11.04.26 Conservation Commission Public Hearing 2026-11-04 [0:02] And everyone is in now. [0:03] Great. Thank you. Okay. Good evening. In [0:05] accordance with the Massachusetts [0:06] Wetlands Protection Act, MGLC 131, [0:09] section 40 in the Boston Wetlands [0:11] Ordinance, Boston City Code Ordinances, [0:13] Chapter 7-1.4, Four, the Boston [0:16] Conservation Commission will hold a [0:17] virtual public hearing this evening on [0:19] November 4th, 2026 to review the [0:21] following projects to determine what [0:24] conditions, if any, the commission will [0:25] impose in order to protect the interests [0:27] of the public and private water supply: [0:29] groundwater, prevention of pollution, [0:30] flood control, prevention of storm [0:32] damage, protection of fisheries and land [0:34] containing shellfish, and protection of [0:36] wildlife habitat. Uh this evening's [0:39] hearings will be followed by our regular [0:40] meeting and in accordance with chapter [0:42] 107 of the acts of 2022. We are [0:45] conducting this meeting online to ensure [0:47] public access to the deliberations of [0:49] the conservation commission. The public [0:50] may access this call through telephone [0:52] and video conferencing. Additionally, [0:54] the meeting is being recorded. If you do [0:56] not wish to be recorded, please turn off [0:57] your video. Members of the public may [1:00] have an opportunity to ask questions and [1:01] provide public comment on applications [1:03] and discussions. To do so, please raise [1:06] your hand or type in the chat in the [1:07] application via the Zoom meeting [1:08] platform. If you're calling in and [1:10] cannot use the platform, you can raise [1:12] your hand by pressing star9 and star six [1:14] to unmute yourself or send questions to [1:17] staff via email at cc@boston.gov. [1:20] For the record, I am Michael Parker, [1:21] chair of the commission. Could staff [1:22] please identify themselves? [1:24] Elena with the environment department. [1:27] Dee Hernandez with the environment [1:29] department. [1:31] Lucina Dawala with the environment [1:33] department. [1:33] Great. Thank you. Uh, okay. I'll call [1:36] the role of, uh, commissioners present. [1:38] Uh, Commissioner Sullivan, [1:39] John Sullivan, [1:40] Commissioner Len, [1:42] Amy Len, [1:43] uh, Commissioner Essiasi, has he made it [1:46] yet? [1:46] He has not joined us yet. [1:47] Okay. He'll be here later, apparently. [1:49] Uh, okay. Commissioner Herpst. [1:52] Okay. Okay. First, uh, item on the [1:55] agenda tonight actually has been [1:57] continued to the December 9th, 2026 [1:59] hearing. its notice of intent for D file [2:01] number 006 2135 in Boston file number [2:04] 2026-032 [2:07] from AECOM on behalf of uh DCR uh for [2:11] the proposed inkind replacement of a [2:13] water line and placement of concrete [2:15] mattresses from Hull to George's Island. [2:17] Uh second item on the agenda uh is [2:20] notice of intent for D file number [2:22] 0062149 [2:24] Boston file number 2026-043 [2:27] from GM2 on behalf of the United States [2:29] Postal Service for the proposed pavement [2:31] resurfacing and storm water improvements [2:33] at the Boston Vehicle Maintenance [2:34] Facility located at 131A Street South [2:37] Boston uh waterfront uh resource area [2:41] land subject to coastal storm flowage. [2:43] Um this meeting uh or this hearing has [2:46] been continued from the October 21st, [2:48] 2026 hearing. So uh who's here on behalf [2:51] of the proponent? [2:54] Good evening. My name is Brett Alen of [2:56] GM2 Associates. [2:58] Okay, [3:00] anyone else? [3:02] We also have Christy Filippo from MMT. [3:09] Okay. So, um we had a few uh as we said, [3:13] we already uh had one hearing on this. [3:16] So, we have uh this hearing we had a few [3:19] things that we were asking for. Uh I [3:22] remember um the uh turning radiuses in [3:25] the parking lot uh because we're trying [3:27] to see if uh we could cut back on some [3:29] of the imperous surface. Uh we're asking [3:32] about uh the storm water infiltration [3:35] system and uh evidence from the LSP that [3:39] um storm water infiltration was uh not a [3:42] good idea at this site because of the uh [3:44] soils underneath the parking lot. Um [3:47] Ellena, is there anything else here? [3:50] Uh the only other thing that I had [3:52] included were some additional questions [3:53] from Commissioner Sullivan. Uh they're [3:55] noted in the staff comments and the [3:56] project team had uh provided answers to [3:59] those questions. Uh I haven't been able [4:02] to check with Commissioner Sullivan to [4:03] see if those um satisfied the the [4:06] inquiries. [4:08] Okay. So, uh Brett, why don't we go over [4:10] the uh issues that were residual from [4:12] the last hearing? We don't have to go [4:14] over the whole presentation again. [4:16] Uh it's actually a new presentation [4:17] addressing those comments specifically. [4:19] Perfect. [4:20] So, it might be uh something we can flip [4:22] through quickly. So, if we go to the [4:24] next slide, um it does indicate, as you [4:27] mentioned a couple times, October 21st [4:29] was our last presentation to the board. [4:31] Um we did submit on October 30th a LSP [4:35] letter addressing stormwater [4:36] infiltration um by the project's LSP, [4:39] which is WSP. Um a vehicle turning [4:42] figure was also provided as well as [4:44] revised project plans. [4:47] Next slide, if you could. [4:52] So project plans were updated based on [4:55] some of the exterior surrounding [4:56] vegetation uh generally along the abuing [5:00] roadways uh from Medallion A to the [5:02] west, Hall Road to the east, and some [5:05] isolated vegetated trees at the project [5:08] limits. There's really nothing on the [5:09] interior. However, we did provide uh [5:12] those notations on the project plans as [5:14] a good effort to ensure those are [5:16] protected. Um we can go to the next [5:18] slide. [5:22] This is actually a similar slide to the [5:24] last and it comes into play with some of [5:26] the vehicle turning and green space [5:28] considerations. Uh as a reminder, a lot [5:30] of the vehicles are double parked under [5:32] today's condition. This is just a [5:34] snapshot from Google Maps 2026 showing [5:37] the personal vehicles are double parked. [5:39] The operations vehicles on the right [5:41] figure are double parked, maybe even [5:43] triple parked. Um and then we have [5:45] carrier vehicles that are parking in [5:46] unstriped territory. Um partially [5:50] because of sight constraints as well as [5:51] some of the operations for sequencing to [5:53] get the personal vehicles in while the [5:56] operation vehicles are uh shifted about [6:00] we can move to the next if you don't [6:02] mind. [6:04] So we did provide vehicle turning tests [6:07] for that southern parking area. Um, this [6:10] area is stored with 11 ton box trucks. [6:13] And a consideration is that USPS [6:16] standard, which is in that lower left uh [6:19] clip, actually requires the parking [6:21] stalls to be 35 ft in length. We have a [6:24] 30 foot as an exemption to the USPS [6:27] federal uh or national criteria for the [6:30] design to maximize parking on site. So, [6:33] if we did have 35 foot long stalls, we [6:37] would inherently be losing some parking [6:39] on site. Um, additionally, this is a [6:42] select few uh kind of randomized parking [6:46] considerations for the vehicles to turn [6:48] and get into those stalls. [6:52] We can move on. [6:55] Uh, we also had some comments regarding [6:57] proprietary devices and as mentioned, [7:00] Commissioner Sullivan had some secondary [7:02] comments received over the past couple [7:03] weeks that I'm hoping to go over now. [7:06] Um, so there are 10 proprietary devices [7:09] uh generally for pre-treatment or a a [7:12] form of pre-treatment for sediment [7:15] removal and solids removal. Um these are [7:19] storm scepters shown on the project [7:21] drawings and generally they are [7:23] positioned offline of the main trunk [7:25] line. The main trunk line receives storm [7:27] water from the surrounding streets and [7:30] goes into a 30 in uh two 30-inch [7:33] conveyance as well as a 42in conveyance [7:35] on site. So these proprietary carry [7:37] devices are selected offline and subject [7:41] to only the storm water received within [7:43] the project limits. Um the intent is [7:46] that we are not providing any adverse [7:48] effects to the larger storm water [7:51] conveyance throughout the property. Um [7:53] we also had some comments on the hoods [7:55] and bioskirt locations. Those are shown [7:57] on the drawings as well as um detailed [8:00] and again those are provided offline of [8:03] the main conveyance structures. Um we [8:06] can go to the next slide if you could. [8:09] And some of the last comments we had, we [8:11] had two regarding uh roof conveyance as [8:15] well as the existing sumps. Um so this [8:18] is an example um kind of two birds with [8:21] one stone situation. Uh so shown in the [8:24] red uh layout there is a blow up showing [8:28] the rims inverts and sumps were obtained [8:32] um in the survey as shown on the [8:35] drawings as well as the 10-in uh pipe [8:40] roof leader connecting into the larger [8:41] conveyance on site. Um, one comment that [8:45] did come up uh outside of the meeting [8:47] was that regarding the existing storm [8:49] water structures, uh, those are to [8:51] remain. So, they're going to be cleaned. [8:53] The pipe on site is going to be cleaned, [8:56] structures cleaned, and then there's [8:57] going to be some modifications to the [8:59] new pipe connections, uh, with the [9:01] proprietary devices. Um, [clears throat] [9:04] I believe that, [9:06] um, was both the comments addressed from [9:08] the last meeting as well as some that we [9:10] received in the last couple days, but [9:11] I'd like to open it for any comments or [9:13] concerns, questions, etc. [9:15] Sure. Thank you. So, I did read the [9:18] letter uh, from your LSP. Uh, so that [9:21] answered my questions. I don't think you [9:23] went into it uh, in the presentation. Do [9:25] you want to give a brief overview of um, [9:28] of that issue? [9:30] Uh, I I'll only say that the LSP [9:34] identified that any infiltration would [9:36] be um against the regulations for [9:39] stormwater infiltration due to adverse [9:42] underlying conditions. Um, I defer to [9:45] them on what the underlying conditions [9:47] are specifically. I think they mentioned [9:48] it in the letter as well as some [9:50] history. [9:51] Yep, understood. Um, yeah, there are two [9:53] RTNs there. Okay. Um, Elellanena, what [9:56] do you have on this? [9:58] I didn't have anything further on this. [9:59] Um, I would defer to Commissioner [10:01] Sullivan on the follow-up questions for [10:03] the um, issues that are noted in the [10:04] staff comments. [10:05] Okay. So, we'll go to Commissioner [10:07] Sullivan on the um, questions he had and [10:09] uh, Commissioner Essargia, let the [10:11] record uh, reflect that he's joined us [10:13] and he had the questions about the uh, [10:16] truck turning radius. So, I'll uh, leave [10:18] that to his in his good hands. [10:20] Commissioner Sullivan. [10:22] Yeah. Yeah. So, I reviewed um what the [10:25] answers were when I had asked the [10:26] question were there 4oot sumps? Uh the [10:29] response was why don't you read the [10:30] plans? Um which I did and there's a [10:32] whole bunch of them with 2 and 1/2t [10:34] sumps. So