2:40:15] district. The site is adjacent to Fields [2:40:17] Corner in the Olsson Meeps Industrial [2:40:19] Park, which was originally established [2:40:20] by our organization, the Boston Economic [2:40:22] Development and Industrial Corporation [2:40:24] to support economic development in [2:40:26] Dorchester. No recent planning [2:40:28] initiatives have addressed this [2:40:29] geography, but its local industrial [2:40:31] zoning remains generally consistent with [2:40:32] current land use patterns. While self [2:40:34] storage would introduce a new use for [2:40:36] this fabric, the subdist's current [2:40:37] zoning has not been updated to [2:40:38] differentiate between active businesses [2:40:40] with a warehouse component and self- [2:40:42] storage facilities. Accordingly, as [2:40:44] noted on the slide, the proposed project [2:40:46] is consistent with all current use and [2:40:48] dimensional regulations. Plan department [2:40:50] staff worked with the proponent to [2:40:51] refine the design of this as of right [2:40:53] use as project as the proponent will [2:40:55] describe on the sub subsequent slides. [2:40:57] Thank you and I will now turn over to [2:40:58] the proponent to present in more detail. [2:41:00] Thank you. [2:41:03] Hi, good evening. [2:41:05] Oh, [2:41:06] thank you madam chair members. [2:41:11] There might be about that. My name is [2:41:13] Greg Serena, VP of development with [2:41:15] Perven Chic Group, the developer here. [2:41:17] As you see, you'll probably recognize a [2:41:19] lot of those team names from our project [2:41:21] team list. This is 144,000T self-s [2:41:24] storage facility in Dorchester. Uh we [2:41:27] are proposing [2:41:30] site context here so you can see where [2:41:32] we are outlined in red. We are in an [2:41:35] industrial corridor off a private [2:41:37] industrial way. The Mate Street is a [2:41:39] public right of way. access to the [2:41:41] facility is off the private industrial [2:41:44] drive. We are proposing right-of-way [2:41:46] improvements along our frontage, new [2:41:48] street trees, many trees throughout the [2:41:51] facility, uh, and improvements to a [2:41:54] currently vacant building. [2:41:56] Next slide, please. [2:42:00] As you can see, our neighbors are all [2:42:02] industrial users. Uh, this is an [2:42:05] industrial corridor through and through. [2:42:08] This will be a wellwelcomed adaptive uh [2:42:12] full redevelopment of an underutilized [2:42:14] property that's existing vacant. I'll [2:42:15] pass it over to our project architect to [2:42:17] talk about his plans. [2:42:19] Thanks. [2:42:21] Thank you, Greg. Um good evening, madam [2:42:24] chair, members of the board. Kevin Dler, [2:42:27] uh principal of ROI Architects. Um try [2:42:29] to go through this quickly. Um, this [2:42:32] slide here is really uh orients you to [2:42:35] the views of the site. As Greg [2:42:37] mentioned, this is off of a private [2:42:39] industrial way. Uh, the one portion of [2:42:42] the site that meets a public way on Mate [2:42:45] Street is the top photo. Second photo is [2:42:48] at the entrance point off of the current [2:42:51] existing curb cut. And finally, the the [2:42:54] one is on the other corner of that site [2:42:56] also. Um seeing that this is a single [2:42:59] story uh surrounded by surface parking. [2:43:01] Um next slide please. [2:43:05] Um you also can see the rail line uh [2:43:08] abuing or MBTA is one of our abutters. [2:43:11] That's the uh red line uh brainree line. [2:43:14] So and commuter rail. So trains are [2:43:16] going by there pretty fast. That also [2:43:18] creates a buffer against uh the closest [2:43:21] residential neighborhood um clamp point [2:43:23] and Dorchester. Um this is the site [2:43:27] plan. Um you can kind of see M Street um [2:43:30] in the C circle right there. That's the [2:43:32] public way. Uh at that point it changes [2:43:34] over to a private drive uh into the [2:43:37] industrial park. Um mainly our our focus [2:43:40] was to put all the public space uh along [2:43:43] that that existing location of the uh [2:43:46] current co curb cut. Uh provide much [2:43:49] safer pedestrian access off of that um [2:43:52] public way into the site. focused a lot [2:43:55] of the attention of of the landscape [2:43:57] into that area uh creating a safe and um [2:44:01] easily recognizable area to gain access [2:44:03] to the to the building. Um 17 parking [2:44:06] spaces uh spread around the front and [2:44:09] then on the other corner as well. Um [2:44:12] there's also a number of uh units that [2:44:15] are accessible on the um other two sides [2:44:18] of the of the building um around the [2:44:21] sides. Um next slide, please. [2:44:24] Um no surprise that these plans look [2:44:27] very rational, efficient. Um it's one of [2:44:30] the reasons why we can achieve such a [2:44:32] high uh carbon net neutral uh standard [2:44:36] for this. Um self- storage buildings [2:44:38] consume very little energy. Um the [2:44:42] temperature range is uh allowed to [2:44:44] fluctuate um considerably very few [2:44:46] openings. Uh and um so our our goal [2:44:50] really is to um you know keep it that [2:44:53] way. Um and uh with solar uh these these [2:44:57] can start to uh become net zero. Um next [2:45:00] slide please. Um [2:45:08] upper floors as well. No surprises [2:45:10] there. Um this is a fourstory uh 42 ft [2:45:14] high. Um the rail line that abuts the [2:45:17] the building comes up to about 25 ft. So [2:45:20] we have a real natural buffer. Um even [2:45:23] though we are increasing the height over [2:45:24] the existing building that's there. Um [2:45:27] next slide will show some perspectives. [2:45:30] Um our strategy here is to really kind [2:45:33] of exercise a little bit of restraint on [2:45:36] um allowing this honest expression, [2:45:39] simple, clean um modern industrial [2:45:42] building. Um, we wanted to focus all of [2:45:46] the effort into signage and wayfinding [2:45:49] security, making um, any visitors to [2:45:51] this and the employees there feel safe. [2:45:54] Um, so we have been able to actually [2:45:58] gain the number of trees that um, over [2:46:01] the the current property. Um, so really [2:46:04] we're just trying to create a backdrop [2:46:05] for for this uh, new landscaping that's [2:46:08] uh, visible off the private way. Um, [2:46:12] next slide please. [2:46:15] It's just a series of of different uh [2:46:18] views, different elevations um at each [2:46:20] corner of the property even though the [2:46:22] plan is extremely simple um has [2:46:25] different site conditions. So we do have [2:46:27] a different response. Um you have your [2:46:30] classic uh where is myself storage [2:46:32] building um feature. Um and that is the [2:46:37] the one part of the green that sort of [2:46:38] is at that corner. Uh so you can see [2:46:40] that from Park Street which is a fairly [2:46:43] busy area. Again signage and way finding [2:46:45] are the one of the biggest design [2:46:47] constraints for these properties. Um so [2:46:50] next slide please. [2:46:54] And this just is an illustration also [2:46:57] kind of giving you a a view of how the [2:46:59] building's fitting into its context. Um [2:47:02] it's surrounded by other large [2:47:03] industrial buildings. Um and you kind of [2:47:05] have to work hard at finding places [2:47:07] where it's visible from the public way. [2:47:10] Um but where it is visible, you