you know thank god I could [10:36] read the light shaded gray uh which I [10:39] did. There are also some catch bases in [10:41] Medallion Avenue which um I I get from [10:44] the proponent that it's like well that's [10:46] not my problem. Well Medallion Avenue in [10:48] that location is a private way. When you [10:51] are but the private way you own half the [10:53] street so it is your problem. But [10:55] there's no data on those catch bases. [10:57] So, I couldn't figure out what's what. [10:59] The proprietary stuff, I don't disagree [11:01] with you. Um, those those are all fine. [11:04] Um, I was trying to say, is there a [11:06] better way to space them out, have less [11:08] of them, maybe a little larger? You [11:10] could save yourself money because in [11:13] [clears throat] the order conditions, [11:14] you'll be required to give us updates [11:16] when you clean them and all that, but [11:17] should you choose to use 11, uh, you [11:20] know, good luck to you. And the [11:21] bioskirts, I found those interesting. um [11:25] you're putting them on a bunch of the [11:26] basins and those will be required in the [11:29] order of conditions I'm assuming under [11:31] the maintenance plan that you check them [11:33] for the first year or two and then once [11:35] a year change them so we can just modify [11:38] that you do have extraneous water [11:40] entering your site uh owned by um I [11:44] think Massport Authority owns some I [11:46] know that Mass DOT has water running [11:48] through your site with a particle [11:49] separator sitting in your site I was [11:52] surprised that you and pull all that [11:54] out. I I see what you're saying is, [11:57] well, they're not mine, so I don't have [11:58] to worry about them despite the fact I [12:00] connect to them. So, overall, I was [12:03] disappointed also in the AUL call. I try [12:06] to check that out, the RTN numbers. I It [12:10] looked to me like the AUL had been [12:12] lifted um at some point a couple years [12:15] ago, and that the AUL wasn't covering [12:17] the entire site. Not saying that you [12:20] couldn't do partial infiltration some [12:22] spot uh and not in others. Um what we'll [12:26] do is we'll be following up with that [12:27] later with the professional LSP to see [12:30] what what was really going on um as part [12:33] of the water sewer washing out because [12:35] you discharge into our pipes and we can [12:37] control what comes into our pipes. So [12:40] overall, um, very disappointed in the [12:42] professionalism of what the way I was [12:44] responded to, but we will continue the [12:47] hearing and see where everybody goes on [12:49] it. I do understand a lot of dirt in [12:52] that area is not good, but I'm not sure [12:54] you violate the um the uh any of the [12:58] Commonwealth's requirements on [13:00] groundwater given I didn't see exactly [13:03] what was contaminating the site. I [13:06] couldn't figure it out. I had to go [13:08] fetch the uh RTNs, look them all up. Um [13:12] I thought most of them were down in the [13:14] lower part of your site, not the upper [13:15] part of your site. So those were just my [13:18] comments. [13:19] Okay. Okay. Thank you. So So Brett, uh [13:23] the RTN's don't uh encompass the entire [13:26] site. [13:27] My understanding and we can follow up [13:30] with WSP as needed. Um but my [13:33] understanding is that you can't have two [13:36] within the same piece of land. So the [13:38] current restriction is on the building [13:40] itself and that um it I don't want to [13:44] talk myself into a corner because I [13:46] don't really know enough about the [13:47] soils. That's why we do have WSB. Um but [13:50] my understanding is that there is one [13:51] within the building itself and but that [13:53] doesn't mean that the soils are not um [13:56] compliant enough for any infiltration [13:58] and we can follow up um separately if [14:02] needed. [14:02] Okay. [14:03] To address that. [14:04] I mean because you can have uh multiple [14:06] RTNS on one site. One can address [14:09] groundwater, one can address soils, one [14:10] can address air. Um so where is WSP? Uh [14:15] were you able to bring an LSP with you [14:16] this evening? I I think that would be [14:18] helpful. [14:21] Uh Chris, any Chris, I don't know if [14:24] you've been [14:25] able to listen in anything from WSP for [14:28] today or were they preoccupied? [14:31] Um [14:34] I know the postal service has contracted [14:36] with them directly. They're a consultant [14:39] to the postal service, not to us. um [14:41] they were uh contacted and um I do [14:46] believe they were provided with this [14:48] meeting request. I can't answer for why [14:50] they're not in attendance. [14:52] Okay, I appreciate that. So um like with [14:55] Commissioner Sullivan, I mean it's not [14:57] up to us to try to parse out the um [15:00] sketch plans and the areas that are [15:02] covered by the AUL. So, uh, [15:05] unfortunately, I think you're headed for [15:07] another continuence here and, uh, you [15:10] have one or two options. Have an LSP [15:12] accompany you next time. Uh, tell your [15:15] client that we really want to talk to [15:16] the LSP or, uh, a much more detailed [15:19] letter, um, addressing the questions [15:22] that, uh, Commissioner Sullivan raised. [15:25] Um, Commissioner Len, what do you have? [15:28] Uh, I don't have any additional [15:29] questions. Thank you. [15:30] Okay. Commissioner Essayazi, [15:32] I I arrived just as it looked like you [15:36] were doing the parking arrangements. [15:38] What I think I was seeing on those was [15:41] that in order to do a single back and [15:43] fill or, you know, one a two-part K turn [15:46] into the spaces, you need the entire [15:48] middle. Um, [15:51] that certainly is efficient. Um, but it [15:54] certainly means you have a lot of black [15:55] top that you're not that you're only [15:58] using for essentially [16:02] reducing from a say a three-point turn [16:04] to a two-point turn. Um, I if that's how [16:08] the post office really feels they have [16:10] to operate, [16:12] you know, from an environmental [16:14] perspective, I'm I'm a little [16:16] disappointed that there's a a little bit [16:18] more uh tradeoff for being able to have [16:22] more imper less impervious coverage and [16:25] um maybe a tiny bit of extra work on the [16:28] part of the drivers. Um, but I'm I'm not [16:31] sure that I feel strongly enough about [16:32] it to say no. Um, but it's it is [16:36] worthwhile thinking a little bit. You've [16:38] shown us a just a few places where [16:40] you're able to do this in one back and [16:42] fill. [16:44] I think I mentioned at the last meeting [16:46] um my office has uh several [16:51] um loading docks for our surrounding [16:54] businesses which back up onto a uh 20 [16:57] foot wide street. And they get into [17:00] those spaces all day long every day. [17:04] Okay. [17:05] So, [clears throat] what I can how I can [17:06] respond to that is that this site, as uh [17:10] Brett alluded to, has um non-standard [17:13] parking stalls. The postal service [17:16] requires that these trucks be parked in [17:18] 35 ft parking stalls and that they be [17:21] provided with 30 foot turning radiuses [17:26] um and a 60-oot turning circle. And [17:30] currently we have exactly um 60 ft nose [17:34] tonose on the parking stalls and they're [17:36] only 30 ft deep um from and that's a [17:40] deviation from their standard and that [17:43] was something that they uh approved uh [17:46] in order to maximize their their parking [17:48] on this property. But the um the turning [17:51] radiuses they they would not relieve on [17:54] the parking layout. And it's something [17:57] throughout their entire network that [17:59] they have um conservative uh uh space [18:03] requirements for uh not only straight [18:06] trucks but uh tractor trailers and um so [18:10] they require that these sites be [18:13] designed in accordance with their [18:14] criteria and that's what has happened [18:17] here. So, so I guess I would say when [18:19] you're responding to your client [18:22] suggesting that they bring along their [18:23] LSP at a subsequent meeting that you [18:26] might ask them at least for a statement [18:28] that says that they don't think that the [18:30] environmental to standard parking [18:33] arrangements is worth any tradeoff. Um, [18:36] it seems like a bit of a straightforward [18:38] bure bureaucratic answer as opposed to [18:41] environmental review type answer. and [18:44] and I'm pretty sure looking at other [18:46] post offices in the area that um they do [18:50] make exceptions when they want to. [18:53] Okay. [18:54] Thank you. [18:55] Thank you. So, another thing I might [18:57] suggest is I think in one of the um [18:59] slides here you showed vegetation [19:01] surrounding the perimeter. Could we go [19:04] back to that? [19:06] Is that on the post office property? [19:11] Some may be, but it's outside of the [19:13] work limits itself. [19:15] We can look at the drawings to fine-tune [19:18] where the property line actually is, but [19:20] the work limits are actually bound by [19:22] the payment. [19:24] Yeah, understood. Um, but maybe there is [19:28] uh some and think about this. Maybe [19:30] there's a creative solution here where [19:33] you could uh have a more robust uh [19:36] landscaping plan uh or landscaping [19:39] scheme uh in that green area uh that [19:42] we're seeing there. It looks like it's [19:44] it doesn't look like it's um all that [19:47] robust. It looks like there could be [19:48] some improvement there. So, uh [19:50] we'd have to look at the property lines [19:52] on that. I don't believe that is postal [19:55] service property. [19:57] Okay. Well, I I assumed it was because [20:00] you you included it and and pointed it [20:03] out here. Um so, okay. Um well, why [20:07] don't you look into it and see uh what [20:09] the property lines are. Um who the [20:12] adjacent property owner is. Maybe they [20:14] would uh be happy with some uh [20:16] additional landscaping here. Um, but you [20:20] know, throwing that out there because I [20:21] think you're gonna you're going to need [20:23] to come up with uh something a bit more [20:25] creative here. Uh, Commissioner Herpst, [20:28] uh, nothing for me other than looking [20:30] for my fellow commissioner's questions [20:32] to get addressed. Thanks. [20:33] Okay. Thank you. Um, Ellena, uh, I don't [20:36] see any hands raised. Did you get any [20:38] emails? [20:39] Uh, nothing beyond the email that we had [20:41] mentioned at the last hearing related to [20:43] the, uh, lighting choices [20:44] [clears throat] [20:45] at this site. Um but since then no hands [20:48] and no additional emails. [20:50] Okay. Thank you. So with that I'd [20:51] entertain a motion to continue the [20:53] hearing. [20:54] So moved. [20:55] We have a second. [20:56] Second. [20:57] Okay. Commissioner Sullivan. [20:58] I. [20:59] Commissioner Len. [21:04] Commissioner Essarazzi. [21:05] I. [21:06] Commissioner Herpst. [21:07] I. [21:08] I vote I. Commissioner Len. Are you Did [21:11] we lose her? [21:12] Oh, sorry. I You may not have heard me. [21:14] Hi. [21:15] Oh, I'm sorry. Okay. Thank you. That [21:17] carries 5 nothing. Okay. Thank you. [21:20] Um, next item on the agenda is notice of [21:22] intent for D file number 0062156 [21:25] from WSP on behalf of H Highleberg [21:29] Materials US Cement LLC for the [21:31] unauthorized pipeline maintenance, peer [21:33] repairs and installation of a new chain [21:35] link fence um security fence at 88 Black [21:38] Falcon Avenue uh South Boston waterfront [21:41] resource areas land subject to coastal [21:43] storm flowage. designated port area 100t [21:45] buffer to coastal bank who's here on [21:47] behalf of the applicant. [21:48] Hi uh hi commission members. My name is [21:50] David Goldstein from WSP and I'll be [21:53] presenting the project. [21:54] Great. [21:56] All right. So um I just want to start [21:59] off again. Thank you very much for [22:00] having us uh for the hearing this [22:02] evening. Um, on the behalf of the [22:05] applicant, H Highleberg Materials US [22:07] Cement LLC, WSP is submitting this after [22:10] the fact notice of intent application to [22:13] the Boston Conservation Commission in [22:15] response to an enforcement order issued [22:17] on on October 7th, 2025 for peer [22:20] repairs, maintenance, and security fence [22:23] installation located at 88 Black Falcon [22:26] Avenue in Boston. [22:28] All subject all work subject to this [22:30] after the fact NOI occurred on Massport [22:33] property under Massport's enabling act. [22:35] Uh Massport is charged with the [22:37] development, operation, and maintenance [22:39] of its properties. As a general rule, [22:41] Massachusetts case law provides that an [22:43] authority or agency of the Commonwealth [22:45] is not subject to municipal bylaws, [22:47] ordinances, or regulations so long as [22:50] the authority or agency is performing an [22:52] essential governmental function and [22:54] there is no specific statutory provision [22:56] to the contrary. Accordingly, as the 88 [22:59] Black Falcon Avenue peer repair and [23:01] maintenance improvements project is the [23:02] performance of an essential government [23:04] function by Massport and the Enabling [23:06] Act does not spec specifically require [23:09] Massport to be subject to local wetland [23:11] ordinances, the project filing by [23:13] Massport is not subject to the city of [23:15] Boston's local wetland ordinance and [23:17] related regulations. Uh, this NOI is [23:20] being filed pursuant to the [23:21] Massachusetts Wetlands Protection Act [23:23] and its implementing regulations. So, [23:26] now that I got that out of the way, we [23:27] can go to the next slide. [laughter] [23:30] Sounds like the disclaimer for an [23:32] investment or something. [23:33] Yeah, right. Doesn't it? [clears throat] [23:35] So, uh we'll go over the project [23:37] overview pretty quickly. So, the [23:39] application purpose was to address [23:40] unauthorized peer repairs, maintenance, [23:43] and chain link security fence [23:44] installation uh through this after the [23:47] fact notice of intent. [23:49] Um the enforcement response uh was [23:52] issued by the conservation commission on [23:54] on October 7th, 2025. [23:57] Uh all work again occurred on Massport [23:59] property and uh the completed work uh [24:02] includes pure repairs and maintenance [24:04] along with the installation of a chain [24:05] link security fence. Um and um the local [24:10] ordinance uh we already kind of talked [24:13] about already. So we can continue on to [24:14] the next slide. [clears throat] [24:18] So I'll talk next about the project [24:20] location and site description. So uh [24:23] it's a cement and slag distribution [24:25] terminal at 88 Black Falcon Avenue. Bulk [24:29] vessels deliver materials to the [24:30] northern side of the pier where they are [24:33] transferred to storage silos by a steel [24:35] pipeline. H Highleberg's lease port uh [24:38] lease portion of the pier contains no [24:40] utilities is constructed of timber [24:43] pilings and buffers uh connected to the [24:45] stone concrete and asphalt pier base and [24:48] all work was completed above meanh high [24:51] water and did not extend into previously [24:53] undisturbed resource areas. Next slide. [24:59] So we can go over the resource area [25:00] summary. Um the entire project area is [25:03] within a FEMA zone AE with a base flood [25:06] elevation of 12 feet. We're obviously in [25:09] in a designated port area, the South [25:11] Boston water dependent industrial and [25:13] commercial area supporting marine [25:15] transportation and we're also within a [25:18] 100t buffer to coastal bank. There is an [25:21] adjacent coastal bank um that's a [25:23] man-made concrete seaw wall supported on [25:26] steel H piles found underneath the pier. [25:29] And you can see the uh mapping um the [25:32] project locus. Next slide. [25:38] So the project need uh first was [25:40] pipeline maintenance to maintain the [25:42] integrity of the primary cement and slag [25:44] transport line and supports the material [25:47] transfer from bulk discharge vessels to [25:49] the storage silos. Number two is timber [25:52] maintenance. We repaired and replaced [25:54] pierside timbers used as a sacrificial [25:57] buffer and it also helps absorb vessel [25:59] impacts and protect the permanent pier [26:01] structure in dockside operations. And [26:04] finally, the security fence installation [26:07] as requested by the coast guard uh [26:09] creating a safety buffer for employees [26:11] and contractors during unloading events [26:14] and it also enhanced security when ships [26:16] are in port. Um, shallow concrete pads [26:19] brought select areas to grade. Um, as [26:22] part of the climate resilience and [26:24] facility longevity, Boston's waterfront [26:27] is increasingly vulnerable to climate [26:29] change and extreme weather events and [26:31] maintaining critical terminal [26:32] infrastructure helps ensure safe and [26:35] reliable operations during future [26:37] climate related stressors. Right, next [26:39] slide. [26:42] So for the construction activities um it [26:45] included a thousand linear feet of chain [26:47] link security fence. Um along that [26:50] security fence there were nine uh new [26:52] swinging gates. The concrete pad uh that [26:56] was replaced in kind was 1,65 square ft. [27:01] The concrete that was placed was also 32 [27:04] cubic yards and seven pipe gaskets were [27:07] replaced. Some additional work uh as [27:10] part of the project included pipeline [27:11] repainting, repainting and maintenance, [27:14] replacement of damaged oak timbers and [27:16] pier bumpers, concrete grading and steel [27:20] plate installation [27:21] and fence post caps and related [27:23] incidental improvements. Next slide. [27:29] Uh so here are some site photographs. Uh [27:31] the photograph on the left shows the uh [27:34] new timber uh as well as the new uh [27:38] concrete that was that was uh installed. [27:42] You can also see in that lefth hand side [27:43] photo a swinging gate. You can see the [27:45] um the little wheel there. So that's one [27:47] of the swinging gates that's part of the [27:49] entire um uh chain link fence structure [27:53] on the right hand side. that is the most [27:57] uh the eastern terminal um of the of the [28:00] chain link fence. And you can see the [28:03] difference between the uh asphalt on the [28:05] left and the new um new cement on the [28:09] right. Um and that extends um almost all [28:14] the way down uh to the west. Next slide, [28:17] please. [28:20] Uh on the left hand side you could see [28:22] uh one of those um steel plating again [28:25] um to grade along the uh the edge there [28:28] of the pier. And on the right hand side [28:31] you could actually see those swinging [28:33] gates in action. Um you know those were [28:36] installed uh specifically um you know [28:38] for access to any sort of barges or um [28:43] other um boats that might be up against [28:46] the pier. [28:48] Next slide. [28:51] So impacts and conformance with [28:53] performance standards. Uh in terms of [28:55] land subject to coastal storm flowage, [28:57] there is no specific WA performance [29:00] standards uh applying to this project. [29:02] Ponding, storm surge, recession and [29:05] flooding are unchanged. Uh for the [29:08] designated port area, there have been no [29:10] effects to water circulation, water [29:12] quality, storm damage prevention, or [29:14] flood control as part of the project. [29:17] And lastly uh for the 100 foot buffer to [29:19] coastal bank there was no work done on [29:22] the seaw wall. There was no effect on [29:24] the wave action, sediment movement, bank [29:26] stability or rare wildlife habitat. All [29:29] of the work was done um on the uh pier [29:32] itself. Next slide. [29:37] Uh so again work was combined to the [29:39] existing developed pier um and resource [29:42] area values and functions were not [29:44] adversely affected. So, uh, the [29:47] applicant respectfully requests approval [29:49] of the completed pure repairs, [29:51] maintenance, and chain linking fence [29:52] security, uh, installation under the [29:55] Massachusetts Wetlands Protection Act. [29:58] Okay. Thank you, David. So, um, the [30:00] questions I have on this, uh, more [30:02] procedural, uh, and Elellena and I, um, [30:05] had a discussed this, uh, earlier today. [30:08] Um the question was um uh actually for [30:13] me it relates to for the certificate of [30:17] completion. Uh do you have a uh stamped [30:21] um [30:22] stamped plan showing the finished [30:25] conditions? [30:27] Yes. Yeah, we do. [30:28] Okay. Was that included in the uh file? [30:30] I'm not sure I saw that. It was. Okay. [30:32] It was. Okay. Uh because I think the [30:35] process here is uh if we um close this [30:39] tonight, it would be issuing an order of [30:40] conditions that you have to record and [30:42] then come back and uh get a COC. [30:45] Okay. I know that's [30:46] actually I'd like to ask about that too [30:48] because I believe um I think I had a [30:51] conversation with Elellena uh this is [30:53] probably a number of weeks ago at this [30:55] point um that she actually I asked the [30:57] question of whether we would need um a [31:00] COC for this project. Um obviously under [31:03] the you know knowledge that this is the [31:06] project's already completed there were [31:08] no impacts to any sort of you know uh [31:12] resource areas or anything like that. Um [31:14] and she had asked the commission whether [31:18] we would need a COC for this and she [31:20] told me that we wouldn't. So I'd just [31:22] like to get a little bit more clarity on [31:24] that. [31:24] Okay. So um maybe there was some [31:26] miscommunication. Elena what's um [31:29] I can speak to that. David I apologize. [31:31] I um so I think when we had chatted [31:32] about that I had said that it would [31:34] depend on what the commission was [31:35] looking for for the project and when [31:37] Chair Parker and I had touched base [31:38] about this earlier today. Um the thing [31:41] that we were sort of stuck on here is [31:43] that um from a procedural standpoint uh [31:46] the state requires orders of conditions [31:48] to be recorded um so that they're [31:50] present on the deed. Uh, so I know that [31:52] when you and I had talked about this, I [31:54] I wasn't sure whether it was going to be [31:57] based on a question of whether the [31:58] commission needed additional information [32:00] or if there was additional monitoring, [32:02] things like that that would need to [32:03] happen. Um, but it does come down to the [32:05] administrative piece. [32:07] Sure. Okay. All right. No, that makes [32:08] sense to me. Thank you. [32:10] Yeah. I mean, I think when the order of [32:11] conditions is issued, it says right on [32:13] there it has to be um recorded within, I [32:15] don't know, 15 days, maybe 30 days. Um [32:18] and then Elena, you bring up um the [32:20] other point about uh monitoring. Um I'll [32:23] let you take that. [32:25] Absolutely. Yeah. So, uh just given the [32:28] nature of the work that was done and the [32:29] fact that it wasn't originally um [32:31] permitted in any capacity, one of the [32:33] things that uh we had discussed I [32:35] believe on the site visit was also um [32:37] the question of whether there could be [32:38] some sort of report that is sent to [32:40] commission staff for um the number of [32:43] years that the commission thinks is [32:45] appropriate. um just documenting the [32:47] conditions, ensuring that the work that [32:49] was conducted is is sort of structurally [32:51] stable um isn't experiencing any sort of [32:54] deterioration. Um so I think that that [32:56] would be something that we would [32:57] recommend including in the uh set of [32:59] conditions and I would defer to the [33:01] commission on how frequently we were [33:02] thinking perhaps twice a year um photos [33:05] and you know a written narrative [33:06] submitted to commission staff just to [33:08] ensure that everything is um staying in [33:10] place. [33:11] Sure. Yeah. And uh and to that um I [33:14] would ask um if um H Highleberg the the [33:17] client would be able to uh do that [33:20] inspection themselves. [33:23] I think so. I I mean I think if [33:25] somebody's conducting the inspection and [33:27] has concerns about something that might [33:30] be happening under the deck um other you [33:32] know more structural issues that are [33:33] coming up that would be something that [33:35] we maybe want a second opinion on. But [33:37] for the um I think that if we decide on [33:40] specific locations that are photographed [33:42] um and the specific criteria that we'd [33:43] be looking for in the report um that's [33:45] something that I think H Highleberg [33:47] would be able to provide. [33:48] Okay. Yeah. No, that we're we're [33:50] amendable to that to that. [33:52] Okay, that sounds good. And um I think I [33:55] would phrase this a consultation [33:57] regarding the structural integrity uh [33:59] and conditions of the um of the pier [34:05] as opposed to a report ele um as far as [34:08] a report I think um it's it's it's going [34:10] to be hard for you to nail down exactly [34:12] which portions or which uh you know uh [34:15] yeah portions of the pier or the the [34:17] work site um that you um you know that [34:21] you want. Um, and it might make sense to [34:25] leave it open to if and you have the [34:28] ability to do this anyways. You can [34:30] always go and inspect, but um you might [34:32] want to at least the first time take a [34:34] walk and um to see the site yourself. [34:37] Sounds great. [34:38] Yeah. [34:39] Well, maybe plan to do that um I'm [34:42] thinking late winter, early spring, just [34:45] to see how it's fared through the, you [34:46] know, the worst of that weather. [34:48] Yeah, makes sense. Okay. Uh, [34:50] Commissioner Sullivan. [34:52] Yeah. Um, was there an engineer of [34:54] record that did a design for this work [34:56] or do they just decide to do it on their [34:58] own? [34:59] Um, I'm going to actually [35:02] ask um the client here, Michael, if he [35:06] could um to speak to that. [35:08] Yeah. Good evening. Uh, Michael [35:10] Martunis. I'm the environmental and [35:12] safety manager for the H Highleberg [35:14] Boston terminal. Uh this work was done [35:16] as needed. Uh as the timbers were [35:20] damaged, uh they were replaced as the [35:22] pipeline needed uh maintenance. It was [35:24] repaired. There was not an engineered [35:27] planned project for this work. [35:32] And and I assume this is Massport uh [35:35] land. Uh the the landlord, is that [35:38] correct? [35:38] That is correct. Yes. [35:40] Yeah. And do you guys have to tell [35:42] Massport when you're doing stuff just [35:44] that they're here? They're here before [35:45] us like every other hour and uh it just [35:48] seems very strange that you're within [35:50] five feet of water and it didn't seem [35:52] like you had to do anything. It just I [35:54] just curious how that came about. [35:58] Um as to whether or not we told Massport [36:02] we were doing the repairs. [36:04] Yeah. I mean you're apparently you're [36:05] required to do it even though they own [36:07] the land. You you required to keep the [36:09] repairs, keep it in good shape. [36:12] Yeah. [36:12] Uh yes. Uh I I see Juan Carlos is is on [36:16] the call. Perhaps you can speak to the [36:18] communication. [36:19] Yeah, I'm here. Can you hear me? [36:21] Yes. [36:22] Yeah. So, yes, they are uh Mr. Sullivan, [36:25] they are they are obligated to notify [36:27] Massport of this kind of work. In this [36:29] particular instance, they did not. [36:31] Okay. Yeah, [clears throat] that's all I [36:34] was asking. I just wondering how this [36:36] all happened. That's all. [36:37] Yeah. And I don't mean to break in, but [36:38] Ellena, I think that um this was a [36:41] situation I think the general counsel [36:43] for the company um addressed us uh last [36:47] year. It was I mean it felt like it was [36:49] just yesterday, but it was a while ago. [36:51] Um is this a situation where um H [36:55] Highleberg bought the facility or bought [36:58] the operations? [36:59] That was one of the [37:01] Yeah, they inherited this. Yeah, [37:02] that yeah, that was one of the [37:04] complicating factors here is um that [37:05] this had originally come up when [37:07] commission staff were conducting a site [37:08] visit at the terminal with Massport. Um [37:12] and nobody on the site visit knew that [37:14] this work had occurred. Um and then [37:17] after that work had been completed, uh [37:20] the company changed hands and so H [37:22] Highleberg is is sort of um yeah filing [37:25] this after the fact NOI uh not having [37:27] necessarily been the the entity that [37:30] conducted the work in the first place. [37:32] Yeah, this work was completed under [37:34] Coastal Cement and H Highleberg [37:36] Materials purchased uh Coastal's parent [37:38] company on April 1st of 2025. [37:42] So, they're they're new new to this [37:44] site. [37:46] New, but they've inherited the [37:48] liability. [37:49] Exactly. [37:51] Commissioner Sullivan. [37:52] Yeah. No, if it's any consolation, the [37:54] work looks like it's done [37:55] professionally, so that's a plus. [37:58] Okay. Thank you, Commissioner Len. [38:02] I had a question, and this might be more [38:04] for Ellena, about um [clears throat] in [38:06] the photos there's one of of a diesel uh [38:09] tank, and I was curious if that's [38:11] considered part of the project, and if [38:13] there's anything in the order of [38:15] conditions um addressing that, or [38:17] I think the the rest of this um isn't [38:20] under an existing order. Um it I I think [38:23] that this this part of the seapport uh [38:25] because of all of the different port [38:26] functions tends to kind of [38:30] go about the work differently. Um not to [38:32] say that it wasn't permitted, but I [38:33] think that it's just been there for for [38:35] quite a while. [38:37] Thank you. That's all. [38:38] Thank you, Commissioner Essayazi. [38:41] Nothing on this. Thank you. [38:43] Thank you, Commissioner Herpst. [38:46] Nothing for me either. Thank you. Okay. [38:48] Thank you, Elena. Uh any hands raised? [38:51] I see no hands and nothing in our inbox [38:55] either or nothing in the chat. [38:56] Okay. So with that, I would entertain a [38:58] motion to close the hearing and issue an [39:00] order conditions with a special [39:01] condition that by annually there be a [39:05] consultation with commission staff to uh [39:09] inspect the integrity of the uh work. [39:14] So moved. [39:15] You have a second. [39:18] Second. Thank you, Commissioner [39:20] Sullivan. [39:21] Hi, [39:22] Commissioner Len. [39:23] Hi, [39:23] Commissioner Essayazi. [39:25] Hi, [39:26] Commissioner Herpst. [39:27] Hi. [39:28] And I vote I that carries for uh 5 [39:30] nothing. Thank you. [39:32] Thank you very much. [39:33] You're welcome. Okay, next item on the [39:35] agenda. And I think uh uh Commissioner [39:38] Len um you have something to say to us. [39:40] I'll uh recuse myself from this one. [39:43] Thank you. [39:43] Okay. Thank you. Okay. Uh, notice of [39:46] intent for DP fall number 0062155 in [39:49] Boston, file number 2026-047 [39:52] from Weston and Samson Engineers on [39:53] behalf of the Boston Parks and [39:55] Recreation Department for the temporary [39:57] repair and stabilization of the masonary [39:59] arch openings at Jamaica Pond Boat House [40:02] 507 Jamaica Way, Jamaica Plane. Uh, [40:04] resource areas um bordering land subject [40:07] to flooding, inland bank, land [40:10] underwaterway, 25- ft waterfront area, [40:12] and 100 ft buffer to bank. Who's here on [40:15] behalf of the proponent? [40:17] Alex Gaspar, Weston and Samson. [40:19] Uh Brandon Conungle, Weston and Samson. [40:24] And I do believe uh Kevin Bogle is [40:27] Yeah. Kevin Bogle from Boston Parks [40:29] Department. [40:30] Yeah, he's trying to hide back there. [40:32] Fair enough. Kevin a lot. Yeah. Okay. Um [40:35] floor is all yours. [40:36] Great. Thank you. [40:39] Yep. So, we already sort of opened it [40:41] up, but we have submitted a notice of [40:43] intent for the temporary structural [40:45] support system that we're proposing at [40:47] Jamaica Pond Boat House. Next slide. [40:52] Again, we've sort of already gone over [40:54] our project team, but Alex Gaspar here [40:56] from Weston and Samson um sort of [40:58] heading the environmental permitting. We [41:00] have Brandon Conungle as our project [41:02] manager, and then Kevin Bogle from [41:05] Boston Parks Center Recreation. [41:09] Just sort of to get everyone oriented, [41:12] we are at 507 Jamaica Way. I have sort [41:14] of outlined in a red box um where [41:17] exactly we are working. This is on the [41:19] east side of Jamaica Pond and we are [41:22] working right under this portion of the [41:24] structure um on the arches below the [41:26] structure. I think from there I'll turn [41:29] it over to Brandon to do some background [41:32] and then run you through the project. [41:34] Great. Thanks so much. Next slide. [41:36] So, uh, the building is, uh, uh, very [41:40] well aged. Uh, constructed in 1913. It's [41:43] a brickmasonry structure. Um, about, uh, [41:48] we'll say 7 to 8 years ago. I'm thinking [41:52] of my math. 2019, [41:54] uh, Boston Parks asked us to go out and, [41:58] uh, evaluate the, uh, structural [42:01] integrity of these peers. [42:03] had been noticed that there was some [42:05] cracking and some separation. The mortar [42:08] joints were getting larger. So, we've [42:10] been actually monitoring this uh since [42:12] 2019. Uh we are seeing some increased uh [42:16] separation in the joints and uh slippage [42:19] of the bricks themselves. As you can see [42:21] in the photo to the left, uh we've [42:24] actually uh highly encouraged, strongly [42:26] recommended that the building not be [42:29] occupied. Uh but uh we do understand [42:32] there is a larger project uh coming in [42:35] the pipeline about five years out. [42:37] They're looking to do some significant [42:39] renovations to the building. But in the [42:42] interim, we don't want to continue to [42:44] see the building uh um sacrifices [42:47] sacrifice it structural integrity. So, [42:50] this is really a uh 0 to 5year interim [42:54] uh repair uh in order to keep the [42:57] building from uh falling or uh [43:00] continuing to um uh fall in disrepair uh [43:04] specifically from a structural [43:06] perspective. Next slide. [43:10] As you can see in these uh photos uh the [43:13] significant cracking. There are some [43:15] wood braces in uh one of the arches. Uh [43:18] but there are three arches uh that are [43:21] showing significant cracking [43:22] particularly at the corner. You can see [43:24] in the lower left uh you can see um uh [43:29] also in the lower right some uh [43:32] significant separation breakage slippage [43:34] of the uh brick column itself. [43:37] Next slide. [43:42] So our proposed uh scope is to install [43:45] three temporary structural steel shoring [43:49] u arches uh within the uh the brick [43:53] arches themselves. Uh the intent is uh [43:57] that again we're looking at a zero to [43:59] fiveyear band-aid while the rest of the [44:02] building is uh uh going underneath [44:05] architectural design and you know major [44:09] repairs uh in about a 5-year window. Um [44:13] but we are trying to keep this as [44:15] localized in order to keep uh one the [44:18] overall impacts uh minimal and uh [44:21] prevent further degradation of the [44:23] structural foundations. [44:25] Um noting that uh part of the challenge [44:29] or the issue uh where the uh brick uh [44:34] switches over to a concrete foundation. [44:36] We did note that there is uh some uh rip [44:40] wrap uh or lack of rip wrap, we should [44:43] say, some deterioration of the actual uh [44:47] sediment or the the pond bottom where [44:50] the building meets the pond. Um so we'd [44:54] like to prevent uh further erosion uh of [44:58] that by installing some rip wrap around [45:01] the base of the columns. um and and [45:05] what's happening is the the columns the [45:07] brick or the concrete is being uh [45:10] undermined by the um uh soil erosion. So [45:14] we're trying to prevent that. Next [45:16] slide. [45:20] Uh so we completely expect to uh access [45:24] the area by land even though the corner [45:27] itself is right at the W's edge. Uh we [45:30] met uh the wonderful folks from the [45:33] concom out there uh last week and uh [45:37] they were able to actually get down and [45:39] walk along uh the edge where the [45:41] building meets the pond and the pond [45:43] meets the building. Uh while it is damp, [45:46] it is uh walkable. We don't expect that [45:49] there will be any work done from the [45:51] water. Um but depending on when the [45:55] actual work happens uh whether you know [45:58] snow melt or rainstorms whatever there [46:01] is slight minimal changes in the water [46:04] elevation. Uh we are prepared to include [46:07] sandbags and potentially dewatering [46:10] while this work happens. Uh very [46:13] localized. Um but we expect that you [46:16] know at most they may need to use a [46:19] small excavator to um go over a railing [46:24] uh to provide you know to put these [46:26] steel members in place uh just due to [46:29] the weight. There is about a 3 to 4 foot [46:32] grade braid change uh between the [46:35] retaining wall that uh meets the [46:37] building and at the pond edge. Uh so [46:41] there may be some temporary whether it's [46:43] a ladder uh or some sort of ramp device [46:46] that uh may be needed for the actual uh [46:50] work to be accessed. Uh but we don't [46:53] actually expect any uh major equipment [46:56] to be down at the pond bottom where the [47:00] uh building meets the pond bottom. So uh [47:03] again it's only three arches. Um, we [47:06] expect that there may be some on-site [47:08] fabrication, some off-site fabrication, [47:11] but conservatively we're giving [47:12] ourselves uh five weeks to do this work. [47:16] Uh, we expect it should take less, but [47:19] uh, you know, weather uh, conditions may [47:22] impact it. Um, the expectation is we uh, [47:26] achieve this permit. Um we'd like to [47:30] finalize any of the plans uh go out to [47:33] bid uh early or December, early January [47:37] so that this work can be done uh March [47:40] uh April and have the building secured [47:44] uh tight tightened up before the spring [47:47] uh programming occurs. Next slide. [47:53] Uh so you can see here a plan uh the you [47:57] know the sandbags if needed uh [48:00] conservatively we're assuming we're [48:01] going to need them but uh just keeping [48:04] the work area dry uh as needed. Um the [48:08] three columns uh are in the lower right [48:11] of the the plan, the building plan [48:13] itself, [48:15] but [clears throat] uh noting that the [48:16] water at the at the time we were out [48:19] there last, the water is sitting a [48:21] little low, but it's within five 5T of [48:25] the building edge. So, next slide. [48:34] Next. I don't know. There we go. Uh just [48:36] a context plan. Uh again, we expect all [48:40] the staging to occur upland out out of [48:43] the water. Uh there's a as I noted about [48:46] a 3 to 4 foot granite block boulder [48:50] retaining wall. This would be uh the [48:53] staging area would be at the top of the [48:55] the wall within the pave existing pave [48:58] sidewalk area, coned off, fenced off for [49:01] public safety purposes. Um, you know, we [49:05] expect it to be very minimal. Just um [49:07] some steel members, maybe some uh [49:10] fabrication equipment or equipment to [49:12] actually um maneuver the the bracing [49:16] into place. Um we're not necessarily [49:19] showing uh the limits of whether it's a [49:22] ladder or a ramp uh depending on the [49:25] contractor and how they choose to access [49:28] the actual work area. Um, but we would [49:31] work with them to ensure, you know, if [49:33] it's a a 4 foot wide by 10 foot long [49:37] ramp, you know, we're assuming a worst [49:39] case scenario for temporary impacts. Uh, [49:42] but uh, in speaking with the engineers, [49:46] uh, we believe most of this will be able [49:48] to be hand uh, maneuvered. Uh so maybe [49:52] you know the contractor just for their [49:54] own cost benefits might just use a [49:56] ladder but uh without having got a [50:00] contractor under scope yet we don't know [50:02] exactly how they anticipate to the the [50:04] work area itself. So um we're trying to [50:08] be a little bit flexible on the means [50:09] and methods. Next slide. [50:11] Okay. Brandon, can you just hold on for [50:12] one second? You bet. Uh Commissioner [50:14] Essargi, how are you doing for time? [50:16] I'm I'm fine. [50:18] Okay. Okay. Thank you, Brandon. Sorry [50:20] for the [50:20] Yeah, no problem. [50:21] Y [50:22] my difficulty was on the earlier end, [50:24] not the later end. [50:25] Oh, okay. [50:27] Uh here's a couple of section details or [50:29] elevation details showing uh the columns [50:34] um where the cracking is. We will be [50:35] doing mortar repairs um to uh help with [50:41] the uh uh decrease of further [50:44] degradation. But uh the major work [50:47] occurring uh with this implementation of [50:50] these steel arches uh as noted in the [50:53] lower uh left detail. um and and [50:57] installing the rip wrap to uh prevent [51:00] further degradation of where the [51:03] concrete meets the pond bottom. Next [51:06] slide. [51:10] And I'm going to hand it back to uh Alex [51:13] to work through all [51:16] impacts. [51:18] Thank you. Yep. So the site was [51:20] delineated. We flagged the annual high [51:23] water in the field which you will see as [51:25] the orange line. Um it does sort of [51:28] become a dashed estimated line under the [51:30] boat house just because we were not able [51:32] to really access underneath the boat [51:34] house at the time of the delineation. [51:36] But um that line does go all the way up [51:39] under the under the boat house. And then [51:42] we just have our associated buffers with [51:45] that which is the 25 ft waterfront area [51:48] in that dashed blue and then the 100 ft [51:51] buffer zone in the dashed yellow. [52:00] Additionally, this does fall within a [52:03] FEMA zone A. So we do have some impacts [52:05] to that resource area as well. um there [52:09] are there is not a elevation associated [52:12] with the zone A. So we have sort of [52:14] overlaid it onto our plans to the best [52:16] of our ability um and estimated those [52:18] impacts [52:26] just our anticipated environmental [52:29] impacts. So, as mentioned at the [52:31] beginning of this presentation, we are [52:33] anticipating impacts to land underwater, [52:35] bordering land subject to flooding bank, [52:38] the 25- ft waterfront area. Um, it looks [52:41] like it got a little skewed, but um the [52:44] 100 foot buffer as well, and we can talk [52:47] through those on the next slide. [52:51] So, our temporary impacts, as Brandon [52:54] mentioned, there is the possibility of [52:55] some water control being needed. So we [52:57] had proposed sandbags and a turbidity [52:59] curtain um with some possible dewatering [53:03] if needed. So we those are our temporary [53:06] impacts. We also have that material [53:08] layown area that we showed on the plans [53:10] that is occurring in our buffer zone. So [53:12] that is resulting in some temporary [53:14] impact to the buffer zone as well as [53:17] access. Access will also be part of our [53:20] temporary impacts for the permanent [53:22] impacts. that's really going to come [53:24] from the placement of the rip wrap and [53:26] concrete. Sort of the meat of the [53:28] project will be the permanent impact. [53:31] But overall, [53:33] the majority of our impacts are [53:35] temporary in nature and mostly from [53:37] controlling the area during [53:39] construction. Overall, the permanent [53:41] impacts are are fairly minimal. And we [53:44] see this project as being necessary to [53:47] prevent any impact to public safety as [53:50] well as the wetland resource areas that [53:52] exist underneath the boat house. [53:55] I believe that is it. So we would love [53:58] to open it up to any questions or [54:00] comments. [54:01] Great. Thank you, Alex. Okay. So quick [54:03] question from me. I guess I have two. [54:05] One is uh marine habitat. I see you're [54:08] using you may be using turbidity um [54:11] curtains. um any issues there? [54:15] We don't anticipate [54:17] there being any issues there. Um as [54:20] Brandon mentioned, I mean, the area is [54:21] fairly dry at the moment, so we aren't [54:24] anticipating having to impact much [54:26] habitat and it's o it's mostly made up [54:30] of rocks and sort of cobble there. So, [54:33] we didn't um note any habitat at the [54:35] time. So, I don't believe that that [54:38] temporary control would would result in [54:41] in any impact to marine habitat. [54:44] Okay. Um, and Brandon, you mentioned uh [54:47] ladder or a ramp. Uh, I know that we're [54:50] interested in um uh your construction [54:53] method there. I assume you're not going [54:54] to know that until you bid this out. So, [54:58] uh, I'd be looking for a special [54:59] condition that, u um, preconstruction [55:03] that, um, staff has provided with more [55:05] information on the means and methods [55:07] there. [55:08] Absolutely. Uh, and that would have been [55:10] our recommendation, uh, prior to closing [55:13] this out anyway. So, you know, we want [55:15] to make sure we're all on the same page [55:18] uh, and that, you know, it's safe, but [55:21] also practical and not overdone or [55:24] underdone. So, [55:25] great. I appreciate that. Elena, what do [55:27] you have? [55:28] Uh, that was it. [55:30] That was it. Okay. [55:31] That condition. Sorry to clarify. [55:33] [laughter] [55:33] Thank you. [55:34] Other than I think you, Hussea, and DD [55:36] deserve hazard pay that look like uh [55:39] maybe a little dangerous place. I I hope [55:41] you don't do things like that uh [55:43] frequently. You're an amazing team. We [55:45] don't want to lose you. [55:47] That that the building looks like it is [55:50] ready to fall down. Um, Commissioner [55:53] Sullivan, [55:54] Brandon, you mentioned a small excavator [55:56] that's going to be um on the upland pot [55:59] and lowering the steel in or is it going [56:01] to be lowered into the where the water [56:04] would be area? [56:06] No, [snorts] I mean so at least in the [56:07] current conditions as we are today um [56:10] it's more for just ease of you know [56:14] handling the material. [56:15] Yeah. Uh the actual arches themselves [56:17] are uh just at the precipice where the [56:21] water meets the building. So it is [56:23] technically walkable, dryable, but just [56:26] for you know we wanted to make sure we [56:28] were conservative on sort of a worst [56:30] case scenario. [56:32] So you're you're doing something [56:35] temporary. Why aren't because it's only [56:37] involving three arches. Why aren't we [56:40] permanently rebuilding the foundation [56:42] now and getting it ready for the big big [56:46] five-year rehab later and then you're [56:48] all done? [56:49] I would uh defer to Kevin on that one. [56:52] Yeah. Yeah. So, I think it's uh it's [56:55] partially a cash flow issue. So, the [56:58] larger renovation will be a larger pot [57:00] of money. Um and we will be able to do [57:03] all of the work at one time. uh at that [57:05] point. Um this work although we have [57:09] been tracking it for eight years, it's [57:11] kind of very recently been a oh we can't [57:14] wait for the master plan redoing of the [57:16] building. We need to kind of step in in [57:19] an emergency uh state and kind of get [57:22] this support up as we continue to [57:24] develop the larger plan for the building [57:27] itself which is not just for this [57:29] building. It's this building. there is [57:31] an adjacent um gazebo uh they call it a [57:35] band shell and a plaza area between so [57:38] it's it's quite a large process um that [57:41] these columns would be a part of. [57:44] Yeah. Yeah. No, I know I I actually had [57:47] seen this several years. I turned it in [57:49] two commissioners ago. [57:51] Okay. [57:52] And and said somebody better watch it [57:54] because this thing's going to slide and [57:56] slip. [57:56] And here we are. So this is this is a [57:59] steel reinforced so you don't worry [58:00] about the wood and if if it if you slip [58:03] it and it goes nine years you're you're [58:05] sure that the building won't go down. [58:06] That's basically what you're doing. [58:09] Correct. [58:10] And you know the idea of the water you [58:12] can control the level of that water over [58:14] by Perkins Street. [58:15] Yeah, we're aware. Um, I mean, I think [58:18] once we get a contractor under, uh, a, [58:22] you know, on board and with a schedule, [58:24] I think, uh, we'll work with Boston [58:26] Parks and [58:28] to adjust the elevation accordingly if [58:31] needed. [58:32] Yeah. Well, it it would make sense [58:34] rather than try to sandbag the thing. [58:36] Yep. [58:36] You know, even rain runoff, you can you [58:38] can drop it in a couple of days when you [58:40] know a big storm's coming. So, [58:42] Right. [58:43] That's that's all I had. [58:45] So, that's interesting. Now, [58:46] Commissioner Sullivan, um, you can, uh, [58:48] regulate the water level. Where does the [58:50] water go when you drain? [58:51] It drops down to the Wards pond lever [58:54] pond down to the Muddy River. [58:55] Oh, interesting. Okay. Thank you. [58:58] Uh, Commissioner Estari, [59:00] another thing I had the same question [59:01] that Commissioner Sullivan had, which is [59:04] why temporary, but uh, Kevin's answer [59:06] makes sense. [59:08] Okay. Thank you, Commissioner Herps. [59:11] Nothing for me. Thanks. [59:12] Okay. Um, Elena, I don't see any hands [59:16] raised. Did you get any emails, texts, [59:18] or otherwise? [59:19] Uh, no, nothing like that. The only [59:21] other thing I I think is that uh we [59:23] would like to be notified if the [59:25] strategy ends up being that the water [59:27] level is going to be um altered to [59:29] conduct the work. So, we would just want [59:30] to be aware of that before it happens. [59:32] Of course. [59:32] Okay. Yep. Okay. Great. So, with that, I [59:35] would uh entertain a motion to close a [59:37] hearing and issue an order of conditions [59:38] with special conditions that once the uh [59:42] uh preconstruction before work starts uh [59:46] um the applicant will provide the uh [59:48] well, you'd be providing the [59:50] construction plans anyway. Um but um [59:53] spotlighting whether you're using a lamp [59:55] and a yeah, lamp, [laughter] a lamp and [59:58] a rer uh a ramp and a ladder. Um uh and [1:00:02] also um notified if the water level is [1:00:07] um decreased to permit work. [1:00:12] So moved. [1:00:14] Do we have a second? [1:00:15] Second. [1:00:17] Commissioner Sullivan [1:00:18] I. [1:00:19] Commissioner Essari. [1:00:20] Hi. [1:00:21] Commissioner Herpst [1:00:23] I. [1:00:24] And I vote I that carries four nothing. [1:00:25] Okay. Thank you. Good luck. Be careful. [1:00:29] We'll do. Thank you all so very much. [1:00:31] Okay, we're now going to be begin our [1:00:33] regular meeting. Uh, first item on the [1:00:35] agenda is a request for a certificate of [1:00:37] compliance for Boston file number [1:00:39] 2024-008 [1:00:41] from the city of Boston Environment [1:00:42] Department for restoration activities [1:00:44] within Matah Hunts property located in [1:00:47] multiple parcels off of Itasa Street and [1:00:50] uh, Conan Street or Cananan Street in [1:00:53] Matapan. uh resource areas, isolated [1:00:56] vegetated wetlands, and 100 ft buffer to [1:00:58] IVW. [1:01:00] Thank you. Yes. So, uh this is of course [1:01:03] a familiar site to everyone on the [1:01:04] commission. Um staff conducted a site [1:01:06] visit in April of this year, uh but [1:01:09] because there were still some plantings [1:01:10] that were establishing, uh the urban [1:01:13] wilds team suggested that the various um [1:01:16] erosion controls were kept in until [1:01:18] those plants were more established. uh [1:01:20] everything has now been removed. So the [1:01:22] the project site is clear of all of that [1:01:24] in jurisdictional areas. Um and based on [1:01:27] that we are uh recommending that the [1:01:29] commission issue a complete certificate [1:01:31] of compliance. Uh there are a few [1:01:33] perpetual maintenance conditions which [1:01:35] we've noted and we also drafted some [1:01:37] additional maintenance conditions which [1:01:39] we think would be appropriate to allow [1:01:42] the urban wilds team to continue [1:01:43] managing uh invasive species and other [1:01:46] uh nuisance plant species within the [1:01:48] buffer zone. Uh there are uh let's see [1:01:52] it is eight of them total and uh they [1:01:55] specify the requirements for anybody [1:01:57] conducting the work. It would be uh [1:01:59] either conducted by urban wild staff or [1:02:01] supervised by urban wild staff and it [1:02:04] would be limited to the type of work [1:02:05] that was already permitted under this [1:02:07] order of conditions. [1:02:09] Okay, good. Anticipated my question. [1:02:12] Okay, which uh perpetual maintenance [1:02:14] conditions are going to be left standing [1:02:16] here? [1:02:16] Yes. So, those are going to be numbers [1:02:18] 58 [1:02:19] Mhm. [1:02:20] 65 [1:02:21] Mhm. [1:02:22] 77, [1:02:24] 83, [1:02:25] 84, [1:02:27] 94, and 95. [1:02:30] Okay. Thank you. Um, any questions from [1:02:33] any commissioners? [1:02:34] How big is this Urban Wild staff? [1:02:38] Uh, how big is the staff? [1:02:39] Yeah, [1:02:40] they uh recently lost a few of their [1:02:42] members. Um, Dee, can you remind me? Are [1:02:45] they down to five people? [1:02:53] Sorry. Um, let's see. I don't think I [1:02:57] know the exact number, but five sounds [1:02:58] about right. [1:02:59] Yeah. No, I'm just curious if it's like [1:03:01] 25 people. [1:03:04] Okay, that's all. [1:03:06] But they um they do have a partnership [1:03:08] with Power Core. So um part of the plan [1:03:11] for this site is uh some of it would be [1:03:13] happening within the 100 foot buffer but [1:03:15] most of it would be happening in [1:03:16] non-jurisdictional areas uh that they [1:03:18] would be working with power core to [1:03:19] train them on the type of work that [1:03:21] would need to happen at Matahun anyway. [1:03:25] Okay. I think that's an increase. I [1:03:28] remember when we did a cleanup I thought [1:03:30] uh at that point it was only uh I [1:03:32] thought they only had like one employee [1:03:34] um uh he was over in Allenale. It went [1:03:38] up and then it went way down. [1:03:40] Yeah. And then Nick came on. Nick Long. [1:03:42] Um I always thought it was just the two [1:03:44] of them. But anyway, um [1:03:46] No, that's just that's just to get you [1:03:48] to work. That's all that is, Mr. Chair. [1:03:50] Yeah, exactly. [1:03:51] They had five people. You'd go back [1:03:52] home. [1:03:53] They're sandbagging us. Yeah, exactly. [1:03:55] Any other questions on Matter Hotwoods? [1:04:00] Okay. So with that, I would um entertain [1:04:04] a motion to issue a certificate of [1:04:06] compliance for Boston file number [1:04:09] 2024-008 [1:04:12] uh with the perpetual maintenance [1:04:14] conditions 586577 [1:04:17] 83 84 94 and 95. [1:04:20] So moved. Do [1:04:21] we have a second? [1:04:24] Second. [1:04:26] Thank you. Commissioner Sullivan. Hi. [1:04:29] Commissioner Esarazzi. I, [1:04:31] Commissioner Herps. [1:04:32] I, [1:04:33] and I vote I. That carries for nothing. [1:04:35] Um, quick question, Elena. Why, uh, was [1:04:39] this work not covered under the, um, [1:04:41] local ordinance? I know it's a [1:04:43] jurisdictional issue. I'm just curious. [1:04:45] Uh, so it's local only, just not state. [1:04:47] So the state doesn't recognize [1:04:50] vegetated wetlands. [1:04:51] Got it. I miss I was misreading it [1:04:53] because D file number is always first [1:04:55] for some reason in my head. It's Boston [1:04:57] file number. Okay. Sorry. [1:04:59] Okay. Dumb question. Okay, next item. [1:05:01] Uh, request for a certificate of [1:05:03] compliance for D file number 0061762 [1:05:07] in Boston file number 2021-00003 [1:05:10] from KO Engineers and Scientists on [1:05:12] behalf of the Massachusetts Department [1:05:14] of Conservation Recreation for pool and [1:05:17] parking lot renovations located at 75 [1:05:20] and 95 Turtle Pond Parkway and Hyde [1:05:22] Park. uh resource areas, riverfront [1:05:25] area, waterfront area, 100 foot buffer [1:05:26] to inland bank, 100 foot buffer to BVW, [1:05:29] and 100 foot buffer to IBW. [1:05:32] Thank you. Yes. So, uh similarly, staff [1:05:35] actually conducted a site visit on the [1:05:36] exact same day as Mata Hunt, uh April [1:05:38] 16th, 2026. Uh at at that point, there [1:05:41] were a few things that still needed to [1:05:43] be done. Uh namely, putting in fish [1:05:45] plates, some signage, and all of that [1:05:47] has now been taken care of. So, the work [1:05:49] is complete. Uh based on that, we would [1:05:52] recommend that the commission issue a [1:05:54] complete certificate of compliance and [1:05:56] the perpetual maintenance conditions are [1:05:58] numbers 27, 45, 51, and 68. [1:06:03] Okay. Any questions? [1:06:07] No. [1:06:07] Okay. So with that, I would entertain a [1:06:10] motion to issue a certificate of [1:06:11] compliance for D file number 0061 [1:06:14] 1762 in Boston file number 2021-00003 [1:06:19] with the perpetual maintenance [1:06:20] conditions 27451 [1:06:22] and 68. [1:06:24] So moved. You [1:06:25] have a second. [1:06:26] Thank you. Commissioner Sullivan [1:06:28] I. [1:06:29] Commissioner Len [1:06:31] I. [1:06:31] Commissioner Essayazi. [1:06:33] I. [1:06:34] Commissioner Herpst. [1:06:35] I. And I vote I that carries 5 nothing. [1:06:38] Okay. Continued as a request for [1:06:40] certificate of compliance for D file [1:06:42] number 0061963 [1:06:44] and Boston file number 2023-053. [1:06:47] Also continued uh request for a [1:06:49] certificate of compliance for D file [1:06:52] 0061816 [1:06:54] and Boston file number 2021-042. [1:06:57] Uh and uh next item is a request for a [1:07:00] certificate of compliance for D file [1:07:03] 0061830 in Boston file number 2021-054 [1:07:07] from Hancock Associates on behalf of 59 [1:07:10] Gov Street LLC or Gove Street LLC for [1:07:14] the construction of a 4-unit residential [1:07:16] dwelling located at 59 GV Street in East [1:07:18] Boston resource area land subject to [1:07:21] coastal storm uh flowage. Elellanena. [1:07:24] Yes. Uh so we had conducted a site visit [1:07:26] on October 15th and uh there were a few [1:07:30] remaining items uh namely that there was [1:07:32] a discrepancy between what was shown in [1:07:34] the asbuilt and what was on observed on [1:07:36] site as far as storm water infiltration. [1:07:38] Uh they have since fixed that and um [1:07:41] based on that we would be recommending a [1:07:43] complete certificate of compliance to be [1:07:45] issued. Um, we did also want to note [1:07:48] that originally the plan for this site [1:07:50] was for the um building to be the units [1:07:53] were going to be sold. Um, but that has [1:07:55] now pivoted and they are going to be [1:07:56] rentals instead. So, as far as any [1:07:59] language included in the deed, we don't [1:08:00] need to um I guess originally the order [1:08:04] of conditions I think had identified [1:08:05] language that was based on these being [1:08:08] uh units that would be sold to new [1:08:09] owners and that's no longer the case. Um [1:08:11] but the perpetual maintenance conditions [1:08:13] that we would recommend are numbers 44, [1:08:16] 46, 52, and 65. [1:08:21] Okay. Any questions from anyone? [1:08:24] Hearing none, I would entertain a motion [1:08:26] to issue a certificate of compliance for [1:08:28] D file number 0061830 and Boston file [1:08:30] number 2021-054 [1:08:32] with the perpetual maintenance [1:08:34] conditions numbers 44, 46, 52, and 65. [1:08:39] So moved. We have a second. [1:08:41] Second. [1:08:42] Thank you. Commissioner Sullivan. [1:08:43] I. [1:08:44] Commissioner Len. [1:08:45] I. [1:08:46] Commissioner Essarialazi. [1:08:47] I. [1:08:48] Commissioner Herps. [1:08:49] I. And [1:08:50] I vote I. Carries. Five. Nothing. Okay. [1:08:51] Elena, the floor is yours. [1:08:53] Administrative updates. [1:08:54] Uh, yes. Taking feedback that we have [1:08:57] gotten recently into account. I will [1:08:58] simply be informing the commission of [1:09:00] administrative approvals that we have [1:09:01] issued and not asking permission. [1:09:04] [laughter] So, please speak now. Um, or [1:09:06] I suppose forever hold your peace. Uh so [1:09:09] the first one is for a sculpture [1:09:11] installation at L Prey Park in East [1:09:13] Boston. We issued an administrative [1:09:15] approval for the installation of the [1:09:17] sculpture. It is within Oh, and DDD, [1:09:19] sorry. We have slides for these if you [1:09:20] want to go to the next one. Um debuting [1:09:23] new slides. Thank you, Husseina. Uh so L [1:09:26] prei park sculpture installation. It's [1:09:27] made up of three separate components. It [1:09:29] will be installed for approximately a [1:09:31] period of 6 months. And uh again, it'll [1:09:33] be within LCSF 100 foot buffer to [1:09:35] coastal bank and 25 ft waterfront. Uh [1:09:38] it's a relatively minimal impact within [1:09:40] these areas of approximately 30 square [1:09:42] ft and considering the entire area is [1:09:44] already paved um and this would not be [1:09:46] impacting permeability, we thought this [1:09:47] was appropriate for an administrative [1:09:49] approval. [1:09:51] Fantastic. Any questions? [1:09:53] Is it a sculpture that some of us could [1:09:55] understand what it means or is it a [1:09:56] total abstract? [1:09:58] I mean sculptures are historically very [1:10:02] literal, easily inter. know I I think [1:10:04] that it will probably be uh a very [1:10:06] experiential sculpture. So um I think [1:10:09] the idea behind this is actually that um [1:10:11] people are going to be able to step up [1:10:12] onto one of the plinths uh to experience [1:10:14] it from a certain uh sort of a certain [1:10:17] perspective and people will also um [1:10:19] they've incorporated a more accessible [1:10:21] portion of the the setup as well. Um so [1:10:24] yeah, I would recommend checking it out [1:10:25] once it's been installed. [1:10:27] Well, you can send me a picture. Yeah, I [1:10:29] was I was just wondering on this is this [1:10:31] a permanent that's it. They put it there [1:10:34] and it lasts 10 years. [1:10:35] So, it'll be it'll be in for about I [1:10:37] believe it's about 6 months. It's at [1:10:38] least it's less than a year and I can [1:10:40] confirm that timeline. Um but it's it's [1:10:42] only for a temporary period [1:10:44] and they've also been in close [1:10:45] coordination uh with parks since this [1:10:48] will be on parks property [1:10:50] and then do they put another one next [1:10:52] year or [1:10:54] uh curious we've had Yeah. So, we've had [1:10:56] interest in this site before. Um, I [1:10:58] think actually the the last time that [1:11:00] somebody had reached out about [1:11:01] installing a sculpture, they were [1:11:02] proposing it in Low Prey, but they were [1:11:04] proposing it in an area that wasn't [1:11:06] already paved, which brought up some [1:11:07] more significant permitting [1:11:09] requirements. And so, they ended up [1:11:10] picking a different site in Boston. [1:11:12] Um, but this one, since it's already in [1:11:13] this paved uh portion of the park, we [1:11:16] thought that this was, you know, a more [1:11:17] appropriate um admin approval situation. [1:11:19] Yeah. [1:11:21] So, there might be more in the future. [1:11:24] Can't wait. [1:11:25] Great. Um, and I did just look up what a [1:11:27] plinth is if you need to know. [1:11:32] Any other questions? [1:11:35] Okay, Elena. [1:11:37] Excellent. Um, slightly less up to [1:11:39] interpretation. Uh, DCR is proposing [1:11:42] some uh ADA compliant fixes to three [1:11:45] sidewalk ramps on Park Drive. Uh, these [1:11:48] are close to the muddy river and, uh, [1:11:50] they would be within the 100 foot buffer [1:11:51] to inland bank and 25 ft uh, waterfront [1:11:54] area. So, uh, they would just be [1:11:57] removing these panels which are [1:11:58] approximately 8 by 12 ft. Uh, they would [1:12:00] be then disposed of off, uh, offsite and [1:12:03] the new ones would be put in on top of a [1:12:05] gravel base, uh, so that the grade [1:12:07] matches and the work is approximately [1:12:09] going to take 2 days. Uh, there are [1:12:11] three of these locations in total. [1:12:13] They're all located within this uh, [1:12:15] screenshot that we have included on the [1:12:16] slide. [1:12:18] Okay, any questions? [1:12:23] Next up, you were busy. [1:12:25] Yes. Um, [1:12:25] we're giving away the story here. [1:12:27] I know. [laughter] [1:12:29] Um, so, uh, this is not an approval of [1:12:31] any sorts, but we just want to inform [1:12:33] the commission. Um, Commissioner Estie [1:12:35] Smartassi, you probably already know [1:12:36] this, but, uh, the MW has informed us [1:12:39] that the annual, uh, Chestnut Hill [1:12:41] Reservoir winter drawdown has started. [1:12:43] Uh, it's taking place currently. So, it [1:12:45] started on November 1st and it will be [1:12:47] going to December 1st. Um this is [1:12:49] something that uh MW has been informing [1:12:52] the commission of since 2015 I believe. [1:12:54] Uh and the purpose of the draw down is [1:12:57] to manage invasive plant species. So the [1:12:59] idea is to allow for the exposed plants [1:13:02] and their roots to freeze. Um and it's a [1:13:05] sort of lighter touch u approach to [1:13:08] invasives management at the site. [1:13:14] Is that is that cruel and unusual [1:13:16] punishment for plants? reason [1:13:18] Commissioner Estee Smartasi. [laughter] [1:13:20] Any comments? [1:13:21] Better than poison, I guess. [1:13:23] Yeah, [1:13:23] it is. And mil foil. [1:13:26] Yeah. [1:13:28] Not less so than herbicide, I guess. [1:13:32] Okay. [1:13:32] And desiccating uh means drying out or [1:13:35] by removing moisture, [1:13:38] potentially causing the roots to die. Is [1:13:40] it successful? [1:13:42] Um most years. It it depends on how cold [1:13:45] it gets. So, um, we've had years where [1:13:48] we it's just been too warm and we end up [1:13:50] refilling without having achieved much. [1:13:52] Um, but, uh, probably two out of three [1:13:56] years we get a significant [snorts] [1:13:58] dieback. We're doing this on several [1:13:59] other reser bigger reservoirs, um, to [1:14:02] the west in the Sbury area. It's been [1:14:05] pretty successful here. Here it's all [1:14:07] rip wrap around the edge and it's really [1:14:10] difficult other than applying draining [1:14:12] the reservoir and applying an herbicide. [1:14:14] It's really difficult to get out the [1:14:15] plants. So, if you get a good freeze, [1:14:18] you really knock them back pretty far. [1:14:20] Okay. Crossing my fingers. [1:14:22] And this will drain to the Muddy River, [1:14:23] too, eventually. [1:14:25] Yeah. [1:14:26] I've been curious about the timeline, [1:14:28] too, considering it was what, 75 degrees [1:14:30] today. So, fingers crossed for more [1:14:33] seasonal weather. [1:14:35] Okay. Um, actually, if the weather stays [1:14:37] like this, maybe you'll burn them off, [1:14:39] right? [1:14:39] Honestly. [laughter] [1:14:41] Um, okay. Uh Elena, what else? [1:14:44] Yes, next up is in fact another [1:14:45] administrative approval. Uh this one is [1:14:47] in Hyde Park, 1530 River Street. Um so [1:14:50] you can see here the work that is [1:14:52] proposed um is within the 100 foot [1:14:55] buffer to the Naponet River. Uh it's an [1:14:57] area that is already completely paved uh [1:14:59] and otherwise developed. So um the [1:15:02] project proponents are proposing to pour [1:15:04] a concrete pad and install a diesel [1:15:06] generator. Uh this will result in 36 ft [1:15:09] of impacts within the 100 foot buffer. [1:15:11] And uh the reason that we thought this [1:15:13] would be appropriate for an [1:15:14] administrative approval is that the [1:15:16] permeability wouldn't be changed on site [1:15:18] because the area is already completely [1:15:19] paved. Uh no materials will be stored on [1:15:22] site and the generator will be installed [1:15:24] once the concrete pad has been poured. [1:15:26] They're expecting uh work to take about [1:15:28] a week and the special conditions that [1:15:30] we include in the administrative [1:15:31] approval include spill management. [1:15:34] Is there a se separate diesel fuel tank [1:15:36] for this thing or is it just the tank [1:15:38] contained in the generator? [1:15:40] That I don't know, but I can ask. [1:15:43] Yeah, because they would have to have a [1:15:45] spill containment [1:15:46] on the if they have a tank. [1:15:49] You'd want to make sure they got a spill [1:15:51] containment that can take the entire [1:15:52] tank. [1:15:53] Excellent. We'll we'll check with them [1:15:55] and depending on their response, uh [1:15:56] we'll make sure that we get that on [1:15:58] file. Yeah, [1:16:00] I don't think they can install it [1:16:01] without containment, but I mean I guess [1:16:04] it depends the size of the generator. [1:16:06] Yeah, [1:16:07] right. Yeah, [1:16:09] interesting. Good question. [1:16:10] Um, yeah. Uh, do you have any others? [1:16:13] Last item actually uh is something that [1:16:15] we are requesting action on from the [1:16:17] commission. So, uh the Boston Harbor [1:16:19] Shipyard and Marina in East Boston uh [1:16:22] reached out to us because a portion of [1:16:24] the seaw wall had collapsed. Um you can [1:16:27] see it in this photo. So, this is taken [1:16:29] um sort of it's a view under the deck. [1:16:32] Uh there was a 15 ft section of the seaw [1:16:34] wall which collapsed and that resulted [1:16:35] in a large piece of concrete leaning up [1:16:37] against one of the piles. So, that's [1:16:39] sort of contributing to this um issue of [1:16:42] the pile becoming structurally unsound. [1:16:44] While we were out there, you could also [1:16:46] really see uh the waves and tidal action [1:16:48] going into this area that is not [1:16:50] supposed to have water in it and uh [1:16:52] pulling more of this fill out. So, um, [1:16:55] based on this, we we thought that an [1:16:56] emergency certification would be [1:16:58] appropriate. Uh, Massport did declare a [1:17:00] public health andor safety emergency for [1:17:02] this because of the potential for the [1:17:04] area to become further destabilized. Uh, [1:17:07] and we issued an emergency certification [1:17:09] on Monday, uh, November 2nd. So, repairs [1:17:13] began yesterday. They're anticipated to [1:17:15] take one week. Um, the way that they're [1:17:17] going about this is that they're [1:17:18] removing the pieces of the seaw wall [1:17:20] that they're able to, and then they are [1:17:21] placing rip wrap along the seawward [1:17:23] slope. uh and they already know that [1:17:24] they will be coming back to the [1:17:26] commission with a notice of intent in [1:17:27] the spring um to conduct additional [1:17:30] repairs for the site, but right now [1:17:32] their priority is uh stabilizing the [1:17:34] site ahead of the winter. [1:17:36] Please tell me Oh, apologies. Yep. [1:17:39] Yeah. No, go ahead. [1:17:40] Uh we to clarify would be requesting [1:17:42] that the commission um ratify the [1:17:44] emergency certification if they find it [1:17:46] appropriate. [1:17:47] Okay. Please don't tell me the three of [1:17:48] you were anywhere near this picture. [1:17:51] Just on top of it. [laughter] [1:17:52] Yeah. just on top of it. [1:17:55] There are people working on boats. They [1:17:56] seemed very unbothered. [1:17:58] Okay. [laughter] [1:17:59] Uh any questions from anyone? [1:18:01] I I do. Um so the filing said referenced [1:18:06] a plan, but the plan was not a plan. It [1:18:08] was like a picture of the site. Um [1:18:10] yes. So they what they were using for [1:18:13] that um is that the the site has their [1:18:15] sort of um repairs and maintenance order [1:18:18] of conditions which was issued I think [1:18:19] in maybe late 2024. Um, and so they were [1:18:23] using that for the delineations, which I [1:18:25] think is why they probably refer to it [1:18:27] as a plan. [1:18:28] Yeah. But I guess what I'm saying is we [1:18:30] don't have a plan. We, you know, they [1:18:31] talk about a new revetment and it [1:18:33] doesn't show and it talks about it not [1:18:35] being in contact with the water, which [1:18:38] was hard to picture. So, [1:18:40] um [1:18:42] I I think we need an actual I mean I [1:18:44] know they they've started so maybe we [1:18:45] need an as built but um we don't really [1:18:48] have anything that tells us what it is [1:18:51] they're doing and they're doing it right [1:18:53] at the W's edge so that doesn't feel [1:18:55] great to me. Um [1:18:56] and I guess yeah, this did raise sort of [1:18:58] an administrative question on our end. [1:19:00] Um when we were sort of talking through [1:19:02] the requirements for the emergency [1:19:04] certification, uh one of the things that [1:19:06] we were sort of going back and forth on [1:19:08] was the amount of documentation, [1:19:11] especially when it comes to stamp plans, [1:19:12] of what to require for an emergency [1:19:14] certification since the state requires [1:19:17] us to at least respond within 24 hours [1:19:19] of getting that notice. So, I didn't [1:19:20] know if um starting to include a [1:19:23] requirement of asbuilts as a standard [1:19:25] condition of the ESERT or um [1:19:27] Commissioner Herbs, if you have [1:19:28] recommendations on sort of what we could [1:19:31] ask for that would allow for the work to [1:19:34] or allow, I guess, for the materials to [1:19:36] come to us in a timely enough manner to [1:19:38] deal with the emergency situation while [1:19:39] still getting us the information that we [1:19:41] would need. [1:19:42] Well, I guess I'm assuming if they're [1:19:43] dealing with it in an emergency, they [1:19:45] they had a plan. They know what they're [1:19:47] going to do. Um, so they should have [1:19:50] been able to show you that. Um, even if [1:19:52] it I I know Commissioner Sullivan always [1:19:56] insists on stamp plans, but I mean I [1:19:58] would have taken a sketch or something [1:20:00] that I mean we just we don't know what [1:20:03] this is or at least I don't. I can't [1:20:04] picture it. Maybe you have a better [1:20:06] picture of it, but I I feel like they [1:20:08] have to know what they're doing. Um, and [1:20:11] so they should be able to tell you like [1:20:13] what size stone, where's it going, that [1:20:15] kind of thing. Um, [1:20:16] Got it. Excellent. So what I will do is [1:20:18] for this I'll go ahead and reach out to [1:20:21] uh the consultant and ask for at least [1:20:23] sketches at this point in time and then [1:20:26] um include maybe in the ratified [1:20:28] emergency certification a requirement [1:20:29] for an asbelt once they've completed the [1:20:31] work and then we can also incorporate [1:20:32] those requirements into future eerts [1:20:34] that we that we might issue. [1:20:37] Yeah, if that makes sense to the [1:20:38] commissioners. I mean I think um [1:20:42] definitely at this point we should at [1:20:44] least get an ass build and and yeah even [1:20:46] a sketch now they [1:20:49] yeah it's a great point and I think [1:20:51] we've had an issue with um this [1:20:53] particular um entity before about uh [1:20:57] after the fact nois and not having an [1:20:59] asbuilt. So [1:21:00] I remember the sinkhole was the the most [1:21:02] recent issue with that where yeah [1:21:04] it was difficult for us to get an [1:21:06] asbuilt uh that somebody would stamp [1:21:09] So, did I did I read it right that [1:21:12] they're saying they're putting in a [1:21:13] revetment, but it's not gonna [1:21:15] I mean, they don't talk about being in [1:21:17] any water-based resource area. I I just [1:21:21] couldn't understand it. Um [1:21:23] I was So, when we originally got the [1:21:25] call, I was hesitant about whether this [1:21:27] would even be an emergency certification [1:21:29] based on the description. And then when [1:21:31] we got there and understood that there [1:21:33] was now water essentially where there [1:21:35] shouldn't be, [laughter] that was I [1:21:38] think what um drove it home for us. And [1:21:40] I'm um I'm just going to pull up any [1:21:43] additional photos that I might have. So [1:21:44] I mean I think they talked about a [1:21:46] siltation curtain. I should know. I just [1:21:47] looked at this. But um anyway, I just [1:21:52] for the future I I feel like this this [1:21:55] went even as an emergency. They we need [1:21:58] a little more than what we got. [1:22:00] Got it. Absolutely. [1:22:02] Okay. Thank you. So, Elena, you know [1:22:06] what to put in the letter. [1:22:07] Yes, absolutely. And um before they [1:22:11] complete work, I'll make sure that we [1:22:12] have some sort of visual for um and [1:22:14] further details on Yeah. the the methods [1:22:18] that they're actually going to be [1:22:19] utilizing. [1:22:20] Okay. [1:22:20] Okay. Thank you. [1:22:21] Commissioner Herps, do you want to [1:22:22] review the letter? [1:22:24] Uh [1:22:26] I'm I don't feel like I have to. I just [1:22:28] Yeah. Thank you. [1:22:30] Sure. Uh any other questions? [1:22:35] Okay. So with that, I would entertain a [1:22:37] motion to uh ratify the emergency [1:22:40] certification [1:22:41] for um the Boston Harbor Shipyard [1:22:44] Marina, 256 Margin General Street in [1:22:46] East Boston, uh regarding the collapsed [1:22:50] seaw wall with the um with the condition [1:22:53] that Elellena uh will be putting in the [1:22:57] um uh the emergency letter um a request [1:23:02] for uh at least a sketch of the work [1:23:06] that's being done now and will be [1:23:08] requiring an asbuilt completion of work. [1:23:14] So moved. [1:23:15] Thank you. Do we have a second? [1:23:17] Second. [1:23:19] Okay. Commissioner Sullivan. [1:23:20] I. [1:23:21] Commissioner Len. [1:23:22] I. [1:23:23] Commissioner Essa Sargi. [1:23:24] I. [1:23:25] Commissioner Herpst. [1:23:26] I. [1:23:27] And I vote I. So that carries five [1:23:28] nothing. Ellen, anything else? [1:23:32] That's it for admin updates. That's all. [1:23:35] You're very busy. You are all very busy. [1:23:37] Thank you for all your work. Okay. Um, [1:23:40] acceptance of meeting minutes. Uh, as [1:23:42] usual, they were done. Uh, very well. [1:23:44] Which leads me to ask, are you having [1:23:46] Claude do the minutes? [1:23:48] Never. Never. Never. [1:23:49] No. Okay. Okay. Let's see what's going [1:23:52] on here. I saw an M dash in a place. [1:23:56] I will. The hill for me to die on is M [1:23:58] dashes and semicolons. And I really hate [1:24:00] that AI is [laughter] taking that away [1:24:02] from me. [1:24:04] Okay. [1:24:05] Okay. So, with that, um, I looked them [1:24:08] over. They look great. Uh, entertain a [1:24:10] motion to accept the meeting minutes [1:24:11] from October 7th, 2026 and October 21st, [1:24:14] 2026. [1:24:16] So moved. [1:24:17] Do we have a second? [1:24:19] Second. [1:24:20] Okay. Commissioner Sullivan, [1:24:21] I. [1:24:22] Commissioner Len, [1:24:23] I. [1:24:24] Commissioner Essa Sargi, [1:24:26] I. [1:24:27] Commissioner Herpst, [1:24:28] I. [1:24:29] And I vote I. Okay. Uh, time to adjourn. [1:24:32] We have one more meeting before [1:24:33] Thanksgiving, right? We do. Okay. So, I [1:24:36] guess we'll see you in a few weeks. [1:24:37] Thank you everyone. [1:24:39] Thanks. [1:24:39] Have a good evening.