know [2:47:12] that you're going in the right [2:47:13] direction. Um and that's the the [2:47:16] approach we took to uh these views and [2:47:19] and the design. Um, so the materials are [2:47:22] uh very clean and simple. Um, and uh [2:47:26] hopefully an honest expression of that [2:47:28] last slide I think. Greg, [2:47:33] thank you. [2:47:36] Project benefit wise, as I said, we're [2:47:38] taking a vacant building and making it [2:47:40] into a larger, more productive building [2:47:43] that has a higher property tax base. uh [2:47:46] we're environmentally responsible, fully [2:47:48] electric, no gas, uh new construction [2:47:51] jobs will be involved. [2:47:54] Uh new street trees and public right of [2:47:57] way improvements. It's an appropriate [2:47:59] use, which I can't emphasize enough. [2:48:00] That doesn't happen often, especially [2:48:02] with these self- storage facilities. Uh [2:48:04] we believe it's in the right spot out of [2:48:06] public view, but also serving a [2:48:08] community that has minimal storage [2:48:09] available, especially for local small [2:48:11] businesses. Uh and then we're a very low [2:48:14] impact traffic use, one of the most [2:48:18] least traffic heavy industrial uses [2:48:20] there are. That's all I have. Thank you [2:48:22] so much. [2:48:22] Great. Thank you. Uh questions or [2:48:25] comments from the board. [2:48:26] Thank you, Madam Chair. Um did you say [2:48:28] it was unclear? Did you say that you are [2:48:29] looking at photovalttaics for the roof? [2:48:33] One more time. [2:48:33] PV panels. [2:48:34] Uh we are investigating PP panels. [2:48:36] So part of the design is you have to [2:48:38] sort of see if it's ready. I would just [2:48:39] argue. I mean, it's it's it's a project [2:48:41] that because of the sort of uh lower [2:48:44] energy intensity compared to other [2:48:46] comparable buildings of that square [2:48:48] footage, um there could be an [2:48:50] opportunity. It looked like in the [2:48:51] overhead uh shots that there was a a a [2:48:54] neighboring building that had [2:48:54] photovoltaics. You could actually be [2:48:57] flirting with um net carbon negative, [2:49:00] which is, you know, a standard that is [2:49:02] quite quite impressive. So, I I would [2:49:04] urge you to do more than exploring. And [2:49:06] if you can make that work, you'll [2:49:08] generate revenue. I mean, it seems to me [2:49:09] it's a good business play as well as a [2:49:10] really, really strong environmental [2:49:12] play. [2:49:12] There's a very high likelihood we use [2:49:13] them on most of our buildings. [2:49:15] Great. Thanks. [2:49:16] Cool. [2:49:16] Additional questions or comments? [2:49:18] Hearing and seeing none, a motion is in [2:49:20] order. [2:49:20] So move. [2:49:21] Second. [2:49:21] All those in favor? I oppose. The eyes [2:49:24] have it. Motion passes. Thank you very [2:49:25] much. Good luck. [2:49:27] Good project. [2:49:29] All right. Item number 28, request [2:49:31] authorization to issue certification of [2:49:33] Excuse me. Pursuant to article 80E, [2:49:35] small project review of the zoning code [2:49:37] for the proposed construction of 23 [2:49:39] residential rental units, including four [2:49:41] IZ units and 26 bicycle parking spaces [2:49:45] located at 1428 Dorchester Avenue and to [2:49:48] enter into community benefits agreement [2:49:50] in connection with the proposed project [2:49:52] and to take all related actions. Dan, [2:49:54] thank you again. Good evening, uh, Madam [2:49:56] Chair, members of the board, uh, [2:49:58] Director Shen. My name is Daniel Palano, [2:50:00] project manager for the small project [2:50:02] before you tonight at 1428 Dorchester [2:50:04] Avenue in Dorchester. On November 2nd, [2:50:07] 2025, the pro proponent uh 1428 [2:50:10] Dorchester A LLC filed an application [2:50:12] for small project review with the BPDA [2:50:14] for the proposed project pursuing [2:50:16] article 80E of the Bosony Code for the [2:50:18] development at 1428 Dorchester Avenue [2:50:21] proposing to construct a new five-story [2:50:23] 23 residential rental dwelling unit [2:50:26] building that will include 26 bike uh [2:50:28] parking spaces for the residents. The [2:50:30] project hosted a virtual meeting on [2:50:32] January 8th, 2026 with a public uh [2:50:34] comment period ending on January 30 uh [2:50:37] 2026. Next slide, please. [2:50:41] The project will include a mix a [2:50:42] residential uh unit mix of approximately [2:50:45] one one-bedroom unit, 19 two-bedroom [2:50:47] units, and three-bedroom units with a [2:50:49] total of four units. In the proposal, [2:50:52] the building is in compliance with net [2:50:54] zerocarbon zoning requirements, [2:50:55] providing all electric uh all efficient [2:50:57] electric building system. The project [2:51:00] has committed to public rele [2:51:01] improvements and pedestrian safety on [2:51:03] site as well as complying with Boston's [2:51:05] green infrastructure policy as [2:51:06] applicable, ensuring robust [2:51:08] infrastructure to support healthy [2:51:09] streets, vegetation, storm water [2:51:11] management. I'll now turn over to Harry [2:51:13] who will speak on the planning context. [2:51:14] Thank you. [2:51:19] Thank you, Dan. My name is Shapiro and I [2:51:22] am the planner assigned to this project. [2:51:25] The proposed project is located at 1428 [2:51:28] Dorchester Avenue near the intersection [2:51:30] with Adam Street in the Adam Street [2:51:32] neighborhood chopping zoning subdist. [2:51:35] The site is well served by transit [2:51:37] situated approximately 0.2 2 miles from [2:51:40] the field's corner MBTA red line station [2:51:44] connects connecting bus service and [2:51:46] local blue bike stations. In addition, [2:51:49] the surrounding area features accessible [2:51:51] open space amenities with both Townfield [2:51:54] and Ronin Park located within half a [2:51:56] mile of the property. Next slide, [2:51:59] please. [2:52:01] As outlined on this slide, the project [2:52:04] requires zoning relief for use because [2:52:07] multif family residential is forbidden [2:52:09] by the current zoning. Staff note that [2:52:12] this use is appropriate and commonly [2:52:15] found in this area. [2:52:18] On the left is a model I created to [2:52:20] illustrate the building dimensions [2:52:22] permitted by zoning in pink and the [2:52:24] proposed massing in yellow. Planning [2:52:27] department staff worked with the [2:52:29] proponent to shape the building's design [2:52:31] to better conform with its context and [2:52:34] respond to the massing of its neighbors. [2:52:36] I will now pass it to Hiong to present [2:52:38] the building and public room designs [2:52:40] that resulted from this work in more [2:52:42] details. [2:52:43] Great. Thank you. [2:52:47] Hi, good evening. Uh my name is Aang [2:52:49] Lee. I'm the senior landscape uh [2:52:51] architect assigned to this project for [2:52:53] the site plan review. The landscape [2:52:56] design of the project support support [2:52:57] the overall site plan through a [2:52:59] combination of streetscape and [2:53:01] circulation improvement along Dorchester [2:53:04] Avenue. The project will provide a new [2:53:06] street tree frontage planting, [2:53:08] short-term bike parking, and the closure [2:53:10] of an existing curb cut to help activate [2:53:13] the building entrance and improve the [2:53:15] pedestrian experience along the [2:53:16] accessible sidewalk. Next slide, please. [2:53:22] The proposed project is located within a [2:53:25] neighborhood design overlay district and [2:53:28] such consideration has been given to the [2:53:31] surrounding context. The upper floors of [2:53:34] the proposed building step back to [2:53:35] mitigate the building's perceived scale [2:53:38] along the street while inset balconies [2:53:40] and differentiated materials help break [2:53:42] down the messing on both the front and [2:53:45] side elevations. A welcoming entry is [2:53:48] articulated at the ground floor through [2:53:50] the insertion of a canopy to signify the [2:53:52] residential entrance. Thank you. And [2:53:54] I'll turn it over to the project [2:53:56] manager. [2:53:57] Thank you. [2:54:02] Thank you. This concludes our [2:54:04] presentation for this item. Our [2:54:05] development teams here available to [2:54:07] answer any questions. Thank you. [2:54:08] Thank you. Uh questions or comments from [2:54:10] the board? [2:54:12] All right. Just one comment. I really [2:54:13] love the um the twobedroom, the [2:54:17] concentration of two bedrooms. I just [2:54:19] really love seeing that. Um uh getting [2:54:22] 19 and then the extra three I think that [2:54:25] were three bedrooms um is something that [2:54:27] we don't uh see often enough. So just [2:54:30] really appreciative of that. Um with [2:54:33] that, uh a motion is in order. [2:54:34] So moved. [2:54:35] Second. [2:54:35] All those in favor? I opposed. The eyes [2:54:38] have it. Motion passes. Thank you very [2:54:40] much. Um congratulations. Good luck. [2:54:44] Item number 29 [2:54:47] requests [2:54:49] authorization to execute a first [2:54:51] amendment to the cooperative agreement [2:54:53] dated February 18th, 2020 by and between [2:54:56] Winterold LLC and the Boston [2:54:58] Redevelopment Authority doing business [2:54:59] as a Boston Planning and Development [2:55:01] Agency with respect to the DOT block [2:55:03] project and to execute an amended and [2:55:05] restated affordable rental housing [2:55:07] agreement and restriction for the [2:55:09] inclusionary development policy units [2:55:11] located in the first two buildings [2:55:13] completed at the project and to take all [2:55:15] related actions. Andy. [2:55:17] Uh thank you, Madam Chair, Director [2:55:19] Shen, uh and members of the board. I'm [2:55:21] Andy Feldman, housing policy manager [2:55:23] with the mayor's office of housing. Uh [2:55:25] tonight, I'm here to request your vote [2:55:27] uh to amend the affordable rental [2:55:28] housing agreement and restriction as [2:55:30] well as the cooperation agreement for [2:55:32] the development uh called DOT block uh [2:55:34] in Dorchester. This development was [2:55:36] approved by the BPDA board in April 2019 [2:55:39] and called for the construction of four [2:55:41] separate buildings. Since then, two [2:55:43] buildings were completed as part of [2:55:44] phase 1 for a total of 245 residential [2:55:48] units, including 33 on-site IDP units. [2:55:51] Uh the proponent now plans to build the [2:55:53] other two buildings as follows. The [2:55:55] third building, called the Hancock [2:55:57] building, will consist of approximately [2:55:59] 84 residential units, all of which will [2:56:01] be incomerestricted. Uh these will be a [2:56:03] mix of both low-income housing tax [2:56:06] credit units as well as off-site IDP [2:56:08] units from the fourth building. The [2:56:10] fourth building, which is the final [2:56:12] building called DOT South, will consist [2:56:14] of approximately 145 market rate rental [2:56:17] apartments. There will be no IDP units [2:56:19] in the fourth building as they will be [2:56:21] located in the third building. Uh [2:56:23] therefore, the vote in front of you [2:56:24] tonight will allow the agency to amend [2:56:26] the ARAR so that it only covers the two [2:56:28] buildings that have already been [2:56:29] completed as it is no longer relevant to [2:56:30] the other two buildings as well as to [2:56:32] amend the cooperation agreement. Thank [2:56:34] you. Happy to answer any questions you [2:56:35] might have. [2:56:35] Okay. Thank you. Uh questions or [2:56:37] comments from the board? Hearing and [2:56:39] seeing none, a motion is in order. [2:56:40] So moved. [2:56:41] Second. [2:56:41] All those in favor? I opposed. The eyes [2:56:44] have it. Thanks, Dandy. [2:56:46] Item number 30, request authorization to [2:56:48] issue a scoping determination waving [2:56:49] further review pursuant to section [2:56:51] ADB-5.4D [2:56:53] 4D of the zoning code in connection with [2:56:56] the project notification form filed by [2:56:58] Horizon Mlen [2:57:00] LLC and CV580 Chelsea LLC on July 9th, [2:57:05] 2026 for the proposed 160 MLEN highway [2:57:08] project with planned uses that include [2:57:11] warehousing, receiving and distribution [2:57:13] accessory office uses, 10 car parking [2:57:15] spaces and loading dock areas and to [2:57:17] issue a certification of compliance or [2:57:19] partial certification of compliance for [2:57:21] the proposed project under section ADB-6 [2:57:24] of the zoning code um upon successful [2:57:27] completion of the article ADB large [2:57:29] project review process and to execute [2:57:31] and deliver a cooperation agreement and [2:57:33] a transit transportation access plan [2:57:35] agreement and to take all related [2:57:37] actions. Dan, [2:57:38] good evening again. Thank you, Madam [2:57:40] Chair Roas, members of the board, [2:57:41] director Shen. My name is Daniel Palano. [2:57:43] I'm the project manager for the proposed [2:57:45] article 80 l project before you tonight [2:57:48] at 160 mlon highway located in the east [2:57:50] Boston neighborhood. The project [2:57:52] proponent, Horizon Mlean LLC, proposes [2:57:55] to demolish the existing building at the [2:57:57] project site and to construct a new [2:57:59] two-story structure compromising of [2:58:01] approximately 152,500 square ft of gross [2:58:05] floor area with planned uses that [2:58:07] include warehousing, receiving and [2:58:09] distribution and accessory office uses [2:58:11] as well as off- streetet parking for [2:58:13] approximately 10 vehicles for the use by [2:58:15] on-site tenants and employees and [2:58:17] loading dog areas. The proposed project [2:58:20] is a plan is planned to serve primarily [2:58:22] as a central receiving and distribution [2:58:23] center for terminal concessions at Logan [2:58:25] International Airport which will replace [2:58:28] an existing facility located in less [2:58:30] than a mile north at 290 MLEN Highway. [2:58:33] As part of their uh public benefits and [2:58:35] mitigation, the proposed project will [2:58:37] provide a one-time contribution with [2:58:38] $250,000 [2:58:40] to support the betterment and [2:58:41] improvement of East Boston, including [2:58:43] the greenway open space in public health [2:58:45] as well as significant improvements to [2:58:47] covering uh bypass extension. [2:58:50] Additionally, the proponent has also [2:58:51] committed to a truck route and access [2:58:53] plan which ongo is ongoing monitoring of [2:58:56] specified routes to be followed by [2:58:58] thirdparty vendors accessing that site [2:59:00] with the intent of minimizing traffic [2:59:01] impact in local streets. The access plan [2:59:04] the access plan will include ongoing [2:59:06] monitoring and reporting by the city to [2:59:07] ensure compliance. As part of the [2:59:09] article 80 process, the project will uh [2:59:12] held a virtual public meeting for the [2:59:14] pro proposed project on August 12th, [2:59:15] 2026 as well as an IG meeting impact [2:59:18] advisory group meeting on August 11th uh [2:59:20] 2026. The virtual public meeting was [2:59:22] posted on the planning department's [2:59:24] website and the calendar calendar [2:59:25] notification went to all subscribers of [2:59:27] the East Boston neighborhood. Thank you [2:59:29] for your consideration for the project [2:59:31] tonight. I have their development team [2:59:32] here to uh present and answer any [2:59:34] questions you may have. Thank you. [2:59:39] Um, so my name is Michelle and I am the [2:59:41] planner assigned to this project. Um, [2:59:43] next. Oh, there we go. So, the proposed [2:59:45] project at 160 Mlan Highway is located [2:59:47] within the East Boston neighborhood [2:59:49] zoning district within the waterfront [2:59:51] economic or we zoning subdist. The site [2:59:53] is located within a restricted roof [2:59:55] district and the coastal flood [2:59:56] resilience overlay district or seafood [2:59:59] governed by 20 by article 25A. The [3:00:02] proposed project also falls within the [3:00:03] study area of Plan East Boston, which [3:00:06] was adopted by the BBDA board in January [3:00:08] 2024 and codified into zoning in April [3:00:11] 2024. Plan East Boston was a [3:00:13] neighborhoodwide planning initiative to [3:00:15] guide growth in East Boston. The plan [3:00:17] established recommendations for [3:00:19] transportation and public realm [3:00:20] improvements, updated regulations for [3:00:23] land use, and broader policy and program [3:00:25] considerations throughout the [3:00:26] neighborhood. Specifically for the [3:00:29] waterfront or industrial areas along [3:00:30] Mlen Highway, the plan recommended [3:00:33] allowing a mix of uses that would [3:00:34] support economic activity and create [3:00:36] employment opportunities. Next slide, [3:00:38] please. [3:00:42] Plan East Boston sought to limit the [3:00:44] expansion of new distribution facilities [3:00:46] by making these uses conditional for [3:00:48] this area. The proposed project is [3:00:50] intended to serve Logan's airports [3:00:52] operational needs offsite by [3:00:54] consolidating multiple existing [3:00:56] facilities into a single location with [3:00:58] direct access to the Coughlin bypass [3:01:00] road extension. The proposed [3:01:02] consolidation of airport related [3:01:04] distribution uses in a single site along [3:01:06] with mitigation measures that include [3:01:08] sustainability and transportation [3:01:10] improvements is consistent with the [3:01:11] criteria for a conditional use permit [3:01:13] under section 6-3 of the zoning code. [3:01:16] These measures include electrifying [3:01:18] trucks accessing the site to reduce [3:01:20] carbon emissions and making improvements [3:01:22] to the Coughlin bypass road. This road [3:01:24] is currently mass property and is [3:01:26] proposed to be extended through the [3:01:28] site. The improvements made will also [3:01:30] preserve the potential for future [3:01:31] improvements and access to the [3:01:33] extension. The proposed project will [3:01:35] also improve pedestrian transit access [3:01:37] through new crosswalks at the [3:01:38] intersection of Chelsea Street and and [3:01:40] Curtis Street and upgrades the two MBTA [3:01:43] bus stops on Chelsea Street with bus [3:01:45] shelters. Thank you. And now I'll turn [3:01:46] it over to the development team to [3:01:48] present the project in more detail. [3:01:50] Okay. [3:01:50] Thank you. [3:01:54] Thank you, Daniel. And uh thank you [3:01:56] Michelle, Director Shen, Madam Chair, [3:01:58] BED Board. I am Jacob Citroen uh the [3:02:01] founder of Cargo Ventures and I want to [3:02:03] start by thanking uh Daniel and Michelle [3:02:05] for helping guide us through the process [3:02:07] here. Uh I'm joined tonight by other key [3:02:10] members of the project team. Behind me [3:02:12] are Pat Capagreo and Brad Mahoney with [3:02:15] Cargo Ventures. uh James Gray and Mark [3:02:18] Whiteside with uh Stantech uh and Ian [3:02:21] McKinnon with Howard Stein Hudson [3:02:23] Stantech project architect Howard Stein [3:02:25] Hudson Traffic Engineering. We're also [3:02:27] joined virtually by Brian Hul Lutner uh [3:02:30] with DA Piper and then most importantly [3:02:33] by Michael Dosla who's the president of [3:02:36] Marketplace Development, our tenant that [3:02:39] is making this project possible. Um next [3:02:42] slide please. [3:02:45] Marketplace was established in 1994 and [3:02:48] headquartered in Boston. And in 2017, [3:02:51] they opened what is the current central [3:02:54] receiving and distribution center for [3:02:55] Logan Airport at our 290 Mlen project. [3:02:59] Next slide, please. [3:03:02] Um, this current CRDC is the central [3:03:05] receiving point for all concessions [3:03:08] within Logan Airport. books, handbags, [3:03:11] food, all of that goes into this [3:03:13] building where it is screened, sorted, [3:03:15] and secured and then delivered by secure [3:03:18] truck to Logan Airport. The graphic on [3:03:20] the left shows the current various [3:03:23] vendors in the red dots that all [3:03:25] function with the CRDC. So all those red [3:03:28] dots must deliver their goods to the [3:03:30] current CRDC [3:03:32] and then there the process happens that [3:03:34] I described and then to the airport. Our [3:03:37] proposal is to create a new facility at [3:03:39] the yellow dot and that new yellow dot [3:03:42] will allow the consolidation of these [3:03:44] various vendors into one building where [3:03:47] the processes would happen within the [3:03:49] building. Next slide please. [3:03:54] The proposed project uh we intend to [3:03:56] develop at our 160 Mlen Highway [3:03:58] property. This is a property we acquired [3:04:01] uh back about 23 years ago. Uh and it's [3:04:04] an existing 21,000 square foot [3:04:07] industrial building built by an air [3:04:09] freight company back in the early 80s. [3:04:12] And um the site is 3.33 acres in size [3:04:16] and as you can see bounded by the old [3:04:18] MWR pump house. That's the red brick [3:04:21] building you see. The new MWR pump house [3:04:24] noted and then the cube smart self- [3:04:26] storage facility. [3:04:28] Next slide, please. [3:04:31] Our proposal is to develop a new [3:04:34] state-of-the-art [3:04:36] 152,500 [3:04:37] square ft two-story industrial building, [3:04:40] and this will be the home of the new [3:04:42] central receiving and distribution [3:04:44] center. [3:04:45] The building will be made of insulated [3:04:47] metal panels, have a rooftop solar field [3:04:50] to generate electricity for on-site [3:04:52] consumption, and all systems will be [3:04:54] built to 2070 sea level rise and storm [3:04:57] surge projections. Next slide, please. [3:05:03] Overall, we'll have 10 on-site car [3:05:05] parking spots with the majority of [3:05:07] employees either parking in an existing [3:05:10] garage in Chelsea or using mass transit. [3:05:13] As part of our collective commitment to [3:05:15] mass transit, uh we will be installing [3:05:18] two new bus shelters and marketplace [3:05:21] will be providing a 25% mass transit [3:05:24] subsidy for all employees in the [3:05:26] building. [3:05:27] Next slide, please. [3:05:31] Sustainability and resiliency will be [3:05:33] key features of this building. As I [3:05:36] described, building floor and key [3:05:37] systems above 2070 flood projections, [3:05:41] all electric and targeting zerocarbon [3:05:44] operations. We will also achieve lead [3:05:46] platinum certification, making this the [3:05:49] first warehouse distribution building in [3:05:52] Massachusetts and one of the few in the [3:05:54] US. Beyond lead platinum certification, [3:05:58] we will with marketplace implement 100% [3:06:02] electric truck transfers from the [3:06:04] building to the airport and that will be [3:06:06] in operation as of day one. Next slide, [3:06:09] please. [3:06:12] The development of the 160 parcel uh has [3:06:15] been part of an extensive community [3:06:17] conversation with presentations dating [3:06:20] back to 2019. Our project notification [3:06:23] form for this building has generated uh [3:06:26] 64 comment submissions of which 53 have [3:06:29] been in support and the conversations [3:06:31] and the process which Daniel and [3:06:33] Michelle certainly guided us led to a [3:06:36] much better project. We believe that is [3:06:39] we're going to result should we be [3:06:41] approved in 150 construction jobs and [3:06:44] 300 full-time jobs following full [3:06:46] occupancy. This is a $120 million [3:06:49] investment. a significant increase in [3:06:51] property taxes following completion, a [3:06:54] reduction of over 3,000 annual truck [3:06:57] trips from the consolidation of [3:06:59] operations that I described, net [3:07:01] zerocarbon footprint, and electric truck [3:07:04] deliveries to the airport. That alone is [3:07:07] estimated by our team to result in a 68 [3:07:10] ton reduction in CO2 emissions. [3:07:13] We will also be one of the first of its [3:07:15] kind emissions monitoring programs with [3:07:18] financial penalties for lack of [3:07:20] compliance. [3:07:22] Lead platinum certification as I [3:07:23] described half a million dollars in [3:07:26] combined community mitigation payments [3:07:28] and installation of new bus shelters and [3:07:30] street improvements. Subject to [3:07:32] permitting, we are hoping to break [3:07:34] ground first quarter of next year. While [3:07:37] we were excited about the potential of [3:07:39] this new building and what it will [3:07:41] represent for our community, it is our [3:07:44] lease with marketplace, their business [3:07:46] model, and our shared values that make [3:07:49] this all possible. So, with that, I'd [3:07:51] like to thank the BPDA staff for working [3:07:54] with us through this process and on [3:07:56] behalf of the project team. Um, we [3:07:59] appreciate your consideration and are [3:08:00] welcome happy to answer questions. Thank [3:08:02] you. [3:08:03] Great. Um, questions or comments from [3:08:05] the board? [3:08:06] Thank you, Madam Chair. Um, I always [3:08:08] knew that Pat Capagreo was an [3:08:10] environmentalist, but I am uh [3:08:12] particularly impressed with some of [3:08:13] these milestones in the sustainability [3:08:14] front. Uh, it's not always easy uh in [3:08:17] the commercial and manufacturing [3:08:18] industry to hit these things. So, I I [3:08:20] think it's great on-site uh solar, you [3:08:22] know, I asked this question at most [3:08:23] meetings and you beat me to the punch. [3:08:24] So, appreciate the work there. Um, I [3:08:27] also want to talk a little bit about the [3:08:29] uh community process uh that you folks [3:08:31] have clearly done. Uh the incredibly [3:08:33] talented BPDA staff provides all of us [3:08:36] with these very exhaustive um you'll see [3:08:37] us on our iPads. We're looking over [3:08:39] there's the packet and every person who [3:08:41] chimes in on a project uh their position [3:08:44] is recorded and I think most of us look [3:08:47] through it just to sort of get a flavor. [3:08:48] It doesn't always determine our vote, [3:08:50] but for this project there are 53 uh [3:08:54] remarks or or letters or or or uh you [3:08:57] know communications of support for this [3:08:59] project. There are two in opposition. [3:09:01] That's remarkable. you don't often see [3:09:02] that. So, I think it's a credit to all [3:09:03] of you for working with uh the [3:09:05] community, working with residents to uh [3:09:07] build a a project that is needed and is [3:09:09] uh going to uh not only serve East [3:09:11] Boston, but the city at large. So, thank [3:09:13] you. [3:09:13] Thank you, sir. [3:09:14] Great. Additional questions or comments? [3:09:17] All right. Um hearing and seeing none, a [3:09:19] motion is in order. [3:09:20] So moved. [3:09:20] Second. [3:09:21] All those in favor? I opposed. Uh the [3:09:23] eyes have it. Motion passes. Great [3:09:25] project. Very impressive. Thank you. [3:09:27] Thank you. Thank you very much. Have a [3:09:29] good evening. [3:09:32] Item number 31, [3:09:36] request authorization to issue a [3:09:38] determination waving further review [3:09:40] pursuant to article 80, section 88-6 of [3:09:43] the zoning code in connection with the [3:09:46] notice of project change for the [3:09:47] proposed 165 Park Drive project and to [3:09:51] issue a certification of a certification [3:09:54] of compliance for the proposed project [3:09:56] pursuant to section ADB-6 of the code. [3:09:59] upon successful completion of the [3:10:00] article 80 large project review process [3:10:02] and to execute a cooperation agreement [3:10:04] and transportation access plan agreement [3:10:06] to take all related actions. Quinn. [3:10:08] Thank you, Madam Chair, members of the [3:10:10] board and director Shen. Uh, next slide, [3:10:12] please. [3:10:15] Uh, one more. There we go. Great. Uh, [3:10:18] the proposal before you is for a notice [3:10:19] of project change to the approved [3:10:21] article 80 large project at 165 Park [3:10:23] Drive in Fenway. Uh the proposed project [3:10:25] is to be constructed on what is [3:10:27] currently a surface parking lot with the [3:10:28] Holy Trinity Cathedral. [3:10:30] The approved project consisted of two [3:10:32] residential buildings over a shared uh [3:10:35] podium totaling approximately 130,000 ft [3:10:38] containing 48 home ownership units and [3:10:40] 69 rental units for a total of 117. [3:10:43] Uh there were proposed to be 42 parking [3:10:45] spaces uh between the ground for garage [3:10:47] and a small surface lot primarily for [3:10:49] the use of the cathedral. The notice of [3:10:52] project change filed in September 11th, [3:10:54] 2026 with the planning department [3:10:56] proposes to make changes to massing and [3:10:58] overall program of the approved project. [3:11:00] The previously approved building uh with [3:11:02] two tower expressions over a shared [3:11:04] podium would be combined into a single [3:11:06] massing expression over that same [3:11:07] podium. The NPC also proposes to remove [3:11:10] the top seven story of the building. So [3:11:12] the resulting building would be six [3:11:13] stories approximately 123,000 ft and [3:11:16] contain 112 residential rental units. [3:11:19] There would be minor alterations to the [3:11:20] vehicle and bike parking program, but no [3:11:22] substantive change to the building [3:11:23] footprint or landscaping. The NPC [3:11:26] project would set aside 20% of the units [3:11:28] as designated uh income restricted, [3:11:30] exceeding the requirements, the [3:11:32] requirements of the inclusionary [3:11:33] development policy. As this project met [3:11:35] the criteria for expedited NPC review, a [3:11:37] public meeting was only required upon [3:11:39] request of an elected official and none [3:11:41] was requested. But I do want to thank [3:11:42] the members of the IIG for their active [3:11:44] engagement with me through this NPC [3:11:46] review period. Uh that concludes the [3:11:48] presentation for this item. Uh Ted [3:11:49] Levitz from the development team is [3:11:51] available on Zoom to answer any [3:11:52] questions the board may have. Thank you. [3:11:54] Okay. Thank you. Uh questions or [3:11:56] comments from the board? [3:11:58] All right. Hearing and seeing none, a [3:12:00] motion is in order. [3:12:01] So moved. [3:12:01] Second. [3:12:02] Roll. Oh no. No. All those in favor? [3:12:04] I opposed. The eyes have it. Motion [3:12:06] passes. Thanks, Glenn. [3:12:08] Thank you. [3:12:08] Item number 32. uh request authorization [3:12:11] to issue a certification of approval [3:12:13] pursuant to article 80 small project [3:12:15] review of the zoning code with proposed [3:12:17] construction of 24 home ownership units [3:12:20] including three IDP units located at 201 [3:12:22] Hampton Street and to enter into a [3:12:25] community benefits agreement is to take [3:12:26] all related actions. Dylan, [3:12:28] thank you and good evening madam chair, [3:12:30] members of the board and director Shen. [3:12:31] I uh my name is Dylan Norris. I'm a [3:12:33] project manager with the development [3:12:35] review division of the planning [3:12:36] department. I'm here before you to [3:12:37] present the proposed article 80 small [3:12:39] project located at 2011 Hampton Street [3:12:42] in the Roxberry neighborhood of Boston. [3:12:44] Next slide. [3:12:47] Just for additional context, the project [3:12:49] site uh encompasses four uh currently [3:12:52] vacant parcels and totals approximately [3:12:54] 52 uh 5,213 [3:12:57] square ft of land. uh Greensmith [3:13:00] Development LLC. The proponent proposes [3:13:02] this project as an update to a [3:13:04] previously permitted sub article 80 [3:13:06] development that contemplated the [3:13:08] development of a five-story mixeduse [3:13:10] residential and commercial structure [3:13:12] with 13 home ownership units and two [3:13:14] commercial units. The proposal before [3:13:16] you now seeks to erect using modular [3:13:19] construction methods, a new five-story [3:13:21] residential building containing 24 home [3:13:23] ownership units, which will include [3:13:25] three incomerestricted units pursuant to [3:13:27] the inclusionary development policy. The [3:13:29] residential units will comprise eight [3:13:31] one-bedroom units, 13 two uh two-bedroom [3:13:34] units, and three-bedroom units. The [3:13:37] project is designed to be highly [3:13:39] sustainable and will achieve a lead [3:13:40] platinum rating with a net zerocarbon [3:13:42] operations as required by zoning. The [3:13:44] building has a Berto annual carbon [3:13:46] emission limit of net zero. The pro a [3:13:49] small project review application was [3:13:50] filed on May 28th, 2026 and the public [3:13:54] comment period in connection with the [3:13:55] proponent submission of the SP concluded [3:13:58] in uh June 29th uh 29 of 2026. [3:14:02] During this public uh comment period, [3:14:04] the planning department sponsored a [3:14:06] public meeting on June 23rd, 2026, which [3:14:09] was noticed through the planning [3:14:10] department's notification distribution [3:14:12] list. events calendar uh for the [3:14:15] relevant Roxberry neighborhood. I'm now [3:14:17] going to turn it over to my colleague [3:14:18] Jason McDonald uh to go over the [3:14:20] planning context in which this project [3:14:22] was reviewed. Thank you. [3:14:27] Thank you, Dylan. Hello, everyone. Uh my [3:14:30] name is Jason McDonald, the planner [3:14:31] assigned to this project. Uh the [3:14:33] proposed project is located within the [3:14:35] St. Patrick neighborhood shopping uh [3:14:37] subd district of Roxberry neighborhood [3:14:40] uh zoning district. Uh you can see it is [3:14:43] located right next to the Dudley Town [3:14:45] Common Park. Uh just due to that [3:14:47] location, it is subject to review by the [3:14:49] Boston Parks and Recreation Commission [3:14:52] uh for design review uh per municipal [3:14:54] ordinance 7.4 to 11. Uh if looking at [3:14:58] the overall site context, you can see it [3:15:00] sits at the nexus of the residential [3:15:02] Roxberry [3:15:03] uh neighborhood and the commercial uses [3:15:06] of the Newberry uh the New Market [3:15:08] Industrial District. Uh and you can kind [3:15:11] of towards the west it would be kind of [3:15:12] part of the Nubian square area. Looking [3:15:15] at this uh project it was once approved [3:15:18] already at the ZBA uh in 2021 for um [3:15:22] which gave zoning relief for numerous uh [3:15:25] dimensional uh regulations and uh [3:15:28] variances that needed. The only new [3:15:31] zoning relief that will be needed with [3:15:33] this is a conditional use permit due to [3:15:35] the movement of the residential use to [3:15:37] the ground floor as well. Um residential [3:15:41] is allowed for the upper stories but uh [3:15:43] conditional for the ground floor. Um [3:15:45] besides that it remains harmonous with [3:15:47] the intent of the code and uh yeah [3:15:50] that's the general information for it. [3:15:51] I'll pass off to Nick to kind of go over [3:15:53] uh my colleague Nick Gilpin. He'll go [3:15:55] over the urban design context of the [3:15:57] project. Thank you. [3:15:58] Thank you. [3:16:01] Thank you, Jason. I'm Nick Gilpin and [3:16:03] I'm the urban design reviewer for this [3:16:05] project. This proposal accommodates [3:16:07] Boston Complete Streets guidelines and [3:16:09] establishes a generous [3:16:11] pedestrianoriented frontage along [3:16:12] Hampton Street. The lobby uh and [3:16:15] residences are accessed by a ground [3:16:17] floor fully accessible entrance [3:16:19] reinforcing the public realm. In [3:16:21] addition, two new street trees are [3:16:23] planted and an obsolete curb cut is [3:16:25] removed to improve the streetscape. [3:16:28] staff and the proponent worked with the [3:16:29] parks department to adjust the setback [3:16:31] adjacent to the Dudley Common to ensure [3:16:34] maintenance access to the BPD retaining [3:16:37] wall. Next slide, please. [3:16:41] This is a five-story all residential [3:16:43] building with a design that makes best [3:16:45] use of a small triangular site. There [3:16:47] are three stacks of residential [3:16:48] balconies along Hampton Street F along [3:16:51] the Hampton Street facade providing [3:16:53] residents access to outdoor amenity [3:16:54] space. Special care was taken to improve [3:16:57] privacy and security for the ground [3:16:59] floor units on the side of the building [3:17:01] that faces the park. The building's [3:17:03] ground floor is given distinct coloring [3:17:05] and materials to meet the street and [3:17:06] frame the entry and amenity spaces in an [3:17:09] inviting way. And while the upper four [3:17:11] stories will have a different finish [3:17:13] that will evoke the existing buildings [3:17:14] of the neighborhood. I will now turn it [3:17:16] back over to Dylan. [3:17:20] Thank you, Nick. And this concludes our [3:17:22] presentation for this item. Myself and [3:17:24] the development team are available to [3:17:26] answer any questions you may have. Thank [3:17:27] you. [3:17:28] Great. Thank you. Um questions or [3:17:30] comments from the board? [3:17:31] The chair. Quick question. Um you [3:17:34] mentioned modular. What's the modular [3:17:36] aspect of it? Stackables or can't see [3:17:40] come in as fully constructed modules [3:17:44] with the kitchens and baths fully [3:17:46] installed. Um, luckily this is on [3:17:48] Hampton Street which gives very good [3:17:50] access to Melania Cass and Route 93. [3:17:53] We're gonna be working with Reframe [3:17:55] Systems, a new startup in Massachusetts [3:17:57] to build this as their first five-story [3:17:59] modular building. [3:18:00] Yes. [3:18:01] So, yeah. [3:18:02] Good. Can't wait to see how it goes. [3:18:03] Thank you. [3:18:04] So, what is that what does that mean? [3:18:06] Like module like what is [3:18:09] So, it's going to come in in boxes. It's [3:18:11] basically going to be 13 ft wide by [3:18:13] about 10 ft high by 40t long. Okay. [3:18:16] Okay. [3:18:16] Will be shipped in, craned into place. [3:18:19] You just like stack it. [3:18:20] Yeah. And it already has the plumbing, [3:18:21] the electrical, kitchen's bass, most of [3:18:23] the finishes installed already. So, in [3:18:26] theory, it will lead to a faster [3:18:27] construction time, but we will find out. [3:18:29] So, [3:18:30] that's why I said I can't wait to see, [3:18:32] you know. [3:18:33] No, I mean, like [3:18:34] I mean, [3:18:35] it sounds fabulous. Like, um, and just a [3:18:38] a comment really um appreciate uh the [3:18:42] home ownership units, 24 home ownership [3:18:44] units. so good, so needed. Um, so I love [3:18:48] to see that small projects um, you know, [3:18:51] keeping going um and, uh, and creating [3:18:54] this this this housing, this much needed [3:18:56] housing. So, um, yeah, that was my one [3:18:59] comment. Any other comments or [3:19:00] questions? [3:19:00] Yeah, I'll have a comment, please, Madam [3:19:02] Chair. Um so the idea of sort of modular [3:19:06] is has been around but I think um to be [3:19:09] able to sort of deploy it in this kind [3:19:11] of setting and hopefully the fact that [3:19:14] it's uh architecturally designed um I [3:19:17] think that will uh help and really [3:19:20] highlight the um you know the special [3:19:23] techniques and the use of this as a [3:19:25] really good tool to develop uh [3:19:28] additional housing in the city. So [3:19:30] really looking forward to seeing it. Um [3:19:34] and having a little bit of experience uh [3:19:36] doing that. I think you will hit the [3:19:39] schedule. You you might not the cost but [3:19:42] you'll but you'll hit the schedule. So [3:19:44] we'll find out. [3:19:45] Congratulations. Yeah. [3:19:46] Thank you. [3:19:46] Very good. Yeah. Great. Great. Um so uh [3:19:50] we're excited and watching. No pressure. [3:19:54] Um but excitement, right? We're we love [3:19:57] this type of innovation coming and be [3:19:59] able to use this as an example um for [3:20:02] you know um other things that could [3:20:04] possibly happen within our city but also [3:20:06] for cities all over the place. So um [3:20:09] with that uh motion is in order. [3:20:10] So moved. [3:20:11] Second. [3:20:11] All those in favor? Opposed? The eyes [3:20:14] have it. Motion passes. Congratulations. [3:20:16] Good luck. [3:20:17] Thank you. Um have a good night. [3:20:18] Yeah. Thanks. [3:20:19] All right. Item number 33 personnel [3:20:23] Mike. [3:20:26] Um, thank you, Madam Chair, members of [3:20:27] the board and director Shen. We have one [3:20:30] item for your consideration on the BRA [3:20:32] agenda with the exact details that are [3:20:34] included in the board memos. We have one [3:20:37] policy and procedure in the office of [3:20:40] general counsel, appointing an acting [3:20:42] general counsel for conflict of interest [3:20:44] and signatory power and the absence of [3:20:47] the general counsel. And that's it. [3:20:48] Answer any questions you may have. [3:20:50] Thank you. Any questions or comments [3:20:52] from the board? Hearing and seeing none. [3:20:54] A motion is in order. [3:20:54] Moved. [3:20:55] Second. [3:20:55] All those in favor? I opposed. The eyes [3:20:58] have it. Motion passes. Thank you, Mike. [3:21:00] Uh item number 34. I need a motion to [3:21:02] pay our bills. [3:21:04] I move that we pay our bills. [3:21:06] I second that motion. [3:21:07] Right. All those in favor? I opposed. [3:21:09] The eyes have it. Please pay the bills. [3:21:12] And finally, director's update. Director [3:21:15] Shen, the floor is yours. [3:21:16] Um good evening, members of the board. [3:21:18] Uh I want to start my report by uh [3:21:21] thanking you for approving uh the 121B [3:21:25] demonstration projects for the three the [3:21:28] four projects um to allow the city staff [3:21:31] to begin formal tax relief uh [3:21:34] negotiations with these proponents. Um [3:21:37] this is one of the top priorities [3:21:39] identified by the mayor to move approved [3:21:42] projects into construction. Um, you may [3:21:46] not know this, but you have already [3:21:47] approved 144 market rate rental projects [3:21:52] um that amount to about 15,000 units [3:21:55] that are actually approved and not yet [3:21:57] constructed. M [3:21:59] so this is also an an uh a historic [3:22:02] moment because while the the the BPDA [3:22:06] have approved um 121Bs [3:22:10] before this is the first time that [3:22:12] actually we are actually um proceeding [3:22:14] with um tax relief for market rate [3:22:18] rental projects alone um these four [3:22:21] projects three of them are in the Austin [3:22:23] Brighton area um I'm not going to repeat [3:22:25] them here and one in um in Charles Town. [3:22:29] Together, all four of these projects [3:22:31] will deliver about 1,400 new homes, of [3:22:34] which 180 of them will be income [3:22:37] restricted. Um, now these uh projects [3:22:41] together will represent 900 million uh [3:22:44] dollars of investment that will actually [3:22:47] create 1,270 [3:22:51] construction jobs. Now the relief that [3:22:55] these projects will be receiving amount [3:22:58] to about $31.5 million uh if you [3:23:02] calculate it as the net present value. [3:23:04] So, and when they all actually uh start [3:23:08] paying the full taxes, three of them in [3:23:11] 5 years after construction or after [3:23:14] occupation and the other one in 10 [3:23:16] years, they will actually annually [3:23:18] generate about $7.5 million worth of um [3:23:22] of of taxes on an annual basis. So I [3:23:26] think it's very much along the lines of [3:23:28] it is a deferring of new taxes as [3:23:32] essentially an investment to actually [3:23:34] generate um $7.5 million of [3:23:38] annual taxes when when finally um uh [3:23:41] completed and and um uh no longer um [3:23:46] receiving the the relief. Um, this is a [3:23:50] you already heard that it's a interdep [3:23:52] departmental effort that the mayor [3:23:54] actually got everybody together. You've [3:23:56] already heard that we work closely with [3:23:58] the mayor's office of housing under the [3:24:01] leadership of Chief Dylan. Um, the U [3:24:04] Boston Housing Authority under [3:24:06] administrator Bock um the finance and uh [3:24:10] cabinet including the assessing [3:24:12] department um and of course uh guided by [3:24:15] the policy chief Kristen McWain. So I [3:24:18] want to thank all of them and their [3:24:19] staff in actually collaborating closely [3:24:21] with our team to get this pro um this uh [3:24:24] relief uh initiative uh into its current [3:24:28] state. Um and the one person I want to [3:24:31] highlight here is Ruben Caner for his [3:24:34] incredibly um persistent and patience in [3:24:38] actually getting us to this point. Um, [3:24:41] not of course he's he's one of many, but [3:24:45] I think uh, Reuben really deserves a lot [3:24:47] of uh, congratulations here. Um, the [3:24:51] other the board also reviewed a number [3:24:54] of important zoning initiatives. Um and [3:24:57] and these are com. So we you approved [3:25:01] the uh clearary square squares and [3:25:04] streets small area plan and then also [3:25:07] you um uh approved the dimensional [3:25:10] definitions uh update in the zoning [3:25:12] code. These are both part of the larger [3:25:16] and continuous effort that our staff [3:25:18] have been working on in modernizing and [3:25:20] reforming the city zoning. Both of these [3:25:24] represent important components of what [3:25:27] we are talking about as a framework for [3:25:30] a completely revised zoning for the [3:25:32] city. Um, clearly square squares and [3:25:35] streets. I think it will be probably the [3:25:38] last of these small area plans because [3:25:40] we are actually discovering that as you [3:25:43] heard it was a two and a half year [3:25:45] effort and what we're discovering is [3:25:47] that the um the pay the payoff for 2 and [3:25:51] 1/2 years work of engagement is [3:25:53] relatively small. So you will be seeing [3:25:56] in the future that we're doing more [3:25:58] comprehensive approaches to neighborhood [3:26:01] zoning uh rather than to target. We [3:26:03] thought that targeting these more area [3:26:05] plans would make it more expeditious but [3:26:07] we're learning in fact that that that [3:26:09] it's not uh faster and many of the [3:26:13] questions that come up are in fact well [3:26:15] what are you doing in the areas [3:26:17] immediately adjoining uh the the squares [3:26:19] and sweets uh uh areas. Um obviously the [3:26:24] adopted plan will deal with um [3:26:26] modernizing the uses that are allowed in [3:26:29] these districts. Um promoting more [3:26:31] mixeduse multif family development and [3:26:33] then also promoting uh businesses local [3:26:36] businesses and activating the square. [3:26:39] There is also new building envelope that [3:26:41] will allow for greater density and [3:26:43] building height uh in many of the [3:26:45] locations and promote transit oriented [3:26:47] development. Um now on the dimensional [3:26:50] definitions I think that this is the [3:26:52] kind of good government that our [3:26:54] department is is conducting. Um it uh [3:26:58] certainly updates dimensional [3:27:01] definitions. It eliminates outdated [3:27:03] kinds of definitions and um cleans up a [3:27:07] lot of the contradictions that exist in [3:27:08] the code today. Um I'm not going to go [3:27:12] over them again, but you saw in some of [3:27:14] the diagrams that we're also making it [3:27:16] much more user friendly. So today the [3:27:19] code is quite difficult to penetrate and [3:27:22] so to actually update it and actually [3:27:25] make it easier to use is one of the uh [3:27:27] the important uh sort of improvements [3:27:30] that we're making. Um this is the kind [3:27:33] of thankless work that the department [3:27:37] conducts. I want to thank the staff for [3:27:38] being persistent again and patient uh in [3:27:42] working through with many of the uh [3:27:44] users and clients of our zoning code. Um [3:27:48] now you will be seeing uh also other [3:27:51] improvements to our zoning code. We're [3:27:54] currently working a whole team of our [3:27:56] staff is working on the neighborhood [3:27:57] housing zoning initiative that will [3:28:00] update um zoning in Hide Park, [3:28:02] Roslandale, and West Roxbury. This is [3:28:04] sort of the companion piece to the [3:28:06] squares and streets which deals with the [3:28:08] fact that many of our the neighborhoods [3:28:12] that I'm talking about that more than [3:28:14] 90% of the existing buildings that [3:28:17] actually exists are non-compliant with [3:28:19] zoning. So the basis of this work that [3:28:22] we will be coming to you hopefully soon [3:28:25] is to actually reverse that to make 90% [3:28:28] non-compliant with the existing zoning [3:28:30] code to 90% compliant. That will [3:28:35] ultimately allow for people to do simple [3:28:37] things like adding to their buildings um [3:28:40] uh doing renovations. It will also [3:28:42] enable auxiliary building uh dwelling [3:28:45] units to be as of right as opposed to [3:28:47] all of these activities that are going [3:28:49] through the zoning board of appeal. Um [3:28:51] it will also uh unclog the kind of [3:28:55] crowded um uh board of appeal kind of um [3:29:00] uh agenda that we have. Um now [3:29:05] in terms of development projects um [3:29:07] there were five new development projects [3:29:09] approved tonight. [3:29:11] 192 new residential units, of which 36 [3:29:14] will be incomerestricted. Uh these [3:29:16] projects represent $180 million worth of [3:29:20] investment that will deliver 452,000 [3:29:24] square ft of new building. Um when these [3:29:27] projects are built, they would put uh [3:29:30] 362 trades people to work and create [3:29:33] over 500 direct jobs. Um I want to end [3:29:36] by just um uh highlighting a certificate [3:29:40] of completion. This is the phase three [3:29:42] of the landmark center development which [3:29:45] has um you know you've seen how that has [3:29:47] impacted that development has impacted [3:29:50] the whole Fenway area. Um they um that [3:29:54] there's some really significant um [3:29:57] community benefits that were delivered. [3:29:59] There were two there's $2 million of [3:30:01] investment into the design and [3:30:03] construction for the extension of a [3:30:05] multi-use path along the green line [3:30:07] right ofway that will connect some of [3:30:09] the existing paths to the riverway and [3:30:12] emerald necklace uh green spaces. [3:30:14] There's also a a million-doll [3:30:16] contribution to the MBTA to the for the [3:30:19] design of the Green Line track [3:30:21] relocation that will be needed for the [3:30:24] extension and make also improvements to [3:30:26] the Fenway station area right next to um [3:30:29] this um the Lamach Center. In addition, [3:30:33] there will be also $500,000 [3:30:35] contribution for a life science [3:30:37] workforce development initiative. This [3:30:40] last phase is the uh a lab building that [3:30:43] will be uh half occupied by uh [3:30:46] children's hospital. Uh and then there's [3:30:48] also $400,000 for neighborhood [3:30:51] beautifification and the maintenance of [3:30:53] Autobon Circle. And then the final [3:30:56] contribution is $250,000 [3:30:59] to the Emerald Necklace Conservancy. So [3:31:01] that ends my report and thank you again [3:31:03] for your service. [3:31:04] Okay. [3:31:05] Thank you. [3:31:06] Um all right. Uh well with that uh I [3:31:09] need a motion to adjourn this meeting. [3:31:10] So move [3:31:10] second. [3:31:11] All those in favor I opposed. The eyes [3:31:14] have it. Um motion passes. Meeting [3:31:15] adjourned. Thank you so much and we'll [3:31:17] see you next month. [3:31:18] Thank